Edison International MD&A: what changed

In Edison International's 10-Q for fiscal Q3 2026, the MD&A added 19 passages, removed 29 and rewrote 53 against the 10-Q for fiscal Q3 2025, the same quarter a year earlier. In its 10-K for fiscal 2025, the MD&A added 34 passages, removed 35 and rewrote 67 against the 10-K for fiscal 2024.

Source: Management's discussion and analysis (Item 2) of EDISON INTERNATIONAL's 10-Q filed Oct 29, 2026 (accession 0000827052-26-000073, period ended Sep 30, 2026) compared with its 10-Q filed Oct 28, 2025 (accession 0000827052-25-000100, period ended Sep 30, 2025), on SEC EDGAR

Added
19
Passages new in the 10-Q for fiscal Q3 2026
10-Q · Oct 29, 2026
Removed
29
In the 10-Q for fiscal Q3 2025 only
10-Q · Oct 28, 2025
Rewritten
53
15+ words changed, figures not counted
10-Q · Oct 29, 2026
Paragraphs compared
157
211 in the 10-Q for fiscal Q3 2025
10-Q · Oct 29, 2026

Edison International's latest quarterly report against the same quarter a year earlier

10-Q for fiscal Q3 2026 against the 10-Q for fiscal Q3 2025

In Edison International's 10-Q for fiscal Q3 2026, the MD&A added 19 passages, removed 29 and rewrote 53 against the 10-Q for fiscal Q3 2025, the same quarter a year earlier.

Compared: Item 2 of the 10-Q filed Oct 29, 2026 (accession 0000827052-26-000073, period ended Sep 30, 2026; 157 paragraphs) and Item 2 of the 10-Q filed Oct 28, 2025 (accession 0000827052-25-000100, period ended Sep 30, 2025; 211 paragraphs).

Edison International's figures, dates and period names change every period and are not counted. A paragraph is rewritten when at least 15 other words were added or removed: added text is underlined and shaded, removed text is struck through, and long unchanged stretches are shortened to the words around each change.

Management Overview

6 added · 14 removed · 21 rewritten

Added in the 10-Q for fiscal Q3 2026

Under “Highlights of Operating Results”

In the second quarter of 2026, Edison International completed the disposition of Trio, a former indirect wholly-owned subsidiary. Trio's business activities have not been material to Edison International. See "Notes to Condensed Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies" for further information. As a result of the disposition, Trio-related income and expenses, including post-closing adjustments, are classified as non-core items.

Added in the 10-Q for fiscal Q3 2026

Under “Highlights of Operating Results”

2Trio's after-tax operating losses of $4 million from the first quarter of 2026 were recast to non-core and included in the nine months ended September 30, 2026 amount. Trio's after-tax operating losses of $1 million and $8 million for the three and nine months ended September 30, 2025, respectively, were included in core earnings as originally reported.

Added in the 10-Q for fiscal Q3 2026

Under “Highlights of Operating Results”

• Wildfire-related recoveries, net of claims and expenses:

Added in the 10-Q for fiscal Q3 2026

Under “Southern California Wildfires”

SCE continues to implement its WMP to reduce the risk of SCE equipment contributing to the ignition of wildfires. In addition to the investments and operational activities under its WMP, SCE uses its PSPS program to proactively de-energize power lines as a last resort to mitigate the risk of significant wildfires during extreme weather events. California has also increased its investment in wildfire prevention and fire suppression capabilities. Yet, the potential for catastrophic wildfire activity in SCE's service area still exists. In February 2026, the OEIS issued a final decision approving SCE’s 2026

– 2028 WMP. In March 2026, the OEIS issued SCE's safety certification which is valid until the later of March 2, 2027, and when OEIS acts on SCE's timely submittal of a request for its next safety certification.

In April 2026, the CEA submitted to the California Legislature and the Governor a report required by SB 254 that evaluates California’s approach to natural catastrophe risk, including wildfires. The report identifies increasing natural catastrophe risk driven by climate‑related factors, development in wildfire‑prone areas, fuel conditions, and other systematic factors, and highlights challenges in wildfire mitigation, insurance availability, liability allocation, and post‑event recovery. The report observes that failure to address escalating wildfire risk would prolong recovery for affected communities, significantly increase electric utility costs, driving higher customer rates, and also could elevate insurance premiums statewide. The report further observes that inaction would expose SCE to risk of credit downgrades and heightened financial stress, limiting access to capital needed to maintain safe and reliable infrastructure. These dynamics would exacerbate affordability pressures, undermine market stability, and impede SCE's ability to support long‑term reliability and California's climate‑related objectives.

Against this backdrop, the report presented a framework of policy options organized around three non‑exclusive pathways: committing to community‑level wildfire mitigation, including measures to reduce the severity and scale of catastrophic events through coordinated community‑based risk reduction, home‑ and neighborhood‑level hardening, and risk-informed targeting of mitigation investments; equitably allocating catastrophe burdens among stakeholders, including through insurance and liability‑related mechanisms such as insurance market reforms, quicker compensation and claims‑handling structures, and potential changes to utility wildfire liability frameworks; and defining potential state roles in catastrophe resilience, including options such as expanded or restructured catastrophe financing mechanisms, state‑level risk pooling or backstops, and other approaches intended to address extreme loss events.

Added in the 10-Q for fiscal Q3 2026

Under “Eaton Fire”

Multiple lawsuits related to the Eaton Fire have been initiated against SCE and Edison International by individual plaintiffs, subrogation plaintiffs, and public entity plaintiffs. Bellwether jury trials in the Eaton Fire litigation have been set for January, May, and September 2027. SCE has filed a motion requesting continuation of the January 2027 trial to June 2027. In January 2026, SCE filed a cross-complaint against certain public and private entities whose actions or inaction may have caused, contributed to or exacerbated the losses that resulted from the fire.

Added in the 10-Q for fiscal Q3 2026

Under “Eaton Fire”

The SED is also conducting an investigation with respect to the Eaton Fire. In addition, Edison International and SCE are also aware of an ongoing investigation by the Los Angeles District Attorney's Office of the Eaton Fire for the purpose of determining whether any criminal violations might have occurred. SCE could be subject to material fines, penalties, or restitution if it is determined that it failed to comply with applicable laws and regulations. SCE believes that there is no basis for a finding of felony liability with regard to the Eaton Fire. Any fines and penalties incurred in connection with the Eaton Fire will not be recoverable from insurance, from the Wildfire Fund, or through electric rates.

SCE has entered into settlements with insurance claimants and with individual and business claimants under its Wildfire Recovery Compensation Program related to the Eaton Fire. As of September 30, 2026, SCE had recorded $1.8 billion in losses related to these settlements. SCE had also recorded expected recoveries from customer-funded self-insurance of $917 million, from the Wildfire Fund of $859 million, and through FERC electric rates of $70 million related to the settlements. In total, through September 30, 2026, the net after-tax charge to earnings recorded related to the settlements was $9 million, the after-tax impact of the required $12.5 million shareholder contribution related to SCE's customer-funded self-insurance coverage.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Highlights of Operating Results”

As discussed in the 2024 Form 10-K, the CPUC approved the TKM Settlement Agreement in January 2025. As a result, in the first nine months of 2025, SCE recorded cost recoveries through CPUC electric rates authorized under the TKM Settlement Agreement. These cost recoveries are reflected either as core earnings or non-core items, as discussed below. This classification is consistent with the original classification when the respective costs were incurred.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Highlights of Operating Results”

• 2017/2018 Wildfire/Mudslide Events claims and expenses, net of recoveries:

• Net earnings recorded in 2025 related to the TKM Settlement Agreement, including ongoing activities: $1,341 million ($966 million after-tax) of claim costs and $58 million ($42 million after-tax) of legal expenses authorized for recovery, partially offset by shareholder-funded wildfire mitigation expenses of $50 million ($36 million after-tax) and impairment of incremental restoration-related assets of $8 million ($6 million after-tax).

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Highlights of Operating Results”

• Other Wildfire Events claims and expenses, net of recoveries:

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Highlights of Operating Results”

• Severance costs of $44 million ($32 million after-tax), net of expected FERC recovery, recorded in 2024 due to reductions in workforce.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Revenue Requirements”

In September 2025, the CPUC approved a final decision on the 2025 GRC, which resulted in a base rate revenue requirement of $9.7 billion in 2025, an increase of $880 million over the adjusted 2024 authorized revenue requirement (see table below for more details). The final decision also authorized adjustment to the post-test years' revenue requirements, allowing the application of an attrition index to operation and maintenance expenses, with the index capped at five percent each year, along with budget-based wildfire mitigation capital additions. Additionally, the final decision adopted zero escalation for all of SCE's non-wildfire related capital additions in the attrition years. Assuming a three percent attrition index increase each year, the final decision results in post-test years' revenue requirement adjustments of $544 million, $522 million, and $447 million, for 2026, 2027, and 2028, respectively.

The table below sets out the authorized revenue and costs of service for the 2024 authorized revenue requirement and the 2025 GRC final decision:

1Adjustments to the 2024 authorized revenue requirement primarily related to the Customer Service Re-Platform project, which was recovered through a CPUC non-GRC recovery mechanism and approved to be included in the GRC-authorized revenue in the 2025 GRC.

2Reflects SCE's GRC authorized revenue as filed in SCE's September 2025 GRC implementation advice letter.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Revenue Requirements”

4Authorized revenue for operation and maintenance expenses increased primarily due to higher authorized wildfire expenditures.

5Authorized revenue for depreciation increased primarily due to higher plant balances.

6Authorized revenue for return increased primarily due to authorized rate base growth.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Revenue Requirements”

The CPUC has approved the establishment of a memorandum account, making the authorized revenue requirement changes effective January 1, 2025. Under the final decision, the increase in authorized revenues of $902 million for January 2025 through September 2025 will be collected over a 24-month period beginning October 1, 2025.

The final decision authorized CPUC-jurisdictional capital expenditures of $6.1 billion for 2025. For 2025 – 2028, the decision authorized capital expenditures of approximately $1 billion to support 212 miles of the wildfire mitigation targeted undergrounding ("TUG") program, along with the deployment of 1,653 circuit miles of covered conductors in high fire risk areas. The final decision authorized a two-way Grid Hardening Balancing Account to track the difference between actual TUG costs up to the approved mile limit and the authorized amounts, with spending in excess of 110% of authorized amounts subject to reasonableness review. SCE is also authorized to record incremental TUG costs that exceed the approved scope in the existing Wildfire Mitigation Plan Memorandum Account, with cost recovery subject to reasonableness review. Additionally, the final decision authorized SCE to establish a memorandum account to track and record capital expenditures above the amounts authorized to support SCE's grid readiness for future transportation electrification demand, with cost recovery subject to reasonableness review.

Show the rest (197 words)

SCE's 2025 CPUC-authorized ROE is 10.33% and weighted average return on rate base is 7.66%.

On March 20, 2025, SCE filed its application with the CPUC for authority to establish its authorized cost of capital for utility operations for a three-year term beginning in 2026 and to reset the related annual cost of capital adjustment mechanism. In August 2025, SCE updated its costs of long-term debt and preferred equity requests based on updated information. As a result, SCE is seeking an ROE of 11.75%, a cost of long-term debt of 4.71%, and a cost of preferred equity of 6.89%. SCE also seeks to maintain its current authorized capital structure, after CPUC-allowed exclusions, of 52% common equity, 43% long-term debt, and 5% preferred equity. Based on the capital structure and cost factors discussed above, SCE's weighted average return on rate base would be 8.48% for 2026. If approved, this application would increase SCE's revenue requirement in 2026 by approximately $448 million compared to the cost of capital currently in rates. In July 2025, the CPUC set a schedule for the 2026 cost of capital proceeding that would result in a proposed decision in the fourth quarter of 2025.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Capital Expenditures”

SCE's capital expenditure forecast has been updated since the filing of the 2024 Form 10-K to reflect planned CPUC-jurisdictional spending as informed by the 2025 GRC final decision (See "—2025 General Rate Case— Capital Expenditures" for further information) and expected FERC capital expenditures.

The table below reflects forecast capital expenditures for 2025 – 2028, based on authorized and planned CPUC-jurisdictional spending and current management expectations of FERC-jurisdictional spending. CPUC-jurisdictional spending includes amounts authorized in the 2025 GRC, and other planned non-GRC CPUC capital spending. Forecast expenditures for FERC capital projects are subject to change due to factors such as timeliness of permitting, licensing, regulatory approvals, contractor bids, supply chain issues, and other operational considerations.

Based on management's judgment of potential capital spending variability informed by historical precedent of previously authorized amounts, potential permitting delays, and other operational considerations, a range case was prepared reflecting reductions to CPUC non-GRC capital expenditures and FERC capital expenditures.

SCE's 2025 – 2028 forecast for major capital expenditures is set forth in the table below:

In addition to the amounts presented in the table above, SCE expects to make additional CPUC capital investments, the recovery of which will be subject to future regulatory approval. This includes non-GRC programs, such as additional spending on an advanced metering infrastructure program. SCE expects the total expenditures of these programs to be at least $2 billion, most of which will be incurred beyond 2028.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Rate Base”

SCE's authorized CPUC-jurisdictional rate base is determined through the GRC and other regulatory proceedings. Differences between actual and CPUC-authorized rate base are addressed in subsequent GRCs or other regulatory proceedings. FERC-jurisdictional rate base is determined based on actual capital expenditures.

Reflected below is SCE's weighted average annual rate base for 2025 – 2028, based on the capital expenditure forecasts discussed above. In addition, the table below does not reflect the SB 254 Excluded Capital Expenditures, which SCE plans to recover through the issuance of securitized bonds. For further information, see "—Southern California Wildfires and Mudslides—Senate Bill 254—SB 254 Excluded Capital Expenditures."

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Southern California Wildfires and Mudslides”

In September 2025, a Continuation Account within the Wildfire Insurance Fund was established under SB 254, described below, to supplement the Initial Account within the Wildfire Insurance Fund by potentially providing up to $18 billion of additional funding for the Wildfire Insurance Fund. Under SB 254, the Initial Account of the Wildfire Insurance Fund will be available for fires ignited before September 19, 2025 (the "SB 254 Effective Date") and the Continuation Account may become available for fires ignited after the SB 254 Effective Date. As described below, the Continuation Account will be funded contingent upon certain conditions. Once all claims under the Initial Account are resolved and no further claims are anticipated, any remaining assets in the Initial Account will be transferred to the Continuation Account. See "—Senate Bill 254" for further information.

