Constellation Energy MD&A: what changed

In Constellation Energy's 10-Q for the quarter ended Sep 30, 2026, the MD&A added 25 passages, removed 11 and rewrote 31 against the 10-Q for fiscal Q3 2025, the same quarter a year earlier. In its 10-K for fiscal 2025, the MD&A added 17 passages, removed 23 and rewrote 37 against the 10-K for fiscal 2024.

Source: Management's discussion and analysis (Item 2) of CONSTELLATION ENERGY CORPORATION's 10-Q filed Nov 9, 2026 (accession 0001868275-26-000119, period ended Sep 30, 2026) compared with its 10-Q filed Nov 7, 2025 (accession 0001868275-25-000092, period ended Sep 30, 2025), on SEC EDGAR

Added
25
Passages new in the 10-Q for the quarter ended Sep 30, 2026
10-Q · Nov 9, 2026
Removed
11
In the 10-Q for fiscal Q3 2025 only
10-Q · Nov 7, 2025
Rewritten
31
15+ words changed, figures not counted
10-Q · Nov 9, 2026
Paragraphs compared
140
97 in the 10-Q for fiscal Q3 2025
10-Q · Nov 9, 2026

Latest quarterly report against the same quarter a year earlier

10-Q for the quarter ended Sep 30, 2026 against the 10-Q for fiscal Q3 2025

In Constellation Energy's 10-Q for the quarter ended Sep 30, 2026, the MD&A added 25 passages, removed 11 and rewrote 31 against the 10-Q for fiscal Q3 2025, the same quarter a year earlier.

Compared: Item 2 of the 10-Q filed Nov 9, 2026 (accession 0001868275-26-000119, period ended Sep 30, 2026; 140 paragraphs) and Item 2 of the 10-Q filed Nov 7, 2025 (accession 0001868275-25-000092, period ended Sep 30, 2025; 97 paragraphs).

Figures, dates and period names change every period and are not counted. A paragraph is rewritten when at least 15 other words were added or removed: added text is underlined and shaded, removed text is struck through, and long unchanged stretches are shortened to the words around each change.

Introduction

2 removed

In the 10-Q for fiscal Q3 2025, not in the 10-Q for the quarter ended Sep 30, 2026

Under “Executive Overview”

We are the nation's largest producer of carbon-free energy and a supplier of energy products and services. Our generating capacity includes primarily nuclear, wind, solar, natural gas, and hydroelectric assets. Through our integrated business operations, we sell electricity, natural gas, and other energy-related products and sustainable solutions to various types of customers, including distribution utilities, municipalities, cooperatives, and commercial, industrial, public sector, and residential customers in markets across multiple geographic regions. We have five reportable segments: Mid-Atlantic, Midwest, New York, ERCOT, and Other Power Regions.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for the quarter ended Sep 30, 2026

Under “Conowingo Hydroelectric Project License Renewal”

In September 2025, we reached a settlement agreement with MDE, Lower Susquehanna Riverkeeper Association, and Waterkeepers Chesapeake, that resolves all outstanding issues related to obtaining a water quality certification from MDE. As a result, MDE issued a water quality certification, clearing the way for the re-licensing and continued operation of our Conowingo hydroelectric facility. The terms of the agreement include operational improvements and commitments for water quality and resiliency, trash and debris removal, aquatic life passage, freshwater mussel restoration, dredging and invasive species management. See Note 3 — Regulatory Matters for more information.

We continue to see legislative support for nuclear energy generation, including the passage of the OBBBA. Signed into law in July 2025, the OBBBA both preserves certain federal tax credits from the IRA and enhances certain credits to allow advanced nuclear facilities to qualify for the energy communities bonus adder, subject to eligibility requirements. Overall, the OBBBA reinforces the long-term economic viability of our nuclear generation assets. See Note 3 — Regulatory Matters for more information.

In June 2025, we signed a 20-year PPA with Meta Platforms, Inc. (Meta) for the output of the Clinton Clean Energy Center to support Meta’s clean energy goals and operations in the region with emissions-free nuclear energy. The agreement, beginning in June 2027, supports the relicensing and continued operations of Clinton for another two decades after the state’s ZEC program expires. This deal will expand Clinton’s clean energy output by 30 megawatts through plant uprates, expected to be fully complete in 2029, and will enable the Clinton Clean Energy Center to continue to flow power onto the local grid, providing grid reliability and low-cost power to the region for decades to come. The uprates are expected to qualify for the technology-neutral clean electricity PTC (45Y) provided for by the IRA and preserved by the OBBBA for its first 10 years of operations.

Executive Overview

1 added

Added in the 10-Q for the quarter ended Sep 30, 2026

Constellation Energy Corporation, a Fortune 200 company headquartered in Baltimore, is the largest private-sector power producer in the world and the nation’s largest producer of clean and reliable energy. With 55 gigawatts of capacity from nuclear, natural gas, oil, geothermal, hydro, wind and solar facilities, our fleet has the generating capacity to power the equivalent of 27 million homes, providing about 10% of the nation’s clean energy and delivering the around-the-clock reliability needed to power America’s growing economy. We are also the largest nuclear energy company in the U.S. and a leading competitive retail supplier, serving approximately 2.5 million customer accounts nationwide, including 80% of the Fortune 100. We are committed to investing in innovation and new technologies to drive the transition to a reliable, sustainable and secure energy future.

Significant Transactions and Developments

2 added · 3 rewritten

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Acquisition of Calpine Corporation”

In March 2026, we entered into an agreement with LS Power Equity Advisors, LLC to sell five natural gas-fired generating facilities with approximately 4.4 GWs of capacity from Calpine's portfolio of generation assets located in PJM to satisfy regulatory commitments related to our acquisition of Calpine. The transaction is valued at $5.0 billion before closing adjustments. Completion of the transaction is subject to customary closing conditions and receipt of applicable regulatory approvals, and is expected to close by the end of this year.

In October 2026, we completed the divestiture of the Brazos Valley Energy Center (f/k/a Jack A. Fusco Energy Center), a 606 MW natural gas-fired plant in ERCOT, to LS Power for $860 million before closing adjustments.

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “New Data Center Facility at Freestone Energy Center”

In the first quarter of 2026, we signed a new 380 MW agreement with Dallas-based CyrusOne, a leading global data center developer and operator, to connect and serve a new data center adjacent to the Freestone Energy Center, in Freestone County, Texas. The agreement provides CyrusOne with access to power, grid connectivity and site infrastructure needed to support development of the new facility, while ensuring electricity continues to flow to the regional grid and ensuring reliability for all customers and communities. We have also entered into an exclusive agreement to provide power, grid connectivity and site infrastructure for Phase 2, which will be an additional 380 MWs. These agreements are in addition to the 400 MW agreements announced in the second half of last year between Calpine and CyrusOne for the Thad Hill Energy Center in Bosque County, Texas.

In April 2026, we celebrated the commissioning of the 105 MW Pastoria Solar Project, the largest renewable energy project contracted by the California Department of Water Resources to date in its mission to fully decarbonize its operations by 2035. The Pastoria Solar Project connects to the grid through the interconnection facilities at our highly efficient 750 MW natural gas-fired Pastoria facility. Also, co-located with the Pastoria Solar Project is the Pastoria Power Bank, an 80 MW/320 MWh Battery Energy Storage System, which came online in July 2026. The Pastoria Power Bank is contracted and supported by a 15-year power purchase agreement with Pacific Gas and Electric Company.

Show the rest (550 words)

In April 2026, our Pin Oak Creek Energy Center achieved commercial operation. Pin Oak Creek is a 460 MW, state-of-the-art natural gas facility designed to provide reliable, dispatchable power to the ERCOT grid. As a peaking facility, it is built to operate when demand is highest and reliability matters most, while also maintaining the flexibility to run longer if system conditions require it. The project is a direct response to Texas’ continued growth and increasing electricity demand across homes, businesses, and industry. Pin Oak Creek will play a critical role in strengthening grid reliability and supporting the state’s economic momentum.

In the second quarter of 2026, we signed long-term PPAs with a diverse group of investment-grade customers covering 920 MW of clean, reliable nuclear generation, primarily from our existing fleet. The agreements have terms of 15 to 20 years and are expected to commence between 2029 and 2032. This total includes a 176 MW PPA with Walmart that will support a 30 MW capacity expansion at our Dresden Clean Energy Center in Illinois, as well as additional investments in the facility, its workforce, and the local community.

In September 2026, we announced a 20-year, 690 MW PPA with Amazon and a related retail supply agreement supporting Amazon's operations in PJM. The agreements will enable more than $3 billion of investment in our Calvert Cliffs Clean Energy Center, including facility improvements and a 190 MW capacity expansion expected to come online between 2030 and 2032, while supporting the facility's continued operation and future relicensing.

In October 2026, we announced a 20-year PPA with Google that will enable more than $4.3 billion of investment across 11 of our nuclear units in Illinois, Pennsylvania, and New Jersey to add approximately 890 MW of incremental generation capacity to the PJM grid, with the first uprate expected in 2028. We also entered into a 15-year financial energy load following agreement with Google for 2,700 MW in PJM.

These agreements reflect continued demand from large-load customers for reliable, clean energy. Realization of the anticipated investments and capacity expansions remains subject to regulatory approvals, successful completion of the planned uprates, continued operation and relicensing of the applicable facilities, and other conditions.

In September 2026, we entered into an agreement to acquire all of the equity interests in RISEC Holdings, LLC, the owner of the Rhode Island State Energy Center, from Shell Energy North America (US), L.P. for $715 million, subject to customary purchase price adjustments. The Rhode Island State Energy Center is a natural gas-fired combined-cycle electric generation facility with a generating capacity of 609 MW. The facility sells electricity and capacity into the competitive ISO New England wholesale power market and is expected to become part of our merchant generation portfolio. Completion of the transaction is subject to receipt of required regulatory approvals and other customary closing conditions.

In October 2026, we signed a conditional loan commitment with the DOE Office of Energy Dominance Financing. Subject to the execution of a loan agreement, the DOE would issue a guarantee for up to $5.0 billion for an unsecured loan from the Federal Financing Bank to support uprates at various nuclear facilities. The loan would have a 30-year term. Interest rates would be fixed upon each advance at a spread of 0.375% above U.S. Treasuries of comparable maturity.

On January 7, 2026, we acquired 100% of the outstanding equity of Calpine for …+38 / −25 words · under “Acquisition of Calpine Corporation”

On January 10, 2025, 7, 2026, we entered an agreement and plan acquired 100% of merger (Merger Agreement) with Calpine Corporation (Calpine) under which we will acquire all the outstanding equity interests of Calpine for a purchase price of approximately $21.8 billion. The merger consideration consisted of 50 million newly issued shares of our common stock, no par value, and approximately $4.5 billion in a cash and stock transaction. on hand. After considering divestitures connected with certain regulatory approvals, Calpine owns and operates a generation fleet of predominantly natural gas, geothermal, battery storage, and solar assets with over 27 approximately 23 GWs of generation capacity, in addition to a competitive retail electric supplier platform with 60 serving approximately 62 TWhs of load annually.

