Added in the 10-Q for fiscal Q1 2027
• uncertainties of regulation policy.
In Applied Digital's 10-Q for fiscal Q1 2027, the MD&A added 24 passages, removed 15 and rewrote 31 against the 10-Q for fiscal Q1 2026, the same quarter a year earlier. In its 10-K for fiscal 2026, the MD&A added 23 passages, removed 20 and rewrote 48 against the 10-K for fiscal 2025.
Source: Management's discussion and analysis (Item 2) of APPLIED DIGITAL CORPORATION's 10-Q filed Oct 7, 2026 (accession 0001144879-26-000059, period ended Aug 31, 2026) compared with its 10-Q filed Oct 9, 2025 (accession 0001144879-25-000069, period ended Aug 31, 2025), on SEC EDGAR
Applied Digital's latest quarterly report against the same quarter a year earlier
In Applied Digital's 10-Q for fiscal Q1 2027, the MD&A added 24 passages, removed 15 and rewrote 31 against the 10-Q for fiscal Q1 2026, the same quarter a year earlier.
Compared: Item 2 of the 10-Q filed Oct 7, 2026 (accession 0001144879-26-000059, period ended Aug 31, 2026; 125 paragraphs) and Item 2 of the 10-Q filed Oct 9, 2025 (accession 0001144879-25-000069, period ended Aug 31, 2025; 107 paragraphs).
Applied Digital's figures, dates and period names change every period and are not counted. A paragraph is rewritten when at least 15 other words were added or removed: added text is underlined and shaded, removed text is struck through, and long unchanged stretches are shortened to the words around each change.
2 added · 2 removed
Added in the 10-Q for fiscal Q1 2027
• uncertainties of regulation policy.
Added in the 10-Q for fiscal Q1 2027
A comparison of our results of operations and cash flows for the three months ended August 31, 2025 can be found under “Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations” in our Quarterly Report on Form 10-Q for the quarter ended August 31, 2025, filed with the SEC on October 9, 2025.
During the fiscal year 2026, we completed the contribution of our Cloud Services Business to ChronoScale (as defined below), formerly Ekso (as defined below). As a result of this transaction, certain prior-period amounts presented in this Quarterly Report have been recast to conform to the current period presentation. The recast primarily reflects changes associated with the transaction, including revisions to the presentation of certain historical financial statement line items and related disclosures. As a result, certain fiscal quarter 2025 amounts presented in this Quarterly Report differ from the amounts previously reported in our Quarterly Report on Form 10-Q for the quarter ended August 31, 2025.
In the 10-Q for fiscal Q1 2026, not in the 10-Q for fiscal Q1 2027
• our ability to complete the negotiation and execution of the definitive transaction documents to close the sale of our Cloud Services Business that is currently held for sale and treated as discontinued operations;
In the 10-Q for fiscal Q1 2026, not in the 10-Q for fiscal Q1 2027
• our ability to continue to grow sales in our hosting business;
• volatility of cryptoasset prices; and
• uncertainties of cryptoasset regulation policy.
1 added · 1 removed · 1 rewritten
Added in the 10-Q for fiscal Q1 2027
We consolidate entities that meet the definition of a variable interest entity (“VIE”) for which the Company is considered the primary beneficiary or entities that meet the definition of a voting interest entity (“VOE”). The Company consolidates a VIE where it has been determined that the Company is the primary beneficiary of the entity's operation in accordance with ASC Topic 810, Consolidations. The primary beneficiary is the party that has both the power to direct the activities that most significantly impact the VIE's economic performance and the obligation to absorb losses or the right to receive benefits of the VIE that could potentially be significant to the VIE. In evaluating whether the Company is the primary beneficiary, the Company evaluates its power to direct the most significant activities of the VIE by considering the purpose and design of the entity and the risks the entity was designed to create and pass through to its variable interest holders. The Company also evaluates its economic interests in the VIE.
On May 5, 2026, we completed the separation of our cloud services business. As of August 31, 2026 we owned approximately 96% of the outstanding common stock of ChronoScale Holdings Corporation (“ChronoScale”). We consolidate ChronoScale under the voting interest model because we hold a controlling financial interest. The ownership interests in ChronoScale not attributable to us are presented as noncontrolling interests in the unaudited condensed consolidated financial statements.
In the 10-Q for fiscal Q1 2026, not in the 10-Q for fiscal Q1 2027
During the fiscal quarter ended May 31, 2025, we determined that our Cloud Services Business met the criteria for held for sale and discontinued operations. As such, the results of the Cloud Services Business, which was previously included as a reportable segment, are presented as discontinued operations in the unaudited condensed consolidated statements of operations and have been excluded from both continuing operations and segment results for all periods presented.
We are a U.S. designer, developer, and operator of high-performance, sustainably engineered data centers and colocation services for artificial intelligence (“AI”), networking, and blockchain workloads. Headquartered in Dallas, TX, We provide digital infrastructure solutions to the rapidly growing industries of high-performance computing (“HPC”) and founded in 2021, the Company combines hyperscale expertise, proprietary waterless cooling, and rapid deployment capabilities to deliver secure, scalable compute at industry-leading speed and efficiency, while creating economic opportunities in underserved communities through its award-winning Polaris Forge AI. Factory model. We operate in two distinct business segments, data center hosting (the "Data Center Hosting Business") and HPC data center hosting (the “HPC Hosting Business”), both of which are included in our unaudited consolidated financial statements, as further discussed below. Management considers the Data Center Hosting Business and the HPC Hosting Business to be our core operations for long-run strategic and performance evaluation purposes.
2 rewritten
[… 58 unchanged words …] U.S. states have considered AI legislation, which aims to reduce risk associated with the use of AI; while certain states have passed comprehensive AI legislation. A number of states have recently issued moratoriums on September 29, 2025, California passed future AI data centers while other states are considering the Transparency in Frontier Artificial Intelligence Act into law, which requires certain AI companies to fulfill transparency requirements and report AI-related safety incidents, among other things. same. In Europe, the EU AI Act has been adopted, portions of which have started to take effect, this year. with other portions continuing to take effect over the next several years.
The amount of energy used for AI and crypto mining has also received significant attention. For example, in January 2024, The U.S. Energy Information Administration conducted an emergency survey of has recently launched surveys relating to electricity consumption from both data from centers and cryptocurrency mining companies in the U.S. Certain U.S. states have also conducted similar studies. This indicates that more focus is being placed on the energy usage of these activities. It is unclear how the information collected will be used for future regulations, but it is expected that energy efficiency and sustainability will be critical factors regulating both AI data centers our industries. While there is currently insufficient support for any particular proposal, we expect that regulatory efforts in this area will continue to evolve and cryptocurrency mining. potentially impact our business.
1 removed
In the 10-Q for fiscal Q1 2026, not in the 10-Q for fiscal Q1 2027
Under “Data Center Hosting Business”
Our Data Center Hosting Business operates data centers to provide energized space to crypto mining customers.
4 added · 4 removed · 4 rewritten
Added in the 10-Q for fiscal Q1 2027
Under “HPC Hosting Business”
In the prior fiscal year, we commenced operations at our first HPC data center at our Polaris Forge 1 campus in Ellendale, North Dakota, with 100 MW of capacity. During the quarter, we began commencing operations at our second HPC data center at our Polaris Forge 1 campus, which reached its full 150MW of capacity as of the date of filing of this Form 10-Q.
Added in the 10-Q for fiscal Q1 2027
Under “HPC Hosting Business”
Our two buildings at our Polaris Forge 2 campus, with an aggregate 300MW of capacity, are currently under construction. We anticipate reaching initial ready for service in the second half of calendar year 2026 and full capacity in early calendar year 2027.
Our two buildings at our Polaris Forge 3 campus, with an aggregate 300MW capacity, are currently under construction. We anticipate reaching initial ready for service in the second half of calendar year 2027 and full capacity in the second half of calendar year 2028.
Our two buildings at our Delta Forge 1 campus, with an aggregate 300MW capacity, are currently under construction. We anticipate reaching initial ready for service in the first half of calendar year 2027 and full capacity in early calendar 2028.
On June 5, 2026, we entered into an approximately 15-year lease (with three five-year renewal options) with a high investment-grade hyperscaler at our Delta Forge 2 campus located in our southern region, comprising a single 210 MW building under construction. The lease is for the full 210 MW of critical IT load, representing approximately $5.2 billion of contracted revenue over the base term, with expected delivery in the first half of calendar year 2028.
We recognized $262.6 million in revenue from this business segment during the three months ended August 31, 2026, with $183.5 million related to services and other revenue and $79.1 million related to data center rental and other revenue.
Added in the 10-Q for fiscal Q1 2027
Under “ChronoScale”
In the prior fiscal year, we completed the separation of our cloud business in a series of transactions. As of August 31, 2026, we own approximately 96% of the issued and outstanding equity of ChronoScale Holdings Corporation ("ChronoScale Holdings"). ChronoScale Holdings owns and operates our historic cloud business through its wholly owned subsidiary, ChronoScale Corporation, and is consolidated into our financial statements.
Added in the 10-Q for fiscal Q1 2027
Under “ChronoScale”
On July 1, 2026, we completed a holding company formation transaction (the “Holding Company Transaction”) that created the new parent holding company as the public company, with its operating companies as wholly-owned subsidiaries, including Applied Digital Cloud Corporation, which changed its name to ChronoScale Corporation. We effected the holding company structure to better reflect our individual operating businesses, which allows for and can accommodate future growth from internal operations and generally provides for greater administrative and operational flexibility. ChronoScale Holdings has the exact same classes and number of shares outstanding after the Holding Company Transaction as its predecessor had outstanding immediately before the Holding Company Transaction, and as such, the shareholders of ChronoScale Corporation prior to the Holding Company Transaction were not diluted as a result thereof. Following the Holding Company Transaction, ChronoScale Holdings became the successor issuer to ChronoScale and continues to trade on Nasdaq under the ticker symbol “CHRN” with the same CUSIP.
On August 6, 2026, ChronoScale entered into a two-year strategic partnership with Microsoft to support the planned development of approximately 50 MW of AI compute capacity. On August 24, 2026, ChronoScale entered into a one-year extension of such strategic partnership, resulting in a total of a three-year service term. Upon projected completion, the deployment is expected to expand available compute capacity and further strengthen ChronoScale’s digital infrastructure supporting AI and cloud computing applications.
In the 10-Q for fiscal Q1 2026, not in the 10-Q for fiscal Q1 2027
Under “HPC Hosting Business”
On May 28, 2025, APLD ELN-02 LLC and APLD ELN-03 LLC, our subsidiaries, each entered into a data center lease (together, the “Data Center Leases”) with CoreWeave, Inc. (“CoreWeave”) to deliver an aggregate of 250 MW of infrastructure to host CoreWeave’s HPC operations at Polaris Forge 1. The first lease is for the full capacity of our 100 MW data center that is currently under construction, and the second lease is for the full capacity of our 150 MW data center that is also under construction. We have guaranteed the obligations of APLD ELN-02 LLC and APLD ELN-03 LLC under the respective Data Center Lease to which such subsidiary is a party.
On August 28, 2025, APLD ELN-02 C LLC, our subsidiary, entered into a third data center lease, the (“Building 4 Lease”) with CoreWeave to deliver an additional 150 MW at Polaris Forge 1, bringing the total capacity under contract at Polaris Forge 1 to 400 MW. We have guaranteed the obligations of APLD ELN-02 C LLC under the Building 4 Lease.
In the 10-Q for fiscal Q1 2026, not in the 10-Q for fiscal Q1 2027
Under “HPC Hosting Business”
On August 18, 2025, we also announced that we would be breaking ground on our Polaris Forge 2 campus, a $3 billion, 280 MW data center near Harwood, North Dakota. The project has begun and we currently anticipate reaching initial capacity in 2026 and reaching full capacity in early 2027.
The Cloud Services Business provides high-performance computing power for AI and machine learning applications. Near the end of the fiscal third quarter 2024, this business began generating revenue. In the fourth quarter of fiscal year 2025, we determined that the Cloud Services Business met the criteria to be classified as “held for sale,” and as the sale represents a strategic shift for the Company, discontinued operations. As such, for the three months ended August 31, 2025, we have reported the Cloud Services Business as held for sale on the unaudited condensed consolidated balance sheets and discontinued operations on the unaudited condensed consolidated statement of operations. The comparative periods have been updated to present the Cloud Services Business as held for sale and discontinued operations as of June 1, 2024.
In the 10-Q for fiscal Q1 2026, not in the 10-Q for fiscal Q1 2027
Under “Management Update”
On August 1, 2025, we entered into an employment agreement with Jason Zhang, one of the Company’s founders and former directors, to serve in the role of Chief Strategy Officer of the Company.
In the 10-Q for fiscal Q1 2026, not in the 10-Q for fiscal Q1 2027
Under “June 2025 At-the-Market Sales Agreement”
On June 2, 2025, the Company entered into a Sales Agreement with Northland Securities, Inc. and Wells Fargo Securities, LLC (the “June 2025 Sales Agreement”), pursuant to which, up to $200,000,000 of shares of the Company's common stock may be issued if and when sold. As of the date of this report, the Company has issued and sold approximately 15.3 million shares under the June 2025 Sales Agreement for gross proceeds of approximately $196.4 million.
On August 14, 2025, we entered into the first amendment (the “First Amendment”) to the Preferred Equity Purchase Agreement (the “PEPA”), dated April 30, 2025, to, among other things, (i) increase the aggregate commitment amount of the shares of Series G Convertible Preferred Stock (the “Series G Preferred Stock”) from $150 million to $300 million, and (ii) increase our access to capital by removing the Put Limitation (as defined in the PEPA) that had previously limited the aggregate purchase price for any Put Issuance (as defined in the PEPA) to no more than $75 million. In connection with the First Amendment, on August 14, 2025, we filed an amendment (the “First CoD Amendment”) to the Series G Certificate of Designation, originally filed with the Secretary of State of the State of Nevada on April 30, 2025. The First CoD Amendment amends the Series G Certificate of Designation to, among other things, (i) increase the initial Floor Price (as set forth in Section 1.5(c)(i) of the Series G Certificate of Designation) to $12.50 from $4.25, and (ii) change the limit below which the Floor Price may not be reduced (as set forth in Section 1.5(c)(ii) of the Series G Certificate of Designation) to $4.33 from $1.34. The Floor Price sets the minimum floor for the conversion price of the Series G Preferred Stock, which price may not be reduced unless we determine to do so in our discretion. The First CoD Amendment further amended the status of converted or repurchased preferred stock such that any shares of Series G Preferred Stock that have been or will be converted will be retired and resume the status of authorized but unissued shares.
We are currently Our third HPC building two HPC focused data center facilities to provide 100 MW and 150 MW, respectively, of capacity at our Polaris Forge 1 campus, in Ellendale, ND. These facilities are being designed and purpose-built to host high-density GPU architecture or other HPC applications, such as artificial intelligence, natural language processing, machine learning, and additional HPC developments. The third HPC focused data center facility, which is expected to provide an additional 150MW of capacity, at Polaris Forge 1, is currently in planning stages with an anticipated under construction. We anticipate reaching full ready for service date in calendar year 2027.
Our Data Center Hosting Business provides energized infrastructure services to crypto mining customers. Our custom-designed data centers allow customers to rent space based on their power requirements. As of August 31, 2025, 2026, our 106 MW facility in Jamestown, North Dakota and our 180 MW facility in Ellendale, North Dakota continue to operate at full capacity.
We recognized $26.3 $37.8 million in tenant fit-out revenue from this business segment during the three months ended August 31, 2025. We anticipate that this business segment will begin generating meaningful revenues associated with the leases once the first building within Polaris Forge 1 becomes operational, which is expected in calendar year 2025. 2026.
We recognized $16.7 million in revenue from this business segment during three months ended August 31, 2025 within discontinued operations. The cloud Services business currently operates in three states: Colorado, Minnesota and Utah. This business provides cloud services to customers, such as AI and machine learning developers by renting space at third party co-location centers and providing the customers with Company-owned access to its cloud computing equipment. Additionally, effective in the first quarter of fiscal year 2027, ChronoScale Holding’s cloud business provides AI infrastructure, or GPU-related, hardware, and ancillary support and maintenance services, through resale arrangements.
3 added · 2 removed · 5 rewritten
Added in the 10-Q for fiscal Q1 2027
Under “Cloud SAFE Payoff”
During the fiscal year ended May 31, 2025, we entered into two Simple Agreements for Future Equity (“SAFEs”) with an investor for equity in Cloud, which was, at that time, our wholly-owned subsidiary, for aggregate proceeds of $12.0 million. On June 2, 2026, following an agreement reached with the investor, we paid off all amounts outstanding under the SAFEs, totaling $13.3 million.
On June 16, 2026, APLD ComputeCo 3 LLC refinanced the Bridge Facility with the closing of a $1.59 billion offering (the “2031 7.000% Notes Offering”) of 7.000% senior secured notes due 2031 (the “2031 7.000% Notes”) at an issue price of 100.000% of par. The 2031 7.000% Notes are senior secured obligations of APLD ComputeCo 3 LLC and bear interest at a rate of 7.000% per annum, payable semi-annually in arrears on June 15 and December 15 of each year, beginning on December 15, 2026. The principal amount of the 2031 7.000% Notes will amortize on a semi-annual basis on June 15 and December 15 of each year, pursuant to the terms and amounts set forth in the 2031 7.000% Notes Indenture. The 2031 7.000% Notes will mature on June 15, 2031, unless earlier redeemed or repurchased in accordance with their terms. The 2031 7.000% Notes are fully and unconditionally guaranteed by the subsidiary guarantors, all of which are wholly owned subsidiaries of APLD ComputeCo 3 LLC. The Company provided a customary completion guarantee for the 2031 7.000% Notes Offering.
Added in the 10-Q for fiscal Q1 2027
Under “Satisfaction of Escrow Release Condition for 6.750% Senior Secured Notes due 2031”
On June 18, 2026, APLD ComputeCo 2 satisfied the escrow release condition under the escrow agreement for the 2031 6.750% Notes and executed and delivered to the escrow agent an escrow release certificate directing the escrow agent to release the funds in the escrow account to APLD ComputeCo 2 and apply such funds in accordance with the escrow agreement and the indenture for the 2031 6.750% Notes.
