AES MD&A: what changed

In AES' 10-Q for fiscal Q3 2026, the MD&A added 27 passages, removed 35 and rewrote 104 against the 10-Q for fiscal Q3 2025, the same quarter a year earlier. In its 10-K for fiscal 2025, the MD&A added 28 passages, removed 25 and rewrote 71 against the 10-K for fiscal 2024.

Source: Management's discussion and analysis (Item 2) of THE AES CORPORATION's 10-Q filed Nov 3, 2026 (accession 0000874761-26-000156, period ended Sep 30, 2026) compared with its 10-Q filed Nov 4, 2025 (accession 0000874761-25-000084, period ended Sep 30, 2025), on SEC EDGAR

Added
27
Passages new in the 10-Q for fiscal Q3 2026
10-Q · Nov 3, 2026
Removed
35
In the 10-Q for fiscal Q3 2025 only
10-Q · Nov 4, 2025
Rewritten
104
15+ words changed, figures not counted
10-Q · Nov 3, 2026
Paragraphs compared
336
329 in the 10-Q for fiscal Q3 2025
10-Q · Nov 3, 2026

AES' latest quarterly report against the same quarter a year earlier

10-Q for fiscal Q3 2026 against the 10-Q for fiscal Q3 2025

In AES' 10-Q for fiscal Q3 2026, the MD&A added 27 passages, removed 35 and rewrote 104 against the 10-Q for fiscal Q3 2025, the same quarter a year earlier.

Compared: Item 2 of the 10-Q filed Nov 3, 2026 (accession 0000874761-26-000156, period ended Sep 30, 2026; 336 paragraphs) and Item 2 of the 10-Q filed Nov 4, 2025 (accession 0000874761-25-000084, period ended Sep 30, 2025; 329 paragraphs).

AES' figures, dates and period names change every period and are not counted. A paragraph is rewritten when at least 15 other words were added or removed: added text is underlined and shaded, removed text is struck through, and long unchanged stretches are shortened to the words around each change.

Forward-Looking Information

1 added · 2 rewritten

Added in the 10-Q for fiscal Q3 2026

• the completion of the proposed transaction between AES and Horizon Parent, L.P. (the “Transaction”) on the anticipated terms and timing;

• the risk that the conditions to the completion of the Transaction are not satisfied in a timely manner or at all;

Show the rest (742 words)

• potential litigation relating to the Transaction, including resulting expense or delay, and the effects of any outcomes related thereto;

• the risk that disruptions from the Transaction will harm AES’ business, including current plans and operations;

• the ability of AES to retain and hire key personnel through the consummation of the Transaction;

• potential adverse reactions or changes to business relationships resulting from the announcement or completion of the Transaction;

• continued availability of capital and financing, and rating agency actions;

• certain restrictions during the pendency of the Transaction that may impact AES’ ability to pursue certain business opportunities or strategic transactions;

• significant transaction costs associated with the Transaction;

• the possibility that the Transaction may be more expensive to complete than anticipated, including as a result of unexpected factors or events;

• the occurrence of any event, change, or other circumstance that could give rise to the termination of the Transaction, including in circumstances requiring AES to pay a termination fee or other expenses;

• competitive responses to the Transaction;

• the economic climate, particularly the state of the economy in the areas in which we operate, which impacts demand for electricity in many of our key markets, including the fact that the global economy faces considerable uncertainty for the foreseeable future, which further increases many of the risks discussed in our 2025 Form 10-K;

• changes in the price of electricity at which our generation businesses sell into the wholesale market and our utility businesses purchase to distribute to their customers, and the success of our risk management practices, such as our ability to hedge our exposure to such market price risk;

• changes in the prices and availability of coal, gas, and other fuels (including our ability to have fuel transported to our facilities) and the success of our risk management practices, such as our ability to hedge our exposure to such market price risk, and our ability to meet credit support requirements for fuel and power supply contracts;

• changes in and access to the financial markets, particularly changes affecting the availability and cost of capital in order to refinance existing debt and finance capital expenditures, acquisitions, investments, and other corporate purposes;

• changes in inflation, demand for power, interest rates, and foreign currency exchange rates, including our ability to hedge our interest rate and foreign currency risk;

• our ability to fulfill our obligations, manage liquidity and comply with covenants under our recourse and non-recourse debt, including our ability to manage our significant liquidity needs and to comply with covenants under our revolving credit facilities and other existing financing obligations;

• our ability to receive funds from our subsidiaries by way of dividends, fees, interest, loans or otherwise;

• changes in our or any of our subsidiaries' corporate credit ratings or the ratings of our or any of our subsidiaries' debt securities or preferred stock, and changes in the rating agencies' ratings criteria;

• our ability to purchase and sell assets at attractive prices and on other attractive terms;

• our ability to compete in markets where we do business;

• our ability to operate power generation, transmission and distribution facilities, including managing availability, outages, and equipment failures;

• our ability to manage our operational and maintenance costs and the performance and reliability of our generating plants, including our ability to reduce unscheduled down times;

• our ability to enter into long-term contracts, which limit volatility in our results of operations and cash flow, such as PPAs, fuel supply, and other agreements and to manage counterparty credit risks in these agreements;

• variations in weather, especially mild winters and cooler summers in the areas in which we operate, the occurrence of difficult hydrological conditions for our hydropower plants, as well as hurricanes and other storms and disasters, wildfires and low levels of wind or sunlight for our wind and solar facilities;

• pandemics, or the future outbreak of any other highly infectious or contagious disease;

• the performance of our contracts by our contract counterparties, including suppliers or customers;

• severe weather and natural disasters;

• our ability to manage global supply chain disruptions;

• our ability to raise sufficient capital to fund development projects or to successfully execute our development projects;

• the success of our initiatives in renewable energy projects and energy storage projects;

• the availability of government incentives or policies that support the development of renewable energy generation projects;

331 more words of this passage are in the 10-Q filed Nov 3, 2026.

2 more paragraphs were rewritten here (+18 / −48 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Overview of Our Business

1 rewritten

We are a diversified power generation and utility company organized into the following four …+18 / −100 words

We are a diversified power generation and utility company organized into the following four SBUs, mainly organized by technology: Renewables (solar, wind, energy storage, and hydro generation facilities), Utilities (AES Indiana, AES Ohio, and AES El Salvador regulated utilities and their generation facilities), Energy Infrastructure (natural gas, LNG, coal, pet coke, diesel, and oil generation facilities), and New Energy Technologies (investments in Fluence, Uplight, Maximo, the AI Fund, and other initiatives). Prior to the first quarter of 2025, our new and innovative energy technology businesses). in Chile (which have a mix of generation sources, including renewables, that were pooled to service our existing PPAs) were reported in the Energy Infrastructure SBU. After the sale or disconnection of a significant portion of AES Andes’ coal plants and the expiration of its coal-indexed contracts with regulated customers at the end of 2024, the results of our businesses in Chile, excluding the two remaining coal plants, are now reported as part of the Renewables SBU. The results of the two remaining coal plants in Chile, Angamos and Cochrane, remain within the Energy Infrastructure SBU. For additional information regarding our business, see Item 1.—Business of our 2024 2025 Form 10-K.

Proposed Merger

1 added

Added in the 10-Q for fiscal Q3 2026

On March 1, 2026, The AES Corporation (the “Company” or “AES”) entered into an Agreement and Plan of Merger (the “Merger Agreement”), by and among the Company, Horizon Parent, L.P., a Delaware limited partnership (“Parent”), and Horizon Merger Sub, Inc., a Delaware corporation and wholly owned subsidiary of Parent (“Merger Sub”). Pursuant to the Merger Agreement, on the terms and subject to the conditions set forth therein, Merger Sub will merge with and into the Company (the “Merger”), with the Company continuing as the surviving corporation in the Merger. Parent is jointly controlled by investment vehicles affiliated with one or more funds, accounts or other entities managed or advised by Global Infrastructure Management, LLC and the EQT Infrastructure VI fund. For further details on this proposed transaction, see Note 1—Financial Statement Presentation included in Item 1.—Financial Statements of this Form 10-Q.

Executive Summary

3 removed · 4 rewritten

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Compared with last year, third quarter diluted earnings per share from continuing operations increased $0.22, from $0.72 to $0.94. This increase is mainly driven by higher income tax benefit, higher contributions from new projects in the Renewables SBU, and higher retail margin at the Utilities SBU. This was partially offset by lower realized tax attributes at the Renewables SBU due to timing of tax attribute recognition, lower other income, and lower interest income.

Adjusted EPS, a non-GAAP measure, increased $0.04 from $0.71 to $0.75, mainly driven by a lower adjusted tax rate, including the impact of tax credit transfers, higher retail margin at the Utilities SBU, and lower general and administrative costs at Corporate. This was partially offset by lower realized tax attributes at the Renewables SBU due to timing of tax attribute recognition.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Adjusted EPS, a non-GAAP measure, decreased $0.07 from $1.60 to $1.53, for the nine months ended September 30, 2025, mainly driven by lower realized tax attributes at the Renewables SBU due to timing of tax attribute recognition, and lower contributions at the Energy Infrastructure SBU primarily due to higher prior year revenues from the monetization of the Warrior Run coal plant PPA. This was partially offset by a lower adjusted tax rate, including the impact of tax credit transfers, and higher realized tax attributes and retail margin at the Utilities SBU.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Overview of Strategic Performance”

AES is leading the industry's transition to clean energy by investing in renewables, utilities, and technology businesses.

• Our PPA backlog, which consists of projects with signed contracts, but which are not yet operational, is 11.1 GW, including 5 GW under construction. Year-to-date, we:

◦Completed the construction of 2.9 GW of solar, energy storage, and wind, and we are on track to add a total of 3.2 GW to our operating portfolio by year-end 2025; and

◦Signed or were awarded new long-term PPAs for 2.2 GW.

• Our U.S. utilities made progress toward securing future growth:

◦AES Ohio reached a unanimous settlement resolving its distribution rate review;

◦AES Indiana reached a partial settlement agreement for its current rate review; and

Compared with last year, third quarter net income increased $10 million, from $517 million …+52 / −48 words

Compared with last year, third quarter net income increased $302 $10 million, from $215 $517 million to $517 $527 million. This increase is primarily due to the result of higher income tax benefit mainly driven by tax credit transfers, higher margins from new projects energy and capacity sales and prices in the Renewables SBU, spot market, higher retail rates and an increase in rider revenues due demand at our utilities, and the prior year impairment of the Uplight equity method investment and adjustments to revised rates at AES Indiana and AES Ohio in the Utilities SBU. This was convertible notes; partially offset by lower generation at income tax benefit, lower contract sales volume mainly due to the Energy Infrastructure SBU expiration of the Maritza PPA in Bulgaria, and the sale of AES Brasil. higher impairment expense.

Compared with last year, net income for the nine months ended September 30, 2026 …+87 / −67 words

Compared with last year, diluted earnings per share from continuing operations net income for the nine months ended September 30, 2025 decreased $0.85, 2026 increased $895 million, from $1.71 $294 million to $0.86. $1,189 million. This decrease increase is mainly driven by lower earnings the result of higher energy and capacity sales and prices in the spot market, higher contributions from development services in the U.S., higher retail rates and demand at the Energy Infrastructure SBU primarily due to higher prior year revenues from the monetization of the Warrior Run coal plant PPA, day-one our utilities, losses on the commencement of sales-type leases recognized in the prior year at AES Clean Energy Development, lower realized tax attributes at a gain on sale of shares in Fluence, one-time costs in the Renewables SBU prior year due to timing the Company’s restructuring program in February 2025, and the prior year impairment of tax attribute recognition, lower interest income, higher foreign currency losses, the Uplight equity method investment and lower other income. This was adjustments to the convertible notes; partially offset by the prior-year impact of derecognition of a valuation allowance on the loan receivable upon reclassifying Mong Duong from held-for-sale to held and used and lower contract sales volume and higher income tax benefit depreciation mainly driven by tax credit transfers. due to the expiration of the Maritza PPA in Bulgaria.

2 more paragraphs were rewritten here (+96 / −36 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Consolidated Revenue and Operating Margin

3 added · 6 removed · 5 rewritten

Added in the 10-Q for fiscal Q3 2026

Under “(in millions)”

• $287 million at Renewables mainly driven by $182 million higher spot sales in Colombia, benefiting from elevated spot prices due to El Niño-related unfavorable hydrological conditions across the country and relatively favorable hydrology at the AES Chivor basin, $77 million positive impact due to the appreciation of the Colombian peso, $56 million due to new projects placed in service in the U.S. and Chile, $34 million due to development services in the U.S., and $21 million higher revenues under our retail supply agreements; partially offset by $61 million lower contracted and spot sales in Chile, and an $18 million unfavorable impact from energy derivatives in the U.S.;

Added in the 10-Q for fiscal Q3 2026

Under “(in millions)”

• $736 million at Renewables mainly driven by $230 million higher spot sales in Colombia, benefiting from elevated spot prices due to El Niño-related unfavorable hydrological conditions across the country and relatively favorable hydrology at the AES Chivor basin and partially offset by lower spot prices in the first quarter, $160 million due to development services in the U.S., $146 million due to new projects placed in service in the U.S. and Chile, $116 million positive impact due to the appreciation of the Colombian peso, a $75 million favorable impact from energy derivatives in the U.S., and $60 million higher revenues under our retail supply agreements; partially offset by $59 million lower contracted and spot sales in Chile;

Added in the 10-Q for fiscal Q3 2026

Under “(in millions)”

• $179 million at Energy Infrastructure mainly driven by $455 million higher energy and capacity sales and prices in the spot market mainly in Argentina, $75 million of higher spot sales in Mexico driven by the expiration of a PPA, and $72 million of higher LNG sales; partially offset by $347 million lower contract sales volume mainly driven by the expiration of the Maritza PPA in Bulgaria, $62 million of prior year net derivative gains as part of our commercial hedging strategy, and $15 million driven by lower availability; and

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “(in millions)”

• $63 million at Renewables mainly driven by a $241 million increase due to the results of AES Andes moving to Renewables in 2025 as described below, net of a current year increase in contracted sales in Chile, and $112 million due to new projects in service; partially offset by a $201 million negative impact from the sale of AES Brasil and $85 million net lower spot sales and prices, mainly at Colombia.

This favorable impact was partially offset by decreases of:

• $131 million at Energy Infrastructure driven by $225 million of prior year revenue related to the AES Andes portfolio, which is reported in the Renewables SBU beginning in 2025 following the sale and expiration of certain coal-related assets and contracts and $21 million due to prior year unrealized and realized derivative gains; partially offset by $90 million higher fuel prices and transportation costs passed through to the offtaker, net of foreign exchange impact, and $21 million due to higher availability in 2025; and

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “(in millions)”

• $24 million at Renewables mainly driven by an $80 million positive impact from new businesses and a $20 million impact from AES Andes moving to Renewables in 2025, as described below; partially offset by a $66 million impact from the sale of AES Brasil and a $14 million increase in fixed costs primarily due to an accelerated growth plan; and

• $15 million at Corporate, Other and Eliminations mainly driven by higher charge-outs of IT and other costs to the businesses and higher premiums earned by AGIC.

These favorable impacts were partially offset by a decrease of $57 million at Energy Infrastructure mainly driven by $29 million of lower generation due to dispatch, $20 million of prior year operating margin at AES Andes, which is reported in the Renewables SBU beginning in 2025, and $9 million driven by lower LNG sales; partially offset by $12 million of higher contract margin driven by lower fuel costs.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “(in millions)”

• $576 million at Energy Infrastructure primarily driven by $697 million of prior year revenue related to the AES Andes portfolio, which is reported in the Renewables SBU beginning in 2025 following the sale and expiration of certain coal-related assets and contracts; $171 million of prior year revenues from the monetization of the Warrior Run coal plant PPA, and $145 million due to prior year unrealized and realized derivative gains; partially offset by $272 million higher fuel prices and transportation costs passed through to the offtaker, $126 million higher CO2 purchases passed through due to higher production, $24 million due to higher availability, and $16 million of higher LNG sales and terminal fees; and

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “(in millions)”

These unfavorable impacts were partially offset by increases of:

• $338 million at Utilities mainly driven by a $306 million increase in transmission, distribution, rider, and wholesale revenues mainly due to higher rates and $42 million due to higher net retail demand mainly driven by favorable weather; partially offset by $6 million of lower Fuel Adjustment Charge rider revenue; and

• $111 million at Renewables mainly driven by a $623 million increase due to the results of AES Andes moving to Renewables in 2025 as described above, net of a current year decrease in regulated contract sales, and $234 million due to new projects in service; partially offset by a $540 million negative impact from the sale of AES Brasil, $174 million net lower spot sales and prices, mainly at Colombia, and a $48 million negative impact related to changes in mark-to-market of energy derivatives.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “(in millions)”

These unfavorable impacts were partially offset by increases of:

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “(in millions)”

• $19 million at Renewables mainly driven by a $147 million impact from new businesses, $42 million impact of the results of AES Andes moving to Renewables in 2025, as described above, $36 million due to higher generation in Panama as a result of better hydrological conditions during the first quarter of 2025, and a $26 million increase in Colombia due to increased availability and lower spot prices on energy purchases in the second quarter of 2025. These positive impacts were partially offset by a $150 million negative impact from the sale of AES Brasil, a $46 million negative impact related to changes in mark-to-market of energy derivatives, a $33 million increase in fixed costs primarily related to an accelerated growth plan, and $17 million of one-time costs due to restructuring; and

• $53 million at Energy Infrastructure mainly driven by $254 million higher energy and …+48 / −74 words · under “(in millions)”

• $344 $53 million at Energy Infrastructure mainly driven by $160 $254 million higher prior year revenues from energy and capacity sales and prices in the monetization spot market mainly in Argentina, $14 million of higher spot sales in Mexico driven by the expiration of a PPA, and $11 million of higher LNG sales; partially offset by $146 million lower contract sales volume mainly driven by the expiration of the Warrior Run coal plant Maritza PPA $117 in Bulgaria, $74 million due to of prior year net derivative gains as part of our commercial hedging strategy, $42 million of prior year operating margin related to the AES Andes portfolio, which is reported in the Renewables SBU beginning in 2025 following the sale and expiration of certain coal-related assets and contracts, $28 million of lower generation mainly driven by dispatch, $20 million of one-time costs due to restructuring, and $17 million due to the prior year selldown of Amman East and IPP4 in Jordan; partially offset by $45 $9 million driven by higher lower availability; in 2025 due to lower maintenance. and

Consolidated Operating Margin — Operating margin increased $685 million, or 42%, for the nine …+86 / −1 words · under “(in millions)”

Consolidated Operating Margin — Operating margin decreased $265 increased $685 million, or 14%, 42%, for the nine months ended September 30, 2025, 2026, compared to the nine months ended September 30, 2024, 2025, mainly due to higher margins at the Renewables SBU driven by contributions from development services in the U.S. and higher spot sales and prices in Colombia driven by El Niño, as well as higher retail rates at AES Ohio at the Utilities SBU, and higher energy and capacity sales and prices in the spot market at the Energy Infrastructure SBU. The increase in operating margin was partially offset by lower contract sales volume mainly due to the expiration of the Maritza PPA in Bulgaria and higher depreciation.