This acquisition is complementary to, and aligns strategically with, our existing business operations and …+6 / −10 words · under “Acquisition of Calpine Corporation”

This acquisition is complementary to, and aligns strategically with, our existing business operations and provides both increased scale and meaningful market diversification. We will couple The merger couples the largest producer of clean, carbon-free emissions-free energy with the reliable, dispatchable natural gas assets of Calpine, and also create creates the nation’s leading competitive retail electric supplier, providing increased scale, diversification and complementary capabilities that will enable us to meet growing demand with a broader array of energy and sustainability products. The addition of Calpine will strengthen strengthens our essential role in providing clean, reliable and affordable energy as the nation seeks to transition to a more sustainable future, and will better position us to pursue investments in new and existing technologies to meet growing demand.

See Note 2 — Mergers, Acquisitions, and Dispositions and Note 13 — Debt and …+6 / −24 words · under “Acquisition of Calpine Corporation”

We have an accounts receivable financing facility with a number of financial institutions which provides us access to revolving loans secured by certain receivables. See Note 12 2 — Mergers, Acquisitions, and Dispositions and Note 13 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information.

Other Key Business Drivers

3 added · 1 removed · 2 rewritten

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “PJM Market Reform”

In January 2026, the National Energy Dominance Council, supported by governors in the PJM territory, urged PJM to propose certain tariff revisions with respect to its capacity auction. PJM subsequently initiated stakeholder discussions regarding potential market reforms, including a reliability backstop auction mechanism, enhancements to large load forecasting and measures to accelerate generator interconnection studies. In February 2026, PJM proposed extending the existing RPM capacity market price collar—approximately $325/MW‑day and $175/MW‑day—for the 2028/2029 and 2029/2030 Base Residual Auctions. FERC accepted the extension in April 2026, citing reliability concerns, significant demand growth, including from data centers, and anticipated market reforms.

In July 2026, PJM proposed a one-time reliability backstop procurement. In September 2026, FERC accepted the proposal and suspended it to become effective February 28, 2027, subject to refund and subject to the outcome of a paper hearing. FERC also encouraged PJM to re-file an updated proposal within 30 days rather than proceeding with the paper hearing. PJM submitted an updated auction filing on October 29, 2026 and proposed that the one-time procurement open March 1, 2027 and close on March 28, 2027, with results announced on May 10, 2027. Many of the proposed auction parameters are the same, with the exception that the load forecast that is used to clear the auction will not be finalized until April 28, 2027. Separately, in August 2026, PJM filed its Interim Resource Adequacy Service proposal, which would have imposed curtailment risk on new large loads over 50 MW coming online after June 1, 2027 that did not contract for new capacity. FERC largely rejected the proposal, finding that it improperly intruded on state jurisdiction over retail rates and that PJM had not established the lawfulness of certain provisions. PJM has indicated that they will make a subsequent filing, but no details are available at this time.

Show the rest (295 words)

In December 2025, FERC issued an order finding the existing PJM Tariff to be unjust and unreasonable and directing PJM to take a number of actions. FERC ordered three new transmission services: an interim interruptible network integration transmission service (IT NITS), which will allow load to take service on an interruptible basis while waiting for the network upgrades required for traditional NITS, and two other services. The IT NITS service allows the load to elect to connect promptly and receive some service from the grid, while avoiding PJM purchases of capacity to serve it, as it will be interruptible. The other services include a firm and non-firm contract demand service for co-located load. FERC also directed several PJM compliance filings and a paper hearing.

In June 2026, FERC ruled on a number of issues presented in the co-location paper hearing and on several PJM compliance filings implementing directives from the December 2025 order. Importantly, FERC pressed PJM to implement changes to accommodate co-located load prior to PJM’s proposed June 2029 effective date. In August 2026, PJM submitted its compliance filing and we are awaiting a FERC order on the filing.

FERC also issued a series of orders in the various RTOs in response to the Advance Notice of Proposed Rulemaking (ANOPR) published by DOE last fall. The orders direct filings by RTOs and their transmission owners that are designed to expedite service to large load (regardless of whether it is co-located) and avoid the expense and delay associated with network upgrades to provide service to these loads. Constellation’s Load Dependent Capacity at Existing Plants (LCEP) proposal, which would expedite connection of new generation when paired with a large load at an existing plant, was flagged in several RTO orders as a proposal to be considered.

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Environmental Regulation”

California Assembly Bill 32, as amended by Senate Bill 32 in 2016, directed the California Air Resources Board (CARB) to adopt regulations to achieve the maximum technologically feasible and cost-effective reductions in GHG emissions, targeting statewide GHG emissions at 1990 levels by 2020 and to at least 40% below 1990 levels by 2030. The California Climate Crisis Act was enacted in 2022 and further establishes the state's policy to achieve net zero GHG emissions as soon as possible, but no later than 2045, and to reduce statewide anthropogenic GHG emissions to 85% below 1990 levels by 2045. To achieve these targets, CARB has promulgated complementary regulatory measures, including the Cap-and-Trade Program and Mandatory Greenhouse Gas Emissions Reporting Regulation. Covered entities, such as our power plants, must surrender compliance instruments, which include both allowances and offset credits, in an amount equivalent to their GHG emissions. Assembly Bill 398, enacted in 2017, authorized the extension of the Cap-and-Trade Program through 2030 and required several changes to the program, including establishing a price ceiling and other price mitigative mechanisms and limiting the amount of offsets allowed to comply with the regulation. In September 2025, California Governor Gavin Newsom signed AB 1207 and SB 840 into law, extending the state’s Cap-and-Trade Program through January 1, 2046, and renaming it the “Cap and Invest" Program.

In September 2021, Illinois Governor JB Pritzker signed into law the Climate and Equitable Jobs Act, which, among other things, establishes a schedule for eliminating CO2 emissions by EGUs. Under that schedule, privately owned natural gas units that exceed an established level of NOx or SO2 emissions and are located within three miles of an environmental justice community, or an equity investment-eligible community must permanently eliminate CO2 and co-pollutant emissions by January 1, 2030, subject to certain reliability exceptions, such as a determination by PJM that the unit is needed for reliability. PJM made such a finding with respect to our natural gas generation facility, Zion Energy Center, acquired as part of Calpine, and accordingly Zion plans to operate past January 2030.

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Environmental Regulation”

See ITEM 1. BUSINESS, Environmental Matters and Regulation of our 2025 Form 10-K for additional information on environmental legislation and regulation we are subject to.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for the quarter ended Sep 30, 2026

Under “Environmental Regulation”

Good Neighbor Rule. In June 2023, EPA published a final rule called “Federal 'Good Neighbor Plan' for the 2015 Ozone National Ambient Air Quality Standards” also known as the "Transport Rule". The rule, among other things, establishes nitrogen oxides emissions budgets requiring fossil fuel-fired power plants in 23 states to participate in an allowance-based ozone season trading program beginning in 2023. In February 2023, EPA disapproved state implementation plans submitted by 21 states for failure to address their obligations under the "good neighbor" provisions of the Clean Air Act. However, several Regional Courts of Appeals issued orders staying, pending judicial review, EPA's disapproval of several state plans (including Texas). In June 2024, the Supreme Court stayed EPA's rule for the duration of the litigation. In November 2024, EPA issued an administrative stay of the rule. EPA has announced its intent to approve state plans that would replace the Good Neighbor Plan.

We are closely monitoring developments of the ongoing Russia and Ukraine conflict, including United …+4 / −173 words · under “Russia and Ukraine Conflict”

[… 64 unchanged words …] of low-enriched uranium into the U.S. that is produced in Russia or by Russian entities, absent a waiver from the DOE. Under a corollary bill, in 2026, the Department of Energy has begun DOE began the process of distributing billions of dollars to support expansion of the domestic nuclear fuel cycle within the United States to improve carbon-free emissions-free energy security. In November 2024, The Russian government issued a decree imposing temporary restrictions on the export of enriched uranium from Russia to the U.S. but allowing for a special Russian export license to be issued for individual shipments. Our nuclear fuel is obtained predominantly through long-term uranium supply and service contracts. We work with a diverse set of domestic and international suppliers years in advance to procure our nuclear fuel to support our refueling needs and mitigate the risk of exposure to Russian nuclear fuel supply. Recognizing the potential for the continuing conflict to impact our longer-term security and cost of supply, we have entered into contracts to increase the size of our nuclear fuel inventory. Our fuel procurement activities comply with all U.S. and international trade laws and we continue to take advantage of all available avenues to maintain continuity in our nuclear fuel supply, including working with the U.S. Government and our diverse set of suppliers to secure the nuclear fuel needed to continue to operate our nuclear fleet long-term.

Regulation of GHGs from Power Plants under the Clean Air Act. In February 2026, …+125 / −74 words · under “Environmental Regulation”

Regulation of GHGs from Power Plants under the Clean Air Act. In April 2024, February 2026, EPA issued a final rule that regulates greenhouse gases from existing coal, new natural gas-fired power plants, and existing oil/gas steam generators under Clean Air Act section 111. The applicable standards are subcategorized by retirement date for existing coal and capacity factor for new gas. In June 2025, EPA issued a proposal to repeal its regulations addressing GHG emissions from the sector. In July 2025, EPA issued a proposed rule to repeal the 2009 Endangerment Finding underpinning all GHG regulation by EPA. Repealing the finding would provide an independent basis In September 2026, EPA issued a final rule to repeal its 2024 GHG power plant standards, except for ending EPA regulation of GHGs from efficiency-based standards that apply to new gas power plants. With the repeal, new baseload gas plants will no longer face compliance obligations based on carbon capture and sequestration/storage beginning in 2032. Both the February 2026 and September 2026 rules have been challenged in the D.C. Circuit. EPA also issued a supplemental proposal in September 2026 to repeal its full suite of power plant GHG regulations, including the efficiency-based standards for new gas power plants, based on its reinterpretation of section 111 of the Clean Air Act. EPA recently accepted comments on the proposal. EPA's approach in the supplemental proposal, if finalized and upheld in court, would limit and/or delay options for future action on climate for the power sector by EPA.

Critical Accounting Policies and Estimates

1 rewritten

Management makes a number of significant estimates, assumptions, and judgments in the preparation of …+0 / −17 words

Management makes a number of significant estimates, assumptions, and judgments in the preparation of our financial statements. At September 30, 2025, 2026, our critical accounting policies and estimates had not changed significantly from December 31, 2024. 2025. See ITEM 7. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS — Critical Accounting Policies and Estimates of our 2024 Form 10-K for further information.