In recognition of the need for further action, SB 254 requires the administrator of the Wildfire Insurance Fund to submit to the California legislature and the governor, by April 1, 2026, a report that evaluates and sets forth recommendations on new models or approaches that mitigate damage, accelerate recovery, and responsibly and equitably allocate the burdens from natural catastrophes, including wildfires, across stakeholders, to complement or replace the Wildfire Insurance Fund.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Eaton Fire”

CAL FIRE has reported that the Eaton Fire burned approximately 14,000 acres and resulted in 18 civilian fatalities and 9 fire personnel injuries/illnesses. An additional fatality has also been reported to be attributed to the Eaton Fire. In addition, according to preliminary information provided by CAL FIRE, the Eaton Fire destroyed approximately 6,018 single residence structures, 3,146 other minor structures, 96 multiple residences and 158 mixed commercial/residential and nonresidential commercial structures; and damaged approximately 750 residential structures, 260 other minor structures, 28 multiple residences and 35 mixed commercial/residential and nonresidential commercial structures. Fire authorities have estimated suppression costs at approximately $100 million.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Eaton Fire”

In September 2025, SCE entered into an agreement (the "Eaton Subrogation Settlement") with an insurance claimant in the Eaton Fire litigation (the "Subrogation Claimant"), under which SCE agreed to pay the Subrogation Claimant $0.52 for each dollar in claims paid or to be paid by the Subrogation Claimant to its policy holders, up to an agreed upon cap. The Subrogation Claimant had paid its policy holders an aggregate of approximately $500 million as of July 31, 2025. No admission of wrongdoing or liability was made in reaching the Eaton Subrogation Settlement, and the Subrogation Claimant agreed to release SCE and Edison International from all claims and potential claims related to or arising from the Eaton Fire. In the third quarter of 2025, SCE recorded $300 million in losses related to the Eaton Subrogation Settlement and will record additional amounts as they become estimable. In the third quarter of 2025, Edison International and SCE also recorded expected recoveries from customer funded self-insurance of $279 million and expected recoveries through FERC electric rates of $21 million related to the Eaton Subrogation Settlement.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Eaton Fire”

SCE has $1.0 billion of customer-funded self-insurance coverage available for wildfires ignited between January 1, 2025 and December 31, 2025, subject to a shareholder contribution of 2.5% of any self-insurance costs ultimately paid exceeding $500 million, up to a maximum possible contribution of $12.5 million.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “2017/2018 Wildfire/Mudslide Events”

Multiple lawsuits and investigations related to the 2017/2018 Wildfire/Mudslide Events have been initiated against SCE and Edison International. SCE has previously entered into settlements with a number of local public entities, subrogation and individual plaintiffs in the TKM and Woolsey Fire litigations and under the SED Agreement. As of October 21, 2025, in addition to the outstanding claims of approximately 100 of the approximately 15,000 initial individual plaintiffs, there were alleged and potential claims of certain public entity plaintiffs, including CAL OES, outstanding.

As discussed in the 2024 Form 10-K, the CPUC approved the TKM Settlement Agreement in January 2025. As a result, in the first quarter of 2025, SCE recorded cost recoveries through CPUC electric rates of $1.6 billion, consisting of $1.3 billion uninsured claims and $0.3 billion associated costs, including legal and financing costs. In April 2025, SCE requested approval from the CPUC to finance these amounts through the issuance of securitized bonds and received a final decision in August 2025 that authorized the transaction. SCE will also implement into CPUC-jurisdictional rates the revenue requirement related to recovery of approximately $55 million of approximately $65 million in restoration costs incurred. Additionally, SCE recorded $50 million of shareholder-funded wildfire mitigation expenses.

Show the rest (556 words)

As discussed in the 2024 10-K, in October 2024, SCE filed an application (the "Woolsey Application") to seek CPUC-jurisdictional rate recovery of prudently incurred losses related to the Woolsey Fire. SCE also sought recovery of approximately $84 million in restoration costs in the proceeding. In September 2025, SCE, Cal Advocates, the Energy Producers and Users Coalition, and Small Business Utility Advocates filed a joint motion in the proceeding seeking approval of a settlement agreement between such parties (the "Woolsey Settlement Agreement"). One party to the proceeding, the Wild Tree Foundation, has opposed the Woolsey Settlement Agreement. If approved by the CPUC, the impacts of the Woolsey Settlement Agreement will be recorded in the period in which a CPUC final decision approving the settlement is received.

Under the Woolsey Settlement Agreement, if approved by the CPUC, SCE will be authorized to recover 35%, or approximately $2.0 billion, of approximately $5.6 billion of losses, consisting of approximately $1.6 billion of uninsured claims paid as of May 31, 2025, and $0.4 billion of costs, comprised of legal costs paid as of May 31, 2025, and estimated ongoing financing costs. SCE will also be authorized to recover 35% of losses paid after May 31, 2025. SCE’s requests for recovery exclude $250 million of uninsured claims and related financing costs which SCE waived its right to seek recovery of under the SED Agreement. Subject to approval of the Woolsey Settlement Agreement, SCE will request approval from the CPUC to finance the amounts authorized under the Woolsey Settlement Agreement through the issuance of securitized bonds. The parties agreed that if SCE’s anticipated application for securitization is denied, the authorized amounts will be recovered in rates over five years, financed using long-term debt.

Further, SCE will be authorized to recover approximately $71 million of approximately $84 million in restoration costs incurred. In the Woolsey Settlement Agreement, SCE also waived its right to seek recovery of uninsured losses tracked in a Wildfire Expense Memorandum Account and incurred in connection with fires that ignited prior to July 12, 2019, the date AB 1054 was adopted. SCE estimates that the waived pre-AB 1054 losses are approximately $157 million.

If the Woolsey Settlement Agreement is approved, SCE will be allowed to permanently exclude any after-tax charges to equity associated with the costs disallowed or waived in the Woolsey Settlement Agreement and the debt issued to finance those costs from its CPUC regulatory capital structure.

Through September 30, 2025, SCE has recorded estimated losses of $9.9 billion, recoveries from insurance of $2.0 billion, all of which have been collected, and expected recoveries through electric rates of $1.8 billion, $403 million of which has been collected through FERC rates subject to refund, related to the 2017/2018 Wildfire/Mudslide Events claims. The cumulative after-tax net charges to earnings related to the 2017/2018 Wildfire/Mudslide Events recorded through September 30, 2025, have been $4.4 billion.

As of September 30, 2025, SCE had paid $9.7 billion under executed settlements and had $60 million to be paid under executed settlements, including $47 million to be paid under the SED Agreement, related to the 2017/2018 Wildfire/Mudslide Events. After giving effect to all payment obligations under settlements entered into through September 30, 2025, Edison International's and SCE's best estimate of expected losses for remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events was $157 million.

1,124 more words of this passage are in the 10-Q filed Oct 28, 2025.

Edison International is the ultimate parent holding company of SCE, which is an investor-owned …+1 / −42 words · under “Highlights of Operating Results”

Edison International is the ultimate parent holding company of SCE, and Edison Energy, LLC, doing business as Trio. SCE which is an investor-owned public utility primarily engaged in the business of supplying and delivering electricity to an approximately 50,000 square mile area across Southern, Central, and Coastal California. Trio is a global energy advisory firm providing integrated sustainability and energy solutions to commercial, industrial and institutional customers. Trio's business activities are currently not material to report as a separate business segment.

Edison International's earnings are prepared in accordance with GAAP. Management uses core earnings (loss) …+38 / −2 words · under “Highlights of Operating Results”

[… 87 unchanged words …] income or loss from discontinued operations and income or loss from significant discrete items that management does not consider representative of ongoing earnings, such as write downs, write-downs, asset impairments, and other income and expense related to changes in law, outcomes in tax, regulatory or legal proceedings, and exit activities, including sale of certain assets and other activities that are no longer continuing. SCE implemented a customer-funded wildfire self-insurance program in 2023. With the commencement of this program, Edison International and SCE no longer consider wildfire-related claim losses to be representative of ongoing earnings and treat such costs as non-core items.

Edison International's third quarter 2026 earnings decreased $108 million from the third quarter of …+20 / −19 words · under “Highlights of Operating Results”

Edison International's third quarter 2025 2026 earnings increased $316 decreased $108 million from the third quarter of 2024, 2025, resulting from an increase a decrease in SCE's earnings of $323 $116 million, and an increase partially offset by a decrease in Edison International Parent and Other's loss of $7 $8 million. SCE's higher lower net income consisted of $327 reflected $172 million of higher lower core earnings partially offset by $4 and a $56 million of higher lower non-core loss. Edison International Parent and Other's loss increased decreased by $7 $8 million due to $8 $9 million of higher lower core loss compared to 2025, partially offset by a $1 million of lower non-core loss in 2026.

Edison International's earnings for the nine months ended September 30, 2026 decreased by $822 …+29 / −20 words · under “Highlights of Operating Results”

Edison International's earnings for the nine months ended September 30, 2025 increased $1,667 2026 decreased by $822 million from compared to the same period ended September 30, 2024, in 2025, resulting from an increase a decrease in SCE's earnings of $1,745 $864 million, partially offset by an increase a decrease in Edison International Parent and Other's loss of $78 $42 million. SCE's higher lower net income consisted of $1,396 reflected a $58 million of higher non-core earnings and $349 loss in 2026 compared to an $847 million non-core benefit in 2025, partially offset by $41 million of higher core earnings. Edison International Parent and Other's higher net loss consisted of $41 decreased by $42 million due to $36 million of higher lower core loss and $37 $6 million of higher lower non-core loss.

The decrease in SCE's core earnings for the three months ended September 30, 2026, …+91 / −10 words · under “Highlights of Operating Results”

3Authorized revenue increased $661 million The decrease in SCE's core earnings for the nine-month period three months ended 2025 September 30, 2026, compared to the same period in 2024. See "Results of Operations—SCE—Impact 2025, primarily reflected earnings recognized in the third quarter of 2025 upon implementation of the 2025 GRC final decision, which was retroactive to January 1, 2025, partially offset by higher revenue resulting from the escalation mechanism authorized in the 2025 GRC final decision. The increase in SCE's core earnings for further information. the nine months ended September 30, 2026, compared to the same period in 2025, was primarily due to higher revenue resulting from the escalation mechanism authorized in the 2025 GRC final decision, partially offset by the absence of a benefit to interest expense related to cost recoveries authorized under the TKM Settlement Agreement in 2025.

The decrease in Edison International Parent and Other's core loss for the three and …+8 / −81 words · under “Highlights of Operating Results”

The increase in SCE's core earnings for the three months ended September 30, 2025 from the same period in 2024 was primarily due to higher revenue from the 2025 GRC final decision. The increase in SCE's core earnings for the nine months ended September 30, 2025, from the same period in 2024, was primarily due to higher revenue from the 2025 GRC final decision, a benefit to interest expense related to cost recoveries authorized under the TKM Settlement Agreement, partially offset by the net impact of wildfire-related regulatory decisions received in the second quarter of 2025 and 2024. The increase decrease in Edison International Parent and Other's core loss for the three and nine months ended September 30, 2025, 2026, was primarily due to lower preferred stock dividends, partially offset by higher interest expense.

• Net charges of $76 million ($39 million after-tax) recorded in 2025, primarily related …+4 / −55 words · under “Highlights of Operating Results”

In the first and second quarters of 2025, SCE recognized revenue based on the 2024 authorized GRC revenue requirement in the absence of a 2025 GRC final decision. The approved 2025 revenue requirement in the 2025 GRC final decision is retroactive to January 1, 2025. SCE recorded the corresponding year-to-date impact in the third quarter of 2025, resulting in $661 million of increased authorized revenue. Additionally, SCE recorded • Net charges of $76 million ($39 million after-tax) recorded in the same quarter, 2025, primarily due related to an $88 million impairment of utility property, plant and equipment associated with historical capital expenditures disallowed in the SCE's 2025 GRC final decision, mainly related to the rooftop solar photovoltaic program. This was partially offset by the recognition of a $12 million clean energy subsidy previously received for this program.

• Net earnings of $1 million ($1 million after-tax) recorded in 2026 primarily due …+32 / −0 words · under “Highlights of Operating Results”

• Net earnings of $1 million ($1 million after-tax) recorded in 2026 primarily due to updated estimates of claims accruals, net of legal expenses, and charges of $50 million ($39 million after-tax) recorded in 2025, both related to wildfire claims insured by EIS. See "Notes to Condensed Consolidated Financial Statements—Note 12. Commitments and Contingencies" for further information.

Total capital expenditures (including accruals) were $5.0 billion and $4.7 billion for the nine …+62 / −1 words · under “Capital Program”

Total capital expenditures (including accruals) were $4.7 $5.0 billion and $4.0 $4.7 billion for the nine months ended September 30, 2026 and 2025, respectively. As discussed in the 2025 Form 10-K, SCE forecasts total capital expenditures ranging from $37.5 billion to $40.6 billion for 2026 – 2030, and 2024, respectively. weighted average annual rate base from $50.8 billion to $67.9 billion for 2026 – 2030. These capital program and rate base projections incorporate the planned CPUC-jurisdictional spending as informed by the 2025 GRC final decision and expected FERC capital expenditures, see "Liquidity and Capital Resources—SCE—Capital Investment Plan" below and "Management Overview—Capital Program" in the 2025 MD&A.

In May 2026, the CAISO approved its 2025-2026 Transmission Plan, which identified new transmission …+55 / −34 words · under “Capital Program”

Furthermore, In May 2025, 2026, the CAISO approved its 2024 – 2025 2025-2026 Transmission Plan, which identified six new transmission projects expected to be constructed by SCE with and finalized the CAISO's reassessment of certain SCE projects from the 2022-2023 Transmission Plan. As a result of this reassessment, certain previously approved projects were removed or modified and offset by newly approved projects. SCE's total anticipated capital expenditures for CAISO-approved transmission projects remain approximately $3 billion, of which approximately $300 million. As discussed $1 billion is included in the total forecasted capital expenditures from 2026 – 2030. For further information, see "Management Overview—Capital Program" in the 2024 2025 MD&A. SCE also expects to construct projects associated with previously approved CAISO Transmission Plans requiring capital investment of at least $2 billion. Most of the capital expenditures are expected to be incurred beyond 2028.