3 more paragraphs were rewritten here (+124 / −58 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Consolidated Results of Operations — Other

6 added · 7 removed · 27 rewritten

Added in the 10-Q for fiscal Q3 2026

Under “Net loss attributable to noncontrolling interests and redeemable stock of subsidiaries”

• Higher income of $23 million at Chile Renovables driven by the recognition of a deferred tax benefit due to reversal of valuation allowance.

Added in the 10-Q for fiscal Q3 2026

Under “Net loss attributable to noncontrolling interests and redeemable stock of subsidiaries”

• Higher income of $23 million at Chile Renovables driven by the recognition of a deferred tax benefit due to reversal of valuation allowance; and

• Higher income of $15 million at Merida due to higher spot sales.

Added in the 10-Q for fiscal Q3 2026

Under “Net loss attributable to noncontrolling interests and redeemable stock of subsidiaries”

• Lower equity earnings of $15 million at Gatun primarily related to debt extinguishment costs; and

• Lower income of $14 million due to the acquisition of the remaining shares of Cochrane.

Added in the 10-Q for fiscal Q3 2026

Under “Net income attributable to The AES Corporation”

• Higher margins from the Energy Infrastructure SBU of $11 million primarily due to higher energy and capacity sales and prices in the spot market and higher margin from LNG transactions, partially offset by lower contract sales volume due to the expiration of the Maritza PPA in Bulgaria, net derivative gains in the prior year, and lower availability.

Added in the 10-Q for fiscal Q3 2026

Under “Net income attributable to The AES Corporation”

• Higher gain on disposal and sale of business interests of $166 million due to a gain on sale of shares in Fluence and the contribution of JK1 and JK2 to a trust, partially offset by a prior-year gain on the sell-down of Dominican Republic Renewables;

• Higher margins from the Utilities SBU of $114 million, excluding one-time restructuring costs in the prior year, primarily due to AES Ohio’s 2024 DRC Settlement, net of certain riders now incorporated into base rates, and higher recovery of costs primarily associated with transmission, distribution, and renewable projects, and higher demand due to the impact of weather in El Salvador; partially offset by higher property taxes;

Added in the 10-Q for fiscal Q3 2026

Under “Net income attributable to The AES Corporation”

• Lower net equity in losses of affiliates of $25 million primarily related to the suspension of equity method accounting at Uplight in the fourth quarter of 2025.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Interest income”

Interest income decreased $97 million, or 31%, to $215 million for the nine months ended September 30, 2025, compared to $312 million for the nine months ended September 30, 2024, primarily due to a $42 million impact from the sale of AES Brasil in October 2024, prior year interest recognized of $34 million on the Stabilization Fund receivables in Chile, and a $20 million decrease at Argentina due to lower short-term investments at lower rates.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Other income and expense”

Other income decreased $63 million, or 53%, to $57 million for the nine months ended September 30, 2025, compared to $120 million for the nine months ended September 30, 2024, mainly due to a $12 million impact from an indexation adjustment of Stabilization Fund receivables at AES Andes in prior year, a $7 million decrease in AFUDC at our U.S. utilities in the current year, and the prior year impacts of a $5 million gain on commencement of a sales-type lease on land, $5 million in insurance proceeds primarily related to property damage at AES Andes, and a $5 million gain on contract termination, partially offset by a $10 million gain at AES Andes corresponding to the write-off of contingent consideration for a renewables development project determined to be no longer viable.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Net income attributable to The AES Corporation”

• Lower general and administrative expenses of $13 million after implementation of the restructuring program;

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Net income attributable to The AES Corporation”

• Higher margins at AGIC of $10 million due to a decrease in reserve for losses and increase in insurance premiums earned.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Net income attributable to The AES Corporation”

• Lower other income of $34 million primarily related to decreased gains on remeasurement of contingent consideration primarily on projects acquired at AES Clean Energy and an indexation adjustment of Stabilization Fund receivables at AES Andes in the prior year, partially offset by a write-off of contingent consideration for a renewables project no longer viable at AES Andes;

• Lower interest income of $33 million primarily due to prior year interest recognized on Stabilization Fund receivables in Chile and the sale of AES Brasil;

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Net income attributable to The AES Corporation”

• Lower interest income of $56 million primarily due to the sale of AES Brasil, prior year interest recognized on Stabilization Fund receivables in Chile, and lower short-term investments at lower rates in Argentina;

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Net income attributable to The AES Corporation”

• Lower other income of $51 million primarily related to a prior year indexation adjustment of Stabilization Fund receivables at AES Andes, a decrease in AFUDC at our U.S. utilities, and the prior year impacts of a gain on commencement of a sales-type lease on land, insurance proceeds, and a gain on contract termination, partially offset by a write-off of contingent consideration for a renewables project no longer viable at AES Andes;

Interest expense increased $40 million, or 4%, to $1,082 million for the nine months …+67 / −36 words · under “Interest expense”

Interest expense decreased $83 increased $40 million, or 7%, 4%, to $1,082 million for the nine months ended September 30, 2026, compared to $1,042 million for the nine months ended September 30, 2025. compared to $1,125 million for the nine months ended September 30, 2024. This decrease increase is primarily due to a $177 million impact from the sale of AES Brasil in October 2024 and lower debt balances higher interest expense at the Energy Infrastructure SBU; partially offset by Parent Company due to a higher weighted average interest rate and debt balance as well as the impact of a prior year realized gain on a de-designated interest rate swap, lower capitalized interest at the Renewables SBU due to fewer projects under construction, and a higher weighted average lower capitalized interest rate and debt balance at the Parent Company. Utilities SBU due to a decrease in the allowance for borrowed funds used during construction; partially offset by lower debt balances at the Energy Infrastructure SBU.

Loss on extinguishment of debt increased $11 million to $13 million for the three …+19 / −66 words · under “Loss on extinguishment of debt”

Other income decreased $45 Loss on extinguishment of debt increased $11 million or 70%, to $19 $13 million for the three months ended September 30, 2026, compared to $2 million for the three months ended September 30, 2025. compared to $64 million for the three months ended September 30, 2024, mainly due to a $13 million decrease in gains on remeasurement This increase is primarily driven by prepayment of contingent consideration primarily on projects acquired debt at AES Clean Energy. and a $12 million impact from an indexation adjustment of Stabilization Fund receivables at AES Andes in prior year, partially offset by a $10 million gain at AES Andes corresponding to the write-off of contingent consideration for a renewables development project determined to be no longer viable.

Gain on disposal and sale of business interests increased $142 million to $212 million …+32 / −55 words · under “Gain on disposal and sale of business interests”

Gain on disposal and sale of business interests increased $27 $142 million or 63%, to $212 million for the nine months ended September 30, 2026, compared to $70 million for the nine months ended September 30, 2025 compared to $43 million for nine months ended September 30, 2024. This was primarily mainly due to a $186 million gain on sale of shares of Fluence and a $24 million gain resulting from the contribution of two of the JK Projects to a trust; partially offset by a $70 million gain on the selldown of Dominican Republic Renewables and a $10 million loss in the prior year. on the selldown of Amman East and IPP4 in Jordan, which are now accounted for as equity method investments. This was partially offset by a $52 million gain in the prior year on dilution of AES’ ownership interest in Uplight as a result of the AutoGrid acquisition.

Income tax benefit decreased $19 million, or 45%, to $23 million for the nine …+42 / −61 words · under “Income tax benefit”

Income tax benefit was decreased $19 million, or 45%, to $23 million for the nine months ended September 30, 2026, compared to $42 million for the nine months ended September 30, 2025. compared to income The Company’s effective tax expense of $52 million rates were (2)% and (12)% for the nine months ended September 30, 2024. 2026 and 2025, respectively. The Company’s effective tax rates were (12)% and 7% for the nine months ended September 30, 2025 and 2024, respectively. Both rates were impacted by the ITC benefits and tax equity allocations described above. Additionally, the 2025 2026 effective tax rate was impacted by the reclassification benefits associated with ITCs and the Bolero BESS project valuation allowance release, partially offset by tax expense resulting from allocations of Mong Duong from held-for-sale losses to held and used, while the 2024 effective tax rate reflected the restructuring of a foreign holding company, as well as the AES Brasil held-for-sale reclassification. equity investors on renewables projects.

Net loss attributable to noncontrolling interests and redeemable stock of subsidiaries decreased $96 million, …+8 / −111 words · under “Net loss attributable to noncontrolling interests and redeemable stock of subsidiaries”

Net loss attributable to noncontrolling interests and redeemable stock of subsidiaries decreased $270 $96 million, or 48%, 79%, to $296 $26 million for the nine three months ended September 30, 2026, compared to $122 million for the three months ended September 30, 2025. compared to $566 million for the nine months ended September 30, 2024. This decrease in net losses was primarily due to: a decrease of $203 million at AES Clean Energy Development primarily attributable to lower allocation of losses to tax equity investors on projects placed in service, $135 million at Mong Duong mostly driven by the derecognition of a valuation allowance on the loan receivable accounted for under ASC 310 upon reclassifying Mong Duong from held-for-sale to held and used, and $39 million related to the sale of AES Brasil. This was partially offset by an increase of $54 million at AES Indiana primarily attributable to higher allocation of losses to tax equity investors on BESS projects placed in service, and $52 million due to day-one losses on the commencement of sales-type leases at AES Clean Energy Development.

• Prior-year $127 million increase in the carrying value of the Mong Duong asset …+2 / −120 words · under “Net income attributable to The AES Corporation”

Asset impairment expense decreased $232 million to a $74 million asset impairment reversal for the nine months ended September 30, 2025, compared to a $158 million expense for the nine months ended September 30, 2024. This decrease was primarily the result of a $243 • Prior-year $127 million increase in the carrying value of the Mong Duong asset group primarily due to the derecognition of a valuation allowance on the loan receivable accounted for under ASC 310 and the elimination of net estimated costs to sell upon reclassifying Mong Duong from held-for-sale to held and used; and lower impairment expense of $37 million and $80 million at Mong Duong and AES Brasil, respectively, associated with the held-for-sale classification. This was partially offset by higher impairment expense of $111 million and $16 million at AES Clean Energy Development and AES Andes, respectively, due to the write-off of project development intangibles and capitalized development costs for projects that were determined to be no longer viable, including $51 million at AES Clean Energy Development in the current year due to the right sizing of our development company as part of the restructuring program initiated in February 2025.

21 more paragraphs were rewritten here (+592 / −420 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Non-GAAP Measures

3 added · 5 removed · 14 rewritten

Added in the 10-Q for fiscal Q3 2026

Under “Renewables SBU”

Operating Margin for the nine months ended September 30, 2026 increased $400 million, primarily driven by $151 million due to development services in the U.S., $128 million from higher net spot sales in Colombia, benefiting from elevated spot prices due to El Niño-related unfavorable hydrological conditions across the country and relatively favorable hydrology at the AES Chivor basin, a $72 million favorable impact from energy derivatives in the U.S., $54 million positive impact due to the appreciation of the Colombian peso, and $17 million due to one-time restructuring costs incurred in the prior year; partially offset by a $56 million increase in fixed costs primarily due to higher depreciation.

Added in the 10-Q for fiscal Q3 2026

Under “Energy Infrastructure SBU”

Operating Margin for the nine months ended September 30, 2026 increased $105 million, primarily driven by $265 million higher energy and capacity sales and prices in the spot market, $41 million higher margin from LNG transactions, and $20 million lower fixed costs mainly due to the 2025 restructuring; partially offset by $143 million driven by lower contract sales volume mainly due to the expiration of the Maritza PPA in Bulgaria, $32 million of higher depreciation in Maritza due to the useful life reassessment in the prior year, $28 million driven by lower availability, and $17 million due to lower net derivative gains.

Added in the 10-Q for fiscal Q3 2026

Under “New Energy Technologies SBU”

Adjusted EBITDA for the nine months ended September 30, 2026 decreased $10 million, primarily due to the drivers above and $12 million higher losses from Fluence mostly driven by liquidated damages incurred due to project delays, increased costs related to the deployment of newer solution offerings, and an increase in battery prices; partially offset by lower losses from Uplight of $8 million after equity method accounting was suspended in the fourth quarter of 2025.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

For the year ended December 31, 2024, the Company updated the definitions of EBITDA and Adjusted EBITDA to include accretion of AROs in the depreciation and amortization add-back. We believe excluding accretion of AROs from these metrics better reflects the underlying business performance of the Company and is aligned with the metrics of our industry peers. For comparability and consistency, all prior period EBITDA and Adjusted EBITDA measures have been recast to conform to the current presentation. The impact of this update resulted in an increase to Adjusted EBITDA of $6 million and $17 million, respectively, for the three and nine months ended September 30, 2024.

During the first quarter of 2024, the Company updated the definitions of Adjusted EBITDA, Adjusted PTC, and Adjusted EPS add-back (a) unrealized gains or losses related to derivative transactions and equity securities to include financial assets and liabilities measured using the fair value option, and updated add-back (e) gains, losses, and costs due to the early retirement of debt to include troubled debt restructuring. We believe excluding these gains or losses better reflects the underlying business performance of the Company. The Company also removed the adjustment for net gains at Angamos, one of our businesses in the Energy Infrastructure SBU, associated with the early contract terminations with Minera Escondida and Minera Spence. As this adjustment was specific to certain contract terminations that occurred in 2020, we believe removing this adjustment from our non-GAAP definitions provides simplification and clarity for our investors. There were no such impacts in 2024.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Adjusted EPS”

The Company reported diluted earnings per share of $0.94 and $0.86 for the three and nine months ended September 30, 2025, respectively. For purposes of measuring earnings per share under U.S. GAAP, income available to AES common stockholders is reduced by increases in the carrying amount of redeemable stock of subsidiaries to redemption value and increased by decreases in the carrying amount to the extent they represent recoveries of amounts previously reflected in the computation of earnings per share. While the adjustments for the three and nine months ended September 30, 2025 decreased earnings per share, neither adjustment impacted Net income on the Condensed Consolidated Statement of Operations. For purposes of computing Adjusted EPS, the Company excluded the adjustment to redemption value from the numerator. The table below reconciles the income available to AES common stockholders used in GAAP diluted earnings per share to the income from continuing operations used in calculating the non-GAAP measure of Adjusted EPS.

(1)Amount primarily relates to unrealized derivative gains on commodities at AES Clean Energy of $15 million, or $0.02 per share, and net unrealized derivative gains at the Energy Infrastructure SBU of $12 million, or $0.02 per share.

Show the rest (589 words)

(2)Amount primarily relates to net unrealized derivative gains at the Energy Infrastructure SBU of $50 million, or $0.07 per share, and unrealized gains on commodity derivatives at AES Clean Energy of $17 million, or $0.02 per share, partially offset by unrealized losses on foreign currency derivatives at Corporate of $17 million, or $0.02 per share.

(3)Amount primarily relates to remeasurement of our investment in 5B of $48 million, or $0.07 per share, and net unrealized derivative losses at the Energy Infrastructure SBU of $34 million, or $0.05 per share.

(4)Amount primarily relates to net unrealized derivative gains at the Energy Infrastructure SBU of $109 million, or $0.15 per share, unrealized gains on commodity derivatives at AES Clean Energy of $33 million, or $0.05 per share, unrealized gains on cross currency swaps in Brazil of $28 million, or $0.04 per share, and unrealized gains on foreign currency derivatives at Corporate of $20 million, or $0.03 per share.

(5)Amount primarily relates to day-one losses on commencement of sales-type leases at AES Clean Energy Development of $153 million, or $0.21 per share, and AES Renewable Holdings of $11 million, or $0.02 per share, and losses on remeasurement of contingent consideration at AES Clean Energy of $15 million, or $0.02 per share, partially offset by gain on sale of Dominican Republic Renewables of $45 million, or $0.06 per share, and write-off of contingent consideration for a renewables development project at AES Andes of $10 million, or $0.01 per share.

(6)Amount primarily relates to day-one losses at commencement of sales-type leases at AES Renewable Holdings of $63 million, or $0.09 per share, and the loss on partial sale of our ownership interest in Amman East and IPP4 in Jordan of $10 million, or $0.01 per share, partially offset by a gain on dilution of ownership in Uplight due to its acquisition of AutoGrid of $52 million, or $0.07 per share.

(7)Amount primarily relates to $32 million, or $0.05, at Uplight related to an impairment of the equity method investment and adjustments to the convertible notes and related embedded derivative feature included within the convertible notes, impairments at a renewables development project at AES Andes of $16 million, or $0.02 per share, and AES Clean Energy Development projects of $11 million, or $0.02 per share.

(8)Amount primarily relates to impairment of AES Brasil of $26 million, or $0.04 per share, and impairment at Mong Duong of $6 million, or $0.01 per share.

(9)Amount primarily relates to impairments at AES Clean Energy Development projects of $61 million, or $0.09 per share, $32 million, or $0.05, at Uplight related to an impairment of the equity method investment and adjustments to the convertible notes and related embedded derivative feature included within the convertible notes, impairments at a renewables development project at AES Andes of $16 million, or $0.02 per share, and Mong Duong of $9 million, or $0.01 per share, partially offset by the derecognition of the valuation allowance on a loan receivable accounted for under ASC 310 and the elimination of estimated costs to sell at Mong Duong of $127 million, or $0.18 per share, after reclassification to held and used.