Financial Results of Operations

18 added · 7 removed · 17 rewritten

Added in the 10-Q for the quarter ended Sep 30, 2026

(d)In 2026, reflects the non-cash impacts of the amortization of certain commodity contracts recorded at fair value associated with the Calpine acquisition.

(e)Reflects costs associated with the completion of the Calpine merger and subsequent integration of its operations. Certain of these transaction-related expenses are not tax deductible.

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

• Unfavorable decommissioning-related activities; and

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

• Lower net unrealized loss on equity investments;

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

• Favorable decommissioning-related activities primarily driven by the 2026 nuclear ARO updates. See Note 9 — Asset Retirement Obligations of the Combined Notes to Consolidated Financial Statements for additional information.

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

• Unfavorable Calpine merger and integration costs;

• Unfavorable interest expense primarily driven by increased long-term debt outstanding; and

• Unfavorable impacts from nuclear outages.

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

(a)% Change in unrealized gains (losses) is not a meaningful measure.

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

Equivalent Forced Outage Factor (Natural Gas, Oil, and Pumped-storage Hydro). As a result of our expanded fleet following the acquisition of Calpine in January 2026, we now consider EFOF to be a key operational metric beginning in 2026. EFOF represents the percentage for which a generating unit is not available due to forced outages and forced deratings in a given period. We consider EFOF to be a useful measure in analyzing the reliability and performance of our natural gas, oil, and pumped-storage hydro fleet. The EFOF for the three and nine months ended September 30, 2026 was 5.9%. This operational metric is being included as a complement to the financial information provided in accordance with GAAP. However, as an operational metric, it may not be calculated or presented in a manner comparable to similar metrics used by other companies.

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

We also enter into bilateral capacity contracts at negotiated contract prices. These contracts primarily relate to resource adequacy in CAISO and have a material impact on our operating revenues. Negotiated contract prices from these bilateral contracts are not included in the table below.

(a)We did not have significant activity at this zone for the three months ended September 30, 2025.

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

Other Power Regions(444)(28.8)%• unfavorable retail load revenue of $185 primarily due to lower energy prices in the West and lower load volumes in New England

• losses on economic hedging activities of $362 in 2026 compared to losses of $156 in 2025, inclusive of Calpine

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

• unfavorable retail load revenue of $285 primarily due to lower load volumes in New England and lower energy prices in the West

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

• gains on economic hedging activities of $633 in 2026 compared to losses of $356 in 2025, inclusive of Calpine (a)% Change in unrealized gains or losses is not a meaningful measure.

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

(a)% Change in unrealized losses (gains) is not a meaningful measure.

Natural Gas Prices. As an owner-operator of a large fleet of natural gas-fired generation facilities, the cost of our natural gas supply has a significant impact on our Purchased power and fuel expense. The following table summarizes the average daily reference price ($/MMBtu) for the periods presented in each geographic region where we have significant activity. This does not reflect prices we ultimately realized.

(a)Transcontinental Gas pipeline located in Mid-Atlantic region.

(b)Houston-area pipeline and industrial network located in ERCOT region.

(c)Pacific Gas & Electric Company virtual trading point located in West region.

(d)Algonquin Gas Transmission physical delivery point located in New England region.

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

• gains on economic hedging activities of $482 in 2026 compared to gains of $25 in 2025, inclusive of Calpine

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

Midwest609 40.9 %• unfavorable $565 associated with purchased power to supply load, net of generation, primarily due to higher costs related to a significant weather event in January 2026 and net transmission costs

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

Other30 1.1 %• unfavorable net wholesale gas purchases of $105, inclusive of realized economic hedges, primarily due to higher gas prices

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

• gains on economic hedging activities of $109 in 2026 compared to gains of $70 in 2025, inclusive of Calpine (a)% Change in unrealized gains or losses is not a meaningful measure.

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

The changes in Operating and maintenance expense consisted of the following:

(a)Primarily reflects increased employee-related costs, including labor and other incentives, as well as higher contracting expense, driven in large part by the addition of Calpine's operations beginning in January 2026.

(b)Includes the co-owned Salem and STP generating units.

(c)Primarily includes administrative expenses such as information technology, regulatory fees, facilities and rentals, and insurance. The increase is driven primarily by the addition of Calpine's operations beginning in January 2026.

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

(a)Includes net realized and net unrealized gains (losses) on NDT fund investments, the elimination of decommissioning-related activities, and the elimination of income taxes related to all NDT fund activity for the Regulatory Agreement Units. See Note 9 — Asset Retirement Obligations and Note 18 — Supplemental Financial Information of the Combined Notes to Consolidated Financial Statements for additional information.

(b)Includes unrealized gains (losses) resulting from an equity investment in a publicly traded company. We record the fair value of this investment in Other deferred debits and other assets in the Consolidated Balance Sheets based on quoted market price of the stock.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for the quarter ended Sep 30, 2026

Under “Tariffs”

The energy sector has been impacted by changes in U.S. and foreign trade policies, particularly the introduction and adjustment of tariffs by the U.S. on the import of various energy-related products and materials. Importantly, oil, natural gas, and uranium (including enriched uranium) are currently excluded from most of the recent tariff changes. The imposition of tariffs on imported goods, including electric transformers and other equipment used for power generation, may lead to increased costs for acquiring essential components to maintain, uprate, and operate our generating facilities. We are committed to navigating the current environment through prudent cost management, utilization of supplier relationships, and potential supply alternatives as mitigants for potential price increases. The long-term impact of tariffs on the energy sector remains uncertain and we cannot predict or estimate the impact on future consolidated financial statements.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for the quarter ended Sep 30, 2026

(d)In 2025, reflects acquisition-related costs associated with the proposed Calpine merger.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

• Higher net unrealized gains on equity investments.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

• Unfavorable net unrealized losses on economic hedges; and

• Higher net unrealized losses on equity investments.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

• Favorable net ZEC revenues, including the impacts of higher revenue recognized for ZECs delivered under the Illinois ZEC program in prior planning years; and

• Favorable net realized and unrealized NDT fund investment activity.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

(a)Reflects New England, which comprises the majority of the activity in the Other region.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

• unfavorable cost of ($270) associated with purchased power to supply load relative to generation volumes primarily driven by higher transmission costs and higher energy prices

Unless otherwise noted, the income tax impact of each reconciling adjustment between GAAP Net …+14 / −68 words

[… 31 unchanged words …] federal and state income tax rates, taking into account whether the income or expense item is taxable or deductible, respectively, in whole or in part, For all adjustments except which may result in an effective tax rate that differs from the NDT fund investment returns, which are included in decommissioning-related activities, marginal rate. The marginal statutory income tax rate was 25.4% and 25.6% and 25.5% for the three and nine months ended September 30, 2026 and 2025, and 2024, respectively. Under IRS regulations, NDT fund investment returns are taxed at different rates for investments if they are in qualified or non-qualified funds. The effective tax rates for the unrealized and realized gains and losses related to NDT funds were 54.9% and 54.6% for the three months ended September 30, 2025 and 2024, respectively and 54.8% and 55.3% for the nine months ended September 30, 2025 and 2024, respectively. The following table provides a reconciliation between GAAP Net Income (Loss) Attributable to Common Shareholders and Adjusted (non-GAAP) Operating Earnings for the three and nine months ended September 30, 2025 2026 compared to the same period in 2024. 2025.

(c)Reflects all gains and losses associated with NDTs, ARO accretion, ARC depreciation, ARO remeasurement, …+44 / −0 words

(c)Reflects all gains and losses associated with NDTs, ARO accretion, ARC depreciation, ARO remeasurement, and impacts of contractual offset for Regulatory Agreement Units. The tax effects of Regulatory Agreement Units result in a 100% effective tax rate under contractual offset accounting. Additionally, the tax effects of NDT investment returns result in different effective tax rates depending on whether the underlying funds are held within qualified or non-qualified trusts.

• Addition of Calpine operations acquired in January 2026, inclusive of the impacts of …+9 / −43 words · under “Results of Operations”

We received regulatory approvals for the merger from the PUCT and NYPSC • Addition of Calpine operations acquired in June 2025 and from the FERC in July 2025. Completion January 2026, inclusive of the transaction is subject to the expiration or termination impacts of any agreement with the DOJ to delay the consummation of the transaction and other customary closing conditions. purchase accounting. See Note 2 — Mergers, Acquisitions, and Dispositions of the Combined Notes to Consolidated Financial Statements for additional information;

With the exception of Calpine's natural gas sales, which are included in the Calpine …+16 / −1 words · under “Results of Operations”

With the exception of Calpine's natural gas sales, which are included in the Calpine segment, wholesale and retail sales of natural gas, as well as sales of other energy-related products and sustainable solutions and other miscellaneous business activities that are not significant to overall results of operations, are reported under Other and not allocated to a region. segment.

Electricity Prices. As a producer and supplier of electricity, the price of electricity has …+28 / −10 words · under “Results of Operations”

[… 27 unchanged words …] the sale and purchase of electricity in the spot market on a net hourly basis in either Operating revenues or Purchased power and fuel expense within each region, depending based on our net hourly position. We assess the net position by ISO/RTO across segments and, where applicable, by segment within the ISO/RTO. The price of electricity is impacted by several variables, including but not limited to, the price of fuels, generation resources in the geographic region, weather, ongoing competition, emerging technologies, as well as macroeconomic and regulatory factors. The following table presents an average day-ahead around-the-clock reference price ($/MWh) for the periods presented for zones/hubs in each of our major regions and ISO/RTO where we have significant activity. This does not necessarily reflect prices we ultimately realized.

Capacity Prices. We participate in capacity auctions in each ISO/RTO where we have qualifying …+29 / −24 words · under “Results of Operations”

Capacity Prices. We participate in capacity auctions in each of our major regions, except ERCOT which does not ISO/RTO where we have a capacity market. qualifying generating assets. We also incur capacity costs associated with load served, which are factored into customer sales prices. Capacity prices have a material impact on our operating revenues and purchased power and fuel expense. We report capacity on a net monthly basis within each region in either Operating revenues or Purchased power and fuel expense. depending on our We assess the net monthly position by ISO/RTO across segments and, where applicable, by segment within the ISO/RTO. The following table presents the average capacity prices ($/MW Day) for each of our major regions. ISO/RTO in which we have significant activity. Prices reflect the weighted average prices for the various auction periods within the three and nine months ended September 30, 2026 and 2025. and 2024.