On June 26, 2026, in connection with the 2026 Revolving Credit Facility, the Company, APLD Intermediate HoldCo, and certain subsidiaries of APLD Intermediate HoldCo entered into an Incremental Assumption Agreement No. 1 (the “Incremental Assumption Agreement”), with First National Bank of Omaha (in its capacities as administrative agent and collateral agent under the 2026 Revolving Credit Facility) and the lenders and issuing banks party thereto, providing for an Incremental Revolving Facility Commitment (as defined in the Incremental Assumption Agreement) in an aggregate principal amount of up to $80.0 million (the “Incremental Revolving Financing”). After giving effect to the Incremental Assumption Agreement, the aggregate revolving commitments under the 2026 Revolving Credit Facility increased to $430.0 million, with an additional $120 million accordion option remaining. The Incremental Revolving Financing constitutes a part of the 2026 Revolving Credit Facility and is subject to the terms and conditions of the Revolving Credit Agreement and the other loan documents entered into in connection therewith.
On June 30, 2026, we entered into a Loan and Security Agreement (the "Texas Capital Loan Agreement") with Texas Capital Bank ("Texas Capital") and a related Promissory Note in favor of Texas Capital in the stated principal amount of $58.5 million (the "Texas Capital Note"). The Texas Capital Loan Agreement contains standard terms, conditions and covenants. Interest is payable on the Texas Capital Note at the sum of an adjusted term SOFR plus an applicable margin. The Texas Capital Note matures on June 30, 2031.
Added in the 10-Q for fiscal Q1 2027
Under “Sale of Legacy Ekso Business”
On September 30, 2026, ChronoScale, through its wholly-owned subsidiary ChronoScale Intermediate LLC, completed the sale of its legacy Ekso business through two related transactions: Ekso and its wholly-owned German subsidiary sold substantially all of the assets of Ekso’s “EksoWorks” industrial exoskeleton business, including the EVO product line, to DynaWear Tech, Inc. under an asset purchase agreement, and immediately thereafter, ChronoScale Intermediate LLC sold all of the outstanding capital stock of Ekso, which held the remaining neuro-rehabilitation business, to WanderEkso Inc., a subsidiary of Wandercraft SAS, under a stock purchase agreement.
On October 4, 2026, the Company entered into a Power Purchase Agreement with Base Electron, for the purchase of capacity and energy from an approximately 1,200 MW natural gas-fired generation facility to be developed by Base Electron in North Dakota, which is intended to provide dedicated generation for our Polaris Forge 3 campus expansion.
In the 10-Q for fiscal Q1 2026, not in the 10-Q for fiscal Q1 2027
Under “CoreWeave Warrants”
On August 28, 2025, in connection with the entry into the Building 4 Lease, the Company issued to CoreWeave a warrant (the “Building 4 Warrant”) to acquire up to 8,393,611 shares of the Company’s common stock at an exercise price of $10.75 per share, subject to adjustment in accordance with the terms and conditions set forth in the Building 4 Warrant. The Building 4 Warrant is on the same Form of Warrant as the initial warrant issued to CoreWeave on May 28, 2025, in connection with the data center leases entered into for Building 2 and Building 3 on May 28, 2025.
On September 9, 2025, APLD FAR-01 LLC, our subsidiary, entered into a promissory note (the “Promissory Note”) with Macquarie Equipment Capital, Inc., a Delaware corporation (the “Lender”). The Promissory Note provides for a principal sum of (a) $50 million (the “Initial Loan”), which was drawn on the Closing Date, plus (b) subject to the mutual consent of us and the Lender, additional loans in an aggregate principal amount not to exceed $25 million (the “Additional Loans” and together with the Initial Loan, the “Loan”).
The Loan shall bear interest at 8.0% per annum, unless an Event of Default (as defined therein) has occurred and is continuing, in which case, the Secured Obligations (as defined therein) shall bear interest at the sum of 8.0% per annum plus an additional 1.50% per month (the “Post-Default Rate”). From the Closing Date until the date that is twelve months following the Closing Date (the “PIK Period”), accrued interest will be paid in kind, with such payment in kind being capitalized to principal monthly and at such other times as may be specified in the Promissory Note. After the PIK Period, accrued interest will be paid in cash, provided that (i) the Post-Default Rate interest is payable in cash on demand and (ii) accrued interest on any principal amount repaid or prepaid is payable on the date of such repayment or prepayment. The Promissory Note matures on the earliest of (i) the date of acceleration of the Loan, (ii) February 1, 2026, if the 200 MW Lease Execution (as defined therein) has not occurred on or before October 31, 2025, or (iii) September 9, 2027. The Loan will accelerate and we must mandatorily prepay the full outstanding principal balance of the Promissory Note, together with accrued interest to the date of prepayment on the principal amount prepaid and any other amounts then due and payable, upon the occurrence of any of the following conditions: (a) a Change of Control (as defined therein), (b) within ninety (90) days following the occurrence of the 200 MW Lease Execution, and (c) within thirty (30) days following a Qualifying Preference Share Issuance (as defined therein).
We may voluntarily prepay all or part of the Promissory Note at any time with no less than three (3) business days’ notice with accrued interest to the date of prepayment on the principal amount prepaid, so long as, with respect to the portion of the Loan then being prepaid, in each case, such prepayment is accompanied by the payment of amounts sufficient to achieve a rate of return that equals or exceeds 1.10 to 1.00. The same 1.10x return hurdle applies to repayment at maturity. Amounts repaid under the Promissory Note will not be available to be re-borrowed.
Proceeds of the Loan under the Promissory Note will be used, in part, to (i) pay transaction costs, (ii) pay transaction expenses in connection with the Note Documents (as defined therein), (iii) fund the purchase of the financed properties located on the Company’s campus in Harwood, ND (“Polaris Forge 2”), including all associated closing costs, title fees, and legal expenses, (iv) finance improvements to the Polaris Forge 2 properties, (v) fund the purchase of the Transformers (as defined therein) and other equipment expected to be installed and used for the improvements of the Polaris Forge 2 properties, (v) to pay any other costs, fees, expenses, or amounts related to or in connection with the development and construction of Polaris Forge 2, and (vi) for general corporate working capital purposes.
400 more words of this passage are in the 10-Q filed Oct 9, 2025.
In the 10-Q for fiscal Q1 2026, not in the 10-Q for fiscal Q1 2027
Under “Series G Preferred Stock Offering”
On October 7, 2025, the Company entered into the third amendment (the “Third Amendment”) to the PEPA, dated April 30, 2025, by and between the Company and the investors signatory thereto, as amended by the First Amendment and the Second Amendment, in order to increase its access to capital to fund the continued construction and development of its Polaris Forge I data center in Ellendale, North Dakota. The Third Amendment amends the PEPA to, among other things, increase the aggregate commitment amount of the shares of the Series G Preferred Stock from $450.0 million to $590.0 million.
As previously disclosed, on January 13, 2025, APLD HPC Holdings LLC (formerly, APLD ELN-02 Holdings LLC), an indirect wholly owned subsidiary of the Company, entered into a Unit Purchase Agreement (the “Unit Purchase Agreement” or “UPA”) for its HPC Hosting Business with MIP VI HPC Holdings, LLC, which is an affiliate of funds and investment vehicles managed by entities within Macquarie Asset Management (“MAM”). On February 11, 2025, APLD HPC Holdings LLC novated and assigned its rights, title and interests and duties, liabilities and obligations under the UPA to APLD HPC TopCo LLC, an indirect wholly-owned subsidiary of the Company (“TopCo 1”). On October 3, 2025, the Company, TopCo 1, APLD HPC TopCo 2 LLC, an indirect wholly-owned subsidiary of the Company (the “Subsidiary Issuer”), and MIP HPC Holdings, LLC (formerly, MIP VI HPC Holdings, LLC) (the “Purchaser”) entered into an Amended and Restated Unit Purchase Agreement (the “A&R UPA”).
On October 6, 2025, all conditions to the Initial Closing (as defined in the A&R UPA) were satisfied and the Initial Closing occurred. At the Initial Closing, the Subsidiary Issuer sold to the Purchaser 112,500 Preferred Units in the Subsidiary Issuer at a price per Preferred Unit of $1,000, for an aggregate purchase price of $112.5 million, and for no additional consideration, the Subsidiary Issuer agreed to issue to the Purchaser such number of Common Units of the Subsidiary Issuer representing, in the aggregate, seven and a half percent (7.5%) of the fully diluted common equity of the Subsidiary Issuer as of immediately following the Initial Closing. The proceeds of the Initial Closing will be used to pay, among other things, construction and development costs of Polaris Forge 1 and transaction expenses. MAM has the right to invest up to an additional $4.9 billion under the A&R UPA.
In addition, pursuant to the A&R UPA, on October 6, 2025, the Company issued to the designated affiliates of the Purchaser, warrants to purchase an aggregate of 2.4 million shares of the Company’s common stock. The warrants will become exercisable upon the Purchaser funding the full $450 million in Polaris Forge 1. Also on October 6, 2025, the Company entered into a registration rights agreement with the Purchaser, pursuant to which the Company agreed to file with the SEC a registration statement registering the resale of the shares of common stock issuable upon exercise of the warrants within 60 days of the execution of the registration rights agreement.
On August 14, 2025, June 26, 2026, we entered into the First sixth amendment to among other things, (i) the PEPA to increase the aggregate commitment amount under the PEPA for the issuance of the shares of Series G Preferred Stock from $150 million $1,590,000,000 to $300 million, and (ii) increase its access to capital by removing the Put Limitation (as defined in the PEPA) that had previously limited the aggregate purchase price for any Put Issuance (as defined in the PEPA) to no more than $75 million. $2,000,000,000.
As Series G Preferred Stock may be reissued, during the three months ended August 31, 2025, the Company 2026, we issued and sold 180,000 283,250 shares of Series G Preferred Stock for aggregate gross proceeds of $175.0 $275.0 million. with a total of 258,000 shares of Series G Preferred Stock being converted into approximately 28.2 million shares of During the Company’s common stock. As of three months ended August 31, 2025, no Series G Preferred Stock was issued and outstanding. 2026,
During the three months ended August 31, 2025, the Company issued and sold 180,000 shares of Series G Preferred Stock for aggregate gross proceeds of $175.0 million. Additionally, during the three months ended August 31, 2025, a total of 258,000 154,500 shares of Series G Preferred Stock were converted into approximately 28.2 4.5 million shares of our common stock. As of August 31, 2026, 128,750 shares of Series G Preferred Stock were issued and outstanding.
During the three months ended August 31, 2025, we received $39.4 million in payments for future data center hosting services. 2026, 276,673 shares of Series E Preferred Stock were redeemed as well as 78 shares of Series E-1 Preferred Stock.
Since Subsequent to the execution of the Second Amendment, 204,000 quarter, 128,750 shares of Series G Preferred Stock have been issued have been issued for aggregate gross proceeds of $200.0 million, of which all 204,000 shares of Series G Preferred Stock have been were converted into an aggregate of approximately 10.2 5.2 million shares of the Company’s common stock.
9 added · 1 removed · 9 rewritten
Added in the 10-Q for fiscal Q1 2027
Under “Revenue”
Data center rental and other revenue was $79.1 million for the three months ended August 31, 2026 compared to no revenue for the three months ended August 31, 2025, as our HPC Hosting Business commenced operations in the second half of the fiscal year 2026, resulting in approximately $65.8 million related to base rent, net of $0.9 million in amortization of customer lease incentives, and $13.3 million related to tenant recoveries.
Added in the 10-Q for fiscal Q1 2027
Under “Cost of revenues”
• approximately $22.4 million in cost of revenue associated with GPU hardware sales related to ChronoScale, which commenced during the current fiscal quarter;
Added in the 10-Q for fiscal Q1 2027
Under “Cost of revenues”
• approximately $3.6 million increase in lease and lease related expenses primarily related to ChronoScale’s operating leases; and
• approximately $0.3 million increase in personnel expenses and other costs due to the increases in headcount as well as other related costs directly supporting revenue.
Added in the 10-Q for fiscal Q1 2027
Under “Cost of revenues”
Data center rental and other cost of revenue increased by $43.7 million, from $0.1 million for the three months ended August 31, 2025 to $43.9 million for the three months ended August 31, 2026 as the Company’s HPC hosting operations were not fully commenced during the first fiscal quarter 2026. The increase in data center rental and other cost of revenue was categorized as follows:
Added in the 10-Q for fiscal Q1 2027
Under “Cost of revenues”
• approximately $13.3 million increase in expenses which are reimbursable as tenant recoveries;
• approximately $5.6 million increase in rental property operating expenses, which are not eligible for recovery from our tenant;
Added in the 10-Q for fiscal Q1 2027
Under “Selling, general and administrative expense”
• approximately $12.1 million increase in professional service expense primarily related to legal services provided on discrete transactions and projects, as well as general support of the business;
Added in the 10-Q for fiscal Q1 2027
Under “Selling, general and administrative expense”
• approximately $9.5 million increase in other selling, general, and administrative expense such as travel, computer and software expenses; and
• approximately $2.0 million increase in lease and lease related expense primarily related to ChronoScale’s operating leases.
Added in the 10-Q for fiscal Q1 2027
Under “Interest expense”
Interest expense increased $69.4 million, or 866%, from $8.0 million for the three months ended August 31, 2025, to $77.4 million for the three months ended August 31, 2026. As we entered into more debt arrangements, there was an increase of approximately $66.4 million in interest expense, approximately $2.8 million in loan issuance discount, and approximately $2.4 million in loan issuance cost. These increases were partially offset by a decrease of $2.2 million in finance lease interest associated with the renegotiation of the majority of our finance leases during fiscal year ended May 31, 2026.
Added in the 10-Q for fiscal Q1 2027
Under “Loss on change in fair value of derivatives”
Loss on the change in fair value of derivatives was $49.5 million for the three months ended August 31, 2026, due a decrease of $56.1 million in the fair value of our Babcock & Wilcox Enterprises, Inc. (“B&W”) common stock warrant and an increase of $6.6 million in the fair value of the derivative assets related to the preferred units and corresponding common units held by APLD HPC TopCo 2’s redeemable noncontrolling interest. There was no such loss recorded in the prior year comparative period.
Loss on change in fair value of investment was $11.4 million for the three months ended August 31, 2026, due to a decrease in fair value of our investment in B&W common stock. There was no such loss recorded in the prior year comparative period.
Other expense, net was $1.3 million for the three months ended August 31, 2026 and consisted of a loss of approximately $1.3 million due to the settlement of the SAFEs as a result of an agreement reached with the investor offset by a gain on the fair value of warrants issued to third parties. There was no such activity recorded in the prior year comparative period.
Income tax expense was $1.9 million for the three months ended August 31, 2026, compared to nominal expense for the three months ended August 31, 2025. This change was driven by an increase in current federal and state income tax expense during the current fiscal quarter.
In the 10-Q for fiscal Q1 2026, not in the 10-Q for fiscal Q1 2027
Under “Comparative Results for the Three Months Ended August 31, 2025 and August 31, 2024”
(2)Includes $25 million received in connection with the sale of our Garden City facility once conditional approval requirements were met and escrowed funds were released during the three months ended August 31, 2024.
Related party Services and other revenue decreased $1.9 increased $181.8 million, or 100%, 225%, from $1.9 $80.9 million for the three months ended August 31, 2024 2025 to no related party revenue $262.8 million for the three months ended August 31, 2025, driven by certain 2026. The increase was primarily due to an increase in tenant fit-out services of approximately $157.2 million. This revenue also consisted of approximately $23.0 million in GPU hardware sales related parties terminating their contracts to ChronoScale. The remaining increase in services and other revenue was due to performance improvements in Data Center Hosting Business and ChronoScale during the first fiscal quarter of three months ended August 31, 2026 compared to the three months ended August 31, 2025.
Cost of revenues increased $32.9 • approximately $151.1 million or 144%, from $22.7 million for the three months ended August 31, 2024 to $55.6 million for the three months ended August 31, 2025. The increase was primarily driven by an increase of $25.0 million in expenses associated with tenant fit-out services for our HPC Hosting Business; an increase of $7.2 million in energy costs associated with our Data Center Hosting Business, and an increase of $0.6 million in other expenses directly attributable to generating revenue.
These increases were partially offset by a $2.3 decrease of approximately $4.7 million decrease in professional service expenses primarily related to a decrease in legal services during the three months ended August 31, 2025 compared to the three months ended August 31, 2024. energy costs associated with our Data Center Hosting Business and other costs directly supporting revenue.
Revenue increased $31.3 • approximately $1.3 million or 95%, from $32.9 million for the three months ended August 31, 2024 to $64.2 million for the three months ended August 31, 2025. Approximately $26.3 million of the increase was due to revenue generated related to tenant fit-out services in property insurance expenses associated with our HPC Hosting Business; The remaining $5.0 million increase in revenue is related to the Data Center Hosting Business and is due to performance improvements compared to the three months ended August 31, 2024.
• approximately $16.6 $51.7 million increase in stock based compensation primarily due to accelerated vesting of certain employee an increase in shares awarded related to the increase in headcount and increase in performance stock awards and granted in the period after the three months ended August 31, 2025;
• approximately $3.9 $9.9 million increase in personnel expenses for employee costs and other costs attributable related to supporting the growth of the business. increase in headcount;
Loss on abandonment of assets increased $1.1 million, or 179%, from $0.6 million for the three months ended August 31, 2024 to $1.8 was $2.2 million for the three months ended August 31, 2025, This was driven by the write down of assets to their fair value upon disposal. There was no such loss recorded in the current year comparative period.
Interest expense, net income increased $1.0 $35.0 million, or 33%, 4,080%, from $3.0 million for the three months ended August 31, 2024, to $3.9 $0.9 million for the three months ended August 31, 2025 The increase was primarily driven by a $1.4 to $35.8 million increase in loan interest due to loan activity during for the three months ended August 31, 2025. These increases were partially offset by a $0.5 million increase in interest income 2026 due to an increase in funds held in money market interest-bearing accounts.
Net loss income from discontinued operations increased $29.5 million, or 146%, from a net loss of $20.2 was $16.1 million for the three months ended August 31, 2024 to a net income of $9.3 million for the three months ended August 31, 2025 2026 and represents the income statement activity related to the Cloud Services Ekso business at ChronoScale classified as held for sale and discontinued operations. There was no such activity in the Cloud Services Business had an increase of $28.3 million in operating income for the prior year comparative periods and a decrease in interest expense of $1.1 million for the comparative periods. period.