(10)Amount primarily relates to impairment of AES Brasil of $38 million, or $0.05 per share, and impairment at Mong Duong of $28 million, or $0.04 per share.

(11)Amount primarily relates to losses incurred at AES Andes due to early retirement of debt $29 million, or $0.04 per share, and costs incurred due to troubled debt restructuring at Puerto Rico of $20 million, or $0.03 per share.

239 more words of this passage are in the 10-Q filed Nov 4, 2025.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Renewables SBU”

Adjusted EBITDA with Tax Attributes for the three months ended September 30, 2025 increased $28 million, primarily driven by the increase in Adjusted EBITDA explained above, partially offset by lower tax attributes realized in the current quarter due to timing of tax attribute recognition. During the three months ended September 30, 2025 and 2024, we realized $421 million and $475 million, respectively, from tax attributes earned by our U.S. renewables business.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Renewables SBU”

Adjusted EBITDA with Tax Attributes for the nine months ended September 30, 2025 increased $255 million, primarily driven by the increase in Adjusted EBITDA explained above, and higher tax attributes realized in the current year due to timing of tax attribute recognition. During the nine months ended September 30, 2025 and 2024, we realized $915 million and $878 million, respectively, from tax attributes earned by our U.S. renewables business.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Energy Infrastructure SBU”

Operating Margin for the nine months ended September 30, 2025 decreased $344 million, driven by $160 million higher prior year revenues from the monetization of the Warrior Run coal plant PPA, $117 million due to prior year net derivative gains as part of our commercial hedging strategy, $42 million of prior year operating margin at AES Andes, which is reported in the Renewables SBU beginning in 2025, $28 million of lower generation mainly driven by dispatch, $20 million of one-time costs due to restructuring, and $17 million due to the prior year selldown of Amman East and IPP4 in Jordan; partially offset by an increase of $45 million driven by higher availability due to lower maintenance in 2025.

Operating Margin for the three months ended September 30, 2026 increased $148 million, primarily …+57 / −37 words · under “Renewables SBU”

Operating Margin for the three months ended September 30, 2025 2026 increased $24 $148 million, This increase was mainly primarily driven by an $80 $100 million from higher net spot sales in Colombia, benefiting from elevated spot prices due to El Niño-related unfavorable hydrological conditions across the country and relatively favorable hydrology at the AES Chivor basin, $39 million positive impact from new businesses due to the appreciation of the Colombian peso, and $28 million due to development services in the U.S.; and Chile and a $20 million impact of the results of AES Andes moving to Renewables in 2025; partially offset by a $66 million impact from the sale of AES Brasil in 2024 and a $14 $20 million increase in fixed costs primarily due to an accelerated growth plan. higher depreciation and a $20 million unfavorable impact from energy derivatives in the U.S.

Operating Margin for the three months ended September 30, 2026 increased $73 million, primarily …+15 / −72 words · under “Utilities SBU”

Operating Margin for the nine three months ended September 30, 2025 2026 increased $47 $73 million, mainly primarily driven by $126 $42 million due to higher retail rates as a result of the AES Ohio’s 2024 Base Rate Order, including the impact DRC Settlement implemented in November 2025, net of certain riders now included in incorporated into base rate; rates, and a $26 million increase in transmission and rider revenues; and favorable margin due to from higher demand, primarily due to the impact of weather. These increases are partially offset by $32 million decrease due to higher depreciation and amortization expense from additional assets placed in service, $17 million decrease due to the impact of planned outages, $16 million decrease from higher fixed costs mainly driven by higher property taxes due to higher assessed values, and $15 million decrease due to higher credit losses.

Operating Margin for the nine months ended September 30, 2026 increased $173 million, primarily …+53 / −78 words · under “Utilities SBU”

Operating Margin for the nine months ended September 30, 2025 2026 increased $19 $173 million, This increase was primarily driven by $147 million positive impact from new businesses, $42 million impact of the results of AES Andes moving to Renewables in 2025, $36 $109 million due to higher generation in Panama retail rates as a result of better hydrological conditions during the first quarter AES Ohio’s 2024 DRC Settlement implemented in November 2025, net of 2025, certain riders now incorporated into base rates, a $56 million net increase from higher recovery of costs primarily associated with transmission, distribution, and renewable projects, and a $26 $34 million increase from higher demand, primarily due to the impact of weather in Colombia as a result of increased availability and lower spot prices on energy purchases in the second quarter of 2025. El Salvador. These positive impacts increases were partially offset by a $150 million negative impact from the sale of AES Brasil in 2024, a $46 million negative impact related to changes in mark-to-market of energy derivatives, a $33 $17 million increase in fixed costs, primarily related to an accelerated growth plan, and $17 million of one-time costs driven by higher property taxes due to restructuring. higher assessed values.

11 more paragraphs were rewritten here (+256 / −160 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Operational

4 added · 4 removed · 7 rewritten

Added in the 10-Q for fiscal Q3 2026

In March 2026, the Office of the U.S. Trade Representative (“USTR”) initiated investigations under Section 301 concerning possible persistent trade surpluses and unused capacity with respect to China, the EU, South Korea, and certain other major trading partners. These investigations are ongoing. In March 2026, the USTR also initiated Section 301 investigations on 60 countries regarding potential failures to take action on forced labor. Effective July 24, 2026, the USTR imposed tariffs ranging from 10% to 12.5% stemming from the investigations concerning forced labor. USTR’s decision is pending on potential tariffs due to alleged trade surpluses and unused capacity. The impact of these new and potential Section 301 tariffs on the Company is uncertain.

In July 2025, Commerce initiated a Section 232 investigation to determine the effects on national security of imports of polysilicon and its derivatives. In August 2026, the President issued a proclamation finding that these imports impair U.S. national security. Effective December 4, 2026, the U.S. Government will implement a minimum import price for polysilicon, wafers and ingots, solar cells, and solar modules, and will impose a 15% tariff on polysilicon and derivative products, including solar cells and modules. Commerce has also implemented an import ban on certain U.S. importers of these products. The impact of these new Section 232 actions on the Company is uncertain.

Added in the 10-Q for fiscal Q3 2026

In January 2026, President Trump issued a Proclamation under Section 232 concerning the importation of several critical minerals (including graphite and lithium) from any country. The Proclamation does not impose tariffs on the critical minerals but directs Commerce and USTR to negotiate agreements with foreign partners to secure reliable access to the critical minerals. If the negotiations fail to result in agreements or to adequately address the identified risks, the President may consider trade-restrictive measures with respect to the critical minerals. The outcome of this process as well as its potential impact on the Company are uncertain.

The Trump Administration has reached bilateral trade agreements or frameworks with several trading partners (including the EU, Japan, and South Korea, among others). Trade negotiations are ongoing with many trading partners concerning various goods and industry sectors.

In July 2026, the Federal Communications Commission (“FCC”) updated its “Covered List” to include new foreign-produced power inverters, thereby generally prohibiting such inverters from receiving FCC authorization to be imported, marketed, or sold in the U.S. However, the FCC’s action does not affect the continued importing, marketing, or selling of existing models of power inverters that have already received FCC equipment authorization or the continued use of such devices that have already been purchased. In addition, entities may seek “Conditional Approval” to import and sell new foreign-produced power inverters. At this time, we do not believe this action by the FCC will have a significant impact on our solar and battery projects under development.

In August 2026, the President issued an Executive Order under IEEPA that, among other things, prohibits the acquisition, importation, or installation of bulk-power system electric equipment (including but not limited to inverters and battery energy storage systems) (“BPSEE”) that is designed, manufactured, or supplied by a Covered Foreign Entity and that poses an undue risk of subversion or disruption of the bulk-power system in the U.S. The Executive Order directs the Secretary of Energy to determine what BPSEE is prohibited from importation into the U.S. after the date of the Executive Order and authorizes the Secretary to determine whether any previously installed BPSEE should be subject to conditions on continued use. The Secretary has not made any such determinations to date, and the impact of this new Executive Order on the Company is uncertain.

Added in the 10-Q for fiscal Q3 2026

El Niño Impacts and Operational Sensitivity to Dry Hydrological Conditions — On July 9, 2026, the National Oceanic and Atmospheric Administration (“NOAA”) declared an El Niño advisory. There is a forecast consensus across agencies, including the International Research Institute for Climate and Society (“IRI”) along with the NOAA, for strong-to-record-setting El Niño conditions in late 2026 into 2027. These conditions have traditionally led to strong weather impacts across the AES markets.

Added in the 10-Q for fiscal Q3 2026

In Panama, while the first quarter 2026 system inflows supported the Bayano and Fortuna reservoirs remaining at above-average levels, the second and third quarters were much drier, leading to lower than average reservoir levels. That said, the presence of the Gatun combined cycle gas power plant has reduced price and volatility, due to the displacement of other thermal generation.

In Colombia, the first half of the year was slightly wetter than average, but the third quarter has been dry. In general, El Niño conditions in Colombia are characterized by dry conditions in the system, causing spot prices generally to be elevated in El Niño seasons. The basin where AES Chivor is located, though, typically experiences conditions that are less dry than the system, and thus far this has been the case through the third quarter. Should these conditions not continue, it may require an increase in purchased power to cover contracted positions.

In Chile, the first half of 2026 was very dry; however, it was marked by a structural decoupling of hydrology and the energy matrix. While wetter conditions have begun in the third quarter, the power system has also demonstrated unprecedented resilience by offsetting the decline in hydroelectricity with record-breaking solar and wind generation, while leveraging the accelerated integration of BESS to mitigate curtailment, stabilize prices, and compensate for depleted system reservoirs.

In the U.S., current seasonal outlooks favor above-normal winter temperatures across the midwestern U.S. during the 2026-2027 heating season, which, if realized, could result in lower retail electric sales during the fourth quarter of 2026 and first quarter of 2027 relative to normal weather assumptions. If actual conditions materialize consistent with the forecast consensus, demand at our U.S. utilities businesses may decrease significantly and the resulting impact could be material to the Company’s results of operations, financial condition, and cash flows.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Separately, the U.S. maintains a global safeguard tariff (currently 14% ad valorem) on solar cells and modules pursuant to the Section 201 Safeguard Action on crystalline silicon photovoltaic products, which became effective in February 2018. On June 21, 2024, President Biden issued Proclamation 10779, revoking the exclusion of bifacial panels from safeguard relief previously proclaimed in Proclamation 10339, and reinstating the tariff on bifacial panels under the Section 201 Safeguard Action, subject to certain qualifications. These global tariffs are expected to expire in February 2026.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

On April 2, 2025, President Trump issued an Executive Order pursuant to IEEPA imposing an indefinite, baseline reciprocal 10% tariff on almost all goods imported into the U.S., effective April 5, 2025, and individualized higher IEEPA tariffs (11% to 50%) starting April 9, 2025 on goods originating from 57 countries with trade surpluses with the U.S. On April 9, 2025, the U.S. government issued a further Executive Order increasing the IEEPA reciprocal tariff on China to 125% effective April 10, 2025. Concurrently, the U.S. government announced a temporary suspension of the country-specific reciprocal tariff measures targeting most U.S. trading partners for a 90-day period, or until July 9, 2025, which was later extended until August 1, 2025. Effective May 14, 2025, the IEEPA reciprocal tariff rate applicable to China was lowered to 10%. IEEPA reciprocal tariffs, at various levels, have now gone into effect for most U.S. trading partners.

Several trading partners (including the EU, Japan, South Korea, and the UK) have reached bilateral trade agreements with the U.S. The ultimate outcome of any reciprocal or other tariffs with countries that have not yet reached such trade agreements with the U.S. is uncertain. Also, the Supreme Court will hold oral argument on November 5, 2025, on the legality of the IEEPA tariffs, following lower court decisions declaring the tariffs unlawful.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

La Niña conditions have emerged towards the end of Q3 2025 in the equatorial Pacific, following a period of ENSO-neutral conditions earlier in the year. According to the Climate Prediction Center (“CPC”) and the International Research Institute for Climate and Society (“IRI”), La Niña is expected to persist through the Northern Hemisphere winter (December 2025 to February 2026), with a transition back to ENSO-neutral conditions likely in early 2026. While the developing La Niña is forecasted to be weak, it may still produce regionally significant effects in some areas.

In Panama, total system inflows have remained near historical averages, with the Bayano and Fortuna reservoirs however experiencing above-average levels due to abundant rainfall in the northern basins. These favorable conditions have supported strong hydroelectric generation, reduced reliance on thermal generation, and enabled potential surplus energy sales into the spot market. Additionally, reduced dispatch of natural gas-fired units may create opportunities for gas reallocation to international markets.

In Colombia, the January to July 2025 period was the wettest since 1977 at key monitoring sites. Reservoir levels remained elevated through Q3, with Chivor and other major reservoirs above seasonal norms. Although August saw a slight decline in rainfall and a rise in spot prices, overall system storage remained robust. The onset of La Niña may bring additional rainfall in Q4, further supporting hydroelectric output and mitigating drought-related risks.

In Chile, 2025 is expected to be the third driest year on record. While winter precipitation and snowpack were near average, prolonged drought has kept reservoir levels low, broadly in line with last year’s levels. A weak La Niña may slow snowmelt; however, it is not expected to meaningfully alter near-term hydrological conditions.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Macroeconomic and Political”

During the past few years, some countries where our subsidiaries conduct business have experienced macroeconomic and political changes. In the event these trends continue, there could be an adverse impact on our businesses.

The Trump Administration has threatened or imposed tariffs on a wide range of countries …+81 / −3 words

The Trump Administration has threatened or imposed tariffs on a wide range of countries and products. On February 10, 2025, President Trump signed Executive Orders modifying existing tariffs under Section 232 tariffs of the Trade Expansion Act of 1962 ("Section 232") on steel and aluminum imports to expand their scope and impose 25% tariffs on both products. The President raised these rates to 50% effective June 4, 2025. Starting in August 2025, the President imposed Section 232 tariffs on imported copper products and copper-intensive derivative products. In April 2026, the President issued a new Proclamation applying a tariff rate of 50% on articles wholly of steel, aluminum, or copper, and a rate of 25% on derivative products substantially made of those metals, in each case assessed on the full customs value of the imported article. In June 2026, the President further adjusted these tariff regimes. At this time, we do not expect that the modifications to tariffs on steel, aluminum, and aluminum to copper will have a material impact on our business.

On February 1, 2025, President Trump issued an Executive Order declaring a national emergency …+103 / −11 words

On February 1, 2025, President Trump issued an Executive Order declaring a national emergency under the International Emergency Economic Powers Act (“IEEPA”) with respect to U.S. importation of fentanyl and imposing tariffs on Mexico, Canada, and China. On April 2, 2025, the President imposed issued an Executive Order pursuant to IEEPA imposing reciprocal tariffs on almost all goods imported into the U.S. In February 2026, on review of lower court decisions declaring the tariffs unlawful, the Supreme Court issued a decision holding that IEEPA does not authorize tariffs. The President then issued new 10% additional tariff tariffs on imports almost all trading partners under Section 122 of the Trade Act of 1974, which expired on July 24, 2026. The Section 122 tariffs are currently under review by the Federal Circuit, following a May 2026 ruling from China, effective February 4, 2025. Effective March 4, 2025, this tariff was increased the CIT finding them to 20%. be unlawful. There has been no material impact on the Company from these Section 122 tariffs.

For our U.S backlog of solar projects scheduled to finish construction and become operational …+25 / −88 words

More specifically, we have contracted and imported into the U.S. all of the solar panels that are necessary to complete our U.S. backlog of solar projects scheduled to finish construction and become operational in 2025. For our U.S backlog of solar projects scheduled to finish construction and become operational in 2026 or 2027, we have contracted for most of our panel supply needs, with the majority of such panels being manufactured in the U.S. and most of the remaining panels have having already been imported into the U.S. As for solar projects that are expected to become operational by 2027, based on current assessments and the ramp-up of domestic manufacturing, we anticipate limited purchases of imported PV modules. These remaining imports are expected to be largely insulated from AD/CVD measures and potential the announced Section 232 outcomes, as they measures through contractual protections with the relevant manufacturers, which are expected to be manufactured using U.S. polysilicon. Imports will exclude modules from countries currently subject to AD/CVD orders or investigations. the importers of record and retain the associated import obligations and risks.

4 more paragraphs were rewritten here (+77 / −71 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Macroeconomic and Political

1 added · 2 removed · 10 rewritten

Added in the 10-Q for fiscal Q3 2026

The Chilean National Reconstruction Bill was fully enacted on October 17, 2026, providing a gradual 4% rate reduction to 23% by 2029. The impact is expected to be material and will be recorded in the fourth quarter of 2026.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

In 2024, we realized $1,313 million of earnings from Tax Attributes, comprised of $1,293 million from the Renewables SBU and $20 million from the Utilities SBU. In 2025, we expect an increase in earnings from Tax Attributes, mainly from our U.S. renewables business that is in line with the growth in that business. For the nine months ended September 30, 2025, we recognized $988 million in Tax Attributes.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Decarbonization Initiatives”

Our strategy involves shifting towards clean energy platforms, including renewable energy, energy storage, LNG, and modernized grids. It is designed to position us for continued growth while reducing our carbon intensity and to be in support of our mission of accelerating the future of energy, together. We have made significant progress on our exit of coal generation, and by year-end 2025, we intend to have exited the substantial majority of our coal facilities that we owned in 2022. Due to a number of factors, including grid and market dynamics, we will continue to work towards exiting coal in the limited markets where we have coal generation. We currently anticipate these efforts will continue beyond 2027. We expect to further reduce the carbon intensity of our operations as we add more long-term contracted renewables to the grid each year.

In addition, initiatives have been announced by regulators, including in Chile, Puerto Rico, Bulgaria, and offtakers in recent years, with the intention of reducing GHG emissions generated by the energy industry. In parallel, the shift towards renewables has caused certain customers to migrate to other low-carbon energy solutions and this trend may continue.

Although we cannot currently estimate the financial impact of these decarbonization initiatives, new legislative or regulatory programs further restricting carbon emissions or other initiatives to voluntarily exit coal generation could require material capital expenditures, result in a reduction of the estimated useful life of certain coal facilities, or have other material adverse effects on our financial results.