Illinois CMC Price. The price received (paid) for each CMC is determined by the …+12 / −12 words · under “Results of Operations”

Illinois CMC Price. The price received (paid) for each CMC is determined by the IPA monthly by subtracting energy and capacity index prices from the bid price, which resulted in $32.50 per MWh for the period June 2023 through May 2024, $33.43 per MWh for the period June 2024 through May 2025, and $33.50 per MWh for the period June 2025 through May 2026, and $34.50 per MWh for the period June 2026 through May 2027. If the monthly CMC price per MWh calculation results in a net positive value, ComEd will multiply that value by the delivered quantity and pay the total to us. If the CMC price per MWh calculation results in a net negative value, we will multiply this value by the delivered quantity and pay the net value to ComEd. The average CMC prices per MWh were ($26.54) and ($17.11) and $5.54 for the three months ended September 30, 2026 and 2025, and 2024, respectively, and ($19.54) and ($6.53) and $7.73 for the nine months ended September 30, 2026 and 2025, and 2024, respectively. The average CMC prices may not necessarily reflect prices we ultimately realize realized as a result of interaction with the nuclear PTC discussed below.

• favorable wholesale load revenue of $165 primarily due to higher contracted energy prices, …+9 / −6 words · under “Results of Operations”

• favorable net generation and wholesale load revenue of $500 $165 primarily due to higher load volumes and contracted energy prices, partially offset by lower load volumes; partially offset by

New York47 2.8 %• favorable net generation revenue of $155 associated with the sale …+17 / −14 words · under “Results of Operations”

• unfavorable cost New York47 2.8 %• favorable net generation revenue of ($465) $155 associated with the sale of generation volumes relative to purchased power to supply load relative to generation volumes primarily due to higher energy prices; lower generation volumes, and higher net capacity expense partially offset by

(b)See Note 12 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial …+1 / −19 words · under “Results of Operations”

• favorable revenues in the United Kingdom, inclusive of realized economic hedges, of $180 primarily due to higher energy prices (b)See Note 11 12 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for additional information on mark-to-market unrealized gains and losses.

With the exception of Calpine's natural gas activity, which is included in the Calpine …+22 / −1 words · under “Results of Operations”

With the exception of Calpine's natural gas activity, which is included in the Calpine segment, wholesale and retail natural gas activity, energy-related activity in the United Kingdom, as well as other miscellaneous business activities that are not significant to overall results of operations are reported under Other and are not allocated to a region. segment.

Midwest183 40.9 %• unfavorable $175 associated with purchased power to supply load, net of …+6 / −10 words · under “Results of Operations”

• Midwest183 40.9 %• unfavorable cost of ($105) $175 associated with purchased power to supply load, relative to net of generation, volumes primarily due to higher energy prices and net capacity expense transmission costs

Other Power Regions(361)(30.1)%• favorable $210 associated with purchased power to supply load primarily due …+8 / −29 words · under “Results of Operations”

• unfavorable cost of ($160) Other Power Regions(361)(30.1)%• favorable $210 associated with purchased power to supply load relative to generation volumes primarily due to higher energy prices primarily due to lower generation load volumes driven by the retirement of Mystic Units 8 and 9 and higher energy prices; partially offset by in New England

Mid-Atlantic$58 2.4 %• unfavorable $475 associated with purchased power to supply load, net of …+24 / −5 words · under “Results of Operations”

• Mid-Atlantic$58 2.4 %• unfavorable cost of ($60) $475 associated with purchased power to supply load, relative to net of generation, volumes primarily due to higher energy prices, higher prices associated with net capacity costs, and higher costs related to an extreme weather event in January 2026; partially offset by

Other Power Regions(826)(23.2)%• favorable $405 associated with purchased power to supply load primarily due …+16 / −9 words · under “Results of Operations”

• unfavorable cost of ($40) Other Power Regions(826)(23.2)%• favorable $405 associated with purchased power to supply load relative primarily due to generation lower load volumes primarily driven by higher in New England, and lower energy prices in the West

(b)See Note 12 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial …+1 / −19 words · under “Results of Operations”

• unfavorable purchases in the United Kingdom, inclusive of realized economic hedges, of ($205) primarily due to higher energy prices (b)See Note 11 12 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for additional information on mark-to-market unrealized gains and losses.

Effective income tax rates were 18.2% and 33.4% for the three months ended September …+51 / −21 words · under “Results of Operations”

Effective income tax rates were 18.2% and 33.4% and 27.3% for the three months ended September 30, 2026 and 2025, and 2024, respectively, and 25.4% and 32.9% and 21.0% for the nine months ended September 30, 2026 and 2025, and 2024, respectively. The change decrease in effective tax rate for 2025 is the three months ended was primarily due to driven by the decrease in nuclear PTCs generated, which are not taxable, as well as higher long-term rate change and lower qualified NDT fund income in the third quarter of 2026 which is taxed at a higher rate. The decrease in effective tax rate for the nine months ended was primarily due to proportionally lower qualified NDT fund income in 2026 which is taxed at a higher rate as well as long-term rate change. See Note 9 10 — Income Taxes of the Combined Notes to Consolidated Financial Statements for additional information.

Liquidity and Capital Resources

1 added · 1 removed · 8 rewritten

Added in the 10-Q for the quarter ended Sep 30, 2026

Under “Net Cash Provided By (Used In) Investing Activities”

Cash used in investing activities was ($6,064) million and ($2,221) million for the nine months ended September 30, 2026 and 2025, respectively. The change is primarily related to cash paid, net of cash acquired, for the Calpine acquisition and an increase in capital expenditures related to the planned restart of Crane, inclusion of Calpine, nuclear uprate projects, and co-location infrastructure. See Note 2 — Mergers, Acquisitions, and Dispositions of the Combined Notes to Consolidated Financial Statements for additional information.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for the quarter ended Sep 30, 2026

Under “Results of Operations”

• Unfavorable net unrealized losses on economic hedges.

Cash provided by operating activities was $4,979 million and $3,432 million for the nine …+60 / −5 words · under “Net Cash Provided By (Used In) Operating Activities”

• Lower Cash provided by operating activities was $4,979 million and $3,432 million for the nine months ended September 30, 2026 and 2025, respectively. Changes in our cash flows from operations were generally consistent with changes in results of operations, as adjusted for changes in working capital in the normal course of business. Included in net cash provided by operating activities for the nine months ended September 30, 2026, are refunds to state programs associated with nuclear PTC revenues in 2025. PTCs. See Note 6 — Government Assistance of the Combined Notes to Consolidated Financial Statements for additional information. and

Cash used in financing activities was ($1,654) million and ($249) million for the nine …+22 / −15 words · under “Net Cash Provided By (Used In) Financing Activities”

Cash used in financing activities was ($1,654) million and ($249) million for the nine months ended September 30, 2026 and 2025, compared to cash used in financing activities of ($2,180) million for the nine months ended September 30, 2024. respectively. The change primarily relates to long-term debt and changes in short-term borrowings. Debt issuances and redemptions or repayments vary each year. For the nine months ended September 30, 2026, these activities reflect the impact of debt transactions associated with the acquisition of Calpine. The remaining change relates is related to repurchases of common stock. during each period. See Note 12 13 — Debt and Credit Agreements and Note 15 16 — Shareholders' Equity of the Combined Notes to Consolidated Financial Statements for additional information.

We fund liquidity needs for capital expenditures, working capital, energy hedging and other financial …+1 / −43 words · under “Credit Matters and Cash Requirements”

We fund liquidity needs for capital expenditures, working capital, energy hedging and other financial commitments through cash flows from operations, public debt offerings, commercial paper markets and large, diversified credit facilities. As of September 30, 2025, 2026, we have access to facilities with aggregate bank commitments of $9.5 approximately $14.5 billion. During the quarter, we amended one of our existing revolving credit facilities to both extend the term of the existing facility and to provide up to $2.5 billion in incremental revolving credit commitments upon the satisfaction of certain conditions following the consummation of our acquisition of Calpine. See Note 12 13 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information.

We believe our cash flow from operating activities, access to credit markets and our …+0 / −30 words · under “Credit Matters and Cash Requirements”

We believe our cash flow from operating activities, access to credit markets and our credit facilities provide sufficient liquidity to support the estimated future cash requirements discussed below. including the cash consideration necessary to close on our proposed acquisition of Calpine. See Note 2 — Mergers, Acquisitions, and Dispositions of the Combined Notes to Consolidated Financial Statements for additional information.

In connection with the acquisition of Calpine in January 2026, we assumed approximately $3 …+101 / −0 words · under “Cash Requirements for Other Financial Commitments”

In connection with the acquisition of Calpine in January 2026, we assumed approximately $3 billion of projected cash payments under existing financial commitments with fixed or minimum payments required. These commitments exclude future cash payments for debt service on assumed debt as much of the debt was refinanced or paid off following the acquisition. See Note 13 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information. Other than as described above and elsewhere in this Quarterly Report on Form 10-Q, there have been no material changes to the cash requirements from contractual and other obligations disclosed in our 2025 Annual Report on Form 10-K. Refer to ITEM 7. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS - Liquidity and Capital Resources of our 2024 2025 Form 10-K for additional information on our cash requirements for financial commitments.

Project financing is based upon a financial structure in which project debt is paid …+29 / −14 words · under “Project Financing”

Project financing is based upon a nonrecourse financial structure in which project debt is paid back from the cash generated by a specific asset or portfolio of assets. Borrowings under these agreements are secured by the assets and equity of each respective project. Lenders do not have recourse against us in the event of a default. If a project financing entity does not maintain compliance with its specific debt covenants, there could be a requirement to accelerate repayment of the associated [… 53 unchanged words …] anticipated could lead to impairments due to a higher likelihood of disposing of the respective project-specific assets significantly before the end of their useful lives. As a result of our acquisition of Calpine in January 2026, we assumed various project financing arrangements. See Note 16 — Debt and Credit Agreements of our 2024 2025 Form 10-K and Note 13 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information on project finance credit facilities and nonrecourse debt.

NRC regulations require that licensees of nuclear generating facilities demonstrate reasonable assurance that sufficient …+2 / −23 words · under “NRC Minimum Funding Requirements”

[… 84 unchanged words …] bonds, letters of credit, or parent company guarantees or making additional cash contributions to the NDT fund to ensure sufficient funds are available. See Note 8 9 — Nuclear Decommissioning of the Combined Notes to Consolidated Financial Statements for additional information regarding the latest funding status report filed with the NRC. Asset Retirement

Obligations of the Combined Notes to Consolidated Financial Statements for additional information regarding the …+11 / −95 words · under “NRC Minimum Funding Requirements”

Cash used in investing activities was ($2,221) million for the nine months ended September 30, 2025, compared to cash provided by investing activities of $5,056 million for the nine months ended September 30, 2024. The change was primarily due to an amendment of our Accounts Receivable Facility. Prior to the amendment, the collection and reinvestment of proceeds associated with the sale of receivables were treated as cash flows from investing activities in the Consolidated Statements of Cash Flows. As a result of the amendment, cash collections of accounts receivable are now treated as Cash flows from operating activities in the Consolidated Statement of Cash Flows. See Note 7 — Accounts Receivable Obligations of the Combined Notes to Consolidated Financial Statements for additional information regarding the latest funding status report filed with the NRC.