4 rewritten
Data Center Hosting Business operating profit decreased $29.8 increased $7.3 million, or 83%, 121%, from a profit of $35.9 million for the three months ended August 31, 2024 to a profit of $6.0 million for the three months ended August 31, 2025 This decrease was primarily due to a $24.8 million gain on classification of held for sale related to the sale of the Garden City facility during the three months ended August 31, 2024, with no such gain recorded in the current year comparative period. Additionally, cost of revenues increased by approximately $8.0 $13.3 million for the three months ended August 31, 2025 2026 primarily due to a decrease of $6.4 million in cost of revenues due to more advantageous power pricing when compared to the prior period, primarily due to an increase of 17% in power cost along with other operating expenses. the three months ended August 31, 2025.
HPC Hosting Business operating loss decreased $0.9 profit increased $35.5 million, or 31%, 1,753%, from a loss of $2.9 million for the three months ended August 31, 2024 to a loss of $2.0 million for the three months ended August 31, 2025 to a profit of $33.4 million for the three months ended August 31, 2026. The change is primarily due to revenue generated related to from the first two buildings at our Polaris Forge 1 campus, as well as tenant fit-out services performed, net of expenses during the three months ended August 31, 2026 compared to the three months ended August 31, 2025.
[… 70 unchanged words …] We believe that these non-GAAP financial measures, when considered together with our GAAP financial results, provide management and investors with an additional understanding of our core business operating results regarding factors and trends affecting our business and provide a reasonable basis for comparing our ongoing results of operations. Management considers the Data Center Hosting Business and the HPC Hosting Business to be our core operations for long-run strategic and performance evaluation purposes. Accordingly, these non-GAAP financial measures exclude the results of our consolidated subsidiary, ChronoScale. ChronoScale is included in our unaudited condensed consolidated financial statements and results of continuing operations. Due to its strategic role relative to the Company’s core business, management believes the ChronoScale results may obscure underlying trends in the performance of core operations when included in certain non-GAAP measures.
These non-GAAP financial measures are provided as supplemental measures to our performance measures calculated in accordance with GAAP and therefore, are not intended to be considered in isolation or as a substitute for comparable GAAP measures. Excluding the results of ChronoScale in our non-GAAP financial measures removes revenues and expenses that are part of the Company’s consolidated results and continuing operations and should not be viewed as measures or reflections of liquidity or profitability in accordance with GAAP. Further, these non-GAAP financial measures have no standardized meaning prescribed by GAAP and are not prepared under any comprehensive set of accounting rules or principles. [… 173 unchanged words …]
1 added · 1 rewritten
Added in the 10-Q for fiscal Q1 2027
“Adjusted revenue” is a non-GAAP financial measure that represents total revenue excluding ChronoScale revenue.
“Adjusted operating income (loss)” Income” and “Adjusted net loss from continuing operations” attributable to common stockholders” are non-GAAP financial measures that represent operating (loss) income and net income (loss) from operations excluding ChronoScale, respectively. Adjusted operating income (loss) is Operating loss excluding operating (loss) income from continuing operations attributable to common stockholders, respectively. Adjusted Operating (Loss) Income is Operating (loss) income excluding ChronoScale, stock-based compensation, non-recurring repair expenses, diligence, acquisition, disposition and integration expenses, litigation expenses, non-cash amortization of customer lease incentives, loss on abandonment of assets, gain on classification of held for sale, accelerated depreciation and amortization, restructuring expenses and other non-recurring expenses that management believes are not representative of the Company’s our expected ongoing costs. Adjusted net loss from continuing operations attributable to common stockholders is Adjusted operating income (loss) Income further adjusted for the interest expense directly attributable to ChronoScale, loss on change in fair value of debt derivatives, and preferred dividends. loss on change in fair value of investment. We define “Adjusted net loss from continuing operations attributable to common stockholders per diluted share” as Adjusted net loss from continuing operations attributable to common stockholders divided by weighted average diluted share count.
1 rewritten
“EBITDA” is defined as earnings before interest expense, net, interest income, income tax expense, and depreciation and amortization and excluding results of ChronoScale. “Adjusted EBITDA” is defined as EBITDA adjusted for stock-based compensation, non-cash amortization of customer lease incentives, non-recurring repair expenses, diligence, acquisition, disposition and integration expenses, litigation expenses, gain on classification of held for sale, loss on abandonment of assets, loss on change in fair value of debt, preferred dividends, derivatives, loss on change in fair value of investments, restructuring expenses, and other non-recurring expenses that management believes are not representative of our expected ongoing costs.
1 added · 2 removed
Added in the 10-Q for fiscal Q1 2027
"Net Operating Income" is a non-GAAP financial measure that represents base rental revenue from the HPC Hosting Business. Net Operating Income is HPC Hosting Business base rental revenue, excluding the non-cash amortization of one- time customer lease incentives provided at contract inception, less rental property operating expenses, property taxes, and property insurance expenses. "Net Operating Income Margin" is defined as Net Operating Income divided by HPC Hosting Business base rental revenue.
(1)Represents stock-based compensation expense and employment taxes incurred in connection with the vesting of stock-based awards.
In the 10-Q for fiscal Q1 2026, not in the 10-Q for fiscal Q1 2027
Under “Reconciliation of GAAP to Non-GAAP Measures”
(4)Represents the acceleration of expense related to assets that were abandoned by us due to operational failure or other reasons. Depreciation and amortization in this amount is included in Depreciation and Amortization expense within our calculation of EBITDA, and therefore is not added back as a management adjustment in our calculation of Adjusted EBITDA.
In the 10-Q for fiscal Q1 2026, not in the 10-Q for fiscal Q1 2027
Under “Reconciliation of GAAP to Non-GAAP Measures”
(7)Represents loss on change in fair value of debt due to adjustments to the fair value of the Yorkville Convertible Debt.
3 added · 2 removed · 4 rewritten
Added in the 10-Q for fiscal Q1 2027
Under “7.000% Senior Secured Notes due 2031”
On June 16, 2026, APLD ComputeCo 3 LLC refinanced the Bridge Facility with the closing of a $1.59 billion offering (the “2031 7.000% Notes Offering”) of 7.000% senior secured notes due 2031 (the “2031 7.000% Notes”) at an issue price of 100.000% of par. The 2031 7.000% Notes are senior secured obligations of APLD ComputeCo 3 and bear interest at a rate of 7.000% per annum, payable semi-annually in arrears on June 15 and December 15 of each year, beginning on December 15, 2026. The principal amount of the 2031 7.000% Notes will amortize on a semi-annual basis on June 15 and December 15 of each year, pursuant to the terms and amounts set forth in the 2031 7.000% Notes Indenture. The 2031 7.000% Notes will mature on June 15, 2031, unless earlier redeemed or repurchased in accordance with their terms. The 2031 7.000% Notes are fully and unconditionally guaranteed by the subsidiary guarantors, all of which are wholly owned subsidiaries of APLD ComputeCo 3 LLC. The Company provided a customary completion guarantee for the 2031 7.000% Notes Offering.
Added in the 10-Q for fiscal Q1 2027
Under “Upsize of 2026 Revolving Credit Facility”
On June 26, 2026, in connection with the 2026 Revolving Credit Facility, the Company, APLD Intermediate HoldCo, and certain subsidiaries of APLD Intermediate HoldCo entered into an Incremental Assumption Agreement No. 1 (the Incremental Assumption Agreement”), with First National Bank of Omaha (in its capacities as administrative agent and collateral agent under the 2026 Revolving Credit Facility) and the lenders and issuing banks party thereto, providing for an Incremental Revolving Facility Commitment (as defined in the Incremental Assumption Agreement) in an aggregate principal amount of up to $80.0 million (the “Incremental Revolving Financing”). After giving effect to the Incremental Assumption Agreement, the aggregate revolving commitments under the 2026 Revolving Credit Facility increased to $430.0 million, with an additional $120.0 million accordion option remaining. The Incremental Revolving Financing constitutes a part of the 2026 Revolving Credit Facility and is subject to the terms and conditions of the Revolving Credit Agreement and the other loan documents entered into in connection therewith.
As of August 31, 2026, approximately $241.0 million of standby letters of credit were outstanding under the 2026 Revolving Credit Facility. Refer to Note 9 - Debt in the accompanying notes to the unaudited condensed consolidated financial statements for additional information.
On June 30, 2026, we entered into a Loan and Security Agreement (the "Texas Capital Loan Agreement") with Texas Capital Bank ("Texas Capital") and a related Promissory Note in favor of Texas Capital in the stated principal amount of $58.5 million (the "Texas Capital Note"). The Texas Capital Loan Agreement contains standard terms, conditions and covenants. Interest is payable on the Texas Capital Note at the sum of an adjusted term SOFR plus an applicable margin. The Texas Capital Note matures on June 30, 2031.
Added in the 10-Q for fiscal Q1 2027
Under “Operating Activities”
The net cash provided by (used in) operating activities changed by $145.5 million, or 178%, from $81.5 million used in operating activities for the three months ended August 31, 2025 to $63.9 million provided by operating activities for the three months ended August 31, 2026. Activities that positively impacted operating cash flows during the three months ended August 31, 2026 included stock-based compensation, loss on change in fair value of derivatives, loss on change in fair value of investment, loss on classification of held for sale and non-cash interest expense. Other impacts included changes in operating assets and liabilities primarily affected by changes in the timing and quantity of services provided and associated working capital needs.
In the 10-Q for fiscal Q1 2026, not in the 10-Q for fiscal Q1 2027
Under “June 2025 At-the-Market Sales Agreement”
On June 2, 2025, the Company entered into a Sales Agreement with Northland Securities, Inc. and Wells Fargo Securities, LLC (the “June 2025 Sales Agreement”), pursuant to which, up to $200,000,000 of shares of the Company's common stock may be issued if and when sold. As of the date of this report, the Company has issued and sold approximately 15.3 million shares under the June 2025 Sales Agreement for gross proceeds of approximately $196.4 million.
On April 30, 2025, we entered into the Preferred Equity Purchase Agreement (the “PEPA”) with certain investors for the issuance and sale of up to 156,000 shares of Series G Convertible Preferred Stock (the “Series G Preferred Stock”) in a transaction. The shares of the Series G Preferred Stock may be put to the investors from time to time at our discretion during the period commencing on April 30, 2025 (the “Commitment Date”) and terminating on the earlier of (i) the 36-month anniversary of the Commitment Date or (ii) such date as there ceases to be a sufficient number of authorized but unissued shares of common stock remaining under the Exchange Cap (as defined in the PEPA).
In the 10-Q for fiscal Q1 2026, not in the 10-Q for fiscal Q1 2027
Under “Operating Activities”
The net cash used in operating activities increased by $6.1 million, or 8%, from net cash used in operating activities of $75.9 million for the three months ended August 31, 2024 to net cash used in operating activities of $82.0 million for the three months ended August 31, 2025. The increase was primarily driven by an increase in accounts receivable due to tenant fit-out services revenue as well as a decrease in depreciation and amortization due to the Cloud Services Business being classified as held for sale during the three months ended August 31, 2025. These impacts were partially offset by an increase in stock based compensation expense due to awards granted between the comparative periods as well as a decrease in gain on classification of held for sale as there was no gain on classification of held for sale during the three months ended August 31, 2025 and a decrease in deferred revenue reflecting timing differences between revenue recognition and new customer invoicing during the three months ended August 31, 2025 when compared to the three months ended August 31, 2024.
Our primary capital requirements are to fund the development and expansion of our data center infrastructure, support working capital needs, cover operating expenses, and finance capital expenditures associated with technology upgrades and facility enhancements. As of August 31, 2025, 2026, we had unrestricted cash and cash equivalents of $73.9 million $2.9 billion and funds restricted for construction expenditures cash of $2.9 $728.0 million. Historically, we have incurred losses and have relied on equity and debt financings to fund our operations. We have primarily generated cash in the last 12 months from the proceeds of our term loans, issuances of common stock, preferred stock, convertible promissory senior secured notes senior unsecured convertible notes, (issued by our subsidiaries), debt facilities and the receipt of contractual deposits and revenue payments from customers.
(4)Financing lease obligations include future minimum payments for our finance leases. We have entered into various leases which are executed but not yet commenced with total minimum payments of approximately $16.6 million and terms of 1.5 years to 2.0 years.
The net cash used in investing activities increased by $216.8 million, $1.8 billion, or 665%, 733%, from $32.6 million for the three months ended August 31, 2024, to $249.4 $249.9 million for the three months ended August 31, 2025, to $2.1 billion for the three months ended August 31, 2026. This increase was primarily due to an increase of approximately $194.6 million $1.8 billion in investments in property and equipment during the three months ended August 31, 2025 2026 as our payments in the current periods period for construction of the each of our Polaris Forge 1, Polaris Forge 2, Polaris Forge 3, Delta Forge 1, and Delta Forge 2 campus data center facilities outpaced the comparative period construction payments. The remaining increase increased as well as investment in net cash used in investing activities was due to there being no proceeds from sale of assets during the three months ended August 31, 2025, compared to the three months ended August 31, 2024. companies.
The net cash provided by financing activities increased by $158.9 million, $1.2 billion, or 97%, 379%, from $163.4 million for the three months ended August 31, 2024 to $322.2 million for the three months ended August 31, 2025 to $1.5 billion for the three months ended August 31, 2026. The primary reason for the change was an increase in the net borrowings of long-term debt of $1.6 billion from the issuance of our 2031 Notes as well as an our draw on the 2026 Revolver of $82.4 million. Additionally, there was an increase in receipt of net proceeds from offerings of our common and preferred stock of approximately $274.0 $104.5 million during the three months ended August 31, 2025. Also contributing to the increase was a decrease of $12.0 million in repayments of long-term debt and payments of deferred financing costs during the three months ended August 31, 2025 2026 compared to the three months ended August 31, 2024. 2025. These increases were partially offset by decreases an increase of $104.9 $313.5 million in borrowings repayments of long term long-term debt and $12.0 as well as a decrease of $196.4 million in proceeds from SAFE agreements for equity in Applied Digital Cloud Corporation, a wholly-owned subsidiary of the Company common stock during the three months ended August 31, 2025, 2026 compared to the three months ended August 31, 2024 as well as increases in repayment of finance leases of $3.9 million, tax payments for restricted stock upon vesting of $4.5 million, and issuance of preferred stock dividends of $1.5 million during the three months ended August 31, 2025.
14 other paragraphs were edited by fewer than 15 words; 10 changed only figures, dates or period names; 20 are word for word the same; 6 were split, merged or moved, with most of their text in the other filing; their text is in the 10-Q for fiscal Q1 2027 and the 10-Q for fiscal Q1 2026 linked above.
Applied Digital's annual report against the year before
In Applied Digital's 10-K for fiscal 2026, the MD&A added 23 passages, removed 20 and rewrote 48 against the 10-K for fiscal 2025.
Compared: Item 7 of the 10-K filed Jul 29, 2026 (accession 0001144879-26-000048, period ended May 31, 2026; 184 paragraphs) and Item 7 of the 10-K filed Jul 30, 2025 (accession 0001144879-25-000021, period ended May 31, 2025; 161 paragraphs).
Applied Digital's figures, dates and period names change every period and are not counted. A paragraph is rewritten when at least 15 other words were added or removed: added text is underlined and shaded, removed text is struck through, and long unchanged stretches are shortened to the words around each change.
1 added · 1 rewritten
Added in the 10-K for fiscal 2026
During the fiscal year 2026, we completed the contribution of our Cloud Services Business to ChronoScale (each as defined below), formerly Ekso (as defined below). As a result of this transaction, certain prior-period amounts presented in this Annual Report have been recast to conform to the current period presentation. The recast primarily reflects changes associated with the transaction, including revisions to segment reporting and the presentation of certain historical financial statement line items and related disclosures. As a result, certain fiscal year 2025 and fiscal year 2024 amounts presented in this Annual Report differ from the amounts previously reported in our Annual Report on Form 10-K for the fiscal year ended May 31, 2025.
This Item generally discusses fiscal year 2026 and 2025 items and year-to-year comparisons between fiscal year 2026 and 2025. A comparison of our results of operations and cash flows for fiscal year 2024 2025 and fiscal year 2023 2024 is not included in this Annual Report and can be found under “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations” in our Annual Report on Form 10-K for the fiscal year ended May 31, 2024, 2025, filed with the SEC on August July 30, 2024. 2025.
12 added · 10 removed · 17 rewritten
Added in the 10-K for fiscal 2026
We consolidate variable interest entities (“VIE”) and voting interest entities ("VOE") where it has been determined that the Company is the primary beneficiary of the entities' operation in accordance with ASC Topic 810, Consolidations. The primary beneficiary is the party that has both the power to direct the activities that most significantly impact the VIE's/VOE's economic performance and the obligation to absorb losses or the right to receive benefits of the VIE/VOE that could potentially be significant to the VIE/VOE. In evaluating whether the Company is the primary beneficiary, the Company evaluates its power to direct the most significant activities of the VIE/VOE by considering the purpose and design of the entity and the risks the entity was designed to create and pass through to its variable interest holders. The Company also evaluates its economic interests in the VIE/VOE.
On May 5, 2026, the Company completed the previously announced divestiture of its cloud business pursuant to that certain Contribution and Exchange Agreement (the “Contribution and Exchange Agreement”), dated February 15, 2026, by and among Ekso Bionics Holdings, Inc. (“Ekso”), APLD Intermediate HoldCo LLC, a Delaware limited liability company (“APLD Intermediate”), APLD ChronoScale HoldCo LLC, a Delaware limited liability company and a wholly owned subsidiary of APLD Intermediate (“Contributor”), each a wholly owned direct or indirect subsidiary of the Company, and Applied Digital Cloud Corporation, a Nevada corporation, a wholly owned indirect subsidiary of the Company and a direct subsidiary of Contributor (“Cloud”), for purposes of consummating a business combination (the “Cloud Business Combination”). Pursuant to the Contribution and Exchange Agreement, Contributor contributed to Ekso all of its right, title and interest in and to 1,200 shares of common stock of Cloud, constituting 100% of the issued and outstanding equity of Cloud, in exchange for 138,216,820 newly issued shares of Ekso common stock, par value $0.001 per share. As a result of the Cloud Business Combination, Cloud became a wholly owned subsidiary of Ekso, Ekso changed its name to ChronoScale Corporation (“ChronoScale”) and ChronoScale’s common stock began trading on the Nasdaq Capital Market under the symbol “CHRN” on May 5, 2026. Immediately following the closing of the Cloud Business Combination, the Company (on an aggregate basis with Contributor), owned approximately 97% of the issued and outstanding equity of ChronoScale.