10 more paragraphs were rewritten here (+298 / −77 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Impairments and Realizability

1 rewritten

1 more paragraph was rewritten here (+59 / −3 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Regulatory

3 added · 1 removed · 3 rewritten

Added in the 10-Q for fiscal Q3 2026

AES Ohio Merger Application Submission — Subject to the terms of the Merger Agreement as described in Note 1—Financial Statement Presentation, the proposed AES Merger, AES, Parent, and Merger Sub are required to use reasonable best efforts to obtain all required regulatory approvals, including certain regulatory approvals from the PUCO. On April 10, 2026, AES Ohio submitted its required merger application to the PUCO, and on September 17, 2026 the PUCO approved the application. The OCC filed a motion for rehearing of the approval, arguing that the approval should have included an investment-grade credit rating maintenance requirement and ring-fencing requirement, which AES Ohio responded to on October 29, 2026. The PUCO’s approval order remains operative.

Added in the 10-Q for fiscal Q3 2026

AES Ohio ESP Appeal — From November 1, 2017 through December 18, 2019, AES Ohio operated pursuant to an approved ESP plan, which was initially approved on October 20, 2017 (“ESP 3”). On December 18, 2019, the PUCO approved AES Ohio's Notice of Withdrawal of ESP 3 and reversion to its prior rate plan (“ESP 1”). Among other items, the PUCO Order approving the ESP 1 rate plan included reinstating the non-bypassable RSC Rider, which provided annual revenue of approximately $79 million. The OCC has appealed to the Ohio Supreme Court the PUCO’s decision approving the reversion to ESP 1, as well as argued for a refund of the RSC revenue dating back to August 2021. Oral arguments regarding this appeal were held on April 22, 2025, and a court decision is pending.

Added in the 10-Q for fiscal Q3 2026

AES Indiana will implement new basic rates and charges authorized under the 2026 Base Rate Order in two phases. Phase one rates and charges became effective on July 27, 2026. Phase two rates and charges are anticipated to be effective in the first quarter of 2027. New basic rates and charges are subject to refund pending resolution of the regulatory petitions and legal appeal processes.

AES Indiana Large Load Customer Project Filing — On April 22, 2026, AES Indiana filed a petition and case in chief seeking IURC approval related to certain generation resources and energy infrastructure investments required to serve increasing demand in AES Indiana's service territory, primarily driven by the anticipated demand for a new data center campus to be located in Monrovia, Indiana (the “Monrovia Project”). AES Indiana is also seeking approval of various accounting and ratemaking requests associated with the Monrovia Project. As part of developing this comprehensive plan, AES Indiana has incorporated certain protections for existing and future customers that ensure the costs of the generation resources and energy infrastructure upgrades required benefit all customers, are fairly allocated, and follow cost causation/beneficiary pays regulatory principles. The petition includes AES Indiana's plan to serve this increasing demand through the acquisition and development of additional generation resources. AES Indiana is seeking approval to acquire two development-stage renewables projects located in Indiana, as well as approval to develop and construct an energy storage project at its existing Hardy Hills renewable facility. The petition also includes AES Indiana's plan to develop and construct specific transmission network upgrades and enhancements required to serve the increasing demand, including seeking approval of a construction service agreement and an electric services agreement executed with the data center customer to provide high-voltage retail electric service to the new data center campus, which includes financial assurances, minimum demand commitments, and exit provisions as protections for existing customers. On October 7, 2026, the IURC issued an order approving AES Indiana’s petition and plan to serve the Monrovia Project.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

AES Maritza PPA Review — DG Comp is conducting a preliminary review of whether AES Maritza’s PPA with NEK is compliant with the European Union's State Aid rules. No formal investigation has been launched by DG Comp to date. AES Maritza has previously engaged in discussions with the DG Comp case team and the Government of Bulgaria to attempt to reach a negotiated resolution of the DG Comp’s review (“PPA Discussions”). There are no active PPA Discussions at present, but those discussions could resume at any time. The PPA continues to remain in place. However, there can be no assurance that, in the context of DG Comp’s preliminary review or any future PPA Discussions, the other parties will not seek a prompt termination of the PPA.

We do not believe termination of the PPA is justified. Nevertheless, the PPA Discussions involved a range of potential outcomes, including but not limited to the termination of the PPA and payment of some level of compensation to AES Maritza. Any negotiated resolution would be subject to mutually acceptable terms, lender consent, and DG Comp approval. At this time, we cannot predict whether and when the PPA Discussions might resume or the outcome of any such discussions. Nor can we predict how DG Comp might resolve its review if the PPA Discussions do not resume or if any such discussions fail to result in an agreement concerning the agency's review. AES Maritza believes that its PPA is legal and in compliance with all applicable laws, and it will take all actions necessary to protect its interests, whether through negotiated agreement or otherwise. However, there can be no assurance that this matter will be resolved favorably; if it is not, there could be a material adverse effect on the Company’s financial condition, results of operations, and cash flows. As of September 30, 2025, the carrying value of our long-lived assets at Maritza is $336 million.

Show the rest (415 words)

AES Ohio Smart Grid Phase 2 Filing — In February 2024, AES Ohio filed a Smart Grid Phase 2 with the PUCO proposing a ten-year investment plan to begin after Smart Grid Phase 1 ends. On September 13, 2024, AES Ohio reached a settlement with the PUCO Staff and other parties on the pending Smart Grid Phase 2 Application and an evidentiary hearing was held on October 29, 2024. A fundamental premise of the application was the continued availability of rider recovery of Smart Grid investments through the plan period. However, with the recent enactment of Sub. H.B. 15 described below, which prohibits AES Ohio from applying for a new electric security plan which includes certain rider recovery mechanisms, as well as the near-term financial uncertainty created by the statute, AES Ohio withdrew its Smart Grid Phase 2 Application on May 23, 2025. This withdrawal will provide AES Ohio flexibility as to the timing and scope of Smart Grid investments to continue to deliver their benefits to customers.

AES Ohio Distribution Rate Case — On November 29, 2024, AES Ohio filed a new distribution rate case with the PUCO. The investments reflected in the distribution rate case include investments to enhance the safety, reliability, and resilience of the distribution system. The application is based on a date certain of September 30, 2024 and a test period of June 1, 2024 to May 31, 2025. On June 27, 2025 the PUCO Staff submitted their Report and Recommendations. On August 13, 2025, AES Ohio entered into an unopposed Stipulation and Recommendation (the “Settlement”) with various intervening parties and the Staff of the PUCO. The Settlement provides for updated base rates for electric distribution service customers in AES Ohio’s service territory and among other matters includes: (i) an increase to its annual distribution revenue requirement of $168 million, which incorporates certain investments that are currently recovered through the Distribution Investment Rider; (ii) a return on equity of 9.999% and a cost of long-term debt of 4.49% on a distribution rate base of $1.25 billion and based on a capital structure of 53.87% equity and 46.13% long-term debt; and (iii) the net recovery of certain expenditures by AES Ohio, primarily related to one-time costs supporting the implementation of AES Ohio’s customer billing system upgrade. During the third quarter of 2025, AES Ohio recorded a net deferral of $8.4 million for previously recognized costs related to this recovery. The settlement is subject to, and conditioned upon, approval by the PUCO.

AES Ohio Legislation and Three-Year Rate Plan (“TYRP”) — On April 30, 2025, the …+150 / −4 words

AES Ohio Legislation and Three-Year Rate Plan (“TYRP”) — On April 30, 2025, the Ohio legislature passed a new energy legislation (H.B. (“House Bill 15”) that was signed by the Governor and became effective on August 14, 2025. The legislation allows Ohio’s electric utilities to file three-year forecasted base distribution rate cases, which would replace electric security plans (“ESPs”) and incorporate associated recovery riders. Among other provisions, the legislation eliminates as of its effective date, the Legacy Generation Resource Rider (“LGR”), Rider, which previously allowed for recovery of net OVEC costs and revenues. Changes to the regulatory framework from this legislation, including the recovery of future net OVEC costs and revenues, could be material to our results of operations, financial condition, and cash flows. To comply with House Bill 15, AES Ohio filed an application with the PUCO on November 10, 2025 to establish a TYRP. This plan describes the investments necessary to strengthen and modernize AES Ohio's infrastructure and expand support for its customers. To enable these ongoing investments, the application also proposes rates for future electric distribution service in 2027, 2028, and 2029. On July 21, 2026, AES Ohio entered into an unopposed Stipulation and Recommendation (the “TYRP Settlement”) with intervening parties and the Staff of the PUCO. The TYRP Settlement provides for base distribution rates for 2027, 2028, and 2029, with annual true-up proceedings to forecasted amounts, and provides for a 9.5% return on equity, subject to annual performance metrics. The TYRP Settlement is subject to, and conditioned upon, approval by the PUCO. The evidentiary hearing was held on August 4, 2026, and AES Ohio anticipates a final order from the PUCO by the end of 2026.

AES Indiana Rate Case Filing — On June 17, 2026, the IURC issued an …+178 / −108 words

AES Indiana Rate Case Filing — On June 3, 2025, 17, 2026, the IURC issued an order (the “2026 Base Rate Order”) approving in part the Stipulation and Settlement Agreement that AES Indiana filed a petition with the IURC for authority to increase its basic rates and charges. entered into on October 15, 2025 AES Indiana entered into a Stipulation and Settlement Agreement (the “Settlement Agreement”) with most parties in AES Indiana’s pending regulatory base rate review at the IURC. This Settlement Agreement provides for updated base rates for electric services in AES Indiana’s territory and is subject, and conditioned upon, approval by the IURC. case filing. Among other things, the Settlement Agreement proposes an increase in AES Indiana’s revenue of $90.7 million and provides a return on common equity of 9.75% and cost of long-term debt of 5.34%, on a 2026 Base Rate base of approximately $5.5 billion for AES Indiana’s Order establishes proposed 2027 electric service base rates AES Indiana expects to receive an providing for a return on equity of 9.5%. In addition, the 2026 Base Rate Order from the IURC during the second quarter of 2026. The partial Settlement Agreement also includes a commitment to not implement additional base rate increases, following the implementation of new base rates under the settlement, 2026 Base Rate Order, until at least January of 2030 and to not start a second TDSIC Plan before January of 2028. On July 7, 2026, the Office of Utility Consumer Counselor (“OUCC”) and Citizens Action Coalition (“CAC”) (parties to the regulatory rate review) each filed a petition for reconsideration and rehearing with the IURC. On July 17, 2026, the OUCC also filed a notice of appeal with the Court of Appeals of Indiana. Following the petitions for reconsideration, on September 2, 2026, the IURC granted (i) the OUCC's request to reconsider the 2026 Base Rate Order based on the IURC's weighing of the five pillars of electric utility service and (ii) the CAC's request to reopen the record for the limited capacity of gathering any new evidence applicable to the rate case concerning the Google Monrovia data center project and the pending AES Merger. A preliminary hearing was held on September 17, 2026 establishing a procedural schedule on this case, and the IURC has set an evidentiary hearing to begin on March 11, 2027.

1 more paragraph was rewritten here (+40 / −36 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Environmental

5 added · 3 removed · 14 rewritten

Added in the 10-Q for fiscal Q3 2026

New Source Performance Standards for Stationary Combustion Turbines — On December 13, 2024, the EPA published a proposed rule that would revise the NSPS regulating NOX and SO2 from certain new, modified, and reconstructed stationary combustion turbines ("CTs"). On January 15, 2026, the EPA issued a final rule establishing more stringent NOX emissions standards for certain CTs while retaining the existing SO2 standards. The final rule establishes NOX emissions limits based on selective catalytic reduction ("SCR") for new, large, high utilization combustion turbines. NOX emissions limits for other new, modified, and reconstructed CTs are based on combustion controls without SCR. The revised standards apply to affected sources that begin construction, modification, or reconstruction after December 13, 2024. The final rule is subject to litigation. We cannot predict the possible outcome or potential impacts of this matter at this time.

Regional Haze Rule — The EPA's "Regional Haze Rule" established timelines for states to improve visibility in national parks and wilderness areas throughout the United States by establishing reasonable progress goals toward meeting a national goal of natural visibility conditions in Class I areas by the year 2064 through a series of state implementation plans ("SIPs"), which may result in additional emissions control requirements for electric generating units (“EGUs”). SIPs for the first planning period (through 2018) did not result in material impact to AES facilities. For all future SIP planning periods, states must evaluate whether additional emissions reduction measures may be needed to continue making reasonable progress toward natural visibility conditions. The deadline for submittal of the SIP covering the second planning period was July 31, 2021. On October 2, 2025, the EPA published an advanced notice of proposed rulemaking requesting public input on potential future changes to the Regional Haze Rule. On January 6, 2026, the EPA published a final rule extending the deadline for states to submit implementation plans for the third planning period from July 31, 2028 to July 31, 2031. To date, none of the states in which we operate have submitted plans that identify potential impacts to Company facilities. However, we cannot predict the possible outcome or potential impacts of this matter at this time.

Added in the 10-Q for fiscal Q3 2026

It is too early to determine any potential impact. GHG regulations, current or future amendments to, resulting state or federal plans, or pending or future litigation associated with such regulations or plans could have a material impact on our business, financial condition, and results of operations.

Added in the 10-Q for fiscal Q3 2026

On July 14, 2026, the EPA published an Advanced Notice of Proposed Rulemaking intended to solicit feedback from the public on a general permit approach that could be developed to allow owners and operators of CCR facilities to temporarily obtain permit coverage until an individual permit is issued by the EPA or an approved state CCR permit program is in effect.

Added in the 10-Q for fiscal Q3 2026

On April 13, 2026, the EPA published proposed revisions to the CCR Rule. The EPA is proposing modifications to the legacy and CCR management units provisions in the CCR Rule, the establishment of site-specific compliance pathways under federal or approved state CCR permits, and the revision of the definition of beneficial use of CCR. It is still too early to determine the potential impacts of these proposed revisions to our businesses.

Added in the 10-Q for fiscal Q3 2026

On April 23, 2020, the U.S. Supreme Court issued a decision in the Hawaii Wildlife Fund v. County of Maui case related to whether a CWA permit is required when pollutants originate from a point source but are conveyed to navigable waters through a nonpoint source, such as groundwater. The Court held that discharges to groundwater require a permit if the addition of the pollutants through groundwater is the functional equivalent of a direct discharge from the point source into navigable waters. A number of legal cases relevant to determination of "functional equivalent" are ongoing in various jurisdictions. On November 27, 2023, the EPA issued a draft guidance addressing how the Supreme Court decision would be applied to the NPDES permit program as it relates to functional equivalent discharge. However, in February 2025, the EPA pulled back the guidance before it cleared the Office of Management and Budget. It is too early to determine whether the Supreme Court decision or the result of litigation to "functional equivalent" may have a material impact on our business, financial condition, or results of operations.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

In October 2016, the EPA published a final rule to update the CSAPR to address the 2008 ozone NAAQS (“CSAPR Update Rule”). The CSAPR Update Rule found that NOx ozone season emissions in 22 states (including Indiana and Maryland) affected the ability of downwind states to attain and maintain the 2008 ozone NAAQS, and, accordingly, the EPA issued federal implementation plans that both updated existing CSAPR NOx ozone season emission budgets for electric generating units (“EGUs”) within these states and implemented these budgets through modifications to the CSAPR NOx ozone season allowance trading program. Implementation started in the 2017 ozone season (May-September 2017). Affected facilities receive fewer ozone season NOx allowances in 2017 and later, possibly resulting in the need to purchase additional allowances. Following legal challenges to the CSAPR Update Rule, on April 30, 2021, the EPA issued the Revised CSAPR Update Rule. The Revised CSAPR Update Rule required affected EGUs within certain states (including Indiana and Maryland) to participate in a new trading program, the CSAPR NOx Ozone Season Group 3 trading program. These affected EGUs received fewer NOx Ozone Season allowances beginning in 2021.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

On February 20, 2020, the EPA published a proposed rule to establish a federal CCR permit program that would operate in states without approved CCR permit programs. If this rule is finalized before Indiana establishes a final state-level CCR permit program, AES Indiana could eventually be required to apply for a federal CCR permit from the EPA. On December 21, 2022, the Indiana Department of Environmental Management (“IDEM”) published in the Indiana Register a Second Notice of Comment Period for its proposed CCR rulemaking which would include regulation of CCR through a state permitting program. On August 7, 2024, in response to changes to Indiana statute, as well as comments received during the Second Notice of Comment Period, IDEM published a Continuation of the Second Notice of Comment Period for proposed amendments to the draft rule language for a State CCR Permitting Program.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

On September 8, 2023, the Agencies published final rule amendments in the Federal Register to amend the final “Revised Definition of ‘Waters of the United States’” rule. This final rule conforms the definition to the definition adopted in the Decision. The Agencies have amended key aspects of the regulatory text to conform the rule to the Decision.

Due to ongoing litigation, the definition of WOTUS (as amended on September 8, 2023) is not operative in certain jurisdictions. In the jurisdictions involved in the litigation the amended 2023 Rule is subject to a preliminary injunction, and the Agencies interpret WOTUS consistent with the pre-2015 regulatory regime and the Supreme Court’s decision in Sackett. In the remaining states the Agencies implement the definition in the January 2023 Rule, as amended in September 2023.

On June 5, 2023, the EPA published a final Federal Implementation Plan (“FIP”) to …+28 / −83 words

[… 25 unchanged words …] The rule establishes a revised CSAPR NOX Ozone Season Group 3 trading program for 22 states, including Indiana and Maryland, and became effective during 2023 The FIP also and includes enhancements to the revised Group 3 trading program. which include a dynamic budget setting process beginning in 2026, annual recalibration of the allowance bank to reflect changes to affected sources, a daily backstop emissions rate limit for certain coal-fired EGUs beginning in 2024, and a secondary emissions limit prohibiting certain emissions associated with state assurance levels. It is too early to determine the impact of the final FIP, but it may result in the need to purchase additional allowances or make operational adjustments. On June 27, 2024, the U.S. Supreme Court issued an order granting a stay of the EPA’s 2023 FIP pending resolution of legal challenges to the FIP. On November 6, 2024, the EPA published an Interim Final Rule in the Federal Register in response to the U.S. Supreme Court’s stay of its FIP addressing interstate transport for the 2015 Ozone national ambient air quality standards. The effective date is November 6, 2024. NAAQS. The Interim Final Rule stays the effectiveness of the Good Neighbor FIP and revises the CSAPR regulations to continue application of the states’ respective trading programs. It is too early to determine the impact of this final rule, but it may result in the need to purchase additional allowances or make operational adjustments.