29 other paragraphs were edited by fewer than 15 words; 9 changed only figures, dates or period names; 9 are word for word the same; 13 were split, merged or moved, with most of their text in the other filing. Open the filings above for their text.

Annual report against the year before

10-K for fiscal 2025 against the 10-K for fiscal 2024

In Constellation Energy's 10-K for fiscal 2025, the MD&A added 17 passages, removed 23 and rewrote 37 against the 10-K for fiscal 2024.

Compared: Item 7 of the 10-K filed Feb 24, 2026 (accession 0001868275-26-000032, period ended Dec 31, 2025; 195 paragraphs) and Item 7 of the 10-K filed Feb 18, 2025 (accession 0001868275-25-000023, period ended Dec 31, 2024; 191 paragraphs).

Figures, dates and period names change every period and are not counted. A paragraph is rewritten when at least 15 other words were added or removed: added text is underlined and shaded, removed text is struck through, and long unchanged stretches are shortened to the words around each change.

Executive Overview

1 rewritten

We are the nation's largest producer of clean energy and a leading supplier of …+14 / −11 words

We are a the nation's largest producer of carbon-free clean energy and a leading supplier of energy products and services. Our generating capacity includes primarily nuclear, wind, solar, natural gas, and hydroelectric assets. Through our integrated business operations, we [… 45 unchanged words …] and Other Power Regions. The following Management’s Discussion and Analysis of Financial Condition and Results of Operations summarizes results for the year ended December 31, 2025 compared to the year ended December 31, 2024. For discussion of the year ended December 31, 2024 compared to the year ended December 31, 2023, For discussion of the year ended December 31, 2023 compared to the year ended December 31, 2022, refer to ITEM 7. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS in the 2023 2024 Form 10-K, which was filed with the SEC on February 27, 2024. 18, 2025.

Significant Transactions and Developments

1 added · 2 removed · 4 rewritten

Added in the 10-K for fiscal 2025

Under “Crane Clean Energy Center”

In November 2025, the DOE Office of Energy Dominance Financing issued a guarantee for up to $1.0 billion for an unsecured loan from the Federal Financing Bank to support the restart of the Crane Clean Energy Center. The loan will mature in October 2055. Interest rates on the loan will be fixed upon each advance at a spread of 37.5 basis points above U.S. Treasuries of comparable maturity. Cash from operations will fund the remaining capital expenditures.

In September 2025, we reached a settlement agreement with MDE, Lower Susquehanna Riverkeeper Association, and Waterkeepers Chesapeake, that resolves all outstanding issues related to obtaining a water quality certification from MDE. As a result, MDE issued a water quality certification, clearing the way for the re-licensing and continued operation of our Conowingo hydroelectric facility. The terms of the agreement include operational improvements and commitments for water quality and resiliency, trash and debris removal, aquatic life passage, freshwater mussel restoration, dredging and invasive species management. See Note 3 — Regulatory Matters of the Combined Notes to Consolidated Financial Statements for more information.

In June 2025, we signed a 20-year PPA with Meta Platforms, Inc. (Meta) for the output of the Clinton Clean Energy Center to support Meta’s clean energy goals and operations in the region with emissions-free nuclear energy. The agreement, beginning in June 2027, supports the relicensing and continued operations of Clinton for another two decades after the state’s ZEC program expires. This deal will expand Clinton’s clean energy output by 30 megawatts through plant uprates, expected to be fully complete in 2029, and will enable the Clinton Clean Energy Center to continue to flow power onto the local grid, providing grid reliability and low-cost power to the region for decades to come. The uprates are expected to qualify for the technology-neutral clean electricity PTC (45Y) provided for by the IRA and preserved by the OBBBA for its first 10 years of operations.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Proposed Acquisition of Calpine Corporation”

Completion of the transaction is conditioned upon review of the transaction by the DOJ, and approval by the FERC, NYPSC, and PUCT, in addition to other regulatory bodies, and is also subject to other customary closing conditions. See Note 2 — Mergers, Acquisitions, and Dispositions of the Combined Notes to Consolidated Financial Statements for additional information.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Share Repurchase Program”

As part of our capital allocation plan, our Board of Directors has authorized up to $3 billion of share repurchases of our outstanding common stock to-date, of which $991 million has yet to be exercised. See Note 19 — Shareholders' Equity of the Combined Notes to Consolidated Financial Statements for additional information.

On January 7, 2026, we acquired 100% of the outstanding equity of Calpine for …+35 / −26 words · under “Acquisition of Calpine Corporation”

On January 10, 2025, 7, 2026, we entered an agreement and plan acquired 100% of merger (Merger Agreement) with Calpine Corporation (Calpine) under which we will acquire all the outstanding equity interests of Calpine for a purchase price of approximately $22 billion. The merger consideration consisted of 50 million newly issued shares of our common stock, no par value, and approximately $4.5 billion in a cash and stock transaction. on hand. After considering divestitures connected with certain regulatory approvals, Calpine owns and operates a generation fleet of natural gas, geothermal, battery storage, and solar assets with over 27 approximately 23 GWs of generation capacity, in addition to a competitive retail electric supplier platform serving approximately 2.5 million customers with 60 62 TWhs of load annually.

This acquisition is complementary to, and aligns strategically with, our existing business operations and …+6 / −10 words · under “Acquisition of Calpine Corporation”

This acquisition is complementary to, and aligns strategically with, our existing business operations and provides both increased scale and meaningful market diversification. We will couple The merger couples the largest producer of clean, carbon-free emissions-free energy with the reliable, dispatchable natural gas assets of Calpine, and also create creates the nation’s leading competitive retail electric supplier, providing increased scale, diversification and complementary capabilities that will enable us to meet growing demand with a broader array of energy and sustainability products. The addition of Calpine will strengthen strengthens our essential role in providing clean, reliable and affordable energy as the nation seeks to transition to a more sustainable future, and will better position us to pursue investments in new and existing technologies to meet growing demand.

See Note 2 — Mergers, Acquisitions, and Dispositions and Note 16 — Debt and …+4 / −39 words · under “Acquisition of Calpine Corporation”

We had an accounts receivable financing facility with a number of financial institutions and a commercial paper conduit to sell certain receivables. The facility was amended effective December 31, 2024 resulting in an increased funding limit secured by certain receivables. See Note 7 2 — Accounts Receivable Mergers, Acquisitions, and Dispositions and Note 16 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information.

In 2024, we announced the restart of Three Mile Island Unit 1, renamed as …+10 / −107 words · under “Crane Clean Energy Center”

During the third quarter of In 2024, we executed a 20-year PPA with Microsoft that will support announced the restart of Three Mile Island Unit 1, renamed as the Crane Clean Energy Center. which was retired in 2019 for economic reasons. Under The agreement, restart is supported by a 20-year PPA with Microsoft will to purchase the output generated from the renewed plant. as part of its goal to help power its data centers in PJM with clean energy. We expect Crane will also be eligible for the technology-neutral clean electricity PTC (45Y) provided for by the IRA for its first 10 years of operations. We estimate the project will require approximately $1.6 billion of cash from operations for capital expenditures necessary to restart the plant, with an estimated in-service date of 2028. The restart of the plant and delivery of electricity under the PPA is subject to certain regulatory approvals, including the NRC comprehensive safety and environmental review, as well as permits from relevant state and local agencies. Additionally, through a separate request, we will pursue obtaining a renewed license that will extend operations at the plant to at least 2054.

Other Key Business Drivers

1 added

Added in the 10-K for fiscal 2025

Under “PJM Market Reform”

On January 16, 2026, the National Energy Dominance Council, with support from Governors within the PJM territory, urged PJM to file proposed tariff revisions at FERC to address reliability and pricing within its capacity auctions. These changes aim to increase supply which is increasingly important as energy-intensive sectors expand. The proposed changes include: 1) providing revenue certainty to new generation (for instance, through a Reliability Backstop Auction to procure new, out of market capacity resources), 2) protecting residential customers from capacity price increases, 3) allocating costs to data centers through the Reliability Backstop Auctions, 4) improving load forecasting, specifically large load modeling, 5) accelerating ongoing generator interconnection studies, and 6) performing market studies to ensure the long-term viability of the PJM capacity market. While this is an emerging issue and tariff revisions have not been developed, this has the potential to impact future revenues received by our fleet.

In December 2025, FERC found PJM's tariff unjust and unreasonable because it lacked sufficient clarity and consistency regarding rates, terms, and conditions of service for serving co-located load. The order also found that the existing behind-the-meter generation rules permitting netting of load and supply were no longer just and reasonable, with certain limited exceptions. FERC also directed that PJM make three new transmission services available to co-located loads: an interim, interruptible network integration transmission service, a permanent firm contract demand service, and a non-firm contract demand service. The rates, terms and conditions for these services will be developed in upcoming compliance filings and a paper hearing at FERC in 2026, as will the scope of technical studies required to pursue service of co-located load ion such services.

We continue to see legislative support for nuclear energy generation, including the passage of the OBBBA. Signed into law in July 2025, the OBBBA both preserves certain federal tax credits from the IRA and enhances certain credits to allow advanced nuclear facilities to qualify for the energy communities bonus adder, subject to eligibility requirements. It also preserves tax credits which benefit our efforts to commercialize CCUS for natural gas power generation and maintains tax credits for geothermal and certain other investments. Overall, the OBBBA reinforces the long-term economic viability of our nuclear generation assets. See Note 3 — Regulatory Matters of the Combined Notes to Consolidated Financial Statements for more information.

Critical Accounting Policies and Estimates

3 added · 4 removed · 8 rewritten

Added in the 10-K for fiscal 2025

Under “Nuclear Decommissioning Asset Retirement Obligations”

(b)Excludes Zion as the ARO is associated with its SNF storage facility.

Added in the 10-K for fiscal 2025

Under “Goodwill”

For reporting units with goodwill, we perform a qualitative assessment to determine whether it is more likely than not that the fair value of the reporting unit is less than its carrying value. As part of the qualitative assessment, we evaluate macroeconomic conditions, such as deterioration in general economic conditions, industry and market considerations, cost factors, and overall financial performance. If we determine, on the basis of qualitative factors, that the fair value of the reporting unit is more likely than not greater than the carrying amount, no further testing is required.

If the qualitative test determines that it is more likely than not that the fair value of the reporting unit is less than its carrying amount, a quantitative goodwill impairment test is performed by calculating the fair value of the reporting unit and comparing it to its carrying amount. The fair value of the reporting units is calculated using a weighted combination of the income approach, which estimates fair value based on discounted cash flows, and the market approach, which estimates fair value based on market comparables in our industry. The income approach uses our internal forecasts to determine estimated cash flows and uses significant assumptions including, but not limited to growth rates, discount rates, customer attrition rates, useful lives, and tax rates. These assumptions are used to arrive at estimated cash flows which are inherently uncertain. Similarly, while comparables used in the market approach are determined to be a reasonable proxy for the fair value of the reporting unit, there is judgment involved and the actual fair value may be different than the fair value implied by the market approach. If the carrying amount of the reporting unit is greater than its fair value, the reporting unit’s goodwill is impaired. The goodwill impairment loss is the difference between the reporting unit’s fair value and carrying amount, and is recorded as a reduction to goodwill and a charge to operating expense.