Added in the 10-K for fiscal 2026
Under “HPC Hosting Business”
On March 30, 2026, the Company and CoreWeave amended the ELN-02 Lease to suspend the term for two of the four data halls covered by the lease (the “ELN-02 Lease Amendment”) and the Company entered into a new datacenter lease with CoreWeave Compute Acquisition Co. VIII, LLC (“CoreWeave SPV”), a wholly owned subsidiary of CoreWeave, for those two data halls on substantially the same terms as the ELN-02 Lease (the “ELN-02 SPV Lease”). The ELN-02 SPV Lease is conterminous with the initial term of the ELN-02 Lease. Upon the expiration or earlier termination of the ELN-02 SPV Lease, the suspended term under the ELN-02 Lease will resume and all four data halls of ELN-02 will once again be governed by the ELN-02 Lease. As further credit enhancement, CoreWeave delivered to APLD ELN-02 LLC an Unconditional Springing Guaranty of Payment and Performance (the “ELN-02 Guaranty”) in connection with CoreWeave SPV’s obligations under the ELN-02 SPV Lease. CoreWeave is obligated to provide a letter of credit in the amount of $50 million to secure obligations under the ELN-02 Lease within 30 days of March 30, 2026.
Also on March 30, 2026, CoreWeave entered into an Assignment, Assumption and Consent Agreement with CoreWeave SPV and APLD ELN-03 LLC, assigning all of CoreWeave’s rights and obligations under the ELN-03 Lease to CoreWeave SPV for the remaining term of the ELN-03 Lease and releasing CoreWeave from the ELN-03 Lease. In addition, CoreWeave also provided an Unconditional Springing Guaranty of Payment and Performance in connection with CoreWeave SPV’s obligations under the ELN-03 Lease, similar to the ELN-02 Guaranty.
On August 28, 2025, APLD ELN-02 C LLC, our subsidiary, entered into a third data center lease, the (“Building 4 Lease”) with CoreWeave to deliver an additional 150 MW at Polaris Forge 1, bringing the total capacity under contract at Polaris Forge 1 to 400 MW. We have guaranteed the obligations of APLD ELN-02 C LLC under the Building 4 Lease.
On August 18, 2025, we also announced that we would be breaking ground on our Polaris Forge 2 campus with an initial 200 MW data center near Harwood, North Dakota. The project has begun and we currently anticipate reaching initial capacity in the calendar year 2026 and reaching full capacity in early calendar year 2027. On October 20, 2025, APLD FAR-01 LLC and APLD FAR-02 LLC, the Company’s subsidiaries, entered into a data center lease with a U.S.-based investment-grade hyperscaler to deliver 200MW of critical IT load to support the hyperscaler’s AI and HPC infrastructure at Polaris Forge 2, which is currently under construction. The initial 200 MW are phased within two buildings expected to begin to come online during the calendar year 2026.
On January 22, 2026 we announced that we broke ground on Delta Forge 1, a 300 MW critical IT load campus located in a strategic southern U.S. market.
On April 20, 2026 and April 22, 2026, APLD AEX-01 LLC and APLD AEX-02 LLC, respectively, each a subsidiary of the Company, entered into separate data center leases with a second U.S.-based investment-grade hyperscaler to deliver a combined 300MW of critical IT load to support the hyperscaler’s AI and HPC infrastructure at Delta Forge 1. Initial operations at Delta Forge 1 are anticipated to commence during calendar year 2027. On May 20, 2026, a different subsidiary of the Company entered into a data center lease with the same U.S.-based investment-grade hyperscaler to deliver a combined 300MW of critical IT load to support the second hyperscaler’s AI and HPC infrastructure at Polaris Forge 3. Initial operations at Polaris Forge 3 are anticipated to commence during calendar year 2027.
We began to generate revenue from this business segment in fiscal year 2026, recognizing $385.3 million in revenue during the fiscal year ended May 31, 2026, with $270.6 million related to services revenue and $114.7 million related to data center rental and other revenue.
Added in the 10-K for fiscal 2026
Under “ChronoScale”
On May 5, 2026, we completed the separation of our cloud business in a series of transactions that resulted in the Company owning approximately 97% of the issued and outstanding equity of ChronoScale Corporation ("ChronoScale"). ChronoScale owns and operates our historic cloud business and is consolidated into our financial statements. The common stock of ChronoScale began trading on the Nasdaq Capital Market under the symbol “CHRN” on May 5, 2026.
ChronoScale's cloud business currently operates in three states: Colorado, Minnesota and Utah. This business provides cloud services to customers, such as AI and machine learning developers by renting space at third party co-location centers and providing the customers with access to its cloud computing equipment.
On January 15, 2026, the Company appointed Jason Zhang, co-founder and Chief Strategy Officer, to serve as the Company’s co-founder and President.
In part to facilitate the 2030 9.250% Notes Offering (as defined below), we completed a targeted reorganization of the entities and assets related to the Polaris Forge 1 campus. This reorganization included a series of steps such as renaming certain existing entities and forming new direct and indirect wholly owned subsidiaries of APLD HPC Holdings 2 LLC, including APLD ComputeCo LLC, the issuer of the 2030 9.250% Notes (“APLD ComputeCo”), and additional internal transactions, including equity distributions and contributions and asset transfers, resulting in APLD ELN-02 LLC and APLD ELN-03 LLC being owned by APLD ComputeCo. APLD ComputeCo is wholly owned by APLD HPC TopCo 2, in which we own 86.5% of fully diluted common equity, and an affiliate of funds and investment vehicles managed by entities within MAM owns 13.5% of fully diluted common equity, as well as preferred equity.
In order to facilitate the 2031 6.750% Notes Offering (as defined below), we also completed a targeted reorganization of the entities and assets related to the Polaris Forge 2 campus consistent with the reorganizations completed in connecting with the 2030 9.250% Notes Offering. This reorganization included a series of steps such as renaming certain existing entities and forming new direct and indirect wholly owned subsidiaries of APLD FAR Holdings LLC, including APLD ComputeCo 2 LLC (“APLD ComputeCo 2”), the issuer of the 2031 6.750% Notes, and additional internal transactions, including equity distributions and contributions and asset transfers. Under the resulting structure, APLD FAR-01 LLC and APLD FAR-02 LLC are owned by APLD ComputeCo 2. APLD ComputeCo 2 is wholly owned by APLD HPC TopCo 2.
Added in the 10-K for fiscal 2026
Under “Series G Preferred Stock”
On September 11, 2025, we entered into the second amendment (the “Second Amendment”) to the PEPA, dated April 30, 2025, by and between us and the investors signatory thereto, as amended by the First Amendment, dated August 14, 2025 in order to increase our access to capital to fund the continued construction and development of our Polaris Forge 1 data center campus in Ellendale, North Dakota and other general corporate purposes.
The Second Amendment amends the PEPA to, among other things, increase the aggregate commitment amount of the shares of Series G Preferred Stock from $300 million to $450 million. Concurrent with the Second Amendment, the
Added in the 10-K for fiscal 2026
Under “Series G Preferred Stock”
On September 25, 2025, the Company filed an amendment (the “Third CoD Amendment”) to the Series G Certificate of Designation, originally filed with the Secretary of State of the State of Nevada on April 30, 2025, as amended. The Third CoD Amendment amended the Series G Certificate of Designation, as amended, to increase the Floor Price (as set forth in Section 1.5(c)(i) of the Certificate of Designation) to $22.00 from $12.50.
On October 7, 2025, the Company entered into the third amendment (the “Third Amendment”) to the PEPA, dated April 30, 2025, by and between the Company and the investors signatory thereto, as amended by the First Amendment and the Second Amendment, in order to increase its access to capital to fund the continued construction and development of its Polaris Forge I data center in Ellendale, North Dakota. The Third Amendment amends the PEPA to, among other things, increase the aggregate commitment amount of the shares of the Series G Preferred Stock from 450.0 million to 590.0 million.
On October 14, 2025, the Company filed a fourth amendment (the “Fourth CoD Amendment”) to the Series G Certificate of Designation, as amended. The Fourth CoD Amendment amended the Series G Certificate of Designation, as amended, which increased the Floor Price (as set forth in Section 1.5(c)(i) of the Certificate of Designation) to $34.00 from $22.00. On October 21, 2025, the Company entered into the fourth amendment (the “Fourth Amendment”) to the PEPA in order to increase its access to capital to fund the continued construction and development of its Polaris Forge 1 and Polaris Forge 2 data centers in Ellendale and Harwood, North Dakota, as well as general working capital purposes and for transaction expenses.
The Fourth Amendment amended the PEPA to, among other things: (i) increase the aggregate commitment amount of the shares of Series G Preferred Stock, from $590.0 million to $1.59 billion; (ii) subject to waiver by a majority-in-interest of the investors, (a) set the maximum put issuance amount to $75.0 million per issuance, (b) set the limit to one put issuance per seven (7) business day period, and (c) set the maximum aggregate stated value of Series G Preferred Stock outstanding at any one time to $75.0 million; (iii) increase the original discount from 2% to 3%; (iv) eliminate the placement agent fee; and (v) eliminate the prohibition on Variable Rate Transactions (as defined in the PEPA). On October 21, 2025, in connection with the entry into the Fourth Amendment, the Applied Digital filed an amendment (the “Fifth Certificate of Designations Amendment”) to the Certificate of the Designations, Powers, Preferences and Rights of Series G Convertible Preferred Stock, originally filed with the Secretary of State of the State of Nevada on April 30, 2025, as amended on each of August 14, 2025, September 11, 2025, September 25, 2025 and October 14, 2025 (as amended, the “Certificate of Designations”). The Fifth Certificate of Designations Amendment amended the Certificate of Designations to, among other things, (i) increase the authorized shares of Series G Preferred Stock from 204,000 shares to 1,030,000 shares, and (ii) increase the limit below which the Floor Price (as defined in Section 1.5(c)(ii) of the Certificate of Designations) may not be reduced from $4.33 to $4.48. In addition, under the Fifth Certificate of Designations Amendment, Applied Digital’s Board of Directors may increase or decrease the applicable Floor Price with respect to any put, at its sole discretion.
On May 29, 2026, the Company entered into the fifth amendment (the “Fifth Amendment”) to the PEPA. The Fifth Amendment amended the PEPA to, among other things: (i) set the maximum put issuance amount to $150,000,000 per issuance, (ii) set the limit to one put issuance per seven (7) calendar day period, (iii) set the maximum aggregate stated value of Series G Preferred Stock outstanding at any one time to $150,000,000, (iv) create a controlled account for which proceeds from the put issuance will be funded, (v) extend the term of the PEPA to August 29, 2029, and (vi) provide a cure period for the investors to pay the purchase price for any put issuance.
Added in the 10-K for fiscal 2026
Under “Amended and Restated Unit Purchase Agreement”
On October 6, 2025, all conditions to the Initial Closing (as defined in the A&R UPA) were satisfied and the Initial Closing occurred. At the Initial Closing, TopCo 2 sold to the Purchaser 112,500 Preferred Units in TopCo 2 at a price per Preferred Unit of $1,000, for an aggregate purchase price of $112.5 million, and for no additional consideration, TopCo 2 agreed to issue to the Purchaser such number of Common Units of TopCo 2 representing, in the aggregate, seven and a half percent (7.5%) of the fully diluted common equity of TopCo 2 as of immediately following the Initial Closing. The proceeds of the Initial Closing will be used to pay, among other things, construction and development costs of Polaris Forge 1 and transaction expenses. MAM has the right to invest up to an additional $4.9 billion under the A&R UPA.
In addition, pursuant to the A&R UPA, on October 6, 2025, the Company issued to the designated affiliates of the Purchaser, warrants to purchase an aggregate of 2.4 million shares of the Company’s common stock. Under its terms the warrants became exercisable on April 6, 2026. Also on October 6, 2025, the Company entered into a registration rights agreement with the Purchaser, pursuant to which the Company agreed to file with the SEC a registration statement registering the resale of the shares of common stock issuable upon exercise of the warrants within 60 days of the execution of the registration rights agreement. On November 25, 2025, TopCo 2 sold to the Purchaser 450,000 Preferred Units in TopCo 2 at a price per Preferred Unit of $1,000, for an aggregate purchase price of $450.0 million.
On December 9, 2025, TopCo 2 sold to the Purchaser an additional 337,500 Preferred Units in TopCo 2 at a price per Preferred Unit of $1,000, for an aggregate purchase price of $337.5 million. Additionally, 27,778 common units were issued.
On May 29, 2026, TopCo 2 completed a fourth closing under its A&R UPA, selling 925,000 preferred units for $925.0 million and issuing an additional 41,815 common units. This brought the total amount funded to date under the A&R UPA to $1.8 billion as of May 31, 2026 and MIP HPC Holdings, LLC's holdings to 13.5% of TopCo 2’s fully diluted common equity.
On October 7, 2025, the Board of Directors approve and authorized 9,291,199 shares of the Company’s capital stock that was currently held in treasury stock to be retired and returned to the authorized but unissued capital stock.
Added in the 10-K for fiscal 2026
Under “Settlement of Prepaid Forward Transaction”
On November 3, 2025, the Company’s Prepaid Forward Transaction associated with the Convertible Notes matured and the Company received 7,165,300 shares of common stock which are now held in treasury stock as of May 31, 2026.
Added in the 10-K for fiscal 2026
Under “Increase in 2024 Plan Authorized Shares”
On November 5, 2025, at the Annual Stockholders’ Meeting, the Company’s stockholders approved an amendment to the Applied Digital Corporation 2024 Omnibus Equity Incentive Plan to increase the number of shares of common stock authorized for issuance thereunder by 15,000,000 shares.
On September 9, 2025, our subsidiary, APLD FAR-01 LLC ("APLD FAR-01"), entered into a promissory note (the “MEC Promissory Note”) with Macquarie Equipment Capital, Inc., a Delaware corporation ("MEC”). The MEC Promissory Note provides for a principal sum of (a) $50 million (the “Initial Loan”), which was drawn on the Closing Date, plus (b) subject to the mutual consent of us and MEC, additional loans in an aggregate principal amount not to exceed $25 million (the “Additional Loans” and together with the Initial Loan, the “MEC Loan”).
The MEC Loan shall bear interest at 8.0% per annum, unless an Event of Default (as defined therein) has occurred and is continuing, in which case, the Secured Obligations (as defined therein) shall bear interest at the sum of 8.0% per annum plus an additional 1.50% per month (the “Post-Default Rate”). From the Closing Date until the date that is twelve months following the Closing Date (the “PIK Period”), accrued interest will be paid in kind, with such payment in kind being capitalized to principal monthly and at such other times as may be specified in the MEC Promissory Note. After the PIK Period, accrued interest will be paid in cash, provided that (i) the Post-Default Rate interest is payable in cash on demand and (ii) accrued interest on any principal amount repaid or prepaid is payable on the date of such repayment or prepayment. The MEC Promissory Note matures on the earliest of (i) the date of acceleration of the MEC Loan, (ii) February 1, 2026, if the 200 MW Lease Execution (as defined therein) has not occurred on or before October 31, 2025, or (iii) September 9, 2027. The MEC Loan will accelerate and we must mandatorily prepay the full outstanding principal balance of the MEC Promissory Note, together with accrued interest to the date of prepayment on the principal amount prepaid and any other amounts then due and payable, upon the occurrence of any of the following conditions: (a) a Change of Control (as defined therein), (b) within ninety (90) days following the occurrence of the 200 MW Lease Execution, and (c) within thirty (30) days following a Qualifying Preference Share Issuance (as defined therein).
We may voluntarily prepay all or part of the MEC Promissory Note at any time with no less than three (3) business days’ notice with accrued interest to the date of prepayment on the principal amount prepaid, so long as, with respect to the portion of the MEC Loan then being prepaid, in each case, such prepayment is accompanied by the payment of amounts sufficient to achieve a rate of return that equals or exceeds 1.10 to 1.00. The same 1.10x return hurdle applies to repayment at maturity. Amounts repaid under the MEC Promissory Note will not be available to be re-borrowed.
Proceeds of the MEC Loan under the MEC Promissory Note were used, in part, to (i) pay transaction costs, (ii) pay transaction expenses in connection with the Note Documents (as defined therein), (iii) fund the purchase of the financed properties located on the Company’s campus in Harwood, North Dakota (“Polaris Forge 2”), including all associated closing costs, title fees, and legal expenses, (iv) finance improvements to the Polaris Forge 2 properties, (v) fund the purchase of the Transformers (as defined therein) and other equipment expected to be installed and used for the improvements of the Polaris Forge 2 properties, (v) to pay any other costs, fees, expenses, or amounts related to or in connection with the development and construction of Polaris Forge 2, and (vi) for general corporate working capital purposes.
In connection with the MEC Loan, (i) APLD FAR-01, APLD FAR Holdings LLC, a Delaware limited liability company ("APLD FAR Holdings"), as parent of the APLD FAR-01, and APLD FAR-02 LLC, a Delaware limited liability company ("APLD FAR-02"), as a subsidiary of APLD FAR Holdings, have entered into a guarantee and collateral agreement, as grantors thereunder, in favor of MEC (the “Guarantee and Collateral Agreement”).
Added in the 10-K for fiscal 2026
Under “2025 Revolving Credit Facility”
On November 10, 2025, the Company entered into a loan and security agreement with First National Bank of Omaha, pursuant to which the lender agreed to make one or more revolving loans, and issue letters of credit, from time to time to the Company in an aggregate principal amount of $65 million (the "2025 Revolving Credit Facility"). Amounts borrowed and repaid are available for future borrowing. Interest accrues on the outstanding balance at a rate of SOFR plus 2.75% per annum. The loan is secured by all of the Company’s (but none of its subsidiaries’) assets. On May 29, 2026, the 2025 Revolving Credit Facility was modified and the standby letters of credit thereunder transferred when the Company and certain of its subsidiaries entered into the 2026 Revolving Credit Facility (as defined below).
Added in the 10-K for fiscal 2026
Under “SMBC Loan Extinguishment”
Concurrently with the closing of the 2030 9.250% Notes Offering, we repaid in full the aggregate principal balance plus accrued interest under the Credit and Guaranty Agreement, dated as of February 11, 2025, by and among APLD HPC Holdings LLC, the Subsidiary Guarantors thereunder (as defined therein), the lenders party thereto and Sumitomo Mitsui Banking Corporation (“SMBC”), as administrative agent.
On December 18, 2025, APLD DevCo LLC ("APLD DevCo”), a subsidiary of the Company, entered into an ongoing credit arrangement with MEC, for the purposes of funding the initial sourcing, planning, development and construction costs associated with a new data center project (the “DevCo Facility”) and other potential projects.