Federal Power Plant GHG Emission Rules — On May 9, 2024, the EPA published …+6 / −146 words

Climate Change Regulation Federal Power Plant GHG Emission Rules — The final NSPS for CO2 emissions from new, modified, and reconstructed fossil-fuel-fired power plants were published in the Federal Register on October 23, 2015. Several states and industry groups challenged the NSPS for CO2 in the D.C. Circuit Court. On December 20, 2018, the EPA published proposed revisions to the final NSPS for new, modified, and reconstructed coal-fired electric utility steam generating units. The EPA proposed that the Best System of Emissions Reduction (“BSER”) for these units is highly efficient generation that would be equivalent to supercritical steam conditions for larger units and sub-critical steam conditions for smaller units, and not partial carbon capture and sequestration (“CCS”), which had been the BSER for these units in the 2015 final NSPS. The EPA did not include revisions for natural-gas combined cycle or simple cycle units in the December 20, 2018 proposal. Challenges to the GHG NSPS remain held in abeyance at this time. On May 9, 2024, the EPA published the final NSPS requiring carbon capture and sequestration for new and reconstructed baseload stationary combustion turbines, among other requirements. The EPA did not finalize revisions to the NSPS for newly constructed or reconstructed coal-fired electric utility steam generating units as proposed in 2018.

Following prior rulemakings and litigation related to regulations for GHG emissions from EGUs, on …+32 / −233 words

On July 8, 2019, the EPA published the final Affordable Clean Energy (“ACE”) Rule which would have established CO2 emission rules Following prior rulemakings and litigation related to regulations for existing power plants under CAA Section 111(d) and would have replaced the EPA's 2015 Clean Power Plan Rule (“CPP”). However, on January 19, 2021, the D.C. Circuit vacated and remanded the ACE Rule. Subsequently, on June 30, 2022, the Supreme Court reversed the judgment of the D.C. Circuit Court and remanded for further proceedings consistent with its opinion holding that the “generation shifting” approach in the CPP exceeded the authority granted to the EPA by Congress under Section 111(d) of the CAA. As a result of the June 30, 2022 Supreme Court decision, on October 27, 2022, the D.C. Circuit issued a partial mandate, holding pending challenges to the ACE Rule in abeyance while the EPA developed a replacement rule. On May 23, 2023, the EPA published a proposed rule that would vacate the ACE Rule and proposed New Source Performance Standards (“NSPSs”) that would establish GHG emissions guidelines in the form of CO2 emissions limitations for certain existing from EGUs, and would require states to develop State Plans that establish standards of performance for such EGUs that are at least as stringent as the EPA’s emissions guidelines. Depending on various EGU-specific factors, the bases of proposed emissions guidelines range from routine methods of operation to carbon capture and sequestration or co-firing low-GHG hydrogen starting in the 2030s. on May 9, 2024, the EPA also published the a final rule regulating GHGs from existing EGUs pursuant to Section 111(d) of the Clean Air Act and effective on July 8, 2024 (these rules, together with the May 9, 2024 NSPS described above, the “2024 Carbon Pollution Standards”). Existing EGUs are those that were constructed prior to January 8, 2014. Depending on various EGU-specific factors, the bases of emissions guidelines for natural gas-fired units under the 2024 Carbon Pollution Standards include the use of uniform fuels and routine methods of operation and maintenance and the bases of emissions guidelines for coal-fired units include 40% natural gas co-firing or carbon capture and sequestration with 90% capture of CO2 depending on the date that coal operations cease. Specific standards for performance for EGUs will were required to be established through a State Plan (or a Federal Plan if a state were to not submit an approvable plan). The May 2024 rule is subject to legal challenges. On October 16, 2024, the U.S. Supreme Court denied emergency stay applications.

On June 17, 2025, the EPA published a proposed rule to repeal the 2024 …+93 / −18 words

On June 17, 2025, the EPA published a proposed rule to repeal the May 9, 2024 final rules Carbon Pollution Standards for new and existing EGUs in addition to 2015 greenhouse gas GHG NSPSs for certain new EGUs. In this proposed rule, the EPA also offered an alternative proposal to repeal a narrower set of greenhouse gas requirements which would include the repeal of requirements for existing EGUs and requirements based on carbon capture and sequestration for new EGUs. On August 1, 2025, September 17, 2026, the EPA published a proposed final rule to rescind repeal certain aspects of the 2009 greenhouse 2024 Carbon Pollution Standards, in particular GHG emission guidelines for existing coal-fired steam generating units and existing natural gas endangerment finding which concluded steam generating units. The September 17, 2026 final rule also repeals the 2024 Carbon Pollution Standards’ carbon capture and sequestration-based requirements for new and reconstructed baseload stationary combustion turbines, among other requirements. Also on September 17, 2026, the EPA published a supplemental notice of proposed rulemaking that, greenhouse gases endanger public health and welfare. if finalized, would repeal all federal GHG emissions standards under section 111 of the Clean Air Act based on the EPA’s proposed best reading of the Clean Air Act.

Waste Management — On October 19, 2015, an EPA rule regulating CCR under the …+102 / −202 words

Waste Management — On October 19, 2015, an EPA rule regulating CCR under the Resource Conservation and Recovery Act as nonhazardous solid waste became effective. The rule established nationally applicable minimum criteria for the disposal of CCR in new and currently operating existing CCR landfills and CCR surface impoundments, including location restrictions, design and operating criteria, groundwater monitoring, corrective action and closure requirements, and post-closure care. The primary enforcement mechanisms under this regulation would be actions commenced by the states and private lawsuits. On December 16, 2016 the Water Infrastructure Improvements for the Nation Act ("WIIN ("WIN Act") was signed into law. This includes provisions to implement the CCR rule through a state permitting program, or if the state chooses not to participate, a possible federal permit program. On February 20, 2020, the EPA published a proposed rule to establish a federal CCR permit program that would operate in states without approved CCR permit programs. On May 28, 2026, the EPA reopened the comment period for the 2020 proposed rule. If this rule a final federal CCR permit program is finalized before Indiana or Puerto Rico establishes a state-level CCR permit program, AES CCR units in those locations could eventually be required to apply for a federal CCR permit from the EPA. Following prior rulemaking development and comment periods, on December 18, 2025, the Indiana Environmental Rules Board adopted a final CCR rule that includes regulation of CCR through a state permitting program. IDEM submitted its State of Indiana Coal Combustion Residuals Permit Program Application (“Program”) to the EPA has indicated that it will implement a phased approach to amending the CCR Rule, which is ongoing. on August 28, 2020, June 26, 2026. On September 16, 2026, the EPA published final amendments to the CCR Rule titled "A Holistic Approach to Closure Part A: Deadline to Initiate Closure," that, among other amendments, required certain CCR units to cease waste receipt and initiate closure by April 11, 2021. The CCR Part A Rule also allowed for extensions proposed approval of the April 11, 2021 deadline if Program. The rule and permitting program would become effective upon approval by the EPA. determines certain criteria are met. Facilities seeking such an extension were required to submit a demonstration to the EPA by November 30, 2020. On January 11, 2022, the EPA released the first in a series of proposed determinations regarding CCR Part A Rule demonstrations and compliance-related letters notifying certain other facilities of their compliance obligations under the federal CCR regulations. The determinations and letters include interpretations regarding implementation of the CCR Rule. On April 8, 2022, petitions for review were filed challenging these EPA actions. The petitions are consolidated in Electric Energy, Inc. v. EPA. On June 28, 2024, the D.C. Circuit dismissed the challenges. It is too early to determine the direct or indirect impact of these letters or any determinations that may be made.

The EPA has indicated that it will implement a phased approach to amending the …+48 / −69 words

On May 18, 2023, The EPA published has indicated that it will implement a proposed rule that would expand the scope of CCR units regulated by phased approach to amending the CCR Rule, which is ongoing. It is too early to include inactive surface impoundments at inactive generating facilities as well as additional inactive and closed landfills and certain other accumulations determine the direct or indirect impact of CCR. these letters or any determinations that may be made. On May 8, 2024, the EPA published final revisions to the CCR rule which are effective on November 8, 2024. The final revisions expand the scope of CCR units regulated by the CCR Rule to include legacy surface impoundments, inactive surface impoundments, and CCR management units. The May 8, 2024 revisions to the CCR Rule are currently subject to legal challenges. On July 22, 2025, February 10, 2026, the EPA published both a direct final rule and a proposed rule that, if finalized, would extend extending certain deadlines for CCR coal combustion residual management units associated with its May 8, 2024 revisions to the CCR Rule. On September 4, 2025, the EPA withdrew the direct final rule due to receipt of adverse comment. It is too early to determine the potential impact from the July 22, 2025 proposed these revisions to the CCR Rule.

In November 2015, the EPA published its final Effluent Limitation Guideline (“ELG”) rule to …+57 / −158 words

In November 2015, the EPA published its final Effluent Limitation Guideline (“ELG”) rule to reduce toxic pollutants discharged into waters of the U.S. by steam-electric power plants through technology applications. These effluent limitations for existing and new sources include dry handling of fly ash, closed-loop or dry handling of bottom ash, and more stringent effluent limitations for flue gas desulfurization wastewater. AES Indiana Petersburg has installed In 2020, the EPA issued a dry bottom ash handling system in response to final rule, known as the CCR 2020 Reconsideration Rule, and wastewater treatment systems in response to the NPDES permits in advance revising certain aspects of the 2015 ELG compliance date. Other U.S. businesses already include dry handling of fly ash and bottom ash and do not generate flue gas desulfurization wastewater. rule. Following the 2019 U.S. Court of Appeals vacatur and remand of portions of the 2015 ELG rule related to leachate and legacy water, on March 29, 2023, the EPA published a proposed rule revising the 2020 Reconsideration Rule. On May 9, 2024, the EPA published a final rule revising the 2020 Reconsideration Rule which became effective on July 8, 2024. The final rule established more stringent best available technology limits for flue gas desulfurization wastewater, bottom ash transport water, and combustion residual leachate and established a new set of definitions and new limits for combustion residual leachate and legacy wastewater. On December 31, 2025, the EPA published a final rule that extended ELG Rule compliance deadlines. On May 2024 rule is subject to legal challenges. On October 10, 2024, the Eighth Circuit Court denied stay applications. On October 2, 2025, 18, 2026, the EPA published a proposed rule that, if finalized, related to unmanaged combustion residual leachate. The proposed rule would revise certain best available technology limits in the 2024 ELG Rule and would extend certain ELG deadlines and allow facilities to choose between the compliance alternatives. On the same date, the EPA also published a direct final rule to extend the deadline for power plants to file a notice of planned participation for the permanent cessation of coal from December 31, 2025, 2029 to December 31, 2031, pending any significant adverse comment. 2034. It is too early to determine whether any outcome of these proposed rules, litigation or current or future revisions to the ELG rule might have a material impact on our business, financial condition, and results of operations.

7 more paragraphs were rewritten here (+209 / −147 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Overview

4 rewritten

4 more paragraphs were rewritten here (+54 / −36 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Cash Sources and Uses

2 rewritten

2 more paragraphs were rewritten here (+12 / −24 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Operating Activities

2 rewritten

2 more paragraphs were rewritten here (+48 / −70 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Investing Activities

3 removed · 3 rewritten

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “(in millions)”

• Purchase of emissions allowances increased $103 million primarily due to higher CO2 purchases at Maritza.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “(in millions)”

(3)Environmental expenditures generally include expenditures to comply with environmental laws and regulations, expenditures for safety programs, and other expenditures to ensure a facility continues to operate in an environmentally responsible manner.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “(in millions)”

• Environmental expenditures decreased $1 million, with no material drivers.

3 more paragraphs were rewritten here (+48 / −43 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Financing Activities

1 removed · 3 rewritten

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “(in millions)”

• The $528 million impact from issuance of preferred shares in subsidiaries is primarily due to the proceeds received from the issuance of preferred shares in AES Global Insurance and Desarrollos Renovables.

• The $861 million impact from sales to noncontrolling interests is primarily due to …+12 / −86 words · under “(in millions)”

• The $420 $861 million impact from sales to noncontrolling interests is primarily due to $540 million from the sale of ownership interest in AES Ohio and $150 million at AES Indiana proceeds from the sale of ownership in the Pike County BESS project to a tax equity investor AES Ohio in the current prior year partially offset by $162 and $332 million decrease higher net proceeds from selldowns in proceeds at AES Clean Energy Development and AES Renewable Holdings due to higher sales of ownership in project companies various projects to tax equity investors in the prior year. $47 million related to the prior year sale of ownership interest in Hardy Hills to a tax equity investor, $35 million related to the prior year sale of ownership interest in the Marahu project, and a $26 million decrease in sales under the Chile Renovables partnership with GIP.

2 more paragraphs were rewritten here (+36 / −38 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Recourse Debt

1 rewritten

1 more paragraph was rewritten here (+0 / −22 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Non-Recourse Debt

1 rewritten

1 more paragraph was rewritten here (+7 / −22 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

58 other paragraphs were edited by fewer than 15 words; 13 changed only figures, dates or period names; 52 are word for word the same; 45 were split, merged or moved, with most of their text in the other filing; their text is in the 10-Q for fiscal Q3 2026 and the 10-Q for fiscal Q3 2025 linked above.

AES' annual report against the year before

10-K for fiscal 2025 against the 10-K for fiscal 2024

In AES' 10-K for fiscal 2025, the MD&A added 28 passages, removed 25 and rewrote 71 against the 10-K for fiscal 2024.

Compared: Item 7 of the 10-K filed Mar 2, 2026 (accession 0000874761-26-000063, period ended Dec 31, 2025; 280 paragraphs) and Item 7 of the 10-K filed Mar 11, 2025 (accession 0000874761-25-000013, period ended Dec 31, 2024; 265 paragraphs).

AES' figures, dates and period names change every period and are not counted. A paragraph is rewritten when at least 15 other words were added or removed: added text is underlined and shaded, removed text is struck through, and long unchanged stretches are shortened to the words around each change.

Executive Summary

1 added · 1 removed · 4 rewritten

Added in the 10-K for fiscal 2025

Compared with last year, net income decreased $640 million, from $802 million to $162 million. This decrease is mainly driven by the prior year gain on sale of AES Brasil, lower earnings at the Energy Infrastructure SBU primarily due to higher prior year revenues from the monetization of the Warrior Run coal plant PPA and lower net derivative gains, higher day-one losses on the commencement of sales-type leases at AES Clean Energy, and higher unrealized foreign currency losses; partially offset by income tax benefit mainly driven by tax credit transfers compared to prior year income tax expense, higher contributions from new projects and better hydrology in the Renewables SBU, and higher retail margin at the Utilities SBU under the 2024 Base Rate Order at AES Indiana and the 2024 DRC Settlement at AES Ohio.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Review of Consolidated Results of Operations”

Gain (loss) from disposal of discontinued businesses, net of income tax benefit (expense) of $7, $7, and $0, respectively(7)7 (14)NM

Adjusted EBITDA, a non-GAAP measure, increased $232 million, from $2,639 million to $2,871 million, …+46 / −46 words

Adjusted EBITDA, a non-GAAP measure, decreased $189 increased $232 million, from $2,828 $2,639 million to $2,639 $2,871 million, mainly driven by record-breaking drought conditions higher contributions from new projects and outages better hydrology in Colombia at the Renewables SBU, lower margins and higher retail margin at the Utilities SBU; partially offset by higher prior year revenues from the monetization of the Warrior Run coal plant PPA in the Energy Infrastructure SBU, due to the sale of AES Brasil in the prior year, margin at and the hedged merchant Southland facilities that are contracted primarily for capacity in impact of the current year AES Ohio and higher outages; partially offset by higher contributions at the Utilities SBU and higher revenues from new projects at the Renewables SBU. AGIC sell-downs.

Compared with last year, diluted earnings per share from continuing operations decreased $1.06, from …+77 / −44 words

Compared with last year, diluted earnings per share from continuing operations increased $2.03, decreased $1.06, from $0.34 $2.37 to $2.37. $1.31. This increase decrease is mainly driven by lower long-lived asset impairments in the current year, higher contributions from renewables projects placed in service in the current year, prior year unrealized foreign currency losses at the Energy Infrastructure SBU, the prior-year gain on sale of AES Brasil, lower earnings at the Energy Infrastructure SBU primarily due to higher prior year revenues from the monetization of the Warrior Run coal plant PPA and lower income tax expense. This was net derivative gains, higher day-one losses on commencement of sales-type leases at AES Clean Energy, higher unrealized foreign currency losses, and impairments related to Uplight. These were partially offset by higher interest income tax benefit mainly driven by tax credit transfers compared to prior year income tax expense, and lower interest income, contributions from new projects and lower margins due to outages. better hydrology in the Renewables SBU.

2 more paragraphs were rewritten here (+58 / −25 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Consolidated Revenue and Operating Margin

2 added · 3 removed · 5 rewritten

Added in the 10-K for fiscal 2025

Under “(in millions)”

• $50 million at Corporate, Other and Eliminations mainly driven by higher eliminations of inter-segment revenue.