The report discusses options with varying implementation timeframes and fiscal impacts and does not …+75 / −13 words · under “Southern California Wildfires”

While The report discusses options with varying implementation timeframes and fiscal impacts and does not recommend or endorse any specific policy approach. The 2025-2026 California legislative session concluded without enacting legislation that addressed any of the policy options identified in the April 2026 CEA report. Edison International and SCE continue to pursue engage with a broad group of stakeholders in the legislative strategies process to address California investor-owned utilities' exposure to wildfire-related liabilities, they cannot improve understanding of the consequences of inaction and help move the process forward with a sense of urgency. However, neither Edison International nor SCE can predict whether or when there will be a comprehensive economy-wide solution mitigating the significant risk faced by California investor-owned utilities related to wildfires.

The Los Angeles County Fire Department (the “LACoFD”) led the investigation into the origin …+52 / −64 words · under “Eaton Fire”

The Los Angeles County Fire Department is leading (the “LACoFD”) led the investigation into the origin and cause of the Eaton Fire, with the assistance of CAL FIRE, and has identified a preliminary area of origin of the fire. In August 2026, the LACoFD and CAL FIRE released initial and supplemental Eaton Fire investigation reports (the “Eaton Reports”) that concluded that the ignition was caused when an electrical arcing event took place on a de-energized idle SCE has transmission facilities facility in the preliminary area of origin As part of its investigation, causing ejected hot metal particles to fall and ignite dry vegetation below the Los Angeles County Fire Department initially requested that SCE preserve in-place its equipment in the preliminary area of origin. Subsequently, in coordination with the Los Angeles County Fire Department and other interested parties, SCE removed certain equipment as part of its investigation. The SED is also conducting an investigation with respect to the Eaton Fire. facility.

SCE’s internal review into the facts and circumstances of the Eaton Fire is complex …+40 / −43 words · under “Eaton Fire”

Multiple lawsuits related to the Eaton Fire have been initiated against SCE and Edison International. SCE’s internal review into the facts and circumstances of the Eaton Fire is complex and ongoing. SCE's review includes ongoing inspections of its facilities and records and of third-party information and testing. While SCE has not conclusively determined that its equipment caused the ignition of the Eaton Fire, concerning circumstantial evidence suggests a viable explanation is that a de-energized idle SCE transmission facility in the preliminary area of origin may have been was associated with the ignition of the fire, Additionally, while and SCE has not determined the mechanism of ignition of the Eaton Fire, it is not aware of evidence pointing to another possible source of ignition. Absent additional evidence, SCE believes that it is likely that its equipment could be found to have been was associated with the ignition of the Eaton Fire. and is SCE has been pursuing settlement of claims through its Wildfire Recovery Compensation Program, a program launched in October 2025 with an announced application deadline of November 2026, and designed to enable eligible individuals and businesses impacted by the Eaton Fire to seek expedited resolution of their claims.

In light of pending litigation, it is probable that Edison International and SCE will …+25 / −47 words · under “Eaton Fire”

In light of pending litigation, it is probable that Edison International and SCE will incur additional material losses in connection with the Eaton Fire. SCE expects to launch its Wildfire Recovery Compensation Program, a program designed to allow eligible individuals and businesses impacted by the Eaton Fire to seek expedited resolution of their claims, in the fall of 2025. Given, SCE's ongoing review into the cause of the Eaton Fire and, among other things, the complexities associated with estimating damages, uncertainties regarding the ultimate number and varying types of claims and the interrelationship among the claims, uncertainties related to the sufficiency of insurance held by plaintiffs and potential plaintiffs, and uncertainties related to litigation processes and participation in the Wildfire Recovery Compensation Program, Edison International and SCE are currently unable to reasonably estimate a range of losses that may be incurred in connection with the Eaton Fire.

SCE exhausted the $1.0 billion of self-insurance recoveries available for losses related to the …+54 / −95 words · under “Eaton Fire”

SCE has advised exhausted the administrator $1.0 billion of the Wildfire Insurance Fund that it anticipates that future resolution of eligible claims arising from self-insurance recoveries available for losses related to the Eaton Fire will require seeking reimbursement from the Initial Account as a result of costs incurred and the administrator has confirmed that the Eaton Fire is a "covered wildfire" for purposes settlements entered into as of accessing the Initial Account. February 11, 2026. SCE will be reimbursed for losses incurred in excess of $1.0 billion for eligible claims for third-party damages related to the Eaton Fire from the Initial Account, subject to approval of the fund administrator and the Initial Account's claims-paying capacity. initially approximately $21 billion for all three participating utilities. Based on PG&E's public disclosures for the first quarter of 2025, The fund administrator has paid or reserved approximately $1.1 reported that at least $21 billion of in the Initial Account reflecting estimates of losses related fund's claims-paying capacity will be available for the Eaton Fire. For more information about recoveries under the Wildfire Fund, see "Notes to the 2019 Kincade fire Condensed Consolidated Financial Statements—Note 12. Commitments and 2021 Dixie fire. The fund administrator is expected to reimburse eligible claims on a first come, first served basis, subject to the fund administrator's review. Contingencies—Contingencies—Southern California Wildfires and Mudslides—Recoveries."

The CPUC will determine the prudency of SCE's ignition-related conduct in a formal proceeding. …+43 / −51 words · under “Eaton Fire”

[… 34 unchanged words …] nevertheless allow cost recovery in full or in part taking into account factors both within and beyond SCE's control that may have exacerbated the costs, and expenses, including, for example, winds, humidity, temperature, emergency response, evacuation timing and winds. availability of firefighting resources. Because SCE held a safety certification at the time of the ignition, it will be required to reimburse the Initial Account only for amounts disallowed by the CPUC up to the applicable Liability Cap of approximately $4.3 billion, unless the fund administrator finds that SCE's actions or inactions relative to the ignition of the Eaton Fire constitute conscious or willful disregard of the rights and safety of others, in which case SCE will be required to reimburse the Initial Account for all withdrawn amounts withdrawn. SCE's requirement that the CPUC disallowed. SCE believes that there is no basis for a finding of conscious or willful disregard of the rights and safety of others with regard to reimburse the Initial Account for any amounts disallowed for fires ignited in 2025 is capped at approximately $4.2 billion. SCE will be able to seek recovery of prudently incurred uninsured wildfire costs not covered by the Initial Account, assessed under the prudency standard clarified under AB 1054, through electric rates. Eaton Fire.

Accounting Policies—Wildfire Fund" and "Notes to Condensed Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern …+0 / −53 words · under “Eaton Fire”

For further information on Southern California Wildfires and Mudslides, see "Risk Factors," "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies—Initial and annual contributions to the wildfire insurance fund established pursuant to California Assembly Bill 1054," and "Business—Southern California Wildfires" in the 2024 Form 10-K; and "Notes to Condensed Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies—Wildfire Insurance Fund" and "Notes to Condensed Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides" in this report.

4 more paragraphs were rewritten here (+67 / −19 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Results of Operations

4 added · 6 removed · 18 rewritten

Added in the 10-Q for fiscal Q3 2026

Under “Wildfire-related Claims, Net of Recoveries”

• Benefits of $21 million mainly due to expected recoveries and reimbursement for costs incurred in prior years related to Other Wildfire Events.

Added in the 10-Q for fiscal Q3 2026

Under “Operating Revenue”

• Other income of $14 million;

Added in the 10-Q for fiscal Q3 2026

Under “Wildfire-related Claims, Net of Recoveries”

• Benefits of $33 million mainly due to expected recoveries and reimbursements for costs incurred in prior years related to Other Wildfire Events.

Added in the 10-Q for fiscal Q3 2026

Under “Interest Expense”

• $87 million pass-through costs mainly associated with securitization of costs approved for recovery under the TKM and Woolsey Settlement Agreements (offset in "Operating Revenue" above).

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Impact of 2025 GRC”

The 2025 GRC final decision determines the amount of revenue that SCE is authorized to collect from customers to recover anticipated costs, including return on rate base. As discussed in "Management Overview—2025 General Rate Case," the 2025 GRC final decision approved an authorized revenue requirement of $9.7 billion in 2025, an increase of $880 million over the adjusted 2024 authorized revenue requirement. This led to an increase in authorized revenue of $243 million and $661 million for the three-month and the nine-month periods ended 2025, respectively, compared to the same periods in 2024. See "Management Overview—2025 General Rate Case" for further information.

In the first and second quarters of 2025, SCE recognized revenue based on the 2024 authorized revenue requirement in the absence of a 2025 GRC final decision. Upon receipt of the 2025 GRC final decision in September 2025, SCE retroactively recorded $418 million of increased authorized revenue for the first and second quarters in the third quarter of 2025. Additionally, SCE recorded net asset impairment related charges of $76 million ($39 million after-tax) in the same quarter. See "Management Overview—2025 General Rate Case" for further information.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Operating Revenue”

• Other income, net of $2 million.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Operating Revenue”

• An increase in revenue of $51 million related to higher balancing account rate base primarily associated with wildfire mitigation efforts and utility owned energy storage projects.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Operating Revenue”

• Other income, net of $6 million.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Operation and Maintenance”

• A net decrease of $249 million mainly related to lower previously deferred wildfire mitigation, vegetation management, and emergency restoration costs authorized for recovery in 2025 than in 2024 (offset in "Operating Revenue" above).

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Wildfire-related Claims, Net of Recoveries”

• A decrease of $490 million related to claim costs for 2017/2018 Wildfire/Mudslide Events recorded in 2024, $27 million of which was expected to be recovered through FERC rates (offset in "Operating Revenue" above).

• A decrease of $124 million related to claim costs recorded in 2024 for Other Wildfire Events, $7 million of which was expected to be recovered through FERC rates (offset in "Operating Revenue" above).

• A decrease in revenue of $330 million associated with the 2025 GRC final …+20 / −11 words · under “Operating Revenue”

• A net increase decrease in revenue of $661 $330 million resulted from higher authorized revenue in associated with the 2025 GRC final decision, as discussed above. primarily reflecting higher revenue recognized in the third quarter of 2025 upon implementation of the decision, which was retroactive to

A decrease in operation and maintenance expense of $27 million was primarily due to …+32 / −0 words · under “Operation and Maintenance”

A decrease in operation and maintenance expense of $245 $27 million was primarily due to a net decrease of $56 million in pass-through costs (offset in "Operating Revenue" above), which is mainly related to the recognition of previously deferred wildfire mitigation and vegetation management costs authorized for recovery in 2025.

An increase in interest expense of $43 million was primarily due to $45 million …+18 / −37 words · under “Interest Expense”

A net decrease An increase in interest expense of $141 $43 million was primarily due to a $171 $45 million benefit related to cost recoveries authorized of higher pass-through costs mainly associated with securitization of costs approved for recovery under the TKM and Woolsey Settlement Agreement, partially offset by higher interest expense from higher borrowings, $23 million of which was pass-through expense mainly associated with wildfire mitigation efforts and utility owned energy storage projects Agreements (offset in "Operating Revenue" above).

A decrease in income tax expense of $373 million was primarily due to $145 …+46 / −8 words · under “Income Taxes”

An increase A decrease in income tax expense of $108 $373 million was primarily due to $118 $145 million of higher lower tax expense on higher resulting from lower pre-tax income partially offset by $10 and $228 million of higher flow-through tax benefits that were passed through to customers (offset by the corresponding pre-tax amount in "Operating Revenue" above). The flow-through tax benefits include $236 million recorded in 2026 upon regulatory approval to return the net proceeds, with interest, to customers from the 2025 monetization of investment tax credits generated by utility-owned energy storage projects and nuclear production tax credits. See "Notes to Condensed Consolidated Financial Statements—Note 8. Income Taxes" for a reconciliation of the federal statutory rate to the effective income tax rate.

• An increase in revenue of $255 million primarily driven by the 2026 escalation …+9 / −52 words · under “Operating Revenue”

• An increase in revenue of $661 $255 million resulting from implementing primarily driven by the 2026 escalation mechanism set forth in the 2025 GRC final decision. in the third quarter of 2025, as discussed in "Management Overview—2025 General Rate Case." Of this amount, $70 million had already been recorded in the first two quarters of 2025 as non-GRC balancing account revenue. Following the final decision, this was reclassified as GRC authorized revenue, resulting in a net increase in revenue of $591 million in the third quarter of 2025.

For further information, see "Notes to Condensed Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern …+0 / −40 words · under “Wildfire-related Claims, Net of Recoveries”

An increase in wildfire-related claims, net of recoveries of $295 million was due to wildfire claim costs recorded in 2025 for the Eaton Subrogation Settlement. These costs were covered by customer-funded wildfire self-insurance and expected FERC recovery (both offset in "Operating Revenue" above). For further information, see "Notes to Condensed Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."

An increase in other income of $4 million was primarily due to an increase …+36 / −13 words · under “Other Income, Net”

A decrease An increase in other income net of $61 $4 million was primarily due to an increase in equity allowance for funds used during construction and $14 million of higher pass-through benefits, mainly reflecting an increase in PBOP non-service benefits (offset in "Operating Revenue" above), partially offset by lower interest income driven by lower balancing account undercollection balances and $6 million of higher pass-through costs (offset in "Operating Revenue" above). lower insurance benefits.

A decrease in income tax expense of $597 million was primarily due to $417 …+49 / −9 words · under “Income Taxes”

An increase A decrease in income tax expense of $611 $597 million was primarily due to $675 $417 million higher of lower tax expense on higher resulting from lower pre-tax income partially offset by $64 and $180 million of higher flow-through tax benefits that are were passed through to customers (offset by the corresponding pre-tax amount in "Operating Revenue" above). The flow-through tax benefits include $236 million recorded in 2026 upon regulatory approval to return the net proceeds, with interest, to customers from the 2025 monetization of investment tax credits generated by utility-owned energy storage projects and nuclear production tax credits. See "Notes to Condensed Consolidated Financial Statements—Note 8. Income Taxes" for a reconciliation of the federal statutory rate to the effective income tax rate.