Added in the 10-K for fiscal 2025

Under “Goodwill”

The acquisition of Calpine is expected to add a significant amount of goodwill to our balance sheet which will be assessed for impairment in accordance with our policy described above.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Nuclear Decommissioning Asset Retirement Obligations”

Increase the likelihood of the DECON scenario by 10 percent and decrease the likelihood of the SAFSTOR scenario by 10 percent(a)

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Nuclear Decommissioning Asset Retirement Obligations”

(b)Excludes Crane and Zion.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Goodwill”

We first perform a qualitative assessment to determine whether a quantitative assessment is necessary. As part of the qualitative assessment, we evaluate, among other things, management’s best estimate of projected operating and capital cash flows for the reporting units and changes in certain market conditions, including the discount rate. Significant assumptions used in these fair value analyses include discount and growth rates, energy prices, and projected operating and capital cash flows.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Depreciable Lives of Property, Plant, and Equipment”

Along with depreciation study results, management considers expected future energy market conditions and generation plant operating costs and capital investment requirements in determining the estimated useful lives of our generating facilities and reassesses the reasonableness of estimated useful lives whenever events or changes in circumstances warrant. When a determination has been made that an asset will be retired before the end of its current estimated useful life, depreciation provisions will be accelerated to reflect the shortened estimated useful life, which could have a material unfavorable impact on future results of operations.

The difference between the purchase price and the net fair value of assets acquired …+0 / −33 words · under “Acquisition Accounting”

The difference between the purchase price amount and the net fair value of assets acquired and liabilities assumed is recognized as goodwill on the balance sheet if the purchase price exceeds the estimated net fair value, or as a bargain purchase gain on the income statement if the purchase price is less than the estimated net fair value. Goodwill is assigned to reporting units that are expected to benefit from the acquisition. Goodwill is not amortized, instead it is subject to an impairment assessment at least annually to consider whether the reporting unit fair value is more likely than not less than the carrying amount. See Note 1 — Basis of Presentation, Note 2 — Mergers, Acquisitions, and Dispositions, and Note 12 — Intangible Assets of the Combined Notes to Consolidated Financial Statements for additional information.

Goodwill is not amortized, but rather is subject to an impairment assessment at least …+12 / −6 words · under “Goodwill”

We perform Goodwill is not amortized, but rather is subject to an impairment assessment for impairment of goodwill at least annually or more frequently if an event occurs or circumstances change that would more likely than not reduce the fair value of the reporting units below their carrying amount. A reporting unit is an operating segment or one level below an operating segment (known as a component) and is the level at which goodwill is tested for impairment. Our current operating segments and reporting units are Mid-Atlantic, Midwest, New York, ERCOT, and Other Power Regions. See Note 5 — Segment Information of the Combined Notes to Consolidated Financial Statements for additional information on our reportable segments. Goodwill is primarily reported within our ERCOT segment. See Note 12 — Intangible Assets of the Combined Notes to Consolidated Financial Statements for additional information.

The 2025 annual assessments indicated no impairments. Adverse regulatory actions or changes in significant …+0 / −17 words · under “Goodwill”

While The 2024 2025 annual assessments indicated no impairments. certain assumptions used in the assessment are highly sensitive to changes. Adverse regulatory actions or changes in significant assumptions could potentially result in future impairments of our goodwill. which could be material.

UEC assets and liabilities represent the remaining unamortized balances of non-derivative energy and fuel …+4 / −23 words · under “Unamortized Energy Contract Assets and Liabilities”

Unamortized energy contract UEC assets and liabilities represent the remaining unamortized balances of non-derivative energy contracts and fuel contracts that we have acquired. The initial amount recorded represents the difference between the fair value of the contracts at the time of acquisition. and The contract value based on the terms of each contract. The unamortized energy contract UEC assets and liabilities are amortized over the life of the contract in relation to accordance with the expected realization of the underlying cash flows. Amortization of the unamortized energy and fuel contract assets and liabilities are recorded through Operating revenues or [… 30 unchanged words …]

We have significant investments in electric generating assets. These assets are generally depreciated on …+68 / −22 words · under “Depreciable Lives of Property, Plant, and Equipment”

[… 59 unchanged words …] a reporting entity depreciates the assets over the average life of the assets in the group. The estimation of asset useful lives requires management judgment, supported informed by formal depreciation studies of historical asset retirement experience. experiences conducted at least every five years and other factors, including expected energy market conditions, operating costs, and capital investment requirements. Management reassesses these estimates when events or changes in circumstances indicate that revisions may be necessary. When a determination has been made that an asset's current estimated useful life will be shortened or extended, depreciation studies are generally conducted periodically if an event, regulatory action, or change in retirement patterns indicate an update is necessary. provisions will be adjusted which could have a material impact on future results of operations.

See Note 1 — Basis of Presentation and Note 8 — Property, Plant, and …+0 / −19 words · under “Depreciable Lives of Property, Plant, and Equipment”

Changes in estimated useful lives of electric generating assets could have a significant impact on future results of operations. See Note 1 — Basis of Presentation and Note 8 — Property, Plant, and Equipment of the Combined Notes to Consolidated Financial Statements for information regarding depreciation and estimated useful lives of the property, plant and equipment.

Commodity Contracts. Identification of a commodity contract as an economic hedge requires us to …+22 / −7 words · under “Accounting for Derivative Instruments”

Commodity Contracts. Identification of a commodity contract as a part of an economic hedge requires us to determine that the authoritative guidance, contract is in accordance with the RMP. We make estimates and assumptions concerning future commodity prices, load requirements, interest rates, the timing of future transactions and their probable cash flows, the fair value of contracts and the expected changes in the fair value in deciding whether to enter derivative transactions, and in determining the initial accounting treatment for derivative transactions. Under the authoritative guidance for fair [… 23 unchanged words …]

Government Assistance. Our existing nuclear plants are eligible for federal government incentives including transferable …+18 / −6 words · under “Revenue Recognition”

[… 56 unchanged words …] financial performance depending on gross receipts received by our nuclear units each year. Further, the nuclear PTC continues to be the subject of additional guidance, expected to be issued from the U.S. Treasury and IRS, that and may materially impact the total amount of benefits we receive. Absence of prescriptive guidance requires the application of judgement judgment in determining annual gross receipts, a primary component in the determination of the credit. We closely monitor developments in relevant tax laws and regulations to [… 62 unchanged words …] progress through the calendar year. See ITEM 1. BUSINESS – Price and Supply Risk Management for additional information on how we mitigate market price risk. See Note 6 — Government Assistance of the Combined Notes to the Consolidated Financial Statements for additional information.

Financial Results of Operations

10 added · 11 removed · 11 rewritten

Added in the 10-K for fiscal 2025

(d)Reflects acquisition-related costs associated with the Calpine merger. The majority of these expenses are not tax deductible.

Added in the 10-K for fiscal 2025

Under “Results of Operations”

• Unfavorable net unrealized losses on economic hedges; and

• Higher net unrealized losses on equity investments.

Added in the 10-K for fiscal 2025

Under “Results of Operations”

(a)% Change in unrealized gains (losses) is not a meaningful measure.

Added in the 10-K for fiscal 2025

Under “Results of Operations”

(b)The New Jersey ZEC program concluded in May 2025.

Added in the 10-K for fiscal 2025

Under “Results of Operations”

The following table summarizes the impacts to Operating revenues related to the benefits of nuclear PTC and state-sponsored programs subject to refund or pass through as described above for the year ended December 31, 2025 compared to 2024:

Added in the 10-K for fiscal 2025

Under “Results of Operations”

• unfavorable activity due to absence of nuclear PTC revenue of $515 due to higher energy and capacity prices in the current year

• favorable net generation and wholesale load revenue of $730 primarily due to higher energy prices, partially offset by lower generation volumes

• favorable net ZEC revenue of $130 primarily due to revenue recognized for Illinois ZECs delivered in prior planning years; partially offset by

• unfavorable activity due to lower nuclear PTC revenue of $1,090 and lower net CMC program revenue of $210 due to higher energy and capacity prices in the current year

• favorable net generation revenue of $255 associated with the sale of generation volumes relative to purchase power to supply load primarily due to higher energy prices and generation volumes

Added in the 10-K for fiscal 2025

Under “Results of Operations”

• unfavorable activity due to absence of nuclear PTC revenue of $150 due to higher energy prices in the current year

• favorable wholesale load revenue of $120 primarily due to higher contracted energy prices, partially offset by lower load volumes

• favorable revenues in the United Kingdom, inclusive of realized economic hedges, of $160 primarily due to higher energy prices (a)% Change in unrealized gains or losses is not a meaningful measure.

Added in the 10-K for fiscal 2025

Under “Results of Operations”

(a)% Change in unrealized losses (gains) is not a meaningful measure.

Added in the 10-K for fiscal 2025

Under “Results of Operations”

• unfavorable purchased power of $1,330 primarily due to lower generation volumes driven by the retirement of Mystic Units 8 and 9, higher energy prices, and higher ancillary charges; partially offset by

• unfavorable purchases in the United Kingdom, inclusive of realized economic hedges, of $190 primarily due to higher energy prices (a)% Change in unrealized gains or losses is not a meaningful measure.

Added in the 10-K for fiscal 2025

Under “Results of Operations”

(b)Includes unrealized gains (losses) resulting from an equity investment in a publicly traded company. We record the fair value of this investment in Other deferred debits and other assets in the Consolidated Balance Sheets based on quoted market price of the stock.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

(d)Represents certain incremental costs related to the separation (system-related costs, third-party costs paid to advisors, consultants, lawyers, and other experts assisting in the separation), including a portion of the amounts billed to us pursuant to the TSA. See Note 1 — Basis of Presentation of the Combined Notes to Consolidated Financial Statements for additional information.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Results of Operations”

• Favorable net mark-to-market activity and other fair value adjustments;

• Favorable nuclear PTC activity related to the IRA beginning in 2024; and

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Results of Operations”

• Higher labor (inclusive of incentives), contracting, and materials;

• Lower unrealized gains resulting from an investment that became a publicly traded company in the second quarter of 2023;

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Results of Operations”

(b)The ZEC price is expected to be $10.00/MWh for each delivery period and is subject to an annual update once full year generation is known. Following the latest annual update in August 2024, the ZEC price for the delivery period beginning June 2023 through May 2024 was calculated to be $9.95.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Results of Operations”

• unfavorable net ZEC and CMC program revenue of ($750) due to decrease in ZEC revenue realized and estimated pass through associated with nuclear PTC

• unfavorable PJM performance bonuses of ($70) due to absence of favorable adjustment in 2023 associated with the December 2022 weather event

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Results of Operations”

• unfavorable nuclear fuel cost of ($55) primarily due to higher amortization rates related to the reversal of the previous decision in 2020 to retire certain sites

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Results of Operations”

• favorable purchased power and fuel of $390 primarily due to lower energy prices and load served, partially offset by the expiration of the Mystic COS

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Results of Operations”

The changes in Operating and maintenance expense consisted of the following:

(a)Primarily reflects increased employee incentive program costs, driven by stock compensation expense and Company performance exceeding relative metrics, increased headcount, and the acquisition of STP in November 2023.