The DevCo Facility is evidenced by, among other documents, that certain Promissory Note, dated as of December 18, 2025 (such date, the “Initial Closing Date”) (as amended and restated by that certain Amendment No. 1 to Promissory Note dated as of February 24, 2026 and as may be further amended, restated, amended and restated, supplemented, or otherwise modified from time to time, the “DevCo Promissory Note”) executed by APLD DevCo in favor of MEC. The DevCo Promissory Note provides for a principal sum of (a) $45 million (the “First Draw”), which was drawn on the Initial Closing Date, plus (b) $40 million (the “Second Draw”) which was drawn on February 24, 2026, plus (c) $15 million (the “Third Draw,” and, together with the First Draw and the Second Draw, the “Initial Loan,” and each, individually, a “Draw”) with the Third Draw to be funded upon APLD DevCo’s request at any time after the Initial Closing Date subject to satisfaction of or waiver by MEC of certain conditions precedent on or prior to the Third Draw, plus (d) the principal sum of any Additional Loans (as defined below, and, together with the Initial Loan, the “DevCo Loan”), if applicable, made by MEC (at the mutual consent of APLD DevCo and MEC).
In addition, the DevCo Promissory Note provides for, upon request of APLD DevCo occurring prior to the Maturity Date (as defined below), (a) rolling over of the outstanding principal balance of the DevCo Loan from time to time into one or more loans for one or more new projects (such rollovers, the “Rollover Loans”), or (b) increasing the size of the existing DevCo Loan by advancing new loans to APLD DevCo (such loans, the “Additional Loans”), in either case, for the purpose of financing development activities at new or existing data center projects at direct or indirect, wholly owned domestic subsidiaries of APLD DevCo, each of which shall become a guarantor with respect to such Additional Loans or Rollover Loans, as applicable, subject to the prior written approval of MEC (in its sole discretion) and the satisfaction of the conditions specified by MEC.
Each Draw is fully committed, but any Additional Loans or Rollover Loans made by MEC under the DevCo Promissory Note would be on an uncommitted, discretionary basis (with no specified maximum borrowing limit for any Additional Loans or Rollover Loans).
The DevCo Loan shall bear interest at 8.0% per annum, unless an Event of Default (as defined therein) has occurred and is continuing, in which case, the Secured Obligations (as defined therein) shall bear interest at the sum of 8.0% per annum plus an additional 1.50% per month (the “Post-Default Rate”).
The DevCo Loan matures on the earliest of (i) the date of acceleration of the DevCo Loan, (ii) July 18, 2026, if the Initial Lease Execution (as defined therein) has not occurred on or before April 18, 2026, or (iii) December 18, 2027 (the “Maturity Date”).
Proceeds from the DevCo Loan will be used, in part, to (i) pay transaction expenses, and (ii) fund the purchase, development and improvement of, and the purchase of equipment for, our latest new project under development.
In connection with the Loan, (i) APLD Intermediate as direct parent of APLD DevCo, and APLD DevCo’s subsidiaries (the “Note Parties”) have entered into a guarantee and collateral agreement, as grantors thereunder, in favor of MEC (the “Guarantee and Collateral Agreement”), and (ii) the Company has entered into a parent guarantee in favor of MEC to guarantee the obligations of the Note Parties under the DevCo Promissory Note.
On May 29, 2026, APLD DevCo repaid the DevCo Loan in full, including all outstanding and unpaid principal, accrued interest, and rate of return, when the Company and certain of its subsidiaries completed the fourth closing under the Amended & Restated Unit Purchase Agreement, as described in Note 11 - Variable Interest Entities.
938 more words of this passage are in the 10-K filed Jul 29, 2026.
Added in the 10-K for fiscal 2026
Under “Delta Forge 2 Lease”
On June 5, 2026, we entered into an approximately 15-year lease (with three five-year renewal options) with a high investment-grade hyperscaler at our Delta Forge 2 210 MW critical IT load campus located in our southern region, comprising a single building under construction. The lease is for the full 210 MW of critical IT load, representing approximately $5.2 billion of contracted revenue over the base term, with expected delivery in the first half of calendar year 2028.
On June 16, 2026, APLD ComputeCo 3 refinanced the Bridge Facility with the closing of a $1.59 billion offering (the “2031 7.000% Notes Offering”) of 7.000% senior secured notes due 2031 (the “2031 7.000% Notes”) at an issue price of 100.000% of par. The 2031 7.000% Notes are senior secured obligations of APLD ComputeCo 3 and bear interest at a rate of 7.000% per annum, payable semi-annually in arrears on June 15 and December 15 of each year, beginning on December 15, 2026. The principal amount of the 2031 7.000% Notes will amortize on a semi-annual basis on June 15 and December 15 of each year, in amounts set forth in the Indenture. The 2031 7.000% Notes will mature on June 15, 2031, unless earlier redeemed or repurchased in accordance with their terms. The 2031 7.000% Notes are fully and unconditionally guaranteed by the subsidiary guarantors, all of which are wholly owned subsidiaries of APLD ComputeCo 3. The Company provided a customary completion guarantee for the 2031 7.000% Notes Offering.
Added in the 10-K for fiscal 2026
Under “Satisfaction of Escrow Release Condition for 6.750% Senior Secured Notes due 2031”
On June 18, 2026, APLD ComputeCo 2 satisfied the escrow release condition under the escrow agreement for the 2031 6.750% Notes and executed and delivered to the escrow agent an escrow release certificate directing the escrow agent to release the funds in the escrow account to APLD ComputeCo 2 and apply such funds in accordance with the escrow agreement and the indenture for the 2031 6.750% Notes.
On June 26, 2026, in connection with the 2026 Revolving Credit Facility, the Company, APLD Intermediate HoldCo, and the subsidiary guarantors party to the Revolving Credit Agreement entered into an Incremental Assumption Agreement No. 1 (the “Assumption Agreement”), with the Revolving Credit Collateral Agent and the lenders and issuing banks party thereto, providing for an Incremental Revolving Facility Commitment in an aggregate principal amount of up to $80,000,000 (the “Incremental Revolving Financing”). After giving effect to the Assumption Agreement, the aggregate revolving commitments under the 2026 Revolving Credit Facility increased to $430.0 million, with an additional $120 million accordion option remaining. The Incremental Revolving Financing constitutes a part of the 2026 Revolving Credit Facility and is subject to the terms and conditions of the Revolving Credit Agreement and the other loan documents entered into in connection therewith.
On June 30, 2026, the Company entered into a Loan and Security Agreement (the "Texas Capital Loan Agreement") with Texas Capital Bank ("Texas Capital") and a related Promissory Note in favor of Texas Capital in the stated principal amount of $58.5 million (the "Texas Capital Note"). The Texas Capital Loan Agreement contains standard terms, conditions and covenants. Interest is payable on the Texas Capital Note at the sum of an adjusted term SOFR plus an applicable margin. The Texas Capital Note matures on June 30, 2031.
On July 1, 2026, ChronoScale, our majority owned public subsidiary, completed a holding company formation transaction (the “Holding Company Transaction”) that created a new parent holding company as the public company, called ChronoScale Holdings Corporation, a Nevada corporation (“ChronoScale Holdings”), with its operating companies as wholly-owned subsidiaries. The holding company structure better reflects ChronoScale’s individual operating businesses, allows for and can accommodate future growth from internal operations and generally provides for greater administrative and operational flexibility. ChronoScale Holdings has the exact same classes and number of shares outstanding after the Holding Company Transaction as ChronoScale had outstanding immediately before the Holding Company Transaction, and as such, the shareholders of ChronoScale were not be diluted as a result of the Holding Company Transaction. Following the Holding Company Transaction, ChronoScale Holdings became the successor issuer to ChronoScale and continues to trade on Nasdaq under the ticker symbol “CHRN” with the same CUSIP.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “Data Center Hosting Business”
Our Data Center Hosting Business builds and operates data centers to provide energized space to crypto mining customers.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “HPC Hosting Business”
We anticipate that this business segment will begin generating meaningful revenues once the first building within Polaris Forge 1 becomes operational, which is expected in calendar year 2025.
The Cloud Services Business provides high-performance computing power for AI and machine learning applications. Near the end of the fiscal third quarter 2024, this business began generating revenue. In the fourth quarter of fiscal year 2025, we determined that the Cloud Services Business met the criteria to be classified as “held for sale,” as the Board of Directors approved further plans for the sale of the segment. The potential sale of the Cloud Services Business represents a strategic shift in our operations and financial results. As such, for the fiscal year ended May 31, 2025, we have reported the Cloud Services Business as held for sale on the consolidated balance sheet and discontinued operations on the consolidated statement of operations. The comparative periods have been updated to present the Cloud Services Business as held for sale and discontinued operations as of June 1, 2022.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “Management Updates”
Effective October 15, 2024, Saidal Mohmand transitioned from his prior role of Executive Vice President of Finance to become our Chief Financial Officer, succeeding David Rench, who served as our Chief Financial Officer from March 2021. Mr. Rench continued with the Company in his new capacity as Chief Administrative Officer until January 31, 2025, when he transitioned to a consultant for the Company.
On January 6, 2025, we welcomed Laura Laltrello as our Chief Operating Officer.
Effective January 31, 2025, Michael Maniscalco, our Chief Technology Officer, resigned from the Company.
On May 6, 2024, we began sales of common stock under an "at the market" sale agreement with Roth Capital Partners, LLC (the “May 2024 Sales Agreement”) pursuant to which we could sell up to $25 million in aggregate proceeds of common stock. During the fiscal year ended May 31, 2025, we sold approximately 3.1 million shares for net proceeds of approximately $14.6 million with commission and legal fees related to the issuance of approximately $0.5 million. This offering was completed as of August 31, 2024.
On May 16, 2024, we entered into a Dealer Manager Agreement with Preferred Capital Securities, LLC (the “Dealer Manager”) pursuant to which the Dealer Manager agreed to serve as our agent and dealer manager for an offering (the
“Series E Offering”) of up to 2,000,000 shares of our Series E Redeemable Preferred Stock (the “Series E Preferred Stock”) (the “Series E Dealer Manager Agreement”). During the fiscal year ended May 31, 2025, we closed on four offerings totaling 301,673 shares of Series E Preferred Stock for net proceeds of approximately $6.9 million. The Series E Dealer Manager Agreement and the associated offering were terminated on August 9, 2024.
On June 11, 2024, we filed a Certificate of Amendment (the “Certificate of Amendment”) to our Second Amended and Restated Articles of Incorporation, as amended (the “Articles of Incorporation”). Pursuant to the Certificate of Amendment, the number of authorized shares of common stock was increased to 300,000,000. The Certificate of Amendment became effective upon filing on June 11, 2024.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “July 2024 At-the-Market Sales Agreement”
On July 9, 2024, we entered into a Sales Agreement (the “July 2024 Sales Agreement”) with B. Riley Securities, Inc., BTIG, LLC, Lake Street Capital Markets, LLC, Northland Securities, Inc. and Roth Capital Partners, LLC (collectively, the “Agents”), pursuant to which we were able to offer and sell, from time to time, through the Agents, up to $125.0 million in shares of our common stock. During the fiscal year ended May 31, 2025, we issued and sold approximately 3.0 million shares of our common stock under the July 2024 Sales Agreement for proceeds of $16.4 million net of issuance costs of $0.5 million. On October 30, 2024, we terminated the July 2024 Sales Agreement with the Agents.
On August 28, 2024, we entered into the SEPA with YA II PN, LTD ("YA Fund"), which was amended on August 29, 2024. Pursuant to the SEPA, subject to certain conditions and limitations, we had the option, but not the obligation, to sell to YA Fund, and YA Fund was obligated to subscribe for, an aggregate amount of up to $250.0 million of common stock, at our request any time during the commitment period commencing on September 30, 2024.
In connection with the execution of the SEPA, we agreed to pay a structuring fee (in cash) to YA Fund in the amount of $25,000. Additionally, we agreed to pay a commitment fee of $2,125,000 to YA Fund, (the Commitment Fee”), in the form of 456,287 shares of common stock (the “Commitment Shares”), representing $2,125,000 divided by the average of the daily VWAPs of the common stock during the three trading days immediately prior to the date of the SEPA. On October 16, 2024, we entered into a letter agreement with YA Fund, whereby we agreed to satisfy our obligations with respect to the Commitment Fee in cash by increasing the principal amount due under the March Note (as defined below) in an equivalent amount, instead of issuing the Commitment Shares. The Commitment Fee was paid in full during the fiscal quarter ended February 28, 2025 as part of the repayment by us of the March Note.
The SEPA was terminated on April 30, 2025.
On August 29, 2024, we entered into a securities purchase agreement (the “Series F Purchase Agreement”) with YA Fund for the private placement (the “Series F Offering”) of 53,191 shares of Series F Convertible Preferred Stock of the Company, par value $0.001 per share (the “Series F Convertible Preferred Stock”), including 3,191 shares representing an original issue discount of 6%. The transaction closed on August 30, 2024, for total proceeds of $50.0 million, prior to fees paid to Northland Securities, Inc. for their role as placement agent in an amount equal to 3.5% of the total proceeds.
Each outstanding share of Series F Convertible Preferred Stock was entitled to receive, in preference to our common stock, cumulative dividends (“Preferential Dividends”), payable quarterly in arrears, at an annual rate of 8.0% of $1,000 per share of Series F Convertible Preferred Stock (the “Series F Stated Value”). At our discretion, the Preferential Dividends were payable either in cash or in kind or accrue and compound in an amount equal to 8.0% multiplied by the Series F Stated Value. In addition, each holder of Series F Convertible Preferred Stock was entitled to receive dividends equal to, on an as-converted to shares of our common stock basis, and in the same form as, dividends actually paid on shares of our common stock when, as, and if such dividends are paid on shares our common stock. The Series F Convertible Preferred Stock became convertible upon the receipt of shareholder approval on November 20, 2024. We filed the Certificate of Designation of the Series F Convertible Preferred Stock with the Secretary of State of the State of Nevada on August 30, 2024.
Pursuant to the Series F Purchase Agreement, YA Fund executed an Irrevocable Proxy, dated August 30, 2024, appointing the Company as proxy to vote in all matters submitted to our stockholders for a vote of all shares of the Series F Convertible Preferred Stock beneficially owned, directly or indirectly, by YA Fund in accordance with the recommendation of our Board of Directors. The Irrevocable Proxy became effective upon the receipt of shareholder approval on November 20, 2024.
140 more words of this passage are in the 10-K filed Jul 30, 2025.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “Private Placement”
On September 5, 2024, we entered into a securities purchase agreement with a group of institutional and accredited investors, NVIDIA and Related Companies (collectively, the "PIPE Purchasers"), for the private placement (the “Private Placement”) of 49,382,720 shares of our common stock (the "PIPE Shares") at a purchase price of $3.24 per share, representing the last closing price of the common stock on the Nasdaq Global Select Market on September 4, 2024. The Private Placement closed during the three months ended November 30, 2024, with aggregate gross proceeds to us of approximately $160 million, before deducting offering expenses. On October 4, 2024, we filed a registration statement on Form S-1 (File No. 333-282518) with the SEC for the resale under the Securities Act by the PIPE Purchasers of the PIPE Shares, which was declared effective by the SEC on October 15, 2024.
On September 23, 2024, we entered into the Dealer Manager Agreement (the “Series E-1 Dealer Manager Agreement”) with the Dealer Manager pursuant to which the Dealer Manager agreed to serve as our agent and dealer manager for the offering of up to 62,500 shares of our Series E-1 Redeemable Preferred Stock, par value $0.001 per share (“Series E-1 Preferred Stock”), at a price per share of $1,000 per share, pursuant to our Registration Statement on Form S-1, filed with the SEC on September 23, 2024. During the fiscal year ended May 31, 2025, we closed on eight offerings of the Series E-1 Preferred Stock, in which we issued and sold 62,500 shares for gross proceeds of $62.5 million. Additionally, during the fiscal year ended May 31, 2025, 15 of the shares were redeemed. As of the date of this report, the offering of the Series E-1 Preferred Stock has been completed.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “Macquarie Warrants”
On February 11, 2025, in connection with entering into the SMBC Credit Agreement and receipt by us of the proceeds related thereto (as described below), we repaid the Macquarie Promissory Note in full. The Macquarie Warrants survived the termination of the Macquarie Promissory Note and were outstanding as of May 31, 2025.
As mentioned above, on January 6, 2025, we welcomed Laura Laltrello as our Chief Operating Officer. As an inducement to Ms. Laltrello accepting this position, we granted her an employment inducement award of 600,000 RSUs, outside of the Company’s 2024 Omnibus Equity Incentive Plan, in accordance with Rule 5635(c)(4) of the Nasdaq Stock Market LLC.
On January 13, 2025, APLDH, our indirect wholly owned subsidiary, entered into the Unit Purchase Agreement for our HPC Hosting Business with MAM, pursuant to the terms of which, MAM will invest up to $900 million to fund the equity portion of the construction costs for Polaris Forge 1, with the initial investment of $225 million payable at closing, and the remaining $675 million payable in increments of $2.25 million for each executed lease of 1 MW of capacity. MAM also will have a right to invest up to an additional $4.1 billion in future HPC development projects. MAM will receive preferred and common units for its investment. The common units will represent fifteen percent (15%) of APLDH’s fully diluted common equity. The preferred units will accrue a dividend at a rate of 12.75% per annum, paid in stock or cash, at APLDH’s election, which will increase by 87.5 basis points on the fifth and sixth anniversaries of the closing, if still outstanding, and will carry a minimum 1.80x multiple of invested capital liquidation preference, inclusive of the value of the common equity. The LLCA is also expected to contain customary provisions for transactions of this nature, including, for example, co-sale rights, transfer restrictions, governance rights, redemption rights, forced sale rights, and step-in rights. As of the date of this report, these terms (as set forth in the LLCA) have been finalized by the parties, the execution of which is expected to occur at closing, subject to satisfaction of the other closing conditions, such as, among other things, APLDH executing a lease with a hyperscaler for the first 100 MW of Polaris Forge 1, in a form acceptable to MAM, for us and APLDH to carry out the Internal Restructuring and entering into the Corporate Services Agreement, as well as customary closing conditions.
In addition, the Unit Purchase Agreement provides that we will issue to MAM at closing up to two warrants to purchase 4,458,069 shares each, for a total of 8,916,138 shares of our common stock, at the exercise price of $8.29 per share. The shares of common stock issuable upon the exercise of the warrants are subject to customary registration rights pursuant to a registration rights agreement to be executed and delivered at closing.