10 more paragraphs were rewritten here (+110 / −112 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Liquidity and Capital Resources

9 added · 9 removed · 14 rewritten

Added in the 10-Q for fiscal Q3 2026

In July 2026, SCE Recovery Funding LLC issued approximately $2.0 billion of securitized recovery bonds to finance cost recoveries authorized under the Woolsey Settlement Agreement. SCE used the proceeds to repay a first quarter $1.5 billion term loan that was due in March 2027 and to retire existing long-term debt that had financed wildfire costs. For further details, see "Management Overview—Southern California Wildfires and Mudslides" in the 2025 Form 10-K, "Notes to Condensed Consolidated Financial Statements—Note 3. Variable Interest Entities and Note 5. Debt and Credit Agreements."

Added in the 10-Q for fiscal Q3 2026

In the first quarter of 2026, SCE redeemed all the outstanding shares of its Series K preference stock for an aggregate paid amount of $119 million, which caused SCE Trust V to redeem all of its outstanding 5.45% Series K Trust Securities. For further details, see "Notes to Condensed Consolidated Financial Statements—Note 13. Equity."

Added in the 10-Q for fiscal Q3 2026

Under “Credit Ratings”

SCE's credit ratings may be affected by various factors, including those that expose SCE to wildfire-related risks, such as a persistent increase in the frequency and severity of wildfires in California or failure by regulators or legislators to successfully implement and maintain a timely, consistent, and credit-supportive framework that adequately mitigates the significant wildfire-related risk faced by California investor-owned utilities. In April 2026, the CEA submitted to the California Legislature and the Governor a report required under SB 254. The report observes that inaction to address escalating wildfire risk would expose utilities to risk of credit downgrades and heightened financial stress, limiting access to capital needed to maintain safe and reliable infrastructure and support electrification and California's clean energy transition. For further discussion about the report, see "Management Overview—Southern California Wildfires." As of September 30, 2026, no legislation addressing the policy options identified in the April 2026 CEA report had been enacted, and SCE cannot predict whether or when such legislation or other measures will be adopted. In addition, material utility liability exposure arising from the outcome of investigations into various wildfire events, associated settlements, litigation outcomes, fines, or penalties, or a determination that the Wildfire Fund is at risk of material depletion, may lead credit rating agencies to downgrade SCE's credit ratings.

Added in the 10-Q for fiscal Q3 2026

Under “NextGen Enterprise Resource Planning ("ERP") Program”

In March 2025, SCE filed an application with the CPUC seeking authorization to recover costs related to its NextGen ERP Program. In April and June 2026, the CPUC issued procedural rulings requesting additional information from SCE, which SCE timely provided. In September 2026, the CPUC approved extending the statutory deadline for a final decision to January 2027. SCE anticipates that a proposed decision will be issued by the CPUC in 2026.

Added in the 10-Q for fiscal Q3 2026

Under “Alberhill System Project”

In March 2026, the CPUC approved the Certificate of Public Convenience and Necessity for the project, authorizing the construction to proceed. Construction for the project is expected to start in the fourth quarter of 2026. For further details on the project, see "Liquidity and Capital Resources—Southern California Edison Company—Capital Investment Plan" in the 2025 Form 10-K.

Added in the 10-Q for fiscal Q3 2026

Under “Edison International Parent and Other”

In the first quarter of 2026, Edison International redeemed all remaining shares of its 5.375% Fixed-Rate Reset Cumulative Perpetual Preferred Stock, Series A ("Series A Preferred Stock") and repurchased 4,434 shares of 5.00% Fixed-Rate Reset Cumulative Perpetual Preferred Stock, Series B ("Series B Preferred Stock") for $414 million and $4 million, respectively. For further details, see "Notes to Condensed Consolidated Financial Statements—Note 13. Equity."

Added in the 10-Q for fiscal Q3 2026

Under “Credit Ratings”

Edison International Parent's credit ratings may be affected by various factors, including those that expose Edison International Parent to wildfire-related risks, such as a persistent increase in the frequency and severity of wildfires in California or failure by regulators or legislators to successfully implement and maintain a timely, consistent, and credit-supportive framework that adequately mitigates the significant wildfire-related risk faced by California investor-owned utilities. In April 2026, the CEA submitted to the California Legislature and the Governor a report required under SB 254. The report observes that inaction to address escalating wildfire risk would expose utilities to risk of credit downgrades and heightened financial stress, limiting access to capital needed to maintain safe and reliable infrastructure and support electrification and California's clean energy transition. For further discussion about the report, see "Management Overview—Southern California Wildfires." As of September 30, 2026, no legislation addressing the policy options identified in the April 2026 CEA report had been enacted, and Edison International Parent cannot predict whether or when such legislation or other measures will be adopted. In addition, material utility liability exposure arising from the outcome of investigations into various wildfire events or associated settlements, litigation outcomes, fines, or penalties, or a determination that the Wildfire Fund is at risk of material depletion, may lead credit rating agencies to downgrade Edison International Parent's credit ratings.

Added in the 10-Q for fiscal Q3 2026

Under “Inflation Reduction Act of 2022”

The IRA imposed a corporate alternative minimum tax ("CAMT"), which Edison International and SCE are subject to beginning in 2026. Edison International and SCE expect that any CAMT paid will be creditable against future income taxes.

In addition, under the IRA, SCE expects to generate $158 million of investment tax credits in future periods related to utility-owned storage projects. The associated tax benefits will be recognized and returned to customers as the credits are utilized.

Added in the 10-Q for fiscal Q3 2026

Under “Net Cash Provided by Operating Activities”

Net cash provided by operating activities increased by $1.1 billion during the nine months ended September 30, 2026 compared to the same period of 2025. The change was primarily due to the increase in 2026 escalation mechanism for rates set forth in the 2025 GRC final decision, the increase in recovery of last year's undercollections, and the increase in sales volume driven by warmer weather, partially offset by wildfire-related claim payments, net of recoveries. For further details related to wildfire-related claim payments and recoveries, see "Notes to Condensed Consolidated Financial Statements—Note 12. Commitments and Contingencies."

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

In April 2025, SCE requested approval from the CPUC to securitize approximately $1.6 billion of cost recoveries authorized under the TKM Settlement Agreement. In August 2025, the CPUC issued an irrevocable order authorizing SCE to finance the amount through the issuance of securitized bonds. For further details, see "Management Overview—Southern California Wildfires and Mudslides."

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Wildfire-related Regulatory Proceedings”

In response to the increase in wildfire activity and faster progression of and increase in damage from wildfires across SCE's service area and throughout California, SCE has incurred wildfire mitigation and wildfire and drought restoration related spending at levels significantly exceeding amounts authorized in SCE's GRCs. For regulatory proceedings related to the 2017/2018 Wildfire/Mudslide Events, see "Management Overview—Southern California Wildfires and Mudslides."

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Wildfire-related Regulatory Proceedings”

In October 2023, SCE requested authorization to recover an initial revenue requirement of $384 million, including interest, associated with 2022 operations and maintenance and capital expenditures incremental to GRC-authorized levels in wildfire mitigation memorandum accounts and the vegetation management balancing account. In July 2024, the CPUC approved SCE's request for interim rate recovery of $210 million of this revenue requirement, subject to refund. The revenue requirement for interim rate recovery is being recovered in rates over 17 months starting October 1, 2024.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Wildfire-related Regulatory Proceedings”

Multi-year Wildfire Mitigation and Catastrophic Events Filing ("WMCE Filing")

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Wildfire-related Regulatory Proceedings”

In March 2025, SCE, Cal Advocates, and Small Business Utility Advocates filed a joint motion seeking approval of a settlement agreement for the WMCE proceeding. The settlement agreement seeks the CPUC's approval to recover $702 million in capital expenditures and $308 million in operation and maintenance expenses. In June 2025, the CPUC issued a final decision adopting the settlement agreement as filed. This resulted in an initial revenue requirement of $314 million, which has been implemented into customer rates over a 12-month period starting October 1, 2025, along with ongoing capital revenue requirement and interest.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Utility Owned Storage”

As discussed in "Liquidity and Capital Resources—Capital Investment Plan" in the 2024 MD&A, in October 2021, SCE contracted with Ameresco, Inc. ("Ameresco") for the construction of utility owned energy storage projects to be in service by August 1, 2022 at three sites in SCE's service area with an aggregate capacity of 537.5 MW, consisting of a 225 MW project, a 200 MW project, and a 112.5 MW project. The 200 MW and 112.5 MW projects went in service during the third quarter of 2024. While Ameresco has stated that the 225 MW project met the requirements to go in service in May 2025, SCE has objected, and as of September 30, 2025, discussions are ongoing between the parties.

As discussed in the 2024 Form 10-K, the CPUC regulates SCE's capital structure which limits the dividends it may pay to its shareholders. In the third quarter of 2023, the CPUC issued a decision on SCE's application to the CPUC for an extension of the waiver of compliance with its equity ratio requirement that allows SCE to exclude from its equity ratio calculations (i) net charges accrued in connection with the 2017/2018 Wildfire/Mudslide Events and (ii) debt issued for the purpose of paying claims related to the 2017/2018 Wildfire/Mudslide Events up to an amount equal to the net charges accrued in connection with the 2017/2018 Wildfire/Mudslide Events. Under the decision, effective as of the beginning of the cost of capital cycle on January 1, 2023, the CPUC also authorized SCE to exclude from its equity ratio calculations debt that exceeds the net charges accrued in connection with the 2017/2018 Wildfire/Mudslide Events due to the timing difference between the wildfire claims payment and the realization of the cash tax benefits.

Show the rest (146 words)

In the first quarter of 2025, the CPUC approved the TKM Settlement Agreement, under which SCE is allowed to permanently exclude any after-tax charges to equity associated with the costs disallowed or funded by shareholders in the TKM Settlement Agreement, and the debt issued to finance these costs. In September 2025, SCE and various intervenors jointly filed a motion seeking approval of a settlement agreement related to the Woolsey Fire. This settlement agreement includes equity ratio calculation exclusions similar to those in the TKM Settlement Agreement. As the CPUC has not yet issued a final decision on cost recovery for the Woolsey Fire, SCE filed an application in August 2025 to extend the existing waiver of compliance with its equity ratio requirement. Under the CPUC's rules, SCE is not deemed to be in violation of the equity ratio requirement while the waiver application is pending resolution.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Inflation Reduction Act of 2022”

The IRA imposes a 15% corporate alternative minimum tax ("CAMT") on adjusted financial statement income ("AFSI") of corporations with average AFSI exceeding $1.0 billion over the three preceding calendar years. The CAMT was effective beginning January 1, 2023. Based on the current interpretation of the law and historical financial data, Edison International estimates that it will exceed the $1.0 billion threshold and be subject to CAMT on its consolidated federal tax returns beginning in 2026. SCE will also be subject to CAMT in 2026.

Under the IRA, SCE generated investment tax credits of approximately $231 million in 2024 related to utility owned storage projects and $29 million in nuclear production tax credits. In the third quarter of 2025, SCE monetized the majority of these credits for $236 million. SCE expects to pass the proceeds, net of transaction fees, back to customers.

On July 4, 2025, the One Big Beautiful Bill Act of 2025 ("OBBBA") was enacted into law. The OBBBA, among other things, phases out various clean energy credits enacted as part of the IRA. These phase-outs are not expected to impact the investment tax credits related to SCE's utility owned storage projects discussed above under "Edison International Income Taxes—Inflation Reduction Act of 2022." Edison International and SCE are continuing to evaluate the full scope of potential financial impacts, with most of these impacts expected to be passed through to customers under regulated ratemaking requirements.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Net Cash Provided by Operating Activities”

1Non-cash items include depreciation and amortization, equity allowance for funds used during construction, impairment, deferred income taxes, Wildfire Insurance Fund amortization expenses, and other.

2Changes in working capital items include receivables, inventory, accounts payable, tax receivables and payables, derivative assets and liabilities, and other current assets and liabilities.

3The amount in 2025 represents payments of $208 million for 2017/2018 Wildfire/Mudslide Events, $335 million for Other Wildfire Events, and $225 million for Eaton Fire, partially offset by an increase in wildfire estimated losses of $321 million. The amount in

2024 represents payments of $636 million for 2017/2018 Wildfire/Mudslide Events and $342 million for Other Wildfire Events, partially offset by an increase in wildfire estimated losses of $674 million.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Net Cash Provided by Operating Activities”

Net income and non-cash items increased by $2.8 billion primarily due to net earnings recorded in 2025 from approximately $1.6 billion cost recoveries authorized under the TKM Settlement Agreement (which offset in the regulatory assets and liabilities changes discussed below), higher revenue from the 2025 GRC final decision, and a benefit to interest expense related to cost recoveries authorized under the TKM Settlement Agreement, partially offset by the net impact of wildfire related regulatory decisions received in the second quarter of 2025.

In the next 12 months, SCE expects to fund its cash requirements through operating …+30 / −14 words

In the next 12 months, SCE expects to fund its cash requirements through operating cash flows, capital market and bank financings, and wildfire-related cost recoveries through securitization financings. equity contributions from Edison International Parent, as needed. In addition, SCE expects to fund costs related to the Eaton Fire with proceeds from the Initial Account of the Wildfire Fund. SCE also has availability under its credit facility and agreements with lenders to issue bilateral unsecured standby letters of credit to fund cash requirements. SCE may issue additional debt for general corporate purposes.

The following table summarizes SCE's current long-term issuer credit ratings and outlook from the …+0 / −53 words · under “Credit Ratings”

Following the passage of SB 254 in September 2025, Moody's reaffirmed SCE's long-term issuer credit rating and outlook, and Fitch also reaffirmed SCE's credit rating and revised its outlook from ratings watch negative to stable. However, S&P downgraded SCE's long-term issuer credit rating. For further details on SB 254, see "Management Overview—Southern California Wildfires and Mudslides—Senate Bill 254." The following table summarizes SCE's current long-term issuer credit ratings and outlook from the major credit rating agencies as of October 21, 2025: 22, 2026:

Credit rating downgrades may increase the cost of debt and equity capital and may …+26 / −110 words · under “Credit Ratings”

SCE's credit ratings may be affected by various factors. These include, but are not limited to, failure by regulators to successfully implement AB 1054 and SB 254 in a consistent and credit-supportive manner, or investigations into wildfire events or associated settlements result in material utility liability exposure, particularly in the absence of broader credit-supportive legislative actions to mitigate SCE's wildfire risk, including those to be recommended under SB 254 in a report due April 1, 2026. Additionally, a persistent increase in the frequency and severity of wildfires in California may lead the credit rating agencies to reassess SCE's wildfire-related operational risk exposure or believe the Wildfire Insurance Fund is at risk of material depletion. Credit rating downgrades may increase the cost of debt and equity capital and may also impact the availability of short-term and long-term borrowings, including commercial paper, credit facilities, bond financings, or other borrowings, which could lead to higher customer rates over time. In addition, some of SCE's power procurement and energy contracts, and environmental remediation obligations and workers' compensation self-insurance would require SCE to pay related liabilities or post additional collateral if SCE's credit rating ratings were to fall below investment grade. applicable investment-grade thresholds. For further details, see "—Margin and Collateral Deposits" below.