(b)Includes the co-owned Salem and STP generating units.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Cash Flows from Operating Activities”

• Depending upon whether we are in a net mark-to-market liability or asset position, collateral may be required to be posted with or collected from our counterparties, respectively. In addition, the collateral posting and collection requirements differ depending on whether the transactions are on an exchange or in the over-the-counter markets. See Note 15 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for additional information on collateral.

• Option premiums received (paid), net relate to options contracts that we purchase and sell as part of our established policies and procedures to manage risks associated with market fluctuations in commodity prices. Note 15 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for additional information on derivative contracts.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Cash Flows from Operating Activities”

• A net increase in cash outflows for changes in working capital and other noncurrent assets and liabilities primarily driven by an increase in cash collections applied to the Deferred Purchase Price (DPP) partially offset by an increase in liabilities associated with state-sponsored programs requiring refund or pass through of the nuclear PTC, as well as price changes related to natural gas purchases in 2024. See Note 7 — Accounts Receivable of the Combined Notes to Consolidated Financial Statements for additional information on the sales of customer accounts receivable.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Cash Flows from Investing Activities”

Significant investing cash flow impacts for 2024 and 2023 were as follows:

Unless otherwise noted, the income tax impact of each reconciling adjustment between GAAP Net …+14 / −65 words

[… 31 unchanged words …] federal and state income tax rates, taking into account whether the income or expense item is taxable or deductible, respectively, in whole or in part, For all adjustments except which may result in an effective tax rate that differs from the NDT fund investment returns, which are included in decommissioning-related activities, marginal rate. The marginal statutory income tax rate was 25.6% and 25.5% and 25.1% for the years ended December 31, 2025 and 2024, and 2023, respectively. Under IRS regulations, NDT fund investment returns are taxed at different rates for investments if they are in qualified or non-qualified funds. The effective tax rates for the unrealized and realized gains and losses related to NDT funds were 54.8% and 52.4% for the years ended December 31, 2024 and 2023, respectively. The following table provides a reconciliation between GAAP Net Income (Loss) Attributable to Common Shareholders and Adjusted (non-GAAP) Operating Earnings for the year ended December 31, 2024 2025 compared to the same period in 2023. 2024.

(c)Reflects all gains and losses associated with NDTs, ARO accretion, ARC depreciation, ARO remeasurement, …+44 / −0 words

(c)Reflects all gains and losses associated with NDTs, ARO accretion, ARC depreciation, ARO remeasurement, and impacts of contractual offset for Regulatory Agreement Units. The tax effects of Regulatory Agreement Units result in a 100% effective tax rate under contractual offset accounting. Additionally, the tax effects of NDT investment returns result in different effective tax rates depending on whether the underlying funds are held within qualified or non-qualified trusts.

• Lower Nuclear PTC revenues in 2025. See Note 6 — Government Assistance of …+4 / −11 words · under “Results of Operations”

• Lower Nuclear PTC revenues in 2024, $1,570 million of cash was received related to the sale of nuclear PTCs. 2025. See Note 6 — Government Assistance of the Combined Notes to Consolidated Financial Statements for additional information;

Illinois CMC Price. The price received (paid) for each CMC is determined by the …+112 / −3 words · under “Results of Operations”

Illinois CMC Price. The price received (paid) for each CMC is determined by the IPA monthly by subtracting energy and capacity index prices from the bid price, which resulted in $32.50 per MWh for the period June 2023 through May 2024, $33.43 per MWh for the period June 2024 through May 2025 and $33.50 per MWh for the period June 2025 through May 2026. If the monthly CMC price per MWh calculation results in a net positive value, ComEd will multiply that value by the delivered quantity and pay the total to us. If the CMC price per MWh calculation results in a net negative value, we will multiply this value by the delivered quantity and pay the net value to ComEd. The average CMC prices per MWh were ($7.58) and $8.05 and $4.13 for the years ended December 31, 2025 and 2024, and 2023, respectively. The average CMC prices may not necessarily reflect prices we ultimately realize as a result of interaction with the nuclear PTC discussed above. below.

Nuclear PTC. Beginning in 2024, our nuclear units are eligible for a PTC extending …+6 / −62 words · under “Results of Operations”

Nuclear PTC. Beginning in 2024, our existing nuclear units are eligible for a PTC extending through 2032. The nuclear PTC provides a transferable credit up to $15 per MWh (a base credit of $3 per MWh with a five times multiplier provided certain prevailing wage requirements are met) and is subject to phase-out when annual gross receipts are between $25.00 per MWh and $43.75 per MWh We have evaluated and expect to meet the annual prevailing wage requirements at all our nuclear units $26.00 per MWh and are eligible $44.75 per MWh for the five times multiplier. 2024 and 2025, respectively. Both the amount of the PTC and the gross receipts thresholds adjust for inflation after 2024 annually through the duration of the program based on the GDP price deflator for the preceding calendar year. The benefits of the PTC may be realized through a credit against our federal income taxes or transferred via sale to an unrelated party.

(a)Our estimate required the exercise of judgment in determining the amount of nuclear PTC …+23 / −5 words · under “Results of Operations”

See (a)Our estimate required the exercise of judgment in determining the amount of nuclear PTC expected for each of our nuclear units. Refer to Note 6 — Government Assistance of the Combined Notes to the Consolidated Financial Statements for additional information. regarding nuclear PTC.

(b)See Note 15 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial …+1 / −19 words · under “Results of Operations”

• favorable purchases in the United Kingdom, inclusive of settled economic hedges, of $95 primarily due to lower energy prices (b)See Note 15 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for additional information on mark-to-market unrealized gains and losses.

• unfavorable cost of $660 associated with purchased power to supply load, net of …+17 / −13 words · under “Results of Operations”

• unfavorable cost of ($100) $660 associated with purchased power to supply load, relative net of generation, primarily due to generation volumes primarily driven by higher energy prices, as well as higher prices during peak load periods and higher associated with net transmission capacity costs; partially offset by

• unfavorable cost of $460 associated with purchased power to supply load, net of …+8 / −7 words · under “Results of Operations”

• unfavorable cost of ($170) $460 associated with purchased power to supply load, relative net of generation, primarily due to generation volumes primarily driven by higher net transmission costs and energy prices

(b)See Note 15 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial …+1 / −23 words · under “Results of Operations”

• unfavorable net ZEC program revenue of ($180) due to estimated refund associated with nuclear PTC and decrease in ZEC price in current planning year (b)See Note 15 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for additional information on mark-to-market unrealized gains and losses.

Effective income tax rates were 33.8% and 17.1% for the years ended December 31, …+25 / −7 words · under “Results of Operations”

Effective income tax rates were 33.8% and 17.1% and 35.1% for the years ended December 31, 2025 and 2024, and 2023, respectively. The change in effective tax rate in 2025 compared to 2024 compared 2023 is primarily attributable due to the inclusion of decrease in nuclear PTCs generated, which are non-taxable. not taxable, as well as higher qualified NDT fund income that is taxed at a higher rate. See Note 13 — Income Taxes of the Combined Notes to Consolidated Financial Statements for additional information.

Liquidity and Capital Resources

2 added · 6 removed · 13 rewritten

Added in the 10-K for fiscal 2025

Under “Calpine Acquisition”

In January 2026, upon completion of the acquisition of Calpine, we assumed all of Calpine's outstanding obligations including approximately $12.6 billion of debt composed of approximately $7.6 billion of long-term debt and approximately $5 billion of various project financing arrangements. The acquisition of Calpine had the following impacts on our liquidity position:

• The purchase price included cash consideration of approximately $4.5 billion which was funded through cash on hand from normal operating activities at the time of acquisition.

Show the rest (552 words)

• We assumed approximately $7.6 billion of long-term debt including senior unsecured and secured notes, and corporate term loans. In December 2025, we commenced private exchange offers and related consent solicitations (“Exchange Offers”) with respect to certain outstanding debt of Calpine. Pursuant to the Exchange Offers, we issued new notes in January 2026 effectively replacing $2.3 billion of Calpine's senior unsecured and secured notes. Using the proceeds from our January 2026 bond issuance, as described more fully below, along with cash on hand and short-term debt, we repaid Calpine corporate term loans totaling $2.5 billion immediately after the acquisition closing and repaid additional Calpine senior secured first lien notes totaling $1.25 billion in February 2026. Following the debt exchange and redemptions discussed, approximately $1.5 billion of long-term Calpine corporate debt remains outstanding, which matures primarily in March 2028. See Note 16 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information.

• We assumed approximately $5 billion of various project financing arrangements including:

◦Calpine Construction Finance Company, L.P. (CCFC) term loan, a first lien senior secured facility with $2.1 billion outstanding at acquisition. The CCFC term loan matures July 2030 and is secured by certain real and personal property of CCFC, primarily seven natural gas-fired power plants.

◦Geysers Power Company, LLC (GPC) term loan and credit facility, a first lien senior secured term loan facility, with approximately $1.35 billion and $45 million of borrowings outstanding under the term loan and credit facility, respectively, at acquisition. The GPC term loan and credit facility mature May 2029. The GPC term loan and credit facility is secured by certain real and personal property of GPC and subsidiaries primarily consisting of the Geysers Assets.

◦Nova Power, LLC (Nova Power) credit agreement, comprising credit facilities intended to finance a portion of the cost of the development, construction and operation of the Nova Power battery storage project. These facilities include a first lien term loan with $591 million outstanding at acquisition and letter of credit facilities. The Nova Power credit agreement matures September 2031 and is secured by Nova Power's real and personal property.

◦Greenfield LP (Greenfield) loan facility which includes a term loan with $342 million outstanding at acquisition and several letters of credit facilities. The Greenfield loan facility matures November 2030 and is secured by certain real and personal property, primarily the Greenfield Energy Center in Ontario, Canada.

◦Pin Oak Creek Energy Center loan pursuant to the TEF with lender, PUCT, with an outstanding amount of $230 million at acquisition. The proceeds were used to finance anticipated eligible costs for the development, construction, and installation of Pin Oak Creek Energy Center in Texas. The loan will mature in October 2045.

◦Calpine Development Holdings, LLC Revolver (CDHI Revolver) with total capacity of approximately $1.2 billion and borrowings totaling $319 million outstanding at acquisition. The CDHI Revolver matures March 2028.