The proceeds from the MAM investment will be used to continue the buildout of Polaris Forge 1, repay the existing bridge debt, fund platform general and administrative expenses, and pay transaction expenses.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “Series G Preferred Stock”
Pursuant to the PEPA, we agreed to prepare and file with the SEC a registration statement, registering the resale of the shares of common stock issuable upon the conversion of the shares of Series G Preferred Stock as soon as practicable after June 2, 2025, but in any case, no later than June 9, 2025 (subject to certain exceptions), which we filed with the SEC on June 3, 2025 as further described under "Recent Developments" below.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “Yorkville”
On October 29, 2024, we entered into certain amendments to the Prepaid Advance Agreement between us and YA Fund executed on March 27, 2024 (the “March PPA”) and the promissory note issued in connection therewith (the “March Note”). The amendments (i) provided consent to the Convertible Notes (as defined below) offering and share repurchase transactions, and (ii) removed certain prior restrictions on redemption of the March Note before January 1, 2025.
During the fiscal year ended May 31, 2025, the remaining aggregate principal of $71.3 million of the YA Notes were converted, in exchange for the issuance by us of approximately 19.1 million shares of our common stock to YA Fund. As YA Fund had converted a portion of the principal outstanding balance under the YA Notes into such maximum number of shares allowable under the Nasdaq rules and regulations, the remaining balance of $4.8 million under the March Note was payable in cash. During the quarter ended February 28, 2025, we repaid the $4.8 million in full, including all outstanding and unpaid principal, accrued interest, fees, and expenses, as well as the $2.1 million Commitment Fee under the SEPA.
As previously reported, on June 7, 2024, APLD Holdings 2 LLC (“APLD Holdings”), our subsidiary, entered into a promissory note (as amended, the “CIM Promissory Note”) with CIM APLD Lender Holdings, LLC (the “CIM Lender”). The CIM Promissory Note provided for an initial borrowing of $15 million, which was drawn on June 7, 2024, and subsequent borrowings of up to $110 million (the “Subsequent Tranches”), available subject to the satisfaction of certain conditions as outlined in the CIM Promissory Note. In addition to the initial borrowing, the CIM Promissory Note included an accordion feature that allowed for up to an additional $75 million of borrowings. Principal amounts repaid under the CIM Promissory Note were not available for reborrowing. On August 11, 2024, we and the CIM Lender entered into a waiver agreement (the “Waiver Agreement”), whereby the CIM Lender agreed to waive the satisfaction of certain conditions for the subsequent borrowings, allowing us to draw an additional $20 million (net of original discount and fees) of borrowings under the CIM Promissory Note.
As consideration for the CIM Promissory Note, we agreed to issue to the CIM Lender warrants to purchase up to an aggregate of 9,265,366 shares of our common stock. The warrants were issuable in two tranches, (i) for the purchase of up to 6,300,449 shares of common stock (the “Initial Warrants”), and (ii) for the purchase of up to 2,964,917 shares of common stock (the “Additional Warrants”). The Initial Warrants were issued on June 17, 2024 and the Additional Warrants were issued August 11, 2024 (as consideration for entry into the Waiver Agreement). On October 8, 2024, we entered into the First Amendment to the Promissory Note and Waiver Agreement (the “CIM Amendment”) with the CIM Lender, which amended the CIM Promissory Note to, among other things, extend the availability period thereunder, and draw the remaining $20 million (net of original discount and fees) of borrowings of the Subsequent Tranches available under the CIM Promissory Note.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “Convertible Notes, senior unsecured”
The net proceeds from the sale of the Convertible Notes were approximately $435.2 million after deducting the initial purchasers' discounts, commissions, and estimated offering expenses. We used approximately $84.0 million of the net proceeds to fund share repurchases of common stock in connection with the offering, including (i) $52.7 million to fund the cost of entering into prepaid forward repurchase transactions, and (ii) $31.3 million to repurchase shares of our common stock directly. Additionally, approximately $51.8 million was used to pay the cost of the capped call transactions, which have a cap price of $14.72. The remainder of the net proceeds will be used for general corporate purposes.
The initial conversion rate is 102.5 shares per $1,000 principal amount of Convertible Notes (equivalent to an initial conversion price of approximately $9.75 per share of common stock). Prior to March 1, 2030, the Convertible Notes are convertible only upon the occurrence of certain events. On or after March 1, 2030 until the close of business on the second scheduled trading day immediately preceding the maturity date, holders may convert their Convertible Notes at any time. The Convertible Notes will be convertible into cash, shares of common stock, or a combination thereof, at our election, subject to certain restrictions.
On November 27, 2024, APLD ELN-02 Holdings LLC, our subsidiary, entered into a promissory note (the "Macquarie Promissory Note") with Macquarie Equipment Capital, Inc. for a loan of $150 million. The Macquarie Promissory Note has an 18-month term and bears interest at 0.25% per annum, with no commitment fee or original issue discount. The Macquarie Promissory Note is subject to an initial minimum return hurdle of 1.11x within the first four months that scales up to 1.35x over its term. The proceeds from the Macquarie Promissory Note were used to repay in full and terminate the CIM Promissory Note as well as all of our obligations under the March Note. As partial consideration for the Macquarie Promissory Note, we issued warrants (the "Macquarie Warrants") as described in the section above.
On February 11, 2025, in connection with entering into the SMBC Credit Agreement (as defined below) and receipt by us of the proceeds related thereto (as described below), we repaid the Macquarie Promissory Note in full.
On February 11, 2025, APLD HPC Holdings LLC, our subsidiary, entered into a credit and guaranty agreement (the “SMBC Credit Agreement”) with Sumitomo Mitsui Banking Corporation ("SMBC"). The SMBC Credit Agreement provides for an aggregate of $375 million of term loans (the “SMBC Loans”), which includes base rate loans and SOFR loans, and matures 18 months after the closing date. Base rate loans bear interest at the base rate plus (i) 2.50% from the closing date until the six month anniversary of the closing date, (ii) 3.50% after the six month anniversary of the closing date until the one year anniversary of the closing date, and (iii) 4.50% after the one year anniversary of the closing date while SOFR loans bear interest at the daily simple SOFR plus (i) 3.50% from the closing date until the six month anniversary of the closing date, (ii) 4.50% after the six month anniversary of the closing date until the one year anniversary of the closing date, and (iii) 5.50% after the one year anniversary of the closing date.
The proceeds from the SMBC Loans were used to: (i) prepay in full the Macquarie Promissory Note, (ii) pay for certain data center project development costs at Polaris Forge 1, and (iii) fund the Interest Reserve Account as defined in the
Credit Agreement. Remaining proceeds have been deposited into a separate bank account for future construction costs at Polaris Forge 1.
In connection with entering into the PEPA with certain investors for the issuance and sale of up to 156,000 shares of our Series G Preferred Stock, we entered into the Series G Registration Rights Agreement, pursuant to which we agreed to prepare and file with the SEC a Registration Statement on Form S-3, registering the resale of the shares of common stock issuable upon conversion of the Series G Preferred Stock. On June 3, 2025, we filed a registration statement on Form S-3ASR (File No. 333-287729) for the resale of the common stock issuable upon conversion of the Series G Preferred Stock, which was deemed automatically effective by the SEC upon filing.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “CoreWeave Warrant”
On June 27, 2025, we filed a registration statement on Form S-3ASR (File No. 333-288390) for the resale of the common stock issuable upon the exercise of the Lease Warrants, which was deemed automatically effective upon filing.
In addition, on July 24, 2025, CoreWeave exercised its option for an additional 150MW in our third building at Polaris Forge 1, which is currently in planning stages with an anticipated ready for service date in 2027. Under the option terms, the parties are expected to enter into a new, third lease agreement on substantially the same terms, including the same rent and escalators, as the existing two leases, within 60 days.
We are a U.S. designer, developer, and operator of next-generation digital infrastructure across North America. high-performance, sustainably engineered data centers and colocation services for artificial intelligence (“AI”), networking, and blockchain workloads. We provide digital infrastructure solutions to the rapidly growing industries of high-performance computing (“HPC”) and artificial intelligence AI. As of May 31, 2025, 2026, we operated in two distinct business segments, Blockchain data center hosting (the "Data Center Hosting Business") and HPC data center hosting (the “HPC Hosting Business”), all of which are included in our consolidated financial statements, as further discussed below. During Management considers the fiscal year 2025, we determined that our Cloud Services Data Center Hosting Business met and the criteria HPC Hosting Business to be its core operations for held for sale long-run strategic and discontinued operations. As such, the results of the Cloud Services Business, which was previously included as a reportable segment, are presented as discontinued operations in the consolidated statements of operations and have been excluded from both continuing operations and segment results for all periods presented. performance evaluation purposes.
We are currently building two recently commenced operations at our first HPC focused data center facilities at our Polaris Forge 1 campus with 100MW of capacity. We continue building our second HPC data center at Polaris Forge 1 to provide 100 MW and 150 MW, respectively, an additional 150MW of capacity. in Ellendale, ND. These facilities are being designed and purpose-built to host high-density GPU graphics processing unit architecture or other HPC applications, such as artificial intelligence, natural language processing, machine learning, and additional HPC developments. Our third HPC focused data center facility at Polaris Forge 1, which is expected to provide an additional 150MW of capacity, is currently under construction, with an anticipated ready for service date in calendar year 2027.
On May 28, 2025, APLD ELN-02 LLC and APLD ELN-03 LLC, our subsidiaries, each entered into a data center lease (together, (the “Data Center Leases”) “ELN-02 Lease” and the “ELN-03 Lease”) with CoreWeave, Inc. (“CoreWeave”) to deliver an aggregate of 250 MW of infrastructure to host CoreWeave’s HPC operations at Polaris Forge 1. The first ELN-02 Lease is for the full capacity of our 100 MW data center that is currently under construction, was completed and became operational in October 2025, and the second ELN-03 Lease is for the full capacity of our 150 MW data center that is also under construction. We have guaranteed the obligations of APLD ELN-02 LLC and APLD ELN-03 LLC under the respective Data Center lease to which such subsidiary is a party.
Our Data Center Hosting Business provides energized infrastructure services to crypto mining customers. Our custom-designed data centers allow customers to rent space based on their power requirements. We currently serve one crypto mining customer with a remaining contractual term of one and a half years. As of May 31, 2025, 2026, our 106 MW facility in Jamestown, North Dakota and our 180 MW facility in Ellendale, North Dakota continue to operate at full capacity. This business segment accounts for all of the revenue we generated from our continuing operations for the fiscal year ended May 31, 2025.
We recognized $84.4 $154.4 million, $144.2 million, and $136.6 million in revenue from this business segment during the fiscal year years ended May 31, 2026, May 31, 2025, within discontinued operations. The Cloud Services Business operates in three states: Colorado, Minnesota and Utah, by renting space at third party co-location centers and providing customers with Company-owned equipment. May 31, 2024 respectively.
On June 2, 2025, we the Company entered into a Sales Agreement with Northland Securities, Inc. and Wells Fargo Securities, LLC (the “June 2025 Sales Agreement”), pursuant to which, up to $200,000,000 of shares of our the Company's common stock may be issued if and when sold. pursuant to the June 2025 Sales Agreement. As of the date of this report, we have the Company has issued and sold approximately 15.1 15.3 million shares under the June 2025 Sales Agreement for gross proceeds of approximately $196.4 million.
On April 30, August 14, 2025, we entered into the first amendment (the “First Amendment”) to the Preferred Equity Purchase Agreement (the “PEPA”), with certain investors for dated April 30, 2025, to, among other things, (i) increase the issuance and sale aggregate commitment amount of up to 156,000 the shares of Series G Convertible Preferred Stock (the “Series G Preferred Stock”) from $150 million to $300 million, and (ii) increase our access to capital by removing the Put Limitation (as defined in a transaction. the shares PEPA) that had previously limited the aggregate purchase price for any Put Issuance (as defined in the PEPA) to no more than $75 million. In connection with the First Amendment, on August 14, 2025, we filed an amendment (the “First CoD Amendment”) to the Series G Certificate of Designation, originally filed with the Secretary of State of the State of Nevada on April 30, 2025. The First CoD Amendment amends the Series G Certificate of Designation to, among other things, (i) increase the initial Floor Price (as set forth in Section 1.5(c)(i) of the Series G Certificate of Designation) to $12.50 from $4.25, and (ii) change the limit below which the Floor Price may not be reduced (as set forth in Section 1.5(c)(ii) of the Series G Certificate of Designation) to $4.33 from $1.34. The Floor Price sets the minimum floor for the conversion price of the Series G Preferred Stock, which price may not be put reduced unless we determine to the investors from time to time at do so in our discretion. during The period commencing on April 30, 2025 First CoD Amendment further amended the “Commitment Date”) status of converted or repurchased preferred stock such that any shares of Series G Preferred Stock that have been or will be converted will be retired and terminating on resume the earlier of (i) the 36-month anniversary of the Commitment Date or (ii) such date as there ceases to be a sufficient number status of authorized but unissued shares. of common stock remaining under the Exchange Cap (as defined in the PEPA).
On February 27, May 28, 2025, we in connection with the entry into the data center leases with CoreWeave for Building 2 and Building 3 (the "CoreWeave Leases"), the Company issued to CoreWeave a warrant (the “CoreWeave Warrant”) to STB Applied Holdings LLC acquire up to purchase 1,000,000 13,062,521 shares of our the Company's common stock at the an exercise price of $7.83 $7.19 per share, subject to adjustment in accordance with the “STB terms and conditions set forth in the CoreWeave Warrant. for consideration of $50,000. The CoreWeave Warrant is exercisable beginning on February 27, 2027 (the “Initial Exercise Date”), upon issuance, upon payment of the applicable exercise price in cash or through cashless exercise for a period of five 10 years. from On June 9, 2025, CoreWeave assigned a portion of the Initial CoreWeave Warrant to acquire up to 6,531,261 shares of the Company's common stock to PEAK6 Capital Management, LLC (the “PEAK6 Warrant”). CoreWeave concurrently assigned the remaining portion of the CoreWeave Warrant to acquire up to 6,531,260 shares of the Company's common stock to Jane Street (the “Jane Street CW Warrant”), and on or around May 15, 2026, Jane Street assigned all of its right, title and interest in and to the Jane Street CW Warrant to Wells Fargo Bank, National Association ("WFBNA"). As of May 31, 2026, 300 warrant shares subject to the PEAK6 Warrant have been exercised through cashless exercise. Date.
Additionally, on August 28, 2025, in connection with the Data Center Leases, we entry into the Building 4 Lease, the Company issued to CoreWeave a warrant (the “CoreWeave “Building 4 Warrant”) to acquire up to 13,062,521 8,393,611 shares of our the Company’s common stock (the “CoreWeave Warrant Shares”) at an exercise price of $7.19 $10.75 per share, subject to adjustment in accordance with the terms and conditions set forth in the Building 4 Warrant. The Building 4 Warrant is on the same Form of Warrant as the initial CoreWeave Warrant. In addition, we agreed to file a resale registration statement with the SEC to register the resale of the CoreWeave shares of common stock issuable upon exercise of the Building 4 Warrant Shares pursuant to a the Registration Rights Agreement, dated May 28, 2025, between us and CoreWeave The (“CoreWeave Warrant and the Registration Rights Agreement”). were executed pursuant to a Letter Agreement, dated May 28, On October 31, 2025, between us CoreWeave assigned the Building 4 Warrant and CoreWeave. its rights under the CoreWeave Registration Rights Agreement to Jane Street Global Trading, LLC (“Jane Street”). On or around May 15, 2026, Jane Street assigned all of its right, title and interest in and to the Building 4 Warrant was measured at a fair value of $85.7 million which was recorded to lease incentive asset and additional paid in capital on our consolidated balance sheets, and will be amortized over the life of the respective lease once it commences. WFBNA.
On November 27, 2024, APLD ELN-02 Holdings LLC, our subsidiary, entered into a promissory note (the "Macquarie Promissory Note") with Macquarie Equipment Capital, Inc. for a loan of $150 million. See below for further details. as partial consideration for the Macquarie Promissory Note, we the Company issued warrants to purchase up to 1,035,197 shares of the Company’s common stock at (the “Macquarie Warrants”) to Macquarie Equipment Capital, Inc. (“MEC”). The Macquarie Warrants are exercisable from and after the date that is six months following the date of issuance thereof and will have a five and one-half-year term and an exercise price of $9.66 per share, which exercise price must be paid in cash. The Macquarie Warrants survived the termination of the Macquarie Promissory Note and remain outstanding as of May 31, 2026. On October 31, 2025, MEC assigned the Macquarie Warrants and its rights under the Registration Rights Agreement in connection therewith to Jane Street and on or around May 15, 2026, Jane Street assigned all of its right, title and interest in and to Macquarie Warrants to WFBNA.
As previously disclosed, and as further discussed below, on January 13, 2025, APLD HPC Holdings LLC (“APLDH”), our (formerly, APLD ELN-02 Holdings LLC), an indirect wholly owned subsidiary of the Company, entered into a Unit Purchase Agreement (as amended, (the “Unit Purchase Agreement” or “UPA”) for our its HPC Hosting Business with MIP VI HPC Holdings, LLC, which is an affiliate of funds and investment vehicles managed by entities within Macquarie Asset Management (“MAM”). The closing under the UPA is subject to certain closing conditions, including, APLDH executing a lease with a hyperscaler for the first 100 MW of Polaris Forge 1, in a form acceptable to MAM, the parties finalizing On February 11, 2025, APLD HPC Holdings LLC novated and executing a limited liability company agreement for APLDH (the “LLCA”), for us assigned its rights, title and APLDH to carry out an internal restructuring to segregate the HPC Hosting Business’ assets interests and duties, liabilities before closing (the “Internal Restructuring”), as well as customary closing conditions. As set forth in an amendment to the UPA, entered into by the parties, effective as of April 4, 2025, the parties extended the dates (i) to finalize the form of the LLCA (save for certain specified exhibits thereto) to April 7, 2025, (ii) to finalize the plan for the Internal Restructuring plan and the form of the Corporate Services Agreement to April 18, 2025, and (iii) by which either party may terminate the UPA if closing has not occurred, from July 13, 2025 to October 13, 2025. As of the date of this report, the terms of the LLCA (as disclosed below) have been finalized by the parties, which document is required to be executed and delivered at closing. The parties also entered into a consent on May 21, 2025, in which MAM consented to APLDH entering into the leases for Polaris Forge 1, and also extending certain of the deadlines obligations under the UPA to finalize APLD HPC TopCo LLC, an indirect wholly-owned subsidiary of the foregoing documents. Company (“TopCo 1”). On October 3, 2025, the Company, TopCo 1, APLD HPC TopCo 2 LLC, an indirect wholly-owned subsidiary of the Company (“TopCo 2”), and MIP HPC Holdings, LLC (formerly, MIP VI HPC Holdings, LLC) (the “Purchaser”) entered into an Amended and Restated Unit Purchase Agreement (the “A&R UPA”).