At September 30, 2026, SCE had cash and cash equivalents of $119 million and …+100 / −12 words · under “Available Liquidity”

At September 30, 2025, 2026, SCE had cash on hand and cash equivalents of $305 $119 million and restricted cash of $109 million collected from customer-funded wildfire self-insurance. The restricted cash collected from customer-funded wildfire self-insurance is available only for future wildfire events and is not available to fund claims associated with the Eaton Fire. SCE also has approximately $2.1 $3.2 billion available to borrow on its $3.4 billion revolving credit facility. The In June 2026, SCE extended its credit facility is available through May 2030 and may extend its credit facility for borrowing needs until May 2029. one additional year with the lenders' approval. The aggregate maximum principal amount under the SCE revolving credit facility may be increased up to $4.0 billion, provided that additional lender commitments are obtained. SCE also had standby letters of credit with a total capacity of $660 $545 million, and the unused amount of which $376 million was $467 million available as of September 30, 2025. 2026. For further details, see "Notes to Condensed Consolidated Financial Statements—Note 5. Debt and Credit Agreements." SCE may finance balancing account undercollections and working capital requirements to support operations and capital expenditures with commercial paper, its credit facilities, or other borrowings, subject to availability in the bank and capital markets and within levels authorized by the CPUC.

In December 2025, SCE filed its 2024 WMCE Filing, seeking to recover incremental operating …+41 / −39 words · under “2024 Multi-year Wildfire Mitigation and Catastrophic Events Filing ("WMCE") Filing”

In April 2024, December 2025, SCE filed its 2024 WMCE Filing, seeking to recover incremental operating and maintenance expenses of $320 $55 million and incremental capital expenditures of $702 $78 million, primarily associated with 2019 – 2023 WCCP capital expenditures recorded in the wildfire risk mitigation balancing account, 2023 operations and maintenance and capital expenditures as well as incremental to amounts authorized in wildfire mitigation accounts and the vegetation management balancing account, storm-related costs associated with certain 2020 2017 – 2022 2021 events recorded in the catastrophic event memorandum account. and certain The application also seeks recovery of $36 million in wildfire liability insurance premium expenses recorded mitigation related capital expenditures incurred in the wildfire expense memorandum account, which 2022 that were previously denied without prejudice and permitted to be included in base rates as part of the post-test year ratemaking mechanism. In April 2026, the CPUC adopted a previous schedule with a proposed decision expected in 2027.

In June 2025, the CPUC issued a final decision authorizing recovery of certain requested …+29 / −71 words · under “2021 GRC Wildfire Mitigation Memorandum Account Balance”

In June 2025, the CPUC issued a final decision that authorized authorizing recovery of $291 million in operations certain requested costs and maintenance expenses and $99 million in capital expenditures. The portion of the initial revenue requirement above the interim rate recovery levels has been implemented in customer rates over a 12-month period starting October 1, 2025, along with ongoing capital revenue requirement and interest. Additionally, the final decision denied disallowing recovery of $65 million in operations and maintenance expenses and determined that $36 million of requested capital expenditures. were not eligible for recovery as part of this proceeding. SCE has subsequently filed an application for rehearing with the CPUC regarding the disallowances. In this May 2026, the CPUC granted a limited rehearing to reconsider certain amounts that were disallowed. In August 2026, the CPUC adopted a schedule with a proposed decision citing factual errors and internal inconsistencies expected in the decision. 2027.

In March 2026, SCE filed an application with the CPUC requesting approval of the …+75 / −39 words · under “Advanced Metering Infrastructure ("AMI") 2.0 Program”

In March 2025, 2026, SCE filed an application with the CPUC seeking funding requesting approval of the AMI 2.0 program, which is intended to replace SCE's existing metering infrastructure, including meters, network communications, software systems, and data analytics, as well as to enable new customer programs. The application seeks authorization for the replacement of its core ERP system that has been in service for over 15 years and will soon reach the end of its service life. SCE requested funding through a balancing account of recorded and forecast forecasted capital expenditures of approximately $1.1 $3.1 billion and operations and maintenance expenditures costs of $239 $366 million to be incurred between 2026 and 2033, as well as authorization to establish an AMI 2.0 Memorandum Account and an AMI 2.0 Balancing Account to record the associated costs. In August 2026, the CPUC adopted a schedule with a proposed decision expected in 2027.

At September 30, 2026, Edison International Parent and Other had cash and cash equivalents …+27 / −10 words · under “Edison International Parent and Other”

At September 30, 2025, 2026, Edison International Parent and Other had cash on hand and cash equivalents of $59 $52 million. and $0.8 Edison International Parent also has approximately $1.4 billion available to borrow on its $1.5 billion revolving credit facility. The In June 2026, Edison International Parent extended its credit facility is available through May 2030 and may extend its credit facility for borrowing needs until May 2029. one additional year with the lenders' approval. The aggregate maximum principal amount under the Edison International Parent revolving credit facility may be increased up to $2.0 billion, provided that additional lender commitments are obtained. For further information, details, see "Notes to Condensed Consolidated Financial Statements—Note 5. Debt and Credit Agreements."

The following table summarizes Edison International Parent's current long-term issuer credit ratings and outlook …+0 / −59 words · under “Credit Ratings”

Following the passage of SB 254 in September 2025, Moody's reaffirmed Edison International Parent's long-term issuer credit rating and outlook, and Fitch also reaffirmed Edison International Parent's credit rating and revised its outlook from ratings watch negative to stable. However, S&P downgraded Edison International Parent's long-term issuer credit rating. For further details on SB 254, see "Management Overview—Southern California Wildfires and Mudslides—Senate Bill 254." The following table summarizes Edison International Parent's current long-term issuer credit ratings and outlook from the major credit rating agencies as of October 21, 2025: 22, 2026:

Credit rating downgrades may increase the cost of debt and capital and may also …+15 / −111 words · under “Credit Ratings”

Edison International Parent's credit ratings may be affected by various factors. These include, but are not limited to, failure by regulators to successfully implement AB 1054 and SB 254 in a consistent and credit-supportive manner, or investigations into wildfire events or associated settlements result in material utility liability exposure, particularly in the absence of broader credit-supportive legislative actions to mitigate SCE's wildfire risk, including those to be recommended under SB 254 in a report due April 1, 2026. Additionally, a persistent increase in the frequency and severity of wildfires in California may lead the credit rating agencies to reassess Edison International Parent's wildfire-related operational risk exposure or believe the Wildfire Insurance Fund is at risk of material depletion. Credit rating downgrades may increase the cost of debt and capital and may also impact the availability of short-term and long-term borrowings, including commercial paper, credit facilities, bond note financings, or other borrowings, which could lead to higher customer rates over time.

1Includes nuclear decommissioning trusts. See "Nuclear Decommissioning Activities" below for further information. The 2025 …+1 / −41 words · under “Net Cash Provided by Operating Activities”

4Includes 1Includes nuclear decommissioning trusts. See "Nuclear Decommissioning Activities" below for further information. The 2025 amount includes $236 million in cash proceeds primarily from the monetization of investment tax credits. related to utility owned storage projects, which SCE expects to flow through to customers. The 2024 amount also includes cash received from customers to fund certain construction projects and cash received from certain state incentive programs to pass through to customers.

Net cash provided by (used in) regulatory assets and liabilities, including changes in net …+55 / −93 words · under “Net Cash Provided by Operating Activities”

Net cash provided by (used in) / provided by regulatory assets and liabilities, including changes in net over or undercollections recorded in balancing accounts, was $(1.4) $2.5 billion and $1.6 $(1.4) billion during the nine months ended September 30, 2026 and 2025, respectively. Net cash inflows in 2026 were mainly due to current year overcollections driven by higher sales volume resulting from warmer weather, recovery of prior year undercollections, and 2024, respectively. SCE has a number of balancing and memorandum accounts, which impact additional collections authorized for customer-funded wildfire self-insurance program. Net cash flows based on differences between timing of collection through rates and incurring expenditures. outflow in 2025 changes related was primarily due to regulatory assets and liabilities were primarily driven by current year net undercollections resulting from cost recoveries authorized under the TKM Settlement Agreement (which offset in the net income and non-cash items discussed above). In addition, upon 2025 as well as higher revenue from the 2025 GRC final decision, issued which were both non-cash offsets in September 2025, the increase in authorized revenues for January through September 2025 was authorized to be collected over a 24-month period starting October 2025. These impacts were partially offset by recovery of prior year undercollections. Cash inflow in 2024 was primarily due to recovery of prior-year undercollections. net income.

Net cash used in operating activities is related to interest and dividends less administrative …+6 / −30 words · under “Nuclear Decommissioning Activities”

Net cash used in operating activities relates is related to interest and dividends less administrative expenses, taxes, and SCE's decommissioning costs. Investing activities represent the purchase and sale of investments within the nuclear decommissioning trusts, including the reinvestment of earnings from nuclear decommissioning trust investments. The net cash impact reflects timing of decommissioning payments ($71 million and $131 million in 2026 and $162 million in 2025, and 2024, respectively) and reimbursements to SCE from the nuclear decommissioning trust ($78 million and $141 million in 2026 and $151 million in 2025, and 2024, respectively). The net cash outflow in 2024 also includes $19 million of tax benefits received and a $30 million disallowance under the 2021 NDCTP, both contributed by SCE to the decommissioning trust.

1 more paragraph was rewritten here (+10 / −10 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

33 other paragraphs were edited by fewer than 15 words; 26 changed only figures, dates or period names; 13 are word for word the same; 19 were split, merged or moved, with most of their text in the other filing; their text is in the 10-Q for fiscal Q3 2026 and the 10-Q for fiscal Q3 2025 linked above.

Edison International's annual report against the year before

10-K for fiscal 2025 against the 10-K for fiscal 2024

In Edison International's 10-K for fiscal 2025, the MD&A added 34 passages, removed 35 and rewrote 67 against the 10-K for fiscal 2024.

Compared: Item 7 of the 10-K filed Feb 18, 2026 (accession 0000827052-26-000012, period ended Dec 31, 2025; 291 paragraphs) and Item 7 of the 10-K filed Feb 27, 2025 (accession 0000827052-25-000022, period ended Dec 31, 2024; 307 paragraphs).

Edison International's figures, dates and period names change every period and are not counted. A paragraph is rewritten when at least 15 other words were added or removed: added text is underlined and shaded, removed text is struck through, and long unchanged stretches are shortened to the words around each change.

Management Overview

13 added · 7 removed · 24 rewritten

Added in the 10-K for fiscal 2025

Under “Highlights of Operating Results”

In January and December 2025, the CPUC approved the TKM Settlement Agreement and the Woolsey Settlement Agreement, respectively. As a result, in the year ended 2025, SCE recorded cost recoveries through CPUC electric rates authorized under both the TKM Settlement Agreement and the Woolsey Settlement Agreement. These cost recoveries are reflected either as core earnings or non-core items, as discussed below. This classification is consistent with the original classification when the respective costs were incurred.

Added in the 10-K for fiscal 2025

Under “Highlights of Operating Results”

• Net earnings recorded in 2025 related to the TKM Settlement Agreement, including ongoing legal expenses: $1,341 million ($966 million after-tax) of claim costs and $55 million ($40 million after-tax) of legal expenses authorized for recovery, partially offset by shareholder-funded wildfire mitigation expenses of $50 million ($36 million after-tax) and impairment of incremental restoration-related assets of $8 million ($6 million after-tax).

• Net earnings recorded in 2025 related to the Woolsey Settlement Agreement, including ongoing legal expenses: $1,603 million ($1,154 million after-tax) of claim costs and $35 million ($25 million after-tax) of legal expenses authorized for recovery, partially offset by impairment of incremental restoration-related assets of $10 million ($7 million after-tax).

Added in the 10-K for fiscal 2025

Under “Highlights of Operating Results”

• Eaton Fire claims and expenses:

• Charges of $15 million ($11 million after tax) recorded in 2025 primarily from the shareholder contribution related to SCE's customer-funded self-insurance coverage and legal and other expenses.

Added in the 10-K for fiscal 2025

Under “Highlights of Operating Results”

• Charges of $1 million ($1 million after-tax) recorded in 2025 consisted of $15 million of legal expenses, net of expected regulatory recoveries, partially offset by $14 million of insurance reimbursements for costs incurred in previous years.

Added in the 10-K for fiscal 2025

Under “Highlights of Operating Results”

• Net charges of $76 million ($39 million after-tax) recorded in 2025, primarily related to the impairment of utility property, plant and equipment associated with historical capital expenditures disallowed in SCE's 2025 GRC final decision. See "Results of Operations —Impact of 2025 GRC" for further information.

Added in the 10-K for fiscal 2025

Under “Cost of Capital Application”

In December 2025, the CPUC issued a final decision on SCE's 2026 – 2028 cost of capital application that set SCE's ROE at 10.03%, and maintained SCE's current authorized capital structure, after CPUC-allowed exclusions, of 52% common equity, 43% long-term debt, and 5% preferred equity. Under the final decision, SCE's 2026 authorized cost of long-term debt and preferred equity are 4.71% and 6.89%, respectively. Based on the approved capital structure and costs, SCE's weighted average return on rate base for 2026 will be 7.59%. Based on the revenue requirement approved in SCE's 2025 GRC, the final decision will decrease SCE's revenue requirement in 2026 by approximately $51 million compared to the previously authorized cost of capital. The decision maintains the existing cost of capital adjustment mechanism. For information on the cost of capital adjustment mechanism, see "Business—SCE—Overview of Ratemaking Process."

Added in the 10-K for fiscal 2025

Under “Capital Expenditures”

SCE's capital expenditure forecast has been updated to reflect planned CPUC-jurisdictional spending as informed by the 2025 GRC final decision and expected FERC capital expenditures.