• During 2025, we amended our RCF to increase the capacity from $4.5 billion to $7.0 billion, of which the incremental $2.5 billion became available upon closing of the Calpine acquisition. As a result, Calpine's revolving credit facility and commodity linked revolver were both paid off and terminated at the time of acquisition. See Note 16 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information.

Added in the 10-K for fiscal 2025

Under “Calpine Acquisition”

• In addition to the Calpine revolving credit facility and commodity linked revolver referenced above, we assumed credit facilities totaling approximately $2.3 billion of capacity, which is reduced by outstanding borrowings under the GPC term loan facility and CDHI Revolver totaling $364 million. At the time of the acquisition, there were outstanding letters of credit on the assumed facilities of approximately $1.7 billion. These facilities consist of secured and unsecured Calpine facilities and project facilities including the CDHI Revolver.

• We assumed Calpine's accounts receivable sales program with a financial institution which allows for the sale of, at a discount, up to $500 million of certain Calpine receivables. The program is set to mature November 2026. At the time of acquisition, there was $399 million of accounts receivable sold into the program outstanding.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Cash Flows from Operating Activities”

Our cash flows from operating activities include the sale of energy, energy-related products, and sustainable solutions, as well as sales of nuclear PTCs. Our future cash flows from operating activities may be affected by future demand for, and market prices of, energy and our ability to continue to produce and supply power at competitive costs, as well as to obtain collections from customers.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Cash Flows from Operating Activities”

(a)Includes changes in Accounts receivable, Inventories, Accounts payable and accrued expenses, Income taxes, and Other assets and liabilities.

(b)See the Consolidated Statements of Cash Flows for details of non-cash operating activities, includes Depreciation, amortization, and accretion, Asset impairments, Gain on sale of assets and businesses, Deferred income taxes and amortization of ITCs, Net fair value changes related to derivatives, and Net realized and unrealized activity associated with NDTs and equity investments. See Note 22 — Supplemental Financial Information of the Combined Notes to Consolidated Financial Statements for additional information on the Other non-cash operating activities line.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Cash Flows from Financing Activities”

Significant financing cash flow impacts for 2024 and 2023 were as follows:

• Long-term debt, net varies due to debt issuances and redemptions each year. Refer to the Debt Issuances and Redemptions tables below for additional information.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Cash Flows from Financing Activities”

• Refer to ITEM 5. — MARKET FOR REGISTRANT'S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES for additional information on dividends. See below for quarterly dividends declared.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Debt Issuances and Redemptions”

(a)The Tax-exempt notes have a maturity date of March 2025 - April 2053, and a mandatory purchase date that ranges from March 2025 - June 2029.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Debt Issuances and Redemptions”

(e)The nonrecourse debt has an average blended interest rate.

Our operating and capital expenditure requirements are provided by internally generated cash flows from …+26 / −18 words

Our operating and capital expenditures expenditure requirements are provided by internally generated cash flows from operations, the sale of certain receivables, as well as funds from external sources in the capital markets and through bank borrowings and other capital market sources. Our business is capital intensive and requires considerable capital resources. We annually regularly evaluate our financing plan and credit line sizing, focusing on maintaining our investment grade credit ratings while meeting our cash needs to fund capital requirements, including funding construction expenditures, retire retiring debt, pay paying dividends, fund funding pension and OPEB obligations, and invest investing in new and existing ventures, such as our acquisition of Calpine and planned restart of Crane. A broad spectrum of financing alternatives beyond the core financing options can be used to meet our needs and fund growth, including monetizing assets in the portfolio via project financing, asset sales, and the use of other financing structures (e.g., issuing equity, joint ventures, minority partners, etc.). Our access to external financing on reasonable terms depends on our credit ratings and current overall capital market business conditions. If these conditions deteriorate to the extent that we no longer have access to the capital markets at reasonable terms, we have access to credit facilities with aggregate bank commitments of $9 $9.5 billion. We utilize our credit facilities to support our commercial paper programs, provide for other short-term borrowings and to issue letters of credit. See the [… 46 unchanged words …]

The following table summarizes our cash flow activities for the years ended December 31, …+5 / −11 words · under “Cash Flow Activities”

The following table provides a summary of the change in summarizes our cash flows from operating flow activities for the years ended December 31, 2025 and 2024, and 2023: respectively:

Cash provided by operating activities was $4,237 million for the year ended December 31, …+86 / −12 words · under “Net Cash Provided By (Used In) Operating Activities”

Cash provided by operating activities was $4,237 million for the year ended December 31, 2025, compared to cash used in operating activities of ($2,464) million for the year ended December 31, 2024. Changes in our cash flows from operations were generally consistent with changes in results of operations, as adjusted by for changes in working capital in the normal course of business. except as discussed below. Significant In December 2024, we amended our Accounts Receivable Facility whereby we now retain the rights to our receivables and any changes in our receivable balance flow through operating activities. This increase in cash flow impacts flows from operating activities was partially offset by cash outflows associated with an increase in collateral postings. See Note 7 — Accounts Receivable and Note 15 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for 2024 and 2023 were as follows: additional information.

Cash used in investing activities was ($3,198) million for the year ended December 31, …+78 / −27 words · under “Net Cash Provided By (Used In) Investing Activities”

• Collection Cash used in investing activities was ($3,198) million for the year ended December 31, 2025, compared to cash provided by investing activities of DPP, net increased $7,428 million for the year ended December 31, 2024. The change was primarily due to an amendment of our Accounts Receivable Facility. Prior to the increased amendment, the collection and reinvestment of proceeds associated with the sale of receivables were treated as cash collections applied to DPP flows from investing activities in the Consolidated Statements of Cash Flows. As a result of a decrease the amendment, cash collections of accounts receivable are now treated as Cash flows from operating activities in the drawn Facility balance in 2024 compared to 2023. In addition, more Consolidated Statements of Cash collections were reinvested in the Facility in 2024. Flows. See Note 7 — Accounts Receivable of the Combined Notes to Consolidated Financial Statements for additional information.

Cash used in financing activities was ($420) million for the year ended December 31, …+55 / −10 words · under “Net Cash Provided By (Used In) Financing Activities”

• Cash used in financing activities was ($420) million for the year ended December 31, 2025, compared to cash used in financing activities of ($2,289) million for the year ended December 31, 2024. The change primarily relates to long-term debt and changes in short-term borrowings. Debt issuances and redemptions or repayments vary each year. The remaining change primarily relates to repurchases of common stock is related to our share repurchase program that commenced in March 2023. during each period. See Note 16 — Debt and Credit Agreements and Note 19 — Shareholders' Equity of the Combined Notes to Consolidated Financial Statements for additional information.

(a)The interest rate for long-term debt redemptions prior to October 2025 were based on …+2 / −24 words · under “Debt Issuances and Redemptions”

(c)The (a)The interest rate for long-term debt redemptions prior to June 2023 October 2025 were based on LIBOR SOFR + 2.50%. 2.25%. Beginning in June 2023, October 2025, these redemptions are based on SOFR + 2.76%. See Note 16 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information on the CR nonrecourse debt. 2.00%.

• We issued senior unsecured notes in January 2026 totaling $2.75 billion, the proceeds …+24 / −31 words · under “Calpine Acquisition”

(d)The interest rate for long-term debt redemptions prior • We issued senior unsecured notes in January 2026 totaling $2.75 billion, the proceeds from which were used to May 2023 were based on LIBOR + 2.875%. Beginning in May 2023, these redemptions are based on SOFR + retire certain outstanding indebtedness of Calpine following completion of the variable interest rate of 2.975% - 3.225%. Calpine acquisition. See Note 16 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information. on the West Medway II nonrecourse debt.

OPEB plans are also not subject to statutory minimum contribution requirements, though we have …+25 / −0 words · under “Pension and Other Postretirement Benefits”

OPEB plans are also not subject to statutory minimum contribution requirements, though we have funded a portion of our plans. Annually, we evaluate whether additional funding for those plans is needed. For our funded OPEB plans, we consider several factors in determining the level of our contributions, including liabilities management and levels of benefit claims paid.

(c)Purchase power obligations primarily include REC purchases and capacity payments that are not unit …+2 / −25 words · under “Cash Requirements for Other Financial Commitments”

(c)Purchase power obligations primarily include expected payments for REC purchases and capacity payments associated with contracted generation agreements, which may be reduced based on plant availability. Expected payments exclude payments on renewable generation contracts that are not unit contingent. in nature.

(g)In January 2026, we acquired all of the outstanding equity interest of Calpine in …+27 / −8 words · under “Cash Requirements for Other Financial Commitments”

• (g)In January 2026, we acquired all of the outstanding equity interest of Calpine in a cash and stock transaction. The aggregate purchase price included approximately $4.5 billion in cash. See Note 2 — Mergers, Acquisitions, and Dispositions of the Combined Notes to the Combined Consolidated Financial Statements for additional information. related to the STP acquisition in November 2023.

We have an accounts receivable financing facility that provides us access to revolving loans …+26 / −20 words · under “Accounts Receivable Facility”

• Changes in short-term borrowings, net is driven We have an accounts receivable financing facility that provides us access to revolving loans from a number of financial institutions secured by repayments on and issuances of notes due in less than 365 days. Refer to certain customer accounts receivables. See Note 16 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information.

We meet our short-term liquidity requirements primarily through the issuance of commercial paper. We …+23 / −0 words · under “Credit Facilities”

We meet our short-term liquidity requirements primarily through the issuance of commercial paper. We may use our credit facilities for general corporate purposes, including meeting short-term funding requirements and the issuance of letters of credit. During 2025, we increased the capacity of our RCF from $4.5 billion to $7.0 billion, of which the incremental $2.5 billion became available upon closing of the Calpine acquisition in January 2026. See Note 16 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information on our credit facilities.

As of December 31, 2025, the Crane NDT is fully funded under the SAFSTOR …+34 / −0 words · under “NRC Minimum Funding Requirements”

As of December 31, 2024, 2025, the Crane NDT is fully funded under the SAFSTOR scenario that was the planned decommissioning option, as described in the Crane PSDAR filed with the NRC in April 2019. We will continue to file Crane's decommissioning funding status with the NRC annually until restart, at which point we will file decommissioning funding status reports in accordance with applicable NRC requirements. Additionally, as of December 31, 2024, 2025, we have adequate NDT funds for the remaining radiological decommissioning cost at Zion Station related to the Independent Spent Fuel Storage Installation. Decommissioning costs other than radiological may require funding from us. See Note 10 — Asset Retirement Obligations of the Combined Notes to Consolidated Financial Statements for additional information.

48 other paragraphs were edited by fewer than 15 words; 15 changed only figures, dates or period names; 52 are word for word the same; 10 were split, merged or moved, with most of their text in the other filing. Open the filings above for their text.