During the fiscal year ended May 31, 2025, all 9,265,366 2026, 800,000 of the CIM STB Warrants were exercised on a cashless basis for approximately 4.9 $6.3 million. shares of our common stock in a net settlement transaction.
Additionally, On November 20, 2024, we filed 5, 2025, at the Annual Stockholders’ Meeting, the Company’s stockholders approved an amendment to our the Second Amended and Restated Articles of Incorporation, increasing the number of shares of common stock authorized for issuance thereunder to 400,000,000 600,000,000 shares, and the number of shares of preferred stock authorized for issuance to 10,000,000 shares. which became effective upon filing on November 6, 2025.
On November 27, 2024, in connection with the issuance of the Macquarie Promissory Note (as defined and described below) and the receipt by us of the proceeds related thereto, we 28, 2025, APLD FAR-01 repaid the CIM MEC Promissory Note in full, including all outstanding and unpaid principal, accrued interest, fees, and expenses. rate of return.
On November 4, 2024, we completed 20, 2025, our subsidiary APLD ComputeCo LLC ("APLD ComputeCo"), closed a private $2.35 billion offering (the “2030 9.250% Notes Offering”) of 2.75% Convertible 9.250% senior secured notes due 2030 (the "Convertible “2030 9.250% Notes”) at an issue price of 97.000%. The 2030 9.250% Notes were issued and sold in a private offering to persons reasonably believed to be qualified institutional buyers pursuant to in reliance on Rule 144A under the Securities Act of 1933, as amended, and outside the aggregate principal amount United States to non-U.S. persons in reliance on Regulation S under the Securities Act. The 2030 9.250% Notes are senior secured obligations of Convertible Notes sold in the offering was $450 million, which included $75 million aggregate principal amount issued pursuant to the initial purchasers' fully exercised option. The Convertible Notes APLD ComputeCo and bear interest at a rate of 2.75% 9.250% per year, annum, payable semiannually semi-annually in arrears on June 1 15 and December 1 15 of each year, beginning on June 1, 2025. 15, 2026. The principal amount of the 2030 9.250% Notes will amortize on a semi-annual basis on June 15 and December 15 of each year, beginning on December 15, 2027, in amounts set forth in the Indenture. The 2030 9.250% Notes will mature on December 15, 2030, unless earlier redeemed or repurchased in accordance with their terms. The 2030 9.250% Notes are fully and unconditionally guaranteed by the subsidiary guarantors, all of which are wholly owned subsidiaries of APLD ComputeCo. Other than a customary completion guarantee, the Company is not providing credit support for the 2030 9.250% Notes Offering.
During the fiscal year ended May 31, 2024, 2025, we entered into two prepaid advance Simple Agreements for Future Equity (“SAFEs”) with YA Fund and issued promissory notes, as further described below, an investor for equity in Cloud, which was, at that time, our wholly-owned subsidiary, for aggregate proceeds of $12.0 million. On June 2, 2026, following an agreement reached with the investor, we paid off all amounts outstanding under the SAFEs, totaling $92.1 $13.3 million. (collectively, the “YA Notes”).
On July 15, 2025, the Company June 17, 2026 and June 22, 2026, we issued 78,000 an aggregate of 154,500 shares of Series G Preferred Stock for aggregate total gross proceeds of $75.0 $150.0 million. Of the 154,500 shares of Series G Preferred Stock issued, 81,346 shares have been converted into an aggregate of 1,787,825 shares of our common stock and 73,154 shares remain outstanding.
6 added · 5 removed · 21 rewritten
Added in the 10-K for fiscal 2026
Under “Revenues”
Data center rental and other revenue was $114.7 million for the fiscal year ended May 31, 2026, which is the period during which our HPC Hosting Business commenced operations. This revenue consisted of approximately $99.8 million related to base rent and $14.9 million related to tenant recoveries.
Added in the 10-K for fiscal 2026
Under “Cost of revenues”
• approximately $258.1 million in expenses associated with tenant fit-out services for our HPC Hosting Business which we began providing during the current fiscal year;
Added in the 10-K for fiscal 2026
Under “Cost of revenues”
• approximately $1.0 million increase in other expenses directly attributable to generating revenue primarily related to repairs and maintenance, security, and property insurance associated with our data centers.
These increases were partially offset by decreases of approximately $62.3 million in depreciation and amortization expense and approximately $17.2 million in lease and related expense primarily due to the renegotiations of certain of our leases during fiscal year ended May 31, 2026 as well as due to our cloud services business (the “Cloud Services Business”) being classified as held for sale until February 15, 2026, which resulted in decreased depreciation and amortization recorded and a decrease of $1.2 million in personnel expenses due to the closing of the Cloud transaction.
Data center rental and other cost of revenue was $56.8 million for the fiscal year ended May 31, 2026, which is when we commenced our data center rental operations within our HPC Hosting Business. The primary components of data center rental and other cost of revenue were categorized as follows:
Added in the 10-K for fiscal 2026
Under “Cost of revenues”
• approximately $14.9 million in expenses which are reimbursable as tenant recoveries;
• approximately $8.5 million in rental property operating expenses, which are not eligible for recovery from our tenant;
Added in the 10-K for fiscal 2026
Under “Adjusted Revenue”
“Adjusted revenue” is a non-GAAP financial measure that represents total revenue excluding ChronoScale revenue. Adjusted revenue is total revenue excluding total revenue from ChronoScale.
Added in the 10-K for fiscal 2026
Under “Net Operating Income”
"Net Operating Income" is a non-GAAP financial measure that represents base rental revenue from the HPC Hosting Business. Net Operating Income is HPC Hosting Business base rental revenue less rental property operating expenses, property taxes, and property insurance expenses. "Net Operating Income Margin" is defined as Net Operating Income divided by HPC Hosting Business base rental revenue.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “Revenues”
Comparatively, revenue increased $109.8 million, or 268%, from $41.0 million for the fiscal year ended May 31, 2023 to $150.8 million for the fiscal year ended May 31, 2024. Approximately $80.9 million of the increase was related to continuing operations while $28.9 million was related to discontinued operations. The increase related to continuing operations between periods was primarily due to increased capacity across our three Data Center Hosting facilities, specifically our 180 MW Data Center Hosting Facility in Ellendale, ND, which accounted for a $60.0 million increase in revenue as it was its first full year of operations. The increase in revenue related to discontinued operations was due to the Cloud Services Business segment starting to generate revenue in the third quarter of fiscal year ended May 31, 2024, as a result of the launch of services provided by the Cloud Services Business during that year.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “Cost of revenues”
• approximately $4.8 million decrease in energy costs due to more favorable pricing during the current year; and
• approximately $4.6 million decrease in depreciation and amortization expense as there was minimal accelerated depreciation in the current year as opposed to prior year where we recognized approximately $4.3 million of accelerated depreciation related to transformers that were abandoned by the Company due to operational failure or other reasons.
These decreases were offset by an increase of approximately $4.1 million in personnel expenses for employee costs directly attributable to generating revenue resulting from increased headcount.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “Loss from legal settlement”
Loss from legal settlement was $2.4 million for the fiscal year ended May 31, 2024 primarily due to a settlement agreement entered into by us with respect to employment-related claims by a former executive. The terms of the settlement included payment to the claimant of $2.3 million. There were no such losses recorded in the current year comparative period.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “Loss on extinguishment of related party debt”
Loss on extinguishment of related party debt was $2.5 million for the fiscal year ended May 31, 2024, due to the termination fees related to a previously held related party loan. There were no such losses recorded in the current year comparative period.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “Operating Loss”
HPC Hosting Business operating loss increased $4.6 million, or 1,856%, from a loss of $0.2 million for the fiscal year ended May 31, 2023 to a loss of $4.8 million for the fiscal year ended May 31, 2024. The loss was largely comprised of legal expenses incurred in connection with discrete projects and amortization expense related to finance leases as we ramp up our HPC Hosting Business.
(2)Includes (2)For the fiscal year ended May 31, 2026, amount includes a loss on classification of held for sale of $59.7 million representing the write down of the cloud business assets to their carrying value as of February 15, 2026 when it no longer qualified as held for sale. For the fiscal year ended May 31, 2025, amount includes $25 million received in connection with the sale of our Garden City facility once conditional approval requirements were met and escrowed funds were released. during the fiscal years ended May 31, 2025. The fiscal year ended May 31, 2024 includes $15.4 million loss on classification of held for sale related to the sale of the Garden City facility.
Comparatively, related party Services revenue increased $0.4 $270.0 million, or 2%, 119%, from $14.4 $226.6 million for the fiscal year ended May 31, 2023 2025 to $14.8 $496.6 million for the fiscal year ended May 31, 2024, primarily driven 2026. Our HPC Hosting Business commenced operations during the current fiscal year with the first HPC data center at our Polaris Forge 1 campus resulting in the recognition of approximately $270.6 million related to tenant fit-out services. Additionally, there was an increase of $12.1 million in revenue generated by increased uptime at our Data Center Hosting Business due to performance improvements compared to the Company’s Jamestown, North Dakota facility throughout the period. fiscal year ended May 31, 2025.
Commentary on Segment Data Comparative Results for These increases were slightly offset by a decrease of $12.4 million in revenue generated from ChronoScale during the fiscal year ended May 31, 2024 2026 compared to the fiscal year ended May 31, 2023: 2025 primarily due to a reduction in rates for cloud services.
• approximately $14.5 $198.3 million increase in stock-based compensation primarily due to accelerated vesting of certain employee an increase in shares awarded related to the increase in headcount as well as performance stock awards and the recognition of expense related to performance stock units granted during the fiscal year ended May 31, 2026 compared to the fiscal year ended May 31, 2025;
HPC Hosting Business operating Loss increased $7.3 (gain) on classification of held for sale changed by $84.3 million, or 151%, 342%, from a loss gain of $4.8 million for the fiscal year ended May 31, 2024 to a loss of $12.1 $24.6 million for the fiscal year ended May 31, 2025 to a loss of $59.7 million for the fiscal year ended May 31, 2026. The loss during the fiscal year ended May 31, 2026 was largely comprised primarily due to the write down of legal expenses incurred the Cloud Services Business assets to their carrying value as of February 15, 2026 when it no longer qualified as held for sale. Comparatively, the gain during the fiscal year ended May 31, 2025 was due to the receipt of $25.0 million of funds received in connection with discrete projects the sale of our Garden City facility as conditional approval requirements were met and amortization expense related to finance leases as we ramp up our HPC Hosting Business. escrowed funds were released.
Loss on abandonment of assets was $1.1 increased by $1.7 million, or 231%, from $0.7 million for the fiscal year ended May 31, 2025 to $2.4 million for the fiscal year ended May 31, 2026, driven by the write down of certain assets to their fair value upon disposal. There were no such losses recorded in the prior year comparative period.
Interest expense, net decreased $3.0 $2.6 million, or 17%, 8%, from $17.7 million for the fiscal year ended May 31, 2024 to $14.7 $32.1 million for the fiscal year ended May 31, 2025 The decrease was primarily driven by a $5.7 to $29.5 million decrease in related party loan interest as there were no related party loans outstanding during for the fiscal year ended May 31, 2025 2026. As well as an increase of $2.2 million in interest income due to an increase in funds held in money market accounts. These changes were partially offset by we entered into more debt arrangements during the current fiscal year, there was an increase of approximately $4.9 $53.3 million of in interest expense, due to the increase approximately $3.3 million in finance leases loan issuance cost, and debt obligations between periods. approximately $2.1 million in interest expense issuance discount.
Loss Gain on change in fair value of related party debt derivatives was $8.1 $75.8 million for the fiscal year ended May 31, 2024, 2026, due to the change an increase of $89.2 million in fair value of one our Babcock & Wilcox Enterprises, Inc. (“BWE”) common stock warrant offset by a decrease of our previously $13.3 million in fair value of the derivative assets related to the preferred units and corresponding common units held related party loans. by APLD HPC TopCo 2’s noncontrolling interest. There were was no such losses gain recorded in the current prior fiscal year. comparative period.
Loss Gain on change in fair value of related party warrants investment was $5.7 $10.8 million for the fiscal year ended May 31, 2024, 2026, due to the valuation associated with warrants issued to an increase of $8.8 million in fair value of our investment in BWE common stock and an increase of $2.0 million in fair value of our investment in Base Electron, a related party. There were was no such losses gain recorded in the current prior fiscal year. comparative period.
Loss on conversion of debt was $33.6 million for the fiscal year ended May 31, 2025, due to the difference in the fair value compared to the price at which the promissory notes, totaling $92.1 million, entered into with YA II PN, LTD in the year ended May 31, 2024 (the “YA Notes") were converted. There was no such activity loss recorded in the prior current fiscal year. comparative period.
Loss on change in fair value of debt increased $78.0 million, or 1,054%, from $7.4 million for the fiscal year ended May 31, 2024 to was $85.4 million for the fiscal year ended May 31, 2025, The loss on change in fair value of debt for the fiscal year ended May 31, 2025 was primarily due to a loss of approximately $89.6 million related to the change in fair value of the conversion option derivative of the Convertible Note during the two week period in which we did not have sufficient authorized shares to settle such conversion fully in shares. This loss was partially offset by a gain of approximately $4.1 million related to the change in the fair value of the YA Notes. The loss on change in fair value of debt for the fiscal year ended May 31, 2024 was due to the valuation associated with our borrowings under the YA Notes.
These impacts were partially offset by an $85.4 million loss on change in fair value of debt primarily due a loss of approximately $89.6 million related to the change in fair value of the conversion option derivative of the Convertible Note during the two week period in which the Company did not have sufficient authorized shares to settle such conversion fully in shares. This loss was partially offset by a gain of approximately $4.1 million related to the change in the fair value of the YA Notes. There was no such loss recorded in the current fiscal year.
Loss on change in fair value of warrants was $2.2 million for the fiscal year ended May 31, 2026 due to revaluation of warrants issued by ChronoScale to third parties. Comparatively, loss on change in fair value of warrants was $6.4 million for the fiscal year ended May 31, 2025 primarily due to the initial valuation of the STB Warrants issued during the current period. There were no such losses recorded in the prior fiscal year comparative period. ended May 31, 2025.
Net loss from discontinued operations decreased $2.6 million, or 4% from $75.3 was $1.0 million for the fiscal year ended May 31, 2024 to $72.7 million for the fiscal year ended May 31, 2025 2026 and represents the income statement activity related to the Ekso business at ChronoScale classified as held for sale and discontinued operations. There was no such activity in the prior fiscal year.
Data Center Hosting Business operating profit increased $59.1 decreased $15.6 million, or 1,228%, 24%, from a profit of $4.8 million for the fiscal year ended May 31, 2024 to a profit of $63.9 million for the fiscal year ended May 31, 2025 to $48.3 million for the fiscal year ended May 31, 2026. This increase decrease was primarily due to the recognition of a $25.0 million gain on classification of held for sale due to the release of escrowed funds related to the sale of the Garden City facility Comparatively, there was recognition of a $15.4 million loss on classification of held for sale related to the sale of the Garden City facility in the prior fiscal year Other operating as well as an increase of $2.2 million in cost of revenues due to increases in power, payroll, and repair and maintenance expenses. attributable to Offsetting this decrease was an increase of $10.2 million in revenue as performance improved at the Garden City facility including power and depreciation decreased by approximately $20.6 million, since this facility was sold between the periods. The increase in operating profit was partially offset by increased headcount costs. sites.
Data Center HPC Hosting Business operating profit increased $23.1 $51.2 million, or 126%, 424%, from a loss of $18.3 $12.1 million for the fiscal year ended May 31, 2023 2025 to a profit of $4.8 $39.1 million for the fiscal year ended May 31, 2024. This increase was 2026. The change is primarily due to stock based compensation expense revenue generated related to tenant fit-out services, net of approximately $21.1 million expenses, as well as rental revenues from our first HPC data center at our Polaris Forge 1 campus as it became fully operational during the fiscal year ended May 31, 2023. The remaining increase was due to an increase in revenue of $81.2 million which was then offset by increases in cost of revenue of $61.6 million, selling, general, and administrative expense of $2.3 million, and loss on classification of held of sale related to the Garden City facility of $15.4 million. 2026.
[… 68 unchanged words …] We believe that these non-GAAP financial measures, when considered together with our GAAP financial results, provide management and investors with an additional understanding of our core business operating results regarding factors and trends affecting our business and provide a reasonable basis for comparing our ongoing results of operations. Management considers the Data Center Hosting Business and the HPC Hosting Business to be its core operations for long-run strategic and performance evaluation purposes. Accordingly, these non-GAAP financial measures exclude the results of our consolidated subsidiary, ChronoScale. ChronoScale is included in our consolidated financial statements and results of continuing operations. Due to its strategic role relative to the Company’s core business, management believes the ChronoScale results may obscure underlying trends in the performance of core operations when included in certain non-GAAP measures.
These non-GAAP financial measures are provided as supplemental measures to our performance measures calculated in accordance with GAAP and therefore, are not intended to be considered in isolation or as a substitute for comparable GAAP measures. Excluding the results of ChronoScale in our non-GAAP financial measures removes revenues and expenses that are part of the Company’s consolidated results and continuing operations and should not be viewed as measures or reflections of liquidity or profitability in accordance with GAAP. Further, these non-GAAP financial measures have no standardized meaning prescribed by GAAP and are not prepared under any comprehensive set of accounting rules or principles. [… 173 unchanged words …]
“Adjusted operating income” (Loss)” and “Adjusted net income (loss) from continuing operations attributable to common stockholders” are non-GAAP financial measures that represent operating loss income and net income (loss) from continuing operations attributable to common stockholders, excluding ChronoScale, respectively. Adjusted operating income (Loss) is Operating loss excluding operating loss from ChronoScale, stock-based compensation, non-recurring repair expenses, diligence, acquisition, disposition and integration expenses, litigation expenses, loss on abandonment of assets, (gain) loss on classification as of held for sale, accelerated depreciation and amortization, loss on legal settlement, restructuring expenses and other non-recurring expenses that management believes are not representative of the Company's our expected ongoing costs. Adjusted net income (loss) from continuing operations attributable to common stockholders is Adjusted operating income (Loss) further adjusted for the interest expense directly attributable to ChronoScale, gain on change in fair value of derivatives, gain on change in fair value of investments, loss on conversion of debt, loss on change in fair value of debt, and loss on change in fair value of related party debt, respectively, loss on change in fair value of warrants, and loss on change in fair value of warrants issued to related parties, respectively, loss on extinguishment of debt and loss on extinguishment of related party debt. respectively, and preferred dividends. We define “Adjusted net income (loss) from continuing operations attributable to common stockholders per diluted share” as Adjusted net income (loss) from continuing operations attributable to common stockholders divided by weighted average diluted share count.