Added in the 10-K for fiscal 2025

Under “Capital Expenditures”

In addition, from 2022 to 2025, CAISO released its annual transmission plans approving projects to be constructed by SCE, with total anticipated capital expenditures of approximately $3 billion, of which approximately $1 billion is included in the table above. As part of its 2025-2026 Transmission Planning Process, CAISO is reassessing certain SCE projects from the 2022-2023 Transmission Plan and plans to provide its recommendation by May 2026.

Added in the 10-K for fiscal 2025

Under “Rate Base”

SCE's authorized CPUC-jurisdictional rate base is determined through the GRC and other regulatory proceedings. Differences between actual and CPUC-authorized rate base are addressed in subsequent GRCs or other regulatory proceedings. FERC-jurisdictional rate base is determined based on actual capital expenditures.

Added in the 10-K for fiscal 2025

Under “Southern California Wildfires and Mudslides”

In 2025, a Continuation Account within the Wildfire Fund was established under SB 254 to supplement the Initial Account within the Wildfire Fund that was established in 2019. In recognition of the need for further action, SB 254 requires the administrator of the Wildfire Fund to submit to the California legislature and the governor, by April 1, 2026, a report that evaluates and sets forth recommendations on new models or approaches that mitigate damage, accelerate recovery, and responsibly and equitably allocate the burdens from natural catastrophes, including wildfires, across stakeholders, to complement or replace the Wildfire Fund. While Edison International and SCE continue to pursue legislative strategies to address California investor-owned utilities' exposure to wildfire-related liabilities, they cannot predict whether or when there will be a comprehensive economy-wide solution mitigating the significant risk faced by California investor-owned utilities related to wildfires.

Added in the 10-K for fiscal 2025

Under “Eaton Fire”

Multiple lawsuits related to the Eaton Fire have been initiated against SCE and Edison International by individual plaintiffs, subrogation plaintiffs, and public entity plaintiffs related to the Eaton Fire. A bellwether jury trial in the Eaton Fire litigation has been set for January 2027.

Added in the 10-K for fiscal 2025

Under “Eaton Fire”

SCE has entered into settlements with insurance claimants and claimants under its Wildfire Recovery Compensation Program related to the Eaton Fire. As of December 31, 2025, SCE had recorded $1.1 billion in losses related to these settlements. SCE also recorded expected recoveries from customer-funded self-insurance of $917 million, from the Wildfire Fund of $134 million, and through FERC electric rates of $70 million. The net after tax charge to earnings recorded related to the settlements is $9 million, the after-tax impact of the required $12.5 million shareholder contribution related to SCE's customer-funded self-insurance coverage.

In light of pending litigation, it is probable that Edison International and SCE will incur additional material losses in connection with the Eaton Fire. Given, among other things, the complexities associated with estimating damages, the large number and varying types of claims and the interrelationship among the claims, uncertainties related to the sufficiency of insurance held by plaintiffs and potential plaintiffs, and uncertainties related to litigation processes and the Wildfire Recovery Compensation Program, Edison International and SCE are currently unable to reasonably estimate a range of losses that may be incurred in connection with the Eaton Fire.

In January 2026, SCE filed a cross-complaint against certain public and private entities whose actions or inaction may have caused, contributed to or exacerbated the losses that resulted from the fire.

SCE will exhaust self-insurance recoveries available for losses related to the Eaton Fire as a result of costs incurred and settlements entered into as of February 11, 2026. SCE has advised the administrator of the Wildfire Fund that it anticipates that it will seek reimbursement of eligible claims arising from the Eaton Fire from the Initial Account and the administrator has confirmed that the Eaton Fire is a "covered wildfire" for purposes of accessing the Initial Account. SCE will be reimbursed for losses incurred in excess of $1.0 billion for eligible claims for third-party damages related to the Eaton Fire from the Initial Account, subject to approval of the fund administrator and the Initial Account's claims-paying capacity. The fund administrator has reported that the fund's claims-paying capacity for the Eaton Fire, as of September 30, 2025, exceeds $21 billion.

Added in the 10-K for fiscal 2025

Under “Approval of CPUC-Jurisdictional Rate Recovery in 2025”

Under the Woolsey Settlement Agreement, SCE is also authorized to recover approximately $71 million of approximately $84 million in restoration costs incurred. In the Woolsey Settlement Agreement, SCE also waived its right to seek recovery of uninsured losses tracked in a Wildfire Expense Memorandum Account and incurred in connection with fires that ignited prior to July 12, 2019, the date AB 1054 was adopted. SCE estimates that the waived pre-AB 1054 losses are approximately $157 million.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Highlights of Operating Results”

1Charges of $4 million and $6 million related to claims from wildfires ignited prior to July 1, 2023 were included in core earnings in 2023 and 2022, respectively. Core earnings in periods before the third quarter of 2023 have not been recast to exclude these charges.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Highlights of Operating Results”

• Insurance recovery of $10 million ($7 million after-tax) recorded in 2023, related to settlement of an employment litigation matter. SCE and Edison International settled the matter following an atypical jury award.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “2025 General Rate Case”

SCE filed its 2025 GRC application with the CPUC in May 2023, for the four-year period of 2025 – 2028. In its application, SCE requested that the CPUC authorize a test year 2025 revenue requirement of approximately $10.3 billion. This represents a $1.9 billion, or 23%, increase over the approximately $8.4 billion 2024 revenue requirement adopted in Track 4, prior to adjustments for updated operations and maintenance escalation rates, the CPUC's decisions to adopt SCE's 2023 - 2025 cost of capital, and the expanded use of customer-funded self-insurance for wildfire-related claims.

In February 2024, intervenors to the 2025 GRC proceeding, including Cal Advocates and The Utility Reform Network ("TURN"), submitted testimony in response to SCE's application. Cal Advocates and TURN recommended reductions to SCE's requests for load growth investments, infrastructure replacement, targeted undergrounding of conductors, and other areas of SCE's application.

Show the rest (492 words)

Cal Advocates in its testimony proposed a test year 2025 revenue requirement of approximately $9.3 billion, representing an increase of approximately 11% over the 2024 revenue requirement adopted in Track 4, before the adjustments described above. While TURN did not calculate a test year 2025 revenue requirement in connection with its proposals in its testimony, SCE estimates that TURN's proposals would result in a test year 2025 revenue requirement of approximately 12% over the 2024 revenue requirement adopted in Track 4, before the adjustments described above.

In June 2024, following amendments and other revisions to rebuttal testimony, SCE updated its 2025 revenue requirement request to $10.5 billion, and proposed post-test year revenue requirement increases of approximately $670 million, $750 million and $730 million in 2026, 2027, and 2028, respectively. The updated 2025 revenue requirement included a $220 million increase associated with the cost of capital adjustment authorized by the CPUC in a separate proceeding, which was subsequently modified by a CPUC decision in October 2024, as discussed in "—Cost of Capital."

In July 2024, the CPUC issued a decision approving SCE's request in the 2025 GRC to extend the customer-funded wildfire self-insurance through the 2025 GRC period.

In October 2024, the CPUC approved the establishment of a memorandum account to track changes in the revenue requirement between January 1, 2025, and the implementation date of the final decision. While SCE and certain parties have entered into stipulations to resolve certain contested areas in the 2025 GRC, SCE cannot predict the revenue requirement the CPUC will ultimately authorize or forecast the timing of a final decision. SCE expects to recognize revenue based on the 2024 authorized revenue requirement, adjusted to reflect the 2025 CPUC-authorized ROE as discussed in "—Cost of Capital," until a GRC decision is issued.

The cost of capital adjustment mechanism set by the CPUC provides for an adjustment to SCE's authorized cost of capital that, when triggered, will impact SCE's results of operations and cash flows. In 2023, the cost of capital adjustment mechanism was triggered and resulted in an increase to SCE's CPUC-authorized ROE from 10.05% to 10.75% effective January 1, 2024. The resulting increase to SCE's 2024 GRC-related revenue requirement was $201 million. The cost of capital adjustment mechanism was not triggered in 2024. In October 2024, the CPUC issued a decision modifying the cost of capital adjustment mechanism that changed the mechanism's adjustment ratio from 50% to 20%. This modification was also applied to the increase that was most recently triggered in 2023, effective on January 1, 2025. As a result, SCE's 2025 CPUC-authorized ROE was adjusted to 10.33%. The decision reduces SCE's updated 2025 GRC-related revenue requirement by approximately $117 million. For further information, see "—2025 General Rate Case." For additional information on cost of capital and the ratemaking process, see "Business—SCE—Overview of Ratemaking Process—CPUC."

SCE expects to file its regularly scheduled cost of capital application in March 2025 for rates effective for 2026 – 2028.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Capital Expenditures”

In connection with the 2025 GRC, SCE forecasts capital expenditures of $26.6 billion to $31.5 billion for 2025 – 2028. In the absence of a 2025 GRC decision, SCE has developed, and is executing against, a capital expenditure plan that is expected to allow SCE to meet what is ultimately authorized in the 2025 GRC decision while minimizing the associated risk of unauthorized spending.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Capital Expenditures”

In May 2023, the CAISO released its 2022 – 2023 Transmission Plan based on the CPUC's projections that more than 40 gigawatts of new resources need to be added in California by 2032. As the incumbent transmission owner for a portion of these transmission projects, SCE expects to construct projects requiring capital investment of at least $2.0 billion, most of which will be incurred beyond 2028. In May 2024, the CAISO released its 2023 – 2024 Transmission Plan which identified additional transmission projects expected to be constructed by SCE by 2030 with anticipated capital expenditures of approximately $80 million.

In addition to projects awarded to incumbent transmission owners, the CAISO also identified projects eligible for competitive solicitation. In May 2024, SCE, in association with Lotus Infrastructure Global Operations, LLC, was selected as the approved project sponsor for a 30-mile overhead transmission line project connecting San Diego and Orange Counties. The project is expected to be in-service in 2032 and SCE expects to place approximately $244 million into its transmission rate base in 2032.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Eaton Fire”

According to preliminary information provided by CAL FIRE, the Eaton Fire burned approximately 14,000 acres; destroyed approximately 6,018 single residence structures, 3,146 other minor structures, 96 multiple residences and 158 mixed commercial/residential and nonresidential commercial structures; damaged approximately 750 residential structures, 260 other minor structures, 28 multiple residences and 35 mixed commercial/residential and nonresidential commercial structures and resulted in 17 confirmed civilian fatalities and 9 confirmed fire personnel injuries/illnesses. In addition, fire authorities have estimated suppression costs at approximately $100 million.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Eaton Fire”

SCE has $1.0 billion of customer-funded self-insurance coverage available for wildfires ignited between January 1, 2025 and December 31, 2025, subject to a shareholder contribution of up to $12.5 million. If SCE incurs losses in excess of $1.0 billion for claims for third-party damages related to the Eaton Fire, SCE will be reimbursed for such losses from the Wildfire Insurance Fund, subject to approval of the fund administrator and the Wildfire Insurance Fund’s claims-paying capacity, initially approximately $21 billion for all three participating utilities. PG&E is seeking reimbursement from the Wildfire Insurance Fund for losses related to the 2021 Dixie Fire and has disclosed that, as of December 31, 2024, it had recorded aggregate recoveries from the Wildfire Insurance Fund of $925 million, of which it had received $169 million. Until the fund administrator determines that the fund will be terminated, it is expected to reimburse eligible claims on a first come, first served basis, subject to the fund administrator's review.

The increase in SCE's core earnings in 2025 was primarily due to higher revenue …+42 / −0 words · under “Highlights of Operating Results”

The increase in SCE's core earnings in 2025 was primarily due to higher revenue from the 2025 GRC final decision and a benefit to interest expense related to cost recoveries authorized under the TKM and Woolsey Settlement Agreements. The increase in Edison International Parent and Other's core loss in 2025, was primarily due to higher interest expense and preferred stock redemption loss.

• Charges of $50 million ($39 million after-tax) recorded in 2025 and $4 million …+9 / −23 words · under “Highlights of Operating Results”

• Expected wildfire claims Charges of $50 million ($39 million after-tax) recorded in 2025 and $4 million ($3 million after-tax) insured by EIS recorded in 2024, and net earnings of $42 million ($33 million after-tax) recorded in 2023, both related to customer revenues for an EIS insurance contract offset by expected wildfire claims insured by EIS. See "Notes to Consolidated Financial Statements— Note 12. Commitments and Contingencies" for further information.

In parallel, climate change impacts continue to intensify the need for system resilience and …+12 / −72 words · under “Electricity Industry Trends”

The electric power industry is undergoing urgent and fundamental changes to how energy infrastructure is planned and built, driven by: state government actions to reduce GHG emissions; new sources of demand, such as electric vehicles, data centers, and building electrification; and technological innovations that support clean energy adoption, such as distributed generation and energy storage. These factors, coupled with the increasing impacts of In parallel, climate change are altering impacts continue to intensify the way in which electricity is generated need for system resilience and delivered. clean‑energy adoption. The impacts of climate change are apparent and accelerating. In 2024, the Earth experienced its hottest year on record. This spike in temperature is making [… 52 unchanged words …]

Recent federal actions have challenged clean energy standards and regulations in jurisdictions across the …+58 / −1 words · under “Electricity Industry Trends”

Recent federal actions have challenged clean energy standards and regulations in jurisdictions across the country. Rising customer cost pressures underscore the importance of enacting electricity policies and investment decisions that balance affordability while supporting a reliable and clean energy transition. California is remains committed to reducing its GHG emissions, improving local air quality and supporting continued economic growth. The state codified into law goals to reduce GHG emissions [… 29 unchanged words …] plans also call for substantial improvements including reducing smog-causing nitrogen oxides 90% below 2010 levels by 2032 in the most polluted areas of the state. State and local agencies continue to develop regulations that support the state's climate and clean air goals.

While these policy goals cannot be achieved by the electric sector alone, the electric …+40 / −12 words · under “Electricity Industry Trends”

[… 56 unchanged words …] sellers of electricity to deliver 100% of retail sales from carbon-free sources by 2045, including interim targets of 90% by 2035 and 95% by 2040. In 2024, Using preliminary estimates based on information available as of February 11, 2026, approximately 46% 61% of SCE's customer deliveries in 2025 came from carbon-free resources. SCE continues to make progress towards meeting its long-term RPS and carbon-free power goals and interim targets. In addition, Edison International [… 46 unchanged words …] more resilient grid to reduce climate- and weather-related vulnerabilities. Since 2018, SCE has been adapting to climate change through system hardening to reduce wildfire risk. SCE continues to make grid hardening investments approved in its SCE's 2025 GRC SCE proposed climate adaptation investments to address wildfire risks. SCE is conducting ongoing analysis for wildfire and physical risks other climate adaptation vulnerabilities that could occur by 2030. will be presented in its 2026 climate adaptation vulnerability assessment.