Added in the 10-K for fiscal 2025

Under “(in millions)”

• $104 million at Renewables mainly driven by $91 million due to development services in the U.S., $89 million from new businesses, $68 million in Colombia as a result of increased availability and lower spot prices on energy purchases, $60 million due to the results of AES Andes moving to Renewables in 2025, as described above, and $36 million due to higher generation in Panama as a result of better hydrological conditions during the first quarter of 2025. These increases were partially offset by a $177 million decrease due to the sale of AES Brasil, a $42 million decrease related to changes in mark-to-market of energy derivatives, a $38 million increase in fixed costs primarily related to an accelerated growth plan, and $15 million of one-time costs due to restructuring;

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “(in millions)”

• $75 million at New Energy Technologies mainly driven by the sale of the Fallbrook project in March 2023.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “(in millions)”

• $133 million at Renewables driven by $148 million impact primarily from record-breaking drought conditions in Colombia, alongside drier hydrological conditions in Brazil, $45 million impact of outages at Colombia due to a flooding incident at the Chivor plant which occurred in June 2024, $44 million impact from the sale of our controlling interest in AES Brasil, and $29 million higher fixed costs primarily due to an accelerated growth plan; partially offset by unrealized derivative gains of $61 million and higher contracted energy sales of $58 million; and

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Net income (loss) attributable to The AES Corporation”

• Lower margin from the Energy Infrastructure SBU impacting net income attributable to AES by $147 million, mainly driven by selldowns, higher energy margin from our hedged merchant Southland facilities in the prior year that are contracted primarily for capacity in the current year, and higher outages;

• Lower margin at the Renewables SBU impacting net income attributable to AES by $145 million, mainly driven by record-breaking drought conditions and partial outage due to a flooding incident in Colombia; and

• $805 million at Energy Infrastructure primarily driven by $921 million of prior year …+75 / −42 words · under “(in millions)”

• $598 $805 million at Energy Infrastructure primarily driven by a $398 $921 million decrease of prior year revenue related to the AES Andes portfolio, which is reported in regulated contract sales the Renewables SBU beginning in 2025 following the sale and prices, $319 expiration of certain coal-related assets and contracts; $174 million due to higher prior year unrealized and realized derivative gains, $171 million of prior year revenues from our hedged merchant Southland facilities in the monetization of the Warrior Run coal plant PPA, and $23 million due to the prior year that are contracted primarily for capacity in the current year, $73 million due to lower generation driven by lower dispatch in Argentina, and $69 million impact from the selldown sell-down of Amman East and IPP4 in Jordan; partially offset by $195 $317 million due to higher realized gains on power swaps; fuel prices and transportation costs passed through to the offtaker, $148 million of higher CO2 purchases passed through due to higher production, and $28 million due to higher availability; and

• $332 million at Energy Infrastructure mainly driven by $160 million higher prior year …+79 / −54 words · under “(in millions)”

• $145 $332 million at Energy Infrastructure mainly driven by $110 $160 million higher prior year revenues from the monetization of the Warrior Run coal plant PPA, $108 million due to prior year net derivative gains as part of our commercial hedging strategy, $60 million of prior year operating margin related to the AES Andes portfolio, which is reported in the Renewables SBU beginning in 2025 following the sale and expiration of certain coal-related assets and contracts, $23 million of lower LNG sales net of higher energy margin from our hedged merchant Southland facilities in terminal fees, $18 million of one-time costs due to restructuring, and $17 million due to the prior year that are contracted primarily for capacity in the current year, $54 million impact from the selldown sell-down of Amman East and IPP4 in Jordan; $51 partially offset by $49 million due to driven by higher outages, $39 million due to end of commercial operations at Warrior Run availability in May 2024, and $31 million 2025 due to lower LNG transactions; partially offset by $82 million from a PPA termination loss recognized in the prior year and $45 million of unrealized derivative gains; maintenance.

3 more paragraphs were rewritten here (+87 / −89 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Consolidated Results of Operations — Other

6 added · 5 removed · 14 rewritten

Added in the 10-K for fiscal 2025

Under “Other non-operating expense”

Other non-operating expense was $113 million in 2025 due to a $103 million impairment of the Uplight equity method investment and convertible notes as a result of observable market factors; and a $10 million other-than-temporary impairment of convertible notes for 5B as a result of an observable price change from a transaction between 5B and a third party.

Added in the 10-K for fiscal 2025

Under “Loss from disposal of discontinued businesses”

Net loss from disposal of discontinued businesses was $39 million in 2025, compared to $7 million in 2024, primarily related to alleged damages plus interest, as well as potential future damages, under a dispute related to representations and warranties in the 2016 share purchase agreement for Sul in the current year.

Added in the 10-K for fiscal 2025

Under “Net income (loss) attributable to The AES Corporation”

• Lower margins from the Energy Infrastructure SBU of $271 million, excluding one-time restructuring costs, primarily due to higher prior year revenues from the monetization of the Warrior Run coal plant PPA and prior year net derivative gains as part of our commercial hedging strategy;

Added in the 10-K for fiscal 2025

Under “Net income (loss) attributable to The AES Corporation”

• Higher impairments of $264 million at Maritza due to a reduction in expected cash flows after the expiration of the current PPA, partially offset by a $125 million prior-year impairment at Ventanas;

• Other non-operating expense of $113 million due to an impairment of the Uplight equity method investment and convertible notes, as well as an other-than-temporary impairment of convertible notes for 5B;

• Higher foreign currency translation losses of $102 million primarily related to unrealized losses due to the depreciation of the Argentine peso and unrealized losses in Chile due to the appreciation of the Chilean peso and the appreciation of the Colombian peso;

Added in the 10-K for fiscal 2025

Under “Net income (loss) attributable to The AES Corporation”

• One-time restructuring costs of $51 million.

Added in the 10-K for fiscal 2025

Under “Net income (loss) attributable to The AES Corporation”

• Higher income tax benefit of $257 million due to a lower effective tax rate, mainly driven by tax credit transfers;

• Higher margins from the Renewables SBU of $144 million, excluding one-time restructuring costs, primarily due to increases from new businesses and development services in the U.S., increased availability and lower spot prices on energy purchases in Colombia, and better hydrology in Colombia and Panama, partially offset by the negative impact of the sale of AES Brasil; and

• Derecognition of a valuation allowance on the loan receivable accounted for under ASC 310 upon reclassifying Mong Duong from held-for-sale to held and used of $127 million; and

• Higher margins from the Utilities SBU of $48 million, excluding one-time restructuring costs, primarily due to higher retail rates as a result of the AES Indiana 2024 Base Rate Order and AES Ohio 2024 DRC Settlement, higher transmission rates and rider revenues, and higher demand due to the impact of weather.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Goodwill impairment expense”

Goodwill impairment expense was $12 million in 2023 due to impairment at the TEG TEP reporting unit primarily driven by an increase in the discount rate due to increasing risk of non-renewal of operating permits required after March 31, 2024.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Income tax expense”

The 2023 effective tax rate was impacted by the allocation of losses to noncontrolling interest in U.S. tax-equity partnerships and pretax impairments at certain Mexican subsidiaries and at the Mong Duong coal-fired plant in Vietnam. These impacts were partially offset by inflationary and foreign currency impacts at certain Argentine businesses, net of valuation allowances, as well as the recognition of U.S. investment tax credits for renewables projects placed in service in 2023. See Note 23—Asset Impairment Expense included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for details of the asset impairments.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Net income (loss) attributable to noncontrolling interests and redeemable stock of subsidiaries”

• Higher held-for-sale impairment at Mong Duong in the prior year than the current year of $48 million; and

• Selldowns of business interests resulting in larger shares of income attributable to minority shareholders at the Energy Infrastructure SBU of $46 million.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Net income (loss) attributable to The AES Corporation”

• Lower long-lived asset impairments in the current year of $589 million;

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Net income (loss) attributable to The AES Corporation”

• Lower income tax expense attributable to AES, primarily driven by $273 million of tax benefit resulting from the transfer of ITCs directly to third parties; and

Other income decreased $89 million, or 57%, to $67 million in 2025, compared to …+64 / −25 words · under “Other income”

Other income increased decreased $89 million, or 57%, to $67 million or 75%, in 2025, compared to $156 million in 2024 compared to $89 million in 2023 primarily due to the prior year recognition of a $20 million bargain purchase gain recognized on the Madison and Birdseye acquisition, for $20 million, a $17 million increase in gains on remeasurement prior year gain of contingent consideration primarily on projects acquired at AES Clean Energy, a $14 million gain corresponding to the step acquisition of Felix, and an a prior year indexation adjustment of Stabilization Fund receivables at AES Andes of $12 million, as well as a $10 million decrease in insurance proceeds and a $7 million decrease in AFUDC at our U.S. utilities in the current year. This was partially offset by a $10 million gain at AES Andes in the current year corresponding to the write-off of contingent consideration for a renewables development project determined to be no longer viable.

Asset impairment expense decreased $150 million, or 40%, to $224 million in 2025, compared …+130 / −141 words · under “Asset impairment expense”

Asset impairment expense decreased $693 $150 million, or 65%, 40%, to $224 million in 2025, compared to $374 million in 2024. compared to $1.1 billion in 2023. This decrease was primarily due to higher prior year impairments, including a $198 $243 million impairment associated with PJM's approval to retire increase in the Warrior Run coal-fired facility; a $186 million impairment at New York Wind related to a repowering project that will result in decommissioning the existing turbines and reducing their depreciable lives; a $137 million impairment associated with the commitment to accelerate the retirement carrying value of the Norgener coal-fired facility in Chile; a $77 million and $59 million impairment at TEG and TEP, respectively, due to a reduction in expected capacity cash flows after expiration of the current PPA; and a $59 million impairment at Amman East and IPP4 in Jordan Mong Duong asset group due to the delay in closing derecognition of a valuation allowance on the sale transaction. In addition, loan receivable accounted for under ASC 310 and the decrease was driven by lower impairment expense elimination of $105 million associated with the held-for-sale classification of net estimated costs to sell upon reclassifying Mong Duong from held-for-sale to held and used, and lower impairment expense of $56 $45 million at AES Clean Energy Development related to the write-off of project development intangibles for projects that were determined to be no longer viable. This was partially offset by current Mong Duong and prior year impairments of $125 million and $80 million at Ventanas and AES Brasil, respectively, associated with the held-for-sale classification. This was partially offset by a $264 million impairment at Maritza due to a reduction in expected cash flows after meeting held-for-sale criteria. the expiration of the current PPA, and higher impairment expense of $62 million and $16 million at AES Clean Energy Development and AES Andes, respectively, due to the write-off of project development intangibles and capitalized development costs for projects that were determined to be no longer viable, including $51 million at AES Clean Energy Development due to the right sizing of our development company as part of the restructuring program initiated in February 2025.

Net loss attributable to noncontrolling interests and redeemable stock of subsidiaries decreased $129 million, …+150 / −5 words · under “Net income (loss) attributable to noncontrolling interests and redeemable stock of subsidiaries”

Net loss attributable to noncontrolling interests and redeemable stock of subsidiaries increased $446 decreased $129 million, or 15%, to $748 million in 2025, compared to $877 million in 2024. compared to $431 million in 2023. This increase decrease was primarily due to a decrease of $149 million at Mong Duong mostly driven by the derecognition of a valuation allowance on the loan receivable accounted for under ASC 310 upon reclassifying Mong Duong from held-for-sale to held and used, a decrease of $135 million at AES Clean Energy primarily attributable to lower allocation of losses to tax equity investors on projects placed in service and increased development services in the U.S., $34 million related to the sale of AES Brasil, $25 million related to improved operating results at Southland Energy after maintenance in the prior year, and $23 million related to the sell-down of AGIC. This was partially offset by an increase of $150 million at AES Indiana primarily attributable to higher allocation of losses to tax equity investors on BESS projects placed in service, $55 million due to day-one losses on the commencement of sales-type leases at AES Clean Energy Development, and $25 million related to acquisition of the remaining common shares in Cochrane.

11 more paragraphs were rewritten here (+296 / −299 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Segments

1 rewritten

1 more paragraph was rewritten here (+54 / −29 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Non-GAAP Measures

7 added · 6 removed · 11 rewritten

Added in the 10-K for fiscal 2025

During the first quarter of 2025, the Company updated the definitions of Adjusted EBITDA, Adjusted PTC, and Adjusted EPS to exclude costs directly associated with a major restructuring program, including, but not limited to, workforce reduction efforts. These restructuring initiatives to streamline our organization and right-size our development company would result in significant incremental costs above normal operations, and the inclusion of such costs would result in a lack of comparability in our results of operations and could be misleading to investors. We believe excluding these costs associated with a major restructuring initiative better reflects the underlying business performance of the Company.

Added in the 10-K for fiscal 2025

Under “Adjusted EPS”

The Company reported diluted earnings per share of $1.31 for the year ended December 31, 2025. For purposes of measuring earnings per share under U.S. GAAP, income available to AES common stockholders is reduced by increases in the carrying amount of redeemable stock of subsidiaries to redemption value and increased by decreases in the carrying amount to the extent they represent recoveries of amounts previously reflected in the computation of earnings per share. While the adjustment for the year ended December 31, 2025 decreased earnings per share, it did not impact Net income on the Consolidated Statement of Operations. For purposes of computing Adjusted EPS, the Company excluded the adjustment to redemption value from the numerator. The table below reconciles the income available to AES common stockholders used in GAAP diluted earnings per share to the income from continuing operations used in calculating the non-GAAP measure of Adjusted EPS.

Added in the 10-K for fiscal 2025

Under “Adjusted EPS”

(5)Amount primarily relates to impairments at Maritza of $264 million, or $0.37 per share, at Uplight of $103 million, or $0.14 per share, related to an impairment of the equity method investment and convertible notes, at AES Clean Energy Development projects of $80 million, or $0.11 per share, impairments at a renewables development project at AES Andes of $16 million, or $0.02 per share, and at Mong Duong of $9 million, or $0.01 per share; partially offset by the derecognition of the valuation allowance on a loan receivable accounted for under ASC 310 and the elimination of estimated costs to sell at Mong Duong of $127 million, or $0.18 per share, after reclassification to held and used.

Added in the 10-K for fiscal 2025

Under “Adjusted EPS”

(8)Amount relates to severance costs associated with the Company-wide restructuring program of $51 million, or $0.07 per share, and impairments at AES Clean Energy Development that were the result of the Company’s restructuring program of $38 million, or $0.05 per share.

(9)Amount primarily relates to income tax benefits associated with the day-one losses on commencement of sales-type leases primarily at AES Clean Energy Development of $41 million, or $0.06 per share, valuation allowance related to Uplight impairment of the equity method investment and convertible notes of $39 million, or $0.05 per share, impairments at AES Clean Energy Development projects of $27 million, or $0.04 per share, remeasurement of contingent consideration at AES Clean Energy of $15 million, or $0.02 per share, impairments at Maritza of $12 million, or $0.02 per share, severance costs related to the Company's restructuring program of $10 million, or $0.01 per share, net unrealized derivative losses at AES Integrated Energy of $6 million, or $0.01 per share, and remeasurement of our investment in 5B of $4 million, or $0.01 per share; partially offset by income tax expense associated with the AES Ohio sell-down of $13 million, or $0.02 per share.

Added in the 10-K for fiscal 2025

Under “Renewables SBU”

Operating Margin increased $104 million, primarily driven by $91 million due to development services in the U.S., $89 million from new businesses, $68 million in Colombia as a result of increased availability and lower spot prices on energy purchases, $60 million due to the results of AES Andes moving to Renewables in 2025, and $36 million due to higher generation in Panama as a result of better hydrological conditions during the first quarter of 2025. These increases were partially offset by a $177 million decrease due to the sale of AES Brasil in 2024, a $42 million decrease related to changes in mark-to-market of energy derivatives, a $38 million increase in fixed costs primarily related to an accelerated growth plan, and $15 million of one-time costs due to restructuring.

Added in the 10-K for fiscal 2025

Under “Energy Infrastructure SBU”

Operating Margin decreased $332 million, primarily driven by $160 million higher prior year revenues from the monetization of the Warrior Run coal plant PPA, $108 million due to prior year unrealized and realized derivative gains, $60 million of prior year operating margin at AES Andes, which is reported in the Renewables SBU beginning in 2025, $23 million of lower LNG sales net of higher terminal fees, $18 million of one-time costs due to restructuring, and $17 million due to the prior year sell-down of Amman East and IPP4 in Jordan; partially offset by an increase of $49 million driven by higher availability due to lower maintenance in 2025.

Added in the 10-K for fiscal 2025

Under “New Energy Technologies SBU”

Adjusted EBITDA increased $3 million, primarily due to a $23 million decrease in general and administrative expenses mainly related to lower business development costs, and lower losses from Uplight of $10 million after equity method accounting was suspended in the fourth quarter of 2025; partially offset by higher net losses from Fluence of $26 million mainly driven by a decline in sales, reflecting lower volumes fulfilled due to the timing of customer schedules.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

For the year ended December 31, 2023, the Company changed the definition of Adjusted EPS to remove the adjustment for tax benefit or expense related to the enactment effects of 2017 U.S. tax law reform and related regulations and any subsequent period adjustments related to enactment effects, including the 2021 tax benefit on reversal of uncertain tax positions effectively settled upon the closure of the Company's U.S. tax return exam. As this adjustment was specific to the impacts of tax law reform enacted in 2017, we believe removing this adjustment from our non-GAAP definition provides simplification and clarity for our investors. There were no such impacts in 2022 or 2023.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Adjusted EPS”

(3)Amount primarily relates to unrealized foreign currency losses in Argentina of $262 million, or $0.37 per share, mainly associated with the devaluation of long-term receivables denominated in Argentine pesos, and unrealized foreign currency losses at AES Andes of $25 million, or $0.03 per share.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Adjusted EPS”

(7)Amount primarily relates to asset impairments at Warrior Run of $198 million, or $0.28 per share, at New York Wind of $139 million, or $0.20 per share, at the Norgener coal-fired plant in Chile of $136 million, or $0.19 per share, at TEG and TEP of $76 million and $58 million, respectively, or $0.19 per share, AES Clean Energy development projects of $114 million, or $0.16 per share, at Mong Duong of $88 million, or $0.12 per share, at Jordan of $21 million, or $0.03 per share, and at the GAF Projects at AES Renewable Holdings of $18 million, or $0.03 per share, and a goodwill impairment at the TEG TEP reporting unit of $12 million, or $0.02 per share.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Renewables SBU”

Operating Margin decreased $133 million driven by a $148 million impact primarily from record-breaking drought conditions in Colombia, alongside drier hydrological conditions in Brazil, a $45 million impact from outages at Colombia due to a flooding incident at the Chivor plant which occurred in June 2024, a $44 million impact from the sale of our controlling interest in AES Brasil, and a $29 million impact from higher fixed costs primarily due to an accelerated growth plan. These negative impacts were partially offset by a $33 million positive impact from new businesses, unrealized derivative gains of $61 million, and a $58 million impact from higher contracted energy sales.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Energy Infrastructure SBU”

Operating Margin decreased $145 million, mainly driven by $110 million due to higher energy margin from our hedged merchant Southland facilities in the prior year that are contracted primarily for capacity in the current year, $54 million due to the impact of the selldown of Amman East and IPP4 in Jordan, $51 million due to higher outages, $39 million due to end of commercial operations at Warrior Run in May 2024, and $31 million from lower LNG transactions.