“EBITDA” is defined as earnings before interest expense, net, income tax expense, and depreciation and amortization and excluding results of ChronoScale. “Adjusted EBITDA” is defined as EBITDA adjusted for stock-based compensation, non-recurring non- recurring repair expenses, diligence, acquisition, disposition and integration expenses, litigation expenses, (gain) loss on classification as held for sale, loss on abandonment of assets, gain on change in fair value of derivatives, gain on change in fair value of investments, loss on conversion of debt, loss on change in fair value of debt, and loss on change in fair value of related party debt, respectively, loss on change in fair value of warrants, and loss on change in fair value of warrants issued to related parties, respectively, loss on extinguishment of debt and loss on extinguishment of related party debt, respectively, loss on legal settlement, preferred dividends, restructuring expenses, and other non-recurring expenses that management believes are not representative of our expected ongoing costs.
1 more paragraph was rewritten here (+8 / −7 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.
1 added · 1 rewritten
Added in the 10-K for fiscal 2026
(7)Potentially dilutive securities or other contracts to issue common stock are only included for each period if the effect is dilutive to Adjusted net income (loss) from continuing operations per diluted share.
(1)Represents costs incurred in for the non-recurring repair and replacement of equipment at Ellendale our data center Hosting facility as a result of the previously disclosed power outage. facilities.
1 added · 4 removed · 4 rewritten
Added in the 10-K for fiscal 2026
Under “Promissory Note”
On September 9, 2025, as described above, our subsidiary APLD FAR-01 LLC entered into the MEC Promissory Note with MEC, which provides for a principal sum of (a) $50 million, which was drawn on the Closing Date, plus (b) subject to the mutual consent of us and the Lender, additional loans in an aggregate principal amount not to exceed $25 million. On November 28, 2025, APLD FAR-01 LLC repaid the MEC Promissory Note in full, including all outstanding and unpaid principal, accrued interest, and rate of return.
On October 6, 2025, as described above, the TopCo 2 sold to the Purchaser 112,500 Preferred Units in TopCo 2 at a price per Preferred Unit of $1,000, for an aggregate purchase price of $112.5 million. On November 25, 2025, the TopCo 2 sold to the Purchaser 450,000 Preferred Units in the TopCo 2 at a price per Preferred Unit of $1,000, for an aggregate purchase price of $450.0 million. On December 9, 2025, the TopCo 2 issued to the Purchaser an additional 27,778 common units and 337,500 Preferred Units in the TopCo 2 at a price per Preferred Unit of $1,000, for an aggregate purchase price of $337.5 million. On May 29, 2026, TopCo 2 completed a fourth closing under its A&R UPA, selling 925,000 preferred units for $925.0 million and issuing an additional 41,815 common units. This brought the total amount funded to date under the A&R UPA to $1.8 billion as of May 31, 2026.
On November 10, 2025, as described above, the Company entered into the 2025 Revolving Credit Facility with First National Bank of Omaha, pursuant to which the lender agreed to make one or more revolving loans, and issue letters of credit, from time to time to the Company in an aggregate principal amount of $65 million. On May 29, 2026, the 2025 Revolving Credit Facility was modified and the standby letters of credit thereunder transferred when the Company and certain of its subsidiaries entered into the 2026 Revolving Credit Facility.
On November 20, 2025, as described above, our subsidiary APLD ComputeCo LLC closed the 2030 9.250% Notes Offering of the 2030 9.25% Notes at an issue price of 97.0%. The net proceeds from the 2030 9.250% Notes after issuance costs and repayment of the SMBC Loan were approximately $1.9 billion.
On December 18, 2025, as described above, our subsidiary APLD DevCo LLC and MEC entered into the DevCo Facility. The DevCo Promissory Note provides for a principal sum of (a) the First Draw, plus (b) the Second Draw, plus (c) the Third Draw, with the Third Draw to be funded upon APLD DevCo’s request at any time after the Initial Closing Date subject to satisfaction of or waiver by MEC of certain conditions precedent on or prior to the Third Draw, plus (d) the principal sum of any Additional Loans, if applicable.
The DevCo Loan bears interest at 8.0% per annum, unless an Event of Default (as defined therein) has occurred and is continuing, in which case, the Secured Obligations (as defined therein) shall bear interest at the sum of 8.0% per annum plus an additional 1.50% per month (the “Post-Default Rate”). On May 29, 2026, APLD DevCo repaid the DevCo Loan in full, including all outstanding and unpaid principal, accrued interest, and rate of return.
On March 10, 2026, as described above, our subsidiary APLD ComputeCo 2 LLC closed the 2031 6.750% Notes Offering of the 2031 6.750% Notes at an issue price of 98.0%. The net proceeds from the 2031 6.750% Notes after issuance costs were approximately $2.1 billion.
On May 1, 2026, as described above, our subsidiary APLD ComputeCo 3 entered into a Credit and Guaranty Agreement with Goldman Sachs Bank USA, providing for a bridge loan facility in an aggregate principal amount of $300.0 million. On June 16, 2026, the Bridge Facility was refinanced with the closing of the 2031 7.000% Notes Offering.
On May 29, 2026, as described above, our subsidiary APLD Intermediate HoldCo entered into the 2026 Revolving Credit Facility with First National Bank of Omaha, pursuant to which the lenders and issuing banks party to the Revolving Credit Agreement agreed to make one or more revolving loans, and issue letters of credit, from time to time to APLD Intermediate HoldCo in an initial aggregate principal amount of $350.0 million.
As of May 31, 2026, approximately $65.0 million of standby letters of credit were outstanding under the 2026 Revolving Credit Facility. Refer to Note 8 - Debt in the accompanying Notes to the Consolidated Financial Statements for additional information.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
In addition to the sources of liquidity noted below, subsequent to May 31, 2025, we sold additional shares of our common stock under the June 2025 Sales Agreement which generated proceeds of approximately $193.9 million and issued the remaining 78,000 shares of Series G Preferred Stock, pursuant to the PEPA, for aggregate gross proceeds of $75.0 million.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “Recent Financing Activities”
During the fiscal year ended May 31, 2025, Applied Digital Cloud Corporation, our wholly-owned subsidiary, entered into two Simple Agreement for Future Equity (“SAFE”) agreements totaling $12.0 million with an investor.
During the fiscal year ended May 31, 2025, under the May 2024 Sales Agreement, we sold approximately 3.1 million shares for net proceeds of approximately $14.6 million with commission and legal fees related to the issuance of approximately $0.5 million. This offering was completed as of August 31, 2024.
During the fiscal year ended May 31, 2025, we closed on four offerings of the Series E Preferred Stock in which we sold total shares of 301,673 for proceeds of $6.9 million net of issuance costs of $0.6 million. The Series E Dealer Manager Agreement was terminated upon the termination of the Series E Offering on August 9, 2024.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “Recent Financing Activities”
On July 30, 2024, we announced that the conditional approval requirements related to the release of the escrowed funds from the sale of our Garden City hosting facility had been met. During the quarter ended August 31, 2024, we received the remaining $25 million of the purchase price, previously held in escrow pending such conditional approval.
On August 29, 2024, we entered into a securities purchase agreement with YA Fund for the private placement of 53,191 shares of Series F Convertible Preferred Stock. The Series F Offering closed on August 30, 2024, for total proceeds to us of $50.0 million, prior to fees paid to Northland Securities, Inc. for their role as placement agent in an amount equal to 3.5% of the total proceeds. During the fiscal year ended May 31, 2025, all 53,191 shares of Series F Convertible Preferred Stock were converted into approximately 7.6 million shares of our common stock.
On September 5, 2024, we entered into the PIPE Purchase Agreement with the PIPE Purchasers, for the private placement of 49,382,720 shares of our common stock, at a purchase price of $3.24 per share, representing the last closing price of our common stock on the Nasdaq Global Select Market on September 4, 2024 for total gross proceeds to us of approximately $160 million, before deducting offering expenses.
On September 23, 2024, we entered into the Series E-1 Dealer Manager Agreement with the Dealer Manager pursuant to which the Dealer Manager agreed to serve as our agent and dealer manager for the offering of up to 62,500 shares of our Series E-1 Preferred Stock, at a price per share of $1,000 per share, pursuant to our Registration Statement on Form S-1, filed with the SEC on September 23, 2024. During the fiscal year ended May 31, 2025, we closed on eight offerings of the Series E-1 Preferred Stock, in which we issued and sold 62,500 shares for gross proceeds of $62.5 million. As of the date of this report, the offering of Series E-1 Preferred Stock has been completed.
On November 4, 2024, we completed a private offering of the Convertible Notes to persons reasonably believed to be qualified institutional buyers pursuant to Rule 144A under the Securities Act. The aggregate principal amount of the Convertible Notes sold in the offering was $450 million, which includes $75 million aggregate principal amount issued pursuant to the initial purchasers' fully exercised option. The net proceeds from the sale of the Convertible Notes were approximately $435.2 million after deducting the initial purchasers' discounts and commissions and estimated offering expenses.
On November 27, 2024, our subsidiary, APLD HPC Holdings LLC, formerly known as APLD ELN-02 Holdings LLC, entered into the Macquarie Promissory Note. The proceeds from the Macquarie Promissory Note were used to repay in full and terminate the CIM Promissory Note as well as all obligations under the March Note. On February 11, 2025, in connection with entering into the SMBC Credit Agreement, with the proceeds of the SMBC Loans, we repaid the Macquarie Promissory Note in full, including all outstanding and unpaid principal, accrued interest, and multiple on invested capital.
As of November 30, 2024, the remaining aggregate principal of $71.3 million of the YA Notes had been converted, in exchange for the issuance by us of 19.1 million shares of common stock to YA Fund, and the aggregate principal amount outstanding under the March Note was $6.9 million (consisting of the remaining principal amount of $4.8 million and the additional $2.1 million Commitment Fee), which was repaid in full during the quarter ended February 28, 2025, including all outstanding and unpaid principal, accrued interest, fees, and expenses.
On February 11, 2025, APLD HPC Holdings LLC, our subsidiary, entered into the SMBC Credit Agreement with SMBC for the SMBC Loans. The proceeds from the SMBC Loans were used to: (i) prepay in full the Macquarie Promissory Note, (ii) pay for certain data center project development costs at Polaris Forge 1, and (iii) fund the Interest Reserve Account as defined in the SMBC Credit Agreement. Remaining proceeds have been deposited into a separate bank account for future construction costs at Polaris Forge 1.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “Recent Financing Activities”
During the fiscal year ended May 31, 2025, we received $131.5 million in payments for future data center hosting services.
During the fiscal years ended May 31, 2026 and May 31, 2025, the Company issued and sold 835,800 and 78,000 shares of Series G Preferred Stock, respectively, for gross proceeds of $815.0 million and $75.0 million, respectively. During the fiscal year ended May 31, 2025, we issued and sold 78,000 2026, 913,800 shares of Series G Preferred Stock for aggregate gross proceeds were converted into 51.0 million shares of $75.0 million. the Company’s common stock. As of May 31, 2026, no shares of Series G Preferred Stock were issued and outstanding.
(4)Financing lease obligations include future minimum payments for our finance leases. We have entered into various leases which are executed but not yet commenced with total minimum payments of approximately $16.6 million and terms of 2 years.
(6)Preferred share dividends represent future dividend payments in accordance with preferred stock that has been issued. These amounts do not include preferred dividends related to preferred units of APLD HPC TopCo 2 LLC which may fluctuate depending on the redeemable noncontrolling interest's contribution as well as other factors that may impact the dividend rate. See Note 16 - Temporary Equity for further discussion.
1 more paragraph was rewritten here (+9 / −6 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.
1 added · 1 removed · 2 rewritten
Added in the 10-K for fiscal 2026
Under “Operating Activities”
The net cash provided by (used in) operating activities changed by $205.1 million, or 178%, from $115.4 million used in operating activities for the fiscal year ended May 31, 2025 to $89.7 million provided by operating activities for the fiscal year ended May 31, 2026. Activities that positively impacted operating cash flows during the fiscal year ended May 31, 2026 included stock-based compensation associated with awards granted during the current period, non-cash interest expense associated with the increase in debt borrowings, deferred revenue received, as well as a decrease in net loss between comparative periods. These positive impacts were partially offset by prior period activities which were not present in the current period, including losses on the conversion and fair value of debt. Other impacts included changes in working capital associated with energizing our first HPC data center at our Polaris Forge 1 campus during the current fiscal year.
In the 10-K for fiscal 2025, not in the 10-K for fiscal 2026
Under “Operating Activities”
The net cash (used in) provided by operating activities decreased by $129.2 million, or 937%, from $13.8 million provided by operating activities for the fiscal year ended May 31, 2024 to $115.4 million used in operating activities for the fiscal year ended May 31, 2025. This change was primarily driven by a large increase in accounts payable due to the timing of payments between the periods and a gain on classification of held for sale due to the receipt of $25.0 million of funds released from escrow in association with the sale of our Garden City facility. Also contributing to this change was a decrease in deferred revenue due to changes in our customer base relative to the prior comparative period as well as timing of collections during the fiscal year ended May 31, 2025.
The net cash used in investing activities increased by $495.2 million, $2.3 billion, or 340%, from $172.4 million for the fiscal year ended May 31, 2024 to $667.7 million for the fiscal year ended May 31, 2025 to $2.9 billion for the fiscal year ended May 31, 2026. This increase was primarily due to an increase of approximately $539.8 million $2.2 billion in investments in property and equipment during the fiscal year ended May 31, 2025 2026 as our payments in the current periods period for construction of Polaris Forge 1 outpaced the comparative period construction payments for the Garden City hosting facility related expenses increased as well as an increase in loans to related parties and our HPC data centers investments in the prior year. These increases other companies. Additionally, there were partially offset by the receipt of $25.0 million of funds that were released less proceeds from escrow in association with the sale of our Garden City facility as well as a decrease of $43.9 million in lease prepayments made for leases of hosting equipment to support our Cloud Services Business assets during the fiscal year ended May 31, 2026, compared to the fiscal year ended May 31, 2025 to offset the increase in cash used in investing activities.
The net cash provided by financing activities increased by $727.9 million, $6.0 billion, or 496%, 686%, from $146.8 million for the fiscal year ended May 31, 2024 to $874.7 million for the fiscal year ended May 31, 2025 to $6.9 billion for the fiscal year ended May 31, 2026. The primary reasons reason for the change were was an increase in the receipt net borrowings of long-term debt of $4.1 billion and a capital contribution from our noncontrolling interest partners of $1.8 billion. Also contributing to the increase was an increase in the net proceeds from offerings of our common and preferred stock of approximately $235.1 $627.8 million proceeds from during the Convertible Notes fiscal year ended May 31, 2026. These increases were partially offset by a decrease of $450.0 million and net debt in borrowings of approximately $357.0 million, as well as the receipt of $12.0 million from SAFE agreements for equity in Applied Digital Cloud Corporation, a wholly-owned subsidiary of the Company, under our Convertible Notes which occurred during the fiscal year ended May 31, 2025 These increases were partially offset by the payment of approximately $42.4 million in debt financing costs, as well as an increase of approximately $65.1 $129.5 million in finance lease payments as well as approximately $104.5 million cash used for the capped call and prepaid forward related to the Convertible Notes offering of deferred financing costs during the fiscal year ended May 31, 2026 compared to the fiscal year ended May 31, 2025.
1 added · 2 rewritten
Added in the 10-K for fiscal 2026
Under “Management Incentive Plan Units”
We measured the management incentive plan ("MIP") units granted in connection with the ChronoScale transaction at grant-date fair value (see Note 15 - Stock-Based Compensation Plans for further discussion). We engaged a third party valuation specialist to assist management in its determination of the grant-date fair value of the MIP units. The valuation considered multiple liquidity scenarios, which were measured using a combination of option pricing model ("OPM") and current value method ("CVM"). The valuation incorporated the contractual terms of the awards, the applicable distribution waterfall, and the underlying value of ChronoScale at the time of issuance. Inherent in the valuation are assumptions related to the probability and timing of liquidity events, expected volatility, risk-free interest rates, discounts for lack of marketability, and the underlying equity value of ChronoScale, which are considered Level 3 inputs.
We measure measured the warrants issued to CIM APLD Lender Holdings LLC, Macquarie Equipment Capital, Inc., STB Applied Holdings LLC, and CoreWeave the Company from BWE at fair value (see Note 7 10 - Debt and Note 9 - Stockholders' Equity Derivative Assets for further discussion). We engaged a third party valuation specialist to assist management in its determination of the fair value of the warrants using a [… 29 unchanged words …]
We engaged a third party valuation specialist to assist management in its the determination and allocation of the fair value of the embedded derivative features, the Conversion Option, using Redemption features and the Contingent Dividend Rate Increase feature, associated with the preferred units and corresponding common units issued to APLD HPC TopCo 2's noncontrolling interest. The third party valuation specialist utilized a binomial lattice model in a risk-neutral framework. We allocated Inherent in the principal amount pricing model are assumptions related to the estimated credit spread of the Convertible Notes between associated preferred stock and corresponding common units, volatility, and risk-free rate of the host contract and the embedded derivative based on fair value assets, which are considered Level 3 inputs (see Note 7 10 - Debt Derivative Assets for further discussion).
15 other paragraphs were edited by fewer than 15 words; 12 changed only figures, dates or period names; 14 are word for word the same; 22 were split, merged or moved, with most of their text in the other filing; their text is in the 10-K for fiscal 2026 and the 10-K for fiscal 2025 linked above.
The text is Applied Digital's own disclosure, quoted as filed in the MD&A of the 10-Q for fiscal Q1 2027 and the 10-Q for fiscal Q1 2026, split at its own subsection headings and matched by fixed rules, without a language model; tables of figures are left out. A new, rewritten or removed passage is not a judgment by Stackyear about Applied Digital or its shares. How MD&A pages are compared.
To keep this page to a readable length, passages over 800 words show their opening paragraphs, and the rewrites with the fewest words changed are counted without their text. The counts include them all.
General research from public filings, not investment advice.