Edison International believes that California's 2045 goals can be achieved most economically through emissions …+3 / −182 words · under “Electricity Industry Trends”

[… 31 unchanged words …] 90% of medium-duty vehicles, 54% of heavy-duty vehicles, 80% of buses and 95% of buildings. Additionally, reducing emissions to near zero in the electric sector hinges relies on developing clean firm resources to replace natural gas. Clean firm resources, such as next-generation geothermal, small modular nuclear reactors, natural gas with carbon capture and storage, and clean hydrogen, produce constant power through any weather conditions condition or season with little or no greenhouse gas emissions. By 2045, electricity demand is projected to increase by at least 80% as compared to 2022 per Edison International's analysis. In SCE’s service area, the increase in electricity demand is materializing sooner than expected. SCE’s most recent 10-year load growth forecast has increased by 35% compared to its 2022 distribution system plan. The key drivers of this increase are commercial developments, transportation electrification, and new residential housing. California has demonstrated strong long-term support of transportation electrification as shown by the approval of SCE's Charge Ready programs and 2022 legislation banning sales of new gas vehicles by 2035. However, Edison International believes that more state policy support, along with public and private investment, is needed to enable California to reach its 2030 and 2045 GHG reduction targets. Additional policy and regulatory support is also needed to de-risk the development of clean firm resources, adjust planning processes to enable proactive grid build-out, and streamline permitting processes. The current federal administration has declared a national emergency on energy, stressing the need for a reliable, diversified, and affordable supply of energy. The integrity and expansion of energy infrastructure is an immediate and pressing priority.

Edison International's vision is to lead the transformation of the electric power industry and …+15 / −29 words · under “Electricity Industry Trends”

[… 48 unchanged words …] intended to allow it to achieve these objectives safely while controlling costs and customer rates. SCE expects its bundled system average rate will rise at or below a 2.6% compound annual growth rate from 2024 equal to or below inflation through 2028, which is near the projected rate of local inflation. 2030. This projected rate growth incorporates the requested increases in SCE’s 2025 GRC approval and also assumes a full settlement of the cost recovery of costs associated with proceedings for the 2017/2018 Wildfire/Mudslide Events (See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides" for further information). including TKM Settlement). Partially offsetting these increases are historical costs rolling coming out of rates and rising electricity consumption. SCE projects that, even as electricity bills increase over time, total energy costs for the average SCE household will be reduced by approximately 40% by 2045 due to the efficiency adoption of energy-efficient electrified technologies among other drivers.

SCE’s investments in the grid, utility owned storage capacity, and contracts for substantial new …+21 / −36 words · under “Electricity Industry Trends”

[… 33 unchanged words …] and "Business—SCE—Purchased Power and Fuel Supply—CAISO Wholesale Energy Market" for further details. SCE also continues to implement its transportation electrification programs. As of December 31, 2024, 2025, SCE had completed construction at 386 572 sites to support 6,520 9,761 charge ports under its suite of light-duty Charge Ready programs, and 99 132 sites to support the electrification of 2,251 2,859 medium and heavy-duty vehicles through its Charge Ready Transport program. Subject More than 85% of SCE's planned capital investments are in its distribution grid and are essential to regulatory approval, SCE plans to invest approximately $13 billion in infrastructure replacement between 2023 meeting grid reliability, resiliency, and 2028 to ensure the grid is reliable, resilient, and ready for widespread electrification. This represents approximately 30% of the capital plan for that same time period, readiness objectives, as discussed in "—Capital Program."

SCE intends to file an application with the CPUC in the first quarter of …+34 / −94 words · under “Capital Expenditures”

In addition to the amounts presented in the table above, SCE expects to make additional CPUC capital investments, the recovery of which will be subject to future regulatory approval. This includes non-GRC programs including additional spending on an enterprise resource planning ("ERP") software implementation, an advanced metering infrastructure program and other potential investments in the grid supporting restoration, reliability, resilience and readiness. SCE expects the total expenditures of these programs to be at least $3 billion, some of which will be incurred beyond 2028. In the first half of 2025, SCE intends to file an application with the CPUC in the first quarter of 2026 requesting capital expenditures of at least $3 billion to be spent between 2026 through 2033 for approval an advanced metering infrastructure program that supports improved grid management and customer benefits. Approximately half of the ERP implementation and expects to include approximately $1 billion of capital expenditures through 2029. are included in the table above.

Reflected below is SCE's weighted average annual rate base for 2025 – 2030, based …+42 / −17 words · under “Rate Base”

Reflected below is SCE's weighted average annual rate base for 2024 2025 – 2028, encompassing GRC 2030, based on the capital expenditure forecasts discussed above. In addition, the table below does not reflect the SB 254 Excluded Capital Expenditures, as incorporated in which SCE plans to recover through the requests in the 2025 GRC application, approved non-GRC projects or programs, and FERC issuance of securitized bonds. For further information, see "Business—Southern California Wildfires— Recovery of Wildfire-Related Costs—California Wildfire Legislation—Excluded Capital Expenditures."

The Los Angeles County Fire Department is leading the investigation into the origin and …+99 / −26 words · under “Eaton Fire”

[… 21 unchanged words …] assistance of CAL FIRE, and has identified a preliminary area of origin of the fire. SCE has transmission facilities in the preliminary area of origin As part of its investigation, the Los Angeles County Fire Department has requested that SCE preserve in-place its equipment in the preliminary area of origin. and the SED is also conducting an investigation with respect to the Eaton Fire. Edison International and SCE are also aware of an ongoing investigation by the Los Angeles District Attorney's Office of the Eaton Fire for the purpose of determining whether any criminal violations have occurred. SCE could be subject to material fines, penalties, or restitution if it is determined that it failed to comply with applicable laws and regulations. SCE is not aware of any basis for felony liability with regards to the Eaton Fire. Any fines and penalties incurred in connection with the Eaton Fire will not be recoverable from insurance, from the Wildfire Fund, or through electric rates.

SCE’s internal review into the facts and circumstances of the Eaton Fire is complex …+91 / −44 words · under “Eaton Fire”

Multiple lawsuits related to the Eaton Fire have been initiated against SCE and Edison International. SCE’s ongoing internal review into the facts and circumstances of the Eaton Fire is complex and will require significant time. ongoing. SCE's review includes ongoing inspections of its facilities and records and of third-party information including analysis and testing. While SCE has not conclusively determined that its equipment caused the ignition of concerning images and videos the Eaton Fire, a viable explanation is that suggest a possible link to SCE's de-energized idle SCE transmission facilities facility in the preliminary area of origin As was associated with the ignition of February 27, 2025, based on the information fire and SCE is not aware of evidence pointing to another possible source of ignition. Absent additional evidence, SCE believes that it has reviewed, SCE has not determined whether is likely that its equipment was could have been associated with the ignition of the Eaton Fire and is pursuing settlement of claims through its Wildfire Recovery Compensation Program, a program designed to enable eligible individuals and businesses impacted by the Eaton Fire to seek expedited resolution of their claims.

SCE will file an application with the CPUC for review of its costs and …+29 / −49 words · under “Eaton Fire”

A utility that has received reimbursement of eligible claims from the Wildfire Insurance Fund would SCE will file an application with the CPUC for review of its costs and expenses related to the Eaton Fire after it has resolved all or, if authorized by the CPUC, substantially all third-party damage claims related to a wildfire, the fire, or upon earlier request of the fund administrator. A utility that Because SCE held a valid safety certification at the time of the relevant wildfire, like SCE did at the time of the Eaton Fire, SCE will be presumed to have acted prudently unless a party in the proceeding creates "serious doubt" as to the reasonableness of the utility's its conduct, in which case the utility SCE will have the burden of dispelling that doubt and proving its conduct was prudent. The prudency standard does not necessitate perfect conduct and AB 1054 California Wildfire Legislation requires that the CPUC find that a utility is prudent allow recovery if it determines that the utility's SCE's conduct related to the relevant ignition of the Eaton Fire was consistent with actions of a reasonable utility. SCE believes that the CPUC's determination regarding the reasonableness of a utility's its ignition-related conduct should be based on an evaluation of the reasonableness of the utility’s its overall policies, systems, and practices. The CPUC has not applied the AB 1054 California Wildfire Legislation prudency framework to a wildfire cost-recovery proceeding.

SCE believes that it is a reasonable operator of its electric system. Based on …+1 / −44 words · under “Eaton Fire”

SCE believes that it is a reasonable operator of its electric system. Neither SCE nor any fire agency has determined the cause of the Eaton Fire, including whether SCE’s transmission equipment was associated with its ignition. If it is determined that SCE’s transmission equipment was associated with the ignition of the Eaton Fire, Based on the information it has reviewed, as of February 27, 2025, SCE believes that it would will be able to make a good faith showing that its conduct with respect to its transmission facilities in the preliminary area of origin was consistent with the actions of a reasonable utility.

The CPUC will determine the prudency of SCE's ignition-related conduct in a formal proceeding. …+39 / −105 words · under “Eaton Fire”

The CPUC will determine the prudency of a utility’s SCE's ignition-related conduct in a formal proceeding. If the CPUC finds that a utility’s SCE's conduct related to the ignition of the Eaton Fire was not prudent, it may nevertheless allow cost recovery in full or in part taking into account factors both within and beyond the utility's SCE's control that may have exacerbated the costs, and expenses, including, for example, winds, humidity, temperature, emergency response, evacuation timing and winds. A utility that availability of firefighting resources. Because SCE held a safety certification at the time of the ignition, it will be required to reimburse the fund Initial Account only for amounts disallowed by the CPUC up to the AB 1054 applicable Liability Cap in the year that the disallowance occurs, of approximately $4.3 billion, unless the fund administrator finds that the utility's SCE's actions or inactions relative to the ignition of the Eaton Fire constitute conscious or willful disregard of the rights and safety of others, in which case the utility SCE will be required to reimburse the fund Initial Account for all withdrawn amounts withdrawn. that the AB 1054 Liability Cap is a cap on the aggregate requirement to reimburse the Wildfire Insurance Fund over a trailing three calendar year period and is equal to 20% of the equity portion of the utility's transmission and distribution rate base, excluding general plant and intangibles, in the year of the applicable prudency determination. Utilities will be able to seek recovery of prudently incurred uninsured wildfire costs not covered by the Wildfire Insurance Fund, assessed under the prudency standard clarified under AB 1054, through electric rates. CPUC disallowed.

In January 2025, the CPUC approved the TKM Settlement Agreement under which SCE is …+23 / −83 words · under “Approval of CPUC-Jurisdictional Rate Recovery in 2025”

In August 2023, SCE filed an application to seek CPUC-jurisdictional rate recovery of prudently incurred losses related to the Thomas Fire, the Koenigstein Fire and the Montecito Mudslides. SCE also sought recovery of approximately $65 million in restoration costs in the proceeding. In January 2025, the CPUC approved the TKM Settlement Agreement and closed the proceeding. Parties to the proceeding may file an application for rehearing through March 10, 2025. under the TKM Settlement Agreement, which SCE is authorized to recover 60%, or approximately $1.6 billion, of approximately $2.7 billion of losses, consisting of approximately $1.3 billion of uninsured claims paid [… 46 unchanged words …] other than for $125 million of uninsured claims and related financing costs which SCE waived its right to seek recovery of under the SED Agreement. In August 2025, the CPUC authorized SCE will record a regulatory asset for recoveries permitted under to finance these amounts through the TKM Settlement Agreement issuance of securitized bonds and, in December 2025, SCE issued securitized bonds in the first quarter amount of 2025 and will request approval from the CPUC $1.6 billion to finance the amounts cost recoveries authorized under the TKM Settlement Agreement. through the issuance of securitized bonds.

Under the TKM Settlement Agreement, SCE is also authorized to recover approximately $55 million …+8 / −185 words · under “Approval of CPUC-Jurisdictional Rate Recovery in 2025”

Under the TKM Settlement Agreement, SCE is also authorized to recover approximately $55 million of approximately $65 million in restoration costs incurred. Further, SCE will use shareholder funds to offset $50 million of wildfire mitigation expenses recorded in memorandum accounts between 2024 and 2028. as required under the TKM Settlement Agreement, SCE is allowed to permanently exclude from SCE's CPUC regulatory capital structure any after-tax charges to equity associated with the costs disallowed or funded by shareholders recorded $50 million of shareholder-funded wildfire mitigation expenses in the TKM Settlement Agreement and the debt issued to finance those costs (For further details about SCE's CPUC authorized capital structure, see "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies—SCE Dividends"). In October 2024, SCE filed an application to seek CPUC-jurisdictional rate recovery of $5.4 billion of prudently incurred losses related to the Woolsey Fire, consisting of approximately $4.4 billion of uninsured claims paid as of August 31, 2024, and $1.0 billion of associated costs, composed of legal and financing costs incurred as of August 31, 2024, and estimated ongoing financing costs. SCE is also seeking recovery of approximately $84 million in restoration costs in the proceeding. SCE will not record a regulatory asset for recoveries related to the Woolsey Fire in connection with the approval of the TKM Settlement Agreement. SCE will continue to evaluate the facts and circumstances of the Woolsey Fire cost recovery proceeding in determining if and when a regulatory asset may be recorded. 2025.

7 more paragraphs were rewritten here (+36 / −122 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Results of Operations

9 added · 14 removed · 13 rewritten

Added in the 10-K for fiscal 2025

Under “Impact of 2025 GRC”

The 2025 GRC final decision was approved by the CPUC in September 2025, and determines the amount of revenue that SCE is authorized to collect from customers to recover anticipated costs, including return on rate base. The final decision approved an authorized revenue requirement of $9.7 billion in 2025, an increase of $880 million over the adjusted 2024 authorized revenue requirement (see table below for more details).