The decrease in Operating Margin is partially offset by $82 million from a PPA termination loss recognized in the prior year and $45 million of unrealized gains resulting from derivatives.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “New Energy Technologies SBU”

Adjusted EBITDA increased $24 million, primarily driven by a $44 million improvement in the share of results at Fluence mainly due to improved margins, partially offset by the prior year settlement of contractual claims with a battery module vendor. This increase was partially offset by $21 million higher general and administrative expenses mainly related to higher development costs.

(3)Amount primarily relates to day-one losses on commencement of sales-type leases at AES Clean …+57 / −45 words · under “Adjusted EPS”

(5)Amount (3)Amount primarily relates to the gain on sale of Fluence shares of $136 million, or $0.19 per share, partially offset by costs due to early plant closure at the Ventanas 2 and Norgener coal-fired plants in Chile of $37 million, or $0.05 per share and at Warrior Run of $6 million, or $0.01 per share, and day-one losses recognized at on commencement of sales-type leases at AES Clean Energy Development of $166 million, or $0.23 per share, and AES Renewable Holdings of $20 $13 million, or $0.03 $0.02 per share, and losses on remeasurement of contingent consideration at AES Clean Energy of $66 million, or $0.09 per share; partially offset by gain on sale of Dominican Republic Renewables of $45 million, or $0.06 per share, and write-off of contingent consideration for a renewables development project at AES Andes of $10 million, or $0.01 per share.

Operating Margin increased $92 million, primarily driven by $191 million due to higher retail …+51 / −65 words · under “Utilities SBU”

Operating Margin increased $110 $92 million, mainly primarily driven by $83 million due to higher transmission and rider revenues, $76 $191 million due to higher retail rates as a result of the AES Indiana 2024 Base Rate Order and $72 million AES Ohio 2024 DRC Settlement, including the impact of certain riders now incorporated into base rates, higher transmission and rider revenues, and higher demand due to higher demand primarily from the impact of weather. These increases are were partially offset by $57 a $46 million due to higher increase in depreciation and amortization expense from additional assets placed in service, a $33 million increase in fixed costs mainly driven by higher amortization of regulatory assets property taxes due to higher assessed values, and changes in depreciation rates as a result of the 2024 Base Rate Order, $29 $14 million decrease due to the prior year one-time deferral impact of purchased power costs associated with the approval of ESP 4, and $25 million higher expected credit losses due to the temporary pause of customer disconnections related to the implementation of customer billing system upgrades. planned outages.

9 more paragraphs were rewritten here (+179 / −80 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Operational

4 added · 2 removed · 5 rewritten

Added in the 10-K for fiscal 2025

In 2024, Commerce and the U.S. International Trade Commission (“ITC”) initiated new AD/CVD investigations on solar cells and panels imported from Southeast Asia. On April 18, 2025, Commerce rendered final affirmative determinations and AD/CVD rates with respect to all four countries. On June 13, 2025, the ITC issued its determination that imports from Malaysia and Vietnam have injured the U.S. industry and that imports from Cambodia and Thailand threaten injury. Commerce then issued orders on June 24, 2025, implementing the AD/CVD rates, which will be subject to annual review by Commerce. There is ongoing litigation about these and related matters in the CIT. We do not expect these AD/CVD orders will have a negative impact on our business.

Added in the 10-K for fiscal 2025

On April 2, 2025, President Trump issued an Executive Order pursuant to IEEPA imposing an indefinite, baseline reciprocal 10% tariff on almost all goods imported into the U.S., effective April 5, 2025, and individualized higher IEEPA tariffs (11% to 50%) starting April 9, 2025 on goods originating from 57 countries with trade surpluses with the U.S. On April 9, 2025, the U.S. government issued a further Executive Order increasing the IEEPA reciprocal tariff on China to 125% effective April 10, 2025. Concurrently, the U.S. government announced a temporary suspension of the country-specific reciprocal tariff measures targeting most U.S. trading partners for a 90-day period, or until July 9, 2025, which was later extended until August 1, 2025. Effective May 14, 2025, the IEEPA reciprocal tariff rate applicable to China was lowered to 10%. IEEPA reciprocal tariffs, at various levels, have now gone into effect for most U.S. trading partners.

Several trading partners (including the EU, Japan, South Korea, and the UK) have reached bilateral trade agreements or frameworks with the U.S. The ultimate outcome of any reciprocal or other tariffs with countries that have not yet reached such trade agreements with the U.S. is uncertain. Also, in February 2026, on review of lower court decisions declaring the tariffs unlawful, the Supreme Court issued a decision holding that IEEPA does not authorize tariffs. However, President Trump subsequently stated that new tariffs would be issued under different statutory authority. The impact of these potential new tariffs on the Company is uncertain.

Show the rest (182 words)

In July 2025, Commerce initiated a Section 232 investigation to determine the effects on national security of imports of polysilicon and its derivatives. In August 2025, Commerce initiated a separate investigation under Section 232 to determine the effects on national security of imports of wind turbines and their parts and components. These investigations are ongoing and their outcomes are uncertain.

In January 2026, the President issued a Proclamation under Section 232 concerning the importation of several critical minerals (including graphite and lithium) from any country. The Proclamation does not impose tariffs on the critical minerals but directs Commerce and the U.S. Trade Representative to negotiate agreements with foreign partners to secure reliable access to the critical minerals. An update on the outcome or status of these negotiations must be provided to the President within 180 days of the Proclamation. If the negotiations fail to result in agreements or to adequately address the identified risks, the President may consider trade-restrictive measures with respect to the critical minerals. The outcome of this process as well as its potential impact on the Company are uncertain.

Added in the 10-K for fiscal 2025

For our U.S backlog of solar projects scheduled to finish construction and become operational in 2026 or 2027, we have contracted for most of our panel supply needs, with the majority of such panels being manufactured in the U.S. and most of the remaining panels having already been imported into the U.S. These remaining imports are expected to be largely insulated from AD/CVD measures and potential Section 232 outcomes, as they are expected to be manufactured using U.S. polysilicon. Imports will exclude modules from countries currently subject to AD/CVD orders or investigations.

Additionally, for our U.S. backlog of storage projects scheduled to finish construction and become operational in 2026 or 2027, we have contracted all our battery needs, with almost all of such batteries coming from U.S. or Korean suppliers. We have also completed contracting of U.S. domestically manufactured battery modules to support the remainder of our U.S. energy storage growth through 2027.

For our U.S. backlog of wind projects scheduled to be completed in 2026, we have contracted and received delivery of all turbines, and for our 2027 backlog of U.S. wind projects, we are fully contracted with U.S. suppliers and suppliers with primarily U.S. manufactured turbines.

Added in the 10-K for fiscal 2025

La Niña conditions emerged towards the end of 2025 in the equatorial Pacific, following a period of ENSO-neutral conditions earlier in the year. According to the Climate Prediction Center (“CPC”) and the International Research Institute for Climate and Society (“IRI”), La Niña began to dissipate in January 2026. Forecasts point to a transition back to ENSO-neutral conditions in early 2026 (through March 2026).

In Panama, total 2025 system inflows remained near historical averages, with the Bayano and Fortuna reservoirs however experiencing above-average levels due to abundant rainfall in the northern basins. These favorable conditions have supported strong hydroelectric generation, reduced reliance on thermal generation, and enabled potential surplus energy sales into the spot market. Furthermore, the commissioning of the Gatun combined cycle gas power plant by mid-2025 significantly reduced price and volatility, due to the displacement of other thermal generation. Additionally, the lower dispatch of natural gas-fired units due to favorable hydrology may create strategic opportunities for gas reallocation to international markets.

In Colombia, 2025 was the second wettest year on record. Reservoir levels remained elevated through Q4, with Chivor and other major reservoirs above seasonal norms. The favorable system hydrology throughout the year drove down spot prices compared to the prior year. Although, the fourth quarter saw a slight decline in rainfall and a moderate rise in spot prices, overall system storage remained robust.

In Chile, 2025 ranked as the fifth driest on record; however, it was marked by a structural decoupling of hydrology and the energy matrix. The power system demonstrated unprecedented resilience by offsetting the decline in hydroelectricity with record-breaking solar and wind generation, while leveraging the accelerated integration of BESS to mitigate curtailment, stabilize prices, and compensate for depleted system reservoirs.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Additionally, as part of our supply chain strategy, we are well advanced in securing U.S. domestically manufactured modules to support our U.S. solar growth from 2026 to 2028, with a contractual option to extend deliveries to 2030.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

According to the National Oceanic and Atmospheric Administration ("NOAA"), La Niña Conditions are currently observed. La Niña conditions are expected to persist through February-April 2025, with a transition to ENSO-neutral conditions expected during March-May 2025.

In Panama, La Niña phenomenon typically results in more precipitation than historical average conditions, however local system impacts may vary due to other factors. Higher hydrology may result in energy surpluses after covering the contracted hydro positions, available to be sold in the spot market.

In Colombia, La Niña is typically characterized by more rainfall, possibly leading to a decrease in spot prices. However, during La Niña, impacts vary and the basin where Chivor is located may experience more volatility in rainfall than the rest of the system. Inflows at our Chivor hydroelectric plant were below historical averages in the fourth quarter of 2024. Should dry conditions persist, Chivor may be exposed to higher spot prices.

In Chile, the primary driver for AES’ hydro assets is snowpack volumes. If La Niña persists beyond April, it could divert the frontal weather systems to the south of Chile, reducing rainfall in the central area, and possibly reducing the snowpack formation. Lower snowpack, together with reduced rainfall in the system, could increase both spot prices and energy purchase volumes required to meet contracted positions.

Trade Restrictions and Supply Chain — In April 2022, the U.S. Department of Commerce …+34 / −89 words

Trade Restrictions and Supply Chain — In recent years, April 2022, the U.S. Department of Commerce (“Commerce”) has initiated investigations an investigation into whether imports into the U.S. of solar cells and panels from Cambodia, Malaysia, Thailand, and Vietnam (“Southeast Asia”) are were circumventing antidumping and countervailing duty (“AD/CVD”) orders on solar cells and panels from China. One such investigation initiated In April August 2023, Commerce rendered final affirmative findings of 2022 circumvention with respect to all four countries, which resulted in a final determination by Commerce that circumvention would be deemed to occur under certain circumstances, resulting in the imposition AD and CVD of AD/CVD duties on the certain imported cells and panels Such from Southeast Asia. Commerce’s determination and related matters remain the subject of ongoing litigation Separate AD/CVD investigations initiated by Commerce in May 2024 resulted in preliminary determinations by Commerce that Southeast Asia countries were also dumping and receiving subsidies and therefore Commerce established CVD and AD rates on solar manufacturers. before the U.S. Court of International Trade Commission ("CIT") and the “ITC”) is also investigating this matter. If U.S. Court of Appeals for the Commerce and ITC investigations result in Commerce issuing AD/CVD orders, the orders are likely to be imposed in June 2025. Federal Circuit.

We expect the tariffs on imports from China will increase overall costs for materials …+8 / −157 words

The Trump Administration has threatened or imposed tariffs on a wide range of countries and sectors. On February 10, 2025, President Trump signed Executive Orders modifying existing Section 232 tariffs on steel and aluminum imports to expand their scope of applicability and imposing 25% tariffs on both products. At this time, We do not expect the modifications to tariffs on steel and aluminum to have a material impact on our business. On February 13, 2025, the Trump Administration announced a plan to counter non-reciprocal trading arrangements with all U.S. trading partners by determining the equivalent of a reciprocal tariff with respect to each foreign trade partner. On February 1, 2025, President Trump issued an executive order declaring a national emergency under the International Emergency Economic Powers Act (IEEPA) and imposing a 10% additional tariff on imports from China and on March 4, 2025, this tariff was increased to 20%. We expect that additional tariffs on imports from China will increase overall costs for materials and parts that are imported to build and maintain renewable energy plants for the U.S. industry. However, AES has already shifted its supply chain outside of China for the vast majority of final products used to build and maintain renewable energy plants in the United States and U.S. We expect limited impact to 2025 and projects scheduled to become operational in 2026 projects through 2027 due to the recently announced tariffs on China. Any additional U.S. tariffs on imports from other countries or higher tariffs could negatively impact our business.

The impact of new tariffs, reciprocal tariffs, or U.S. Government investigations or proclamations, the …+31 / −96 words

The impact of new tariffs, including reciprocal tariffs, or Commerce U.S. Government investigations or proclamations, the impact of any additional adverse Commerce determinations or other tariff disputes or litigation, the impact of the UFLPA, the potential future disruptions to the renewable energy supply chain and their effect on AES’ U.S. renewable energy project development and construction activities remain uncertain. AES will continue to monitor developments and take prudent steps towards maintaining a robust supply chain for our renewable energy projects. To that end, we have contracted and imported in accelerated imports into the U.S. the and increased our contracting for U.S. domestically manufactured solar panels, that are necessary to complete our U.S. backlog projects scheduled to finish construction batteries, wind turbines, trackers, and become operational in 2025 and 2026. Additionally, we have secured and imported in other equipment, significantly mitigating the U.S. the majority of the batteries needed for our energy storage projects scheduled to be completed in 2025 and we have contracted with U.S. potential impacts from reciprocal tariffs or Korean- manufacturers for sufficient volume of batteries for our storage projects scheduled to be completed in 2026. For our U.S. wind projects scheduled to be completed in 2025 and 2026, we have contracted with U.S. and non-Chinese manufacturers to meet our supply needs. other tariffs.

2 more paragraphs were rewritten here (+50 / −45 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Macroeconomic and Political

5 added · 6 removed · 7 rewritten

Added in the 10-K for fiscal 2025

U.S. Tax Law Reform and U.S. Renewable Energy Tax Credits — On July 4, 2025, the U.S. enacted H.R. 1 (the “2025 Act”). The legislation significantly revised the laws governing U.S. renewable energy tax credits and the U.S. taxation of certain foreign earnings, which may impact our effective tax rate in future periods and could be material. In addition, the 2025 Act included amendments to, and extensions of, various other U.S. corporate income tax provisions including the determination of limitation on interest expense deductions. Any impact may change as U.S. Treasury and Internal Revenue Service (“IRS”) issue additional guidance, which may be material.

Added in the 10-K for fiscal 2025

The 2025 Act amends the phase out of wind and solar ITC and PTC tax credits. Wind and solar renewables projects that begin construction within 12 months of the enactment of the 2025 Act remain eligible for 100% of the credit without the 2027 placed-in-service deadline, provided that, under current Treasury guidance, the projects are placed in service no more than four calendar years after the calendar year when construction began. Wind and solar projects that begin construction after 12 months of the enactment must be placed in service no later than 2027. Wind and solar projects that began construction by the end of 2024 are not impacted by the 2025 Act. The 2025 Act does not impose tighter timelines for energy storage projects to qualify for the ITC and PTC, and it allows energy storage projects to receive the full ITC or PTC credit if they begin construction by 2033.

The 2025 Act also imposes a restriction precluding credits for renewables and storage projects claiming the ITC or PTC credit that start construction after December 31, 2025 and receive material assistance from a prohibited foreign entity, effectively limiting the percentage of total project costs that may be derived from products that are mined, produced or manufactured in China, with varying permissible percentages depending on the calendar year and applicable technology for the project. This restriction also precludes credit eligibility for taxpayers owning projects that start construction after December 31, 2024 that are classified as having ownership or certain other interests by a prohibited foreign entity, including projects over which a prohibited foreign entity is deemed to exercise formal or effective control.

Show the rest (250 words)

Further, President Trump issued an Executive Order on July 7, 2025 that directed the Secretary of the Treasury to take action to enforce the provisions of the 2025 Act related to issuing updated guidance defining the start of construction for claiming the ITC and PTC and implementing the Foreign Entity of Concern (“FEOC”) Restrictions (the “Treasury Action”). The Executive Order also directed the Secretary of the Interior to take action to review its regulations, guidance, policies, and practices for any preferential treatment of wind and solar projects and eliminate those preferences within 45 days (the “Interior Action”).

On August 15, 2025, the Department of Treasury issued updated guidance defining the start of construction for purposes of claiming the ITC and PTC. AES does not expect the modifications to the start of construction guidance to materially impact its projects. The Department of Treasury has not yet issued comprehensive guidance implementing the FEOC restrictions, however. Further guidance, which may be material, is expected to be released within the coming months.

We expect the vast majority of our renewables project backlog to continue to qualify for the ITC and PTC. However, the Treasury Action may impose additional burdens in qualifying for the ITC and PTC.

In response to the Executive Order, the Department of Interior issued a memorandum requiring any “decisions, actions, consultations, and other undertakings” for wind or solar projects under Department of Interior jurisdiction to go through an additional three-phase approval process ending with approval from the Secretary of the Interior.

Added in the 10-K for fiscal 2025

Net CFC Tested Income (“NCTI”) — The 2025 Act amended the Global Intangible Low-Taxed Income (“GILTI”) provision by eliminating the reduction to foreign earnings subject to GILTI by an allowable economic return on investment beginning January 1, 2026. The GILTI provision was also renamed to the NCTI provision. Additionally, the 2025 Act modified the U.S. foreign tax credit provisions beginning January 1, 2026. Although the new NCTI rules provide for a reduced 14 percent effective tax rate on captured foreign income, by way of a 40 percent deduction, companies with a U.S. net operating loss or otherwise insufficient taxable income will not benefit from the lower effective tax rate and may not be able to utilize foreign tax credits. The new NCTI rules may subject a portion of our foreign earnings to current U.S. taxation in the future and could be material.

Limitation on Interest Expense Deductions — The 2025 Act retroactively amended the existing limitation on the deductibility of net interest expense beginning January 1, 2025. As amended, the deduction will be limited to interest income, plus 30% of tax basis EBITDA. Previously, the limitation was based on 30% of tax basis Earnings Before Interest and Taxes (“EBIT”). We expect the amendment to increase the current period permitted interest deductions and reduce the amount of disallowed interest expense subject to an indefinite carryforward. The limitation continues to be inapplicable to interest expense attributable to regulated utility property.

Added in the 10-K for fiscal 2025

Argentina — In July 2024, the Argentine government enacted Law 27,742, known as Ley Bases, declaring a one-year public emergency in administrative, economic, financial, and energy matters. It grants the President delegated powers and initiates broad state reforms to deregulate the economy, including labor reform, the Incentive Regime for Large Investments, modifications to non-income tax measures, and the privatization of state-owned energy companies. Additionally, the Ministry of Energy issued Resolution 150/2024, repealing certain regulations from previous years that involved excessive state and CAMMESA intervention in the Wholesale Electricity Market (“MEM”).

On January 28, 2025, the Energy Secretariat issued Resolution 21/2025 to reform the MEM and is intended to ensure secure energy supply and stable consumer costs.

On April 11, 2025, the Central Bank of Argentina started a new economic program supported by a $20 billion agreement with the International Monetary Fund. The key points of the program include (a) a removal of exchange restrictions for individuals and (b) foreign shareholders can distribute profits starting from 2025 and deadlines for foreign trade payments are relaxed.

On July 4, 2025, the Argentine government issued Decree 450/25, initiating a 24-month transition period to reform and deregulate the country’s electricity market. The decree encourages free contracting between private entities and fosters competition in electricity generation and commercialization. Subsequently, on October 20, 2025, the Ministry of Economy and the Secretariat of Energy issued Resolution 400/25, which became effective on November 1, 2025, and provides a new framework introducing more competitive price signals, decentralizing fuel management, and reducing subsidies.

Added in the 10-K for fiscal 2025

In 2022, a mediation commenced to resolve the PREPA Title III case. On March 19, 2025, the judge presiding over the case entered an order to permit the filing of an amended plan of adjustment and litigation of specific issues, including administrative expense claim by non-settling bondholders. The stay of plan confirmation and bondholder rights-related litigation was extended without a termination date, and the non-settling bondholders' motion to lift the stay was denied. The PROMESA Oversight Board filed an amended plan of adjustment and disclosure statement for PREPA on March 28, 2025. The mediation period was subsequently extended through April 1, 2026, reflecting the continuing efforts to resolve remaining matters under the Title III proceedings.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Inflation Reduction Act and U.S. Renewable Energy Tax Credits — The U.S. Inflation Reduction Act of 2022 (the “IRA”) was signed into law in the United States. The IRA includes provisions that are expected to benefit the U.S. clean energy industry, including increases, extensions, direct transfers and/or new tax credits for onshore and offshore wind, solar, storage and hydrogen projects. The extension of the solar investment tax credits ("ITCs") and production tax credits (“PTCs”), as well as higher credits available for projects that satisfy wage and apprenticeship requirements has increased demand for our renewables products.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

The IRA also allows us to directly transfer investment tax credits to unrelated tax credit buyers. We account for the transfer proceeds as tax benefit throughout the year the renewables project is placed in service.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

The implementation of the IRA requires substantial guidance and interpretive rules from the U.S. Department of Treasury and other government agencies. Some of the guidance and rulemaking enacted under the Biden Administration could be changed or modified by the Trump Administration, creating uncertainty with respect to implementation of the IRA. Also, the Trump Administration has issued Executive Orders that pause certain funding allocated to projects under the Infrastructure Investment and Jobs Act (IIJA) and the IRA during a 90-day review process. As they currently stand, these Executive Orders do not impact the tax credits under the IRA.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Argentina — On July 8, 2024, the Argentine government enacted Law 27,742 or Ley Bases, translated in English as Law of Bases and Starting Points for the Freedom of the Argentine People. Ley Bases declares a public emergency in administrative, economic, financial, and energy matters for a term of one year, grants delegated powers to the President, and contains a broad reform of the State in order to deregulate the economy, including measures such as labor reform, the implementation of the Incentive Regime for Large Investments, and the modification of several non-income tax measures. The law also opens avenues for privatization of state-owned energy companies.

In addition, the Ministry of Energy published Resolution 150/2024 on July 10, 2024 that repeals certain regulations from previous years that imply excessive involvement of the National State and CAMMESA in the operation and functioning of the wholesale electricity market.

On January 28th, 2025, the Energy Secretariat of the Ministry of Economy of the Nation issued Resolution 21/2025, initiating a series of reforms in the Wholesale Electricity Market (MEM) aimed at ensuring a more efficient, competitive, and sustainable electrical system. The transition will be gradual, ensuring that the energy supply remains secure and costs for consumers do not increase. The key elements of this reform process include (a) decentralization of fuel management, allowing thermal generators to manage their own fuel supplies; (b) promotion of free bilateral contracts in the market between generators, large users, and distributors, replacing the current contract regulations; (c) the national government's commitment to honor existing generation and fuel contracts until their completion. If necessary, competitive tenders will be conducted for new infrastructure. These changes aim to gradually normalize the operation of the MEM, eliminate unnecessary restrictions, and create economic incentives that encourage the addition of new generation capacity under competitive conditions.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

In 2022, mediation commenced to resolve the PREPA Title III case. PREPA's plan confirmation mediation was extended to March 24, 2025, and the decision is still pending.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Decarbonization Initiatives”

Our strategy involves shifting towards clean energy platforms, including renewable energy, energy storage, LNG, and modernized grids. It is designed to position us for continued growth while reducing our carbon intensity and in support of our mission of accelerating the future of energy, together. We have made significant progress on our exit of coal generation, and by year-end 2025 we intend to have exited the substantial majority of our coal facilities that we owned in 2022. Due to a number of factors, including grid and market dynamics, we will continue to work towards exiting coal in the limited markets where we maintain coal generation. We currently anticipate these efforts will continue beyond 2027. We expect to further reduce the carbon intensity of our operations as we add more long-term contracted renewables to the grid each year.

In addition, initiatives have been announced by regulators, including in Chile, Puerto Rico, and Bulgaria, and offtakers in recent years, with the intention of reducing GHG emissions generated by the energy industry. In parallel, the shift towards renewables has caused certain customers to migrate to other low-carbon energy solutions and this trend may continue.

Although we cannot currently estimate the financial impact of these decarbonization initiatives, new legislative or regulatory programs further restricting carbon emissions or other initiatives to voluntarily exit coal generation could require material capital expenditures, resulting in a reduction of the estimated useful life of certain coal facilities, or have other material adverse effects on our financial results.

For further information about the risks associated with decarbonization initiatives, see Item 1A.—Risk Factors—Concerns about GHG emissions and the potential risks associated with climate change have led to increased regulation and other actions that could impact our businesses included in this Form 10-K.

The Netherlands, Bulgaria, and Vietnam adopted legislation to implement Pillar 2 effective as of …+69 / −18 words

The Netherlands, Bulgaria, and Vietnam adopted legislation to implement Pillar 2 effective as of January 1, 2024. On January 5, 2026, the OECD published a side-by-side package to modify the Pillar 2 system in a manner that will fully exclude domestic and foreign profits of US-parented groups from Pillar 2’s Undertaxed Profits Rule and Income Inclusion Rule. The side-by-side package is intended to take effect as of January 1, 2026, but is subject to enactment of legislation in the local jurisdictions. We will continue to monitor the issuance of draft legislation in incorporating the side-by-side package, as well as other non-EU countries where the Company operates that are considering Pillar 2 amendments and new interpretive guidance The impact to in non-EU countries where the Company during 2024 is not material. operates.

6 more paragraphs were rewritten here (+157 / −109 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Regulatory

1 added · 1 removed · 2 rewritten

Added in the 10-K for fiscal 2025

AES Ohio Legislation and Three-Year Rate Plan — On April 30, 2025, the Ohio legislature passed new energy legislation (House Bill 15) that was signed by the Governor and became effective August 14, 2025. The legislation allows Ohio’s electric utilities to file three-year forecasted base distribution rate cases, which would replace electric security plans (ESPs) and associated recovery riders. AES Ohio currently anticipates that remaining recovery rider balances would be included in future base rates. Among other provisions, the legislation eliminates as of its effective date, the LGR, which previously allowed for recovery of net OVEC costs and revenues. Changes to the regulatory framework from this legislation, including the recovery of future net OVEC costs and revenues or remaining recovery rider balances, could be material to our results of operations, financial condition, and cash flows. To comply with House Bill 15, AES Ohio filed an application with the PUCO on November 10, 2025 to establish a Three-Year Rate Plan. This plan describes the investments necessary to strengthen and modernize AES Ohio's infrastructure and expand support for its customers. To enable these ongoing investments, the application also proposes rates for future electric distribution service in 2027, 2028, and 2029. The PUCO has set the evidentiary hearing to begin August 4, 2026, and a Commission Order is anticipated by the end of 2026.

AES Ohio ESP Appeal — From November 1, 2017 through December 18, 2019, AES Ohio operated pursuant to an approved ESP plan, which was initially approved on October 20, 2017 (ESP 3). On December 18, 2019, the PUCO approved AES Ohio's Notice of Withdrawal of ESP 3 and reversion to its prior rate plan (ESP 1). Among other items, the PUCO Order approving the ESP 1 rate plan included reinstating the non-bypassable RSC Rider, which provided annual revenue of approximately $79 million. The OCC has appealed to the Ohio Supreme Court the PUCO’s decision approving the reversion to ESP 1 as well as argued for a refund of the RSC revenue dating back to August 2021. Oral arguments regarding this appeal were held on April 22, 2025, and a court decision is pending.

Show the rest (439 words)

AES Ohio Smart Grid Comprehensive Settlement — On October 23, 2020, AES Ohio entered into a Stipulation and Recommendation with the staff of the PUCO, various customers and organizations representing customers of AES Ohio and certain other parties with respect to, among other matters, AES Ohio's applications for (i) approval of AES Ohio's plan to modernize its distribution grid (Smart Grid Phase 1), (ii) findings that AES Ohio passed the SEET for 2018 and 2019, and (iii) findings that AES Ohio's ESP 1 satisfies the SEET and the more favorable in the aggregate (MFA) regulatory test. On June 16, 2021, the PUCO issued their opinion and order accepting the stipulation as filed. The OCC appealed the final PUCO order with respect to the 2018 and 2019 SEET to the Ohio Supreme Court on December 6, 2021. Oral arguments regarding this appeal were held on April 2, 2025. The Ohio Supreme Court reversed the PUCO's opinion and order with respect to the methodology used by the PUCO to support its findings related to the 2018 and 2019 SEET, and remanded the case to the PUCO to conduct further analysis of the SEET for those years. In the proceeding on remand, AES Ohio filed testimony proposing a refund of $1.6 million based on methodologies sponsored by its external financial consultant. The PUCO held an evidentiary hearing on this issue on October 28 and 29, 2025, and a PUCO decision is pending.

AES Indiana Rate Case Filing — On June 3, 2025, AES Indiana filed a petition with the IURC for authority to increase its basic rates and charges. On October 15, 2025, AES Indiana entered into a Stipulation and Settlement Agreement (the “Settlement Agreement”) with most parties in AES Indiana’s pending regulatory rate review at the IURC. This Settlement Agreement provides for updated base rates for electric services in AES Indiana’s territory and is subject, and conditioned upon, approval by the IURC. Among other things, the Settlement Agreement proposes an increase in AES Indiana’s revenue of $90.7 million and provides a return on common equity of 9.75% and cost of long-term debt of 5.34%, on a rate base of approximately $5.5 billion for AES Indiana’s 2027 electric service base rates. The partial Settlement Agreement also includes a commitment to not implement additional base rate increases, following the implementation of new base rates under the settlement, until at least January 2030 and to not start a second TDSIC Plan before January 2028. An evidentiary hearing with the IURC was held on January 28 and 29, 2026, and AES Indiana anticipates a final order from the IURC in the second quarter of 2026.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

U.S. Executive Orders — A recent Executive Order has required a review of all federal onshore wind leasing and federal permitting practices. In executing this order, the Department of Interior and other agencies have paused federal permitting for all wind projects on federal lands and private lands with a federal nexus, and have also paused federal permitting for solar, storage, and other renewables for 60-days. Our U.S. renewables projects are developed primarily on private land and are designed in a manner that minimizes the potential of a federal nexus. At this time, we do not expect this Order to have a significant impact on our business.

FERC, RTOs, and Interconnection Prioritization — FERC approved one-time queue jumping proposals in PJM, …+34 / −71 words

FERC, RTOs, and Interconnection Prioritization — On February 11, 2025, FERC approved PJM's request for a one-time change queue jumping proposals in its interconnection process PJM, MISO, and SPP over the course of the year. Limited additions to expedite the interconnection of a limited number of high-capacity resources to support near-term resource adequacy and grid reliability. This change to PJM's interconnection process is each RTO’s queue are not expected to materially impact the PJM projects already in our backlog; since however, they have received interconnection approvals. However, it will likely could create uncertainty around network upgrade costs and delays in the time for interconnection approvals for our development pipeline timing of renewables integration of future projects in PJM. Other RTOs are considering similar proposals to expedite interconnection approvals for certain high-capacity resources. each RTO’s queue. See Item 1A.—Risk Factors - — Our development projects are subject to substantial uncertainties of included in this Form 10-K for further details.

1 more paragraph was rewritten here (+53 / −0 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Overview

5 rewritten

5 more paragraphs were rewritten here (+50 / −124 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Long-Term Receivables

2 rewritten

2 more paragraphs were rewritten here (+26 / −49 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Cash Sources and Uses

2 rewritten

2 more paragraphs were rewritten here (+5 / −53 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Operating Activities

2 rewritten

• Change in working capital increased $291 million, primarily due to a decrease in …+58 / −62 words · under “(in millions)”

• Change in working capital decreased $402 increased $291 million, primarily due to a $522 million increase decrease in accounts receivable resulting from higher billings and due to the timing of collections and billings and an increase in contract liabilities related to development services in the U.S. These increases were partially offset by an increase in other current assets due to the timing of collection of tax credit transfer proceeds, the prior year sale of financing receivables under the Warrior Run PPA termination agreement, and an increase in inventory of $220 million due to higher coal purchases and lower consumption. in the prior year; partially offset by a $153 million decrease in prepaid expenses and other assets due to proceeds from interest rate swap settlements, insurance recoveries, and VAT recoveries as well as the collection of Stabilization Fund receivables in Chile, partially offset by additional lease options and long-term security deposits in the current year at ACED.

1 more paragraph was rewritten here (+14 / −18 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Investing Activities

1 removed · 4 rewritten

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “(in millions)”

• Maintenance expenditures decreased $11 million, primarily due to lower expenditures in Brazil of $40 million primarily due to completion of the Cajuina wind projects in the prior year and the sale of AES Brasil in October 2024; partially offset by higher expenditures of $32 million at Southland due to the extension of compliance dates for the OTC units.

4 more paragraphs were rewritten here (+81 / −113 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Financing Activities

5 rewritten

• The $837 million impact from sales to noncontrolling interests is primarily due to …+63 / −24 words · under “(in millions)”

• The $691 $837 million impact from sales to noncontrolling interests is primarily due to a $210 $540 million decrease from the sale of ownership interest in AES Ohio and increase in proceeds received of $328 million and $207 million at AES Clean Energy from the Development and AES Indiana, respectively, due to higher sales of ownership in project companies to tax equity investors; the prior year sales of partially offset by a 20% interest in AES Dominicana for $192 million and a 35% interest in Colon for $140 million, and a $146 $104 million decrease in sales under the Chile Renovables renewables partnerships partnership with GIP, a decrease of $103 million in proceeds at AES Renewable Holdings due to higher sales of ownership in project companies to tax equity investors in the prior year, and $35 million related to the prior year sale of ownership interest in the Marahu project.

4 more paragraphs were rewritten here (+93 / −50 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Non-Recourse Debt

2 added · 2 rewritten

Added in the 10-K for fiscal 2025

Under “Contractual Obligations and Contingent Contractual Obligations”

(1)Excludes payment obligation and commercial transaction arrangements entered into by the Parent Company on behalf of its consolidated subsidiaries, which relate to the Company's own future performance. See Schedule I—Condensed Financial Information of Registrant for additional information on guarantees issued by the Parent Company.

Added in the 10-K for fiscal 2025

Under “Critical Accounting Policies and Estimates”

Hypothetical Liquidation at Book Value — Certain of the Company's businesses are subject to profit-sharing arrangements where the allocation of earnings and losses, cash distributions, and tax benefits are not based on fixed ownership percentages.

Many of these arrangements exist for certain U.S. renewable generation partnerships to designate different allocations of value among investors, where the allocations change in form or percentage over the life of the partnership. For these businesses, the Company uses the HLBV method when it is a reasonable approximation of the profit-sharing arrangement. The HLBV method calculates the proceeds that would be attributable to each partner based on the liquidation provisions of the respective operating partnership agreement if the partnership were to be liquidated at book value at the balance sheet date. Each partner’s share of income in the period is equal to the change in the amount of net equity they are legally able to claim based on a hypothetical liquidation of the entity at the end of a reporting period compared to the beginning of that period, adjusted for any capital transactions.

The HLBV method is used both to allocate the equity earnings attributable to AES when the Company accounts for the renewables business as an equity method investment and to calculate the earnings attributable to noncontrolling interest when the business is consolidated by AES. In the early months of operations of a renewable generation facility where HLBV results in a significant decrease in the hypothetical liquidation proceeds attributable to the tax equity investor due to the recognition of ITCs or other adjustments as required by the U.S. Internal Revenue Code, the Company records the impact (sometimes referred to as the ‘Day one gain’) to income in the same period.

2 more paragraphs were rewritten here (+17 / −118 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

37 other paragraphs were edited by fewer than 15 words; 20 changed only figures, dates or period names; 88 are word for word the same; 21 were split, merged or moved, with most of their text in the other filing; their text is in the 10-K for fiscal 2025 and the 10-K for fiscal 2024 linked above.

How this page works

The text is AES' own disclosure, quoted as filed in the MD&A of the 10-Q for fiscal Q3 2026 and the 10-Q for fiscal Q3 2025, split at its own subsection headings and matched by fixed rules, without a language model; tables of figures are left out. A new, rewritten or removed passage is not a judgment by Stackyear about AES or its shares. How MD&A pages are compared.

To keep this page to a readable length, passages over 800 words show their opening paragraphs, and the rewrites with the fewest words changed are counted without their text. The counts include them all.

General research from public filings, not investment advice.