The table below sets out the authorized revenue and costs of service for the 2024 authorized revenue requirement and the 2025 GRC final decision:

1Adjustments to the 2024 authorized revenue requirement primarily related to the Customer Service Re-Platform project, which was recovered through a CPUC non-GRC recovery mechanism and approved to be included in the GRC-authorized revenue in the 2025 GRC.

2Reflects SCE's GRC authorized revenue as filed in SCE's September 2025 GRC implementation advice letter.

3Authorized revenue for operation and maintenance expenses increased primarily due to higher authorized wildfire expenditures.

4Authorized revenue for depreciation increased primarily due to higher plant balances.

5Authorized revenue for return increased primarily due to authorized rate base growth.

SCE recorded net charges of $76 million ($39 million after-tax), primarily due to an $88 million impairment of utility property, plant and equipment associated with historical capital expenditures disallowed in the final decision, mainly related to the rooftop solar photovoltaic program. This was partially offset by the recognition of a $12 million clean energy subsidy previously received for this program.

Added in the 10-K for fiscal 2025

Under “Operating Revenue”

• An increase in revenue of $880 million resulting from implementing the 2025 GRC final decision, as discussed in "—Impact of 2025 GRC."

Added in the 10-K for fiscal 2025

Under “Operating Revenue”

• Other income of $4 million;

Added in the 10-K for fiscal 2025

Under “Operation and Maintenance”

• $98 million higher FERC-jurisdictional costs primarily due to increased transmission allocation;

Added in the 10-K for fiscal 2025

Under “Operation and Maintenance”

• A decrease of $53 million related to severance costs recorded in 2024 due to workforce reductions.

Added in the 10-K for fiscal 2025

Under “Wildfire-related Claims, Net of Recoveries”

• A recovery of $1,603 million in claim costs was recorded in 2025 as authorized under the Woolsey Settlement Agreement.

Added in the 10-K for fiscal 2025

Under “Wildfire-related Claims, Net of Recoveries”

• A decrease of $14 million due to insurance reimbursements recorded in 2025 for costs incurred in previous years related to Other Wildfire Events.

• An increase of $949 million related to wildfire claim costs recorded in 2025 related to the Eaton Fire. These costs include $917 million covered by customer-funded self-insurance and $19 million expected FERC recovery (offset in "Operating Revenue" above) and $12.5 million from the shareholder contribution related to SCE's customer-funded self-insurance coverage.

Added in the 10-K for fiscal 2025

Under “Asset Impairment”

• $88 million impairment of utility property, plant and equipment associated with historical capital expenditures disallowed in SCE's 2025 GRC final decision.

• $18 million impairment of utility property, plant and equipment associated with historical capital expenditures disallowed in the TKM and Woolsey Settlement Agreements.

Added in the 10-K for fiscal 2025

Under “Interest Expense”

• $171 million benefit related to cost recoveries authorized under the TKM Settlement Agreement;

• $243 million benefit related to cost recoveries under the Woolsey Settlement Agreement;

• $38 million pass-through expense mainly associated with wildfire mitigation efforts and utility owned energy storage projects (offset in "Operating Revenue" above);

• $8 million higher interest expense from higher borrowings.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Operating Revenue”

• An increase in CPUC-related revenues of $617 million primarily due to higher revenue authorized in Track 4 and an increase in the authorized rate of return resulting from the cost of capital adjustment mechanism. See "Management Overview—Cost of Capital" for more information.

• An increase in operating revenues of $51 million primarily due to recognition of previously unrecognized return on rate base related to emergency restoration related capital expenditures.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Operating Revenue”

These pass-through increases were offset by the decreases in the following:

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Operation and Maintenance”

• A net increase in expense of $809 million related to operating expenses that are passed through to customers and offset in "Operating Revenue" above. The increase is mainly driven by:

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Operation and Maintenance”

◦$301 million higher vegetation management expenses

◦$196 million higher public purpose program expenses

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Operation and Maintenance”

◦$116 million higher transmission access charges

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Operation and Maintenance”

◦$209 million previously deferred wildfire insurance premium authorized for recovery in 2023

◦$195 million lower insurance costs due to SCE's expanded use of customer-funded self-insurance since July 2023

• $90 million higher expenses primarily related to plant maintenance

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Operation and Maintenance”

• $25 million higher expenses related to IT software maintenance and capital-related expense

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Operation and Maintenance”

• The 2023 recognition of $17 million related to customer cancellations of certain ECS data services

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Interest Expense”

An increase in interest expense of $219 million due to an increase of $153 million primarily related to higher interest rates on long-term debt and balancing account overcollections, and additional long-term borrowings, and $66 million of pass-through costs mainly related to emergency restoration activities and AB 1054 Excluded Capital Expenditures financed through securitization (offset in "Operating Revenue" above).

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Operating Revenue”

These pass-through decreases are partially offset by increases in the following:

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Operating Revenue”

• An increase in CPUC-related revenues of $320 million primarily due to the escalation mechanism set forth in the 2021 GRC decision.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Operation and Maintenance”

◦$218 million lower insurance costs due to SCE's expanded use of customer-funded self-insurance since July 2023

◦$79 million lower uncollectible accounts expense primarily due to the recognition of $109 million previously deferred uncollectible accounts expense in 2022

◦$56 million lower transmission access charges

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Operation and Maintenance”

◦$209 million previously deferred wildfire insurance premium authorized for recovery in 2023

◦$125 million higher public purpose program expenses

• The 2022 charges of $95 million related to the CPUC's decision on SCE's Upstream Lighting Program, consisting of $76 million in disallowed costs and $19 million in fines

• $40 million lower uncollectible accounts expense due to expense recognized in 2022 not subject to cost recovery

• The 2023 recognition of a $30 million probable disallowance related to the 2021 NDCTP

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Impairment, net of other operating income”

Impairments were recorded in 2022, of which $17 million related to disallowed capital expenditure and $47 million related to a settlement agreement between SCE and TURN in the CSRP proceeding.

An increase in interest expense of $351 million due to an increase of $312 million primarily related to higher interest rates on long-term debt and balancing account overcollections and additional long-term borrowings, and $39 million of pass-through costs primarily related to AB 1054 Excluded Capital Expenditures financed through securitization (offset in "Operating Revenue" above).

An increase in other income, net of $160 million primarily due to higher interest rates applied to balancing account undercollections and increased equity allowance for funds used during construction, partially offset by lower net periodic benefit income related to the non-service cost components for SCE's pension and PBOP.

An increase in preference stock dividend requirements of $16 million primarily due to dividends paid on Series E preference stock at a higher rate.

An increase in tax expense of $293 million in 2023 compared to a tax benefit recorded in 2022, primarily due to higher taxable income and $42 million lower flow-through tax benefits that are passed through to customers.

An increase in depreciation and amortization expense of $368 million was primarily due to …+32 / −0 words · under “Depreciation and Amortization”

An increase in depreciation and amortization expense of $17 $368 million was primarily due to higher plant balances, $108 million of which were pass-through costs mainly associated with wildfire mitigation costs and utility owned energy storage projects (offset in "Operating Revenue" above).

The net loss available to common shareholders from operations of Edison International Parent and …+28 / −4 words · under “Loss from Operations”

The net loss attributable available to common shareholders from operations of Edison International Parent and Other increased $58 $95 million in 2024 2025 compared to 2023 2024 primarily due to lack of earnings expenses from wildfire claims insured by an EIS insurance contract (see "Notes to Consolidated Financial Statements— Note 12. Commitments and Contingencies and Note 17. Related-Party Transactions" for further information), higher interest expense, and preferred stock redemption loss in 2025.

11 more paragraphs were rewritten here (+88 / −147 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Liquidity and Capital Resources

9 added · 12 removed · 22 rewritten

Added in the 10-K for fiscal 2025

In December 2025, SCE issued securitized bonds in the amount of $1.6 billion to finance cost recoveries authorized under the TKM Settlement Agreement. In addition, SCE expects to finance approximately $2.0 billion of cost recoveries authorized under the Woolsey Settlement Agreement by issuing securitized bonds, subject to the approval of a securitization financing application filed in January 2026. For further details on the settlements, see "Management Overview—Southern California Wildfires and Mudslides."

Added in the 10-K for fiscal 2025

In December 2025, SCE repurchased 7,250,967 shares of 5.45% Fixed-to-Floating Rate Trust Preference Securities (the "Series K Trust Securities") issued by SCE Trust V through a tender offer for an aggregate amount paid of $181 million, which includes accrued and unpaid dividends. SCE subsequently exchanged substantially all of these Series K Trust Securities for 72,509 shares of SCE's Series K preference stock, which it retired. SCE paid the consideration and the fees and expenses incurred with cash on hand. In addition, in December 2025, SCE fully redeemed 5.375% Fixed-to-Floating Rate Trust Preference Securities (the "Series J Trust Securities") issued by SCE Trust IV for an aggregate amount paid of $325 million. SCE subsequently exchanged all of these Series J Trust Securities for SCE's Series J preference stock, which it retired. In February 2026, SCE announced that it will redeem all the outstanding shares of its Series K preference stock which will cause SCE Trust V to redeem all of its outstanding 5.45% Series K Trust Securities. The redemption date will be March 15, 2026 at the redemption price of $25 per Series K Trust Security. For further details, see "Notes to Consolidated Financial Statements—Note 14. Equity."

Added in the 10-K for fiscal 2025

Under “Wildfire Related Regulatory Proceedings”

2024 Multi-year Wildfire Mitigation and Catastrophic Events Filing ("2024 WMCE Filing")

Added in the 10-K for fiscal 2025

Under “Wildfire Related Regulatory Proceedings”

2023 Multi-year Wildfire Mitigation and Catastrophic Events Filing ("2023 WMCE Filing")

In June 2025, the CPUC approved a settlement agreement among SCE, Cal Advocates, and Small Business Utility Advocates in the WMCE proceeding under which SCE is authorized to recover $702 million in capital expenditures and $308 million in operation and maintenance expenses. This resulted in an initial revenue requirement of $314 million, which has been implemented into customer rates over a 12-month period starting October 1, 2025, along with ongoing capital revenue requirement and interest.

2021 GRC Wildfire Mitigation Memorandum Account Balances

In June 2025, the CPUC issued a final decision that authorized recovery of $291 million in operations and maintenance expenses and $99 million in capital expenditures. The portion of the initial revenue requirement above the interim rate recovery levels has been implemented in customer rates over a 12-month period starting October 1, 2025, along with ongoing capital revenue requirement and interest. Additionally, the final decision disallowed recovery of $65 million in operations and maintenance expenses, and determined that $36 million of requested capital expenditures were not eligible for recovery as part of this proceeding. SCE has filed an application for rehearing with the CPUC regarding the disallowances in this decision.

In March 2025, SCE filed an application with the CPUC seeking funding for the replacement of its core ERP system that has been in service for over 15 years and will soon reach the end of its service life. SCE requested funding through a balancing account of recorded and forecast capital expenditures of approximately $1.1 billion and operations and maintenance expenditures of $239 million. SCE anticipates a proposed decision will be issued by the CPUC in 2026.

Added in the 10-K for fiscal 2025

Under “Margin and Collateral Deposits”

Furthermore, SCE may be required to post collateral for workers' compensation in excess of standard formula amounts, currently up to $115 million, in the event of volatile credit rating conditions, during which the Office of Self-Insurance Plans, which oversees workers' compensation self-insurance within California, may exercise discretion to impose higher collateral requirements. SCE posted $12 million under such discretionary authority in the second quarter of 2025. SCE may also be required to post up to $50 million in collateral in connection with its environmental remediation obligations, within 120 days of the end of the fiscal year in which a downgrade below investment grade occurs.

Added in the 10-K for fiscal 2025

Under “Edison International Parent and Other”

In December 2025, Edison International repurchased 744,975 shares of its Series A Preferred Stock and 415,517 shares of its Series B Preferred Stock through a tender offer for an aggregate amount paid of $1.2 billion, which includes accrued and unpaid dividends. Edison International paid the consideration and the fees and expenses incurred with cash on hand and proceeds of debt issuances. In February 2026, Edison International announced that it will redeem all outstanding shares of its Series A Preferred Stock. The redemption date will be March 9, 2026 at the redemption price of $1,000 per share of Series A Preferred Stock. For further information, see "Notes to Consolidated Financial Statements—Note 14. Equity."

Added in the 10-K for fiscal 2025

Under “Credit Ratings”

Following the passage of SB 254 in September 2025, Moody's reaffirmed SCE's long-term issuer credit rating and outlook, and Fitch also reaffirmed SCE's credit rating and revised its outlook from ratings watch negative to stable. However, S&P downgraded SCE's long-term issuer credit rating. For further details on SB 254, see "Business—Southern California Wildfires—Recovery of Wildfire-Related Costs—California Wildfire Legislation." The following table summarizes Edison International Parent's current long-term issuer credit ratings and outlook from the major credit rating agencies, and Edison

Added in the 10-K for fiscal 2025

Under “Inflation Reduction Act of 2022”

Under the IRA, SCE generated investment tax credits of approximately $231 million in 2024 related to utility owned storage projects and $29 million in nuclear production tax credits. In 2025, SCE monetized the majority of these credits for $236 million. SCE expects to pass the proceeds, net of transaction fees, back to customers.

On July 4, 2025, the One Big Beautiful Bill Act of 2025 ("OBBBA") was enacted into law. The OBBBA, among other things, phases out various clean energy credits enacted as part of the IRA. These phase-outs, however, are not expected to impact the investment tax credits related to SCE's utility owned storage projects discussed above under "—Inflation Reduction Act of 2022."

Edison International and SCE expect most of the impacts resulting from the implementation of the OBBBA will be passed through to customers.

Added in the 10-K for fiscal 2025

Under “Net Cash Provided by Operating Activities”

Net cash (used in)/provided by regulatory assets and liabilities, including changes in net over or undercollections recorded in balancing accounts, was $(3,445) million and $1,219 million in 2025 and 2024, respectively. Net decrease in regulatory assets and liabilities of $4.7 billion is primarily due to cost recoveries authorized under the TKM and Woolsey Settlement Agreements, as well as higher revenue from the 2025 GRC final decision, which is mostly offset with the increase in net income after adjustment for non-cash items. In addition, the remaining change in regulatory assets and liabilities is mainly due to a decrease in the recovery of prior year undercollections in 2025 compared to 2024. This decrease is driven by undercollections caused by higher gas prices in 2023, which were collected in 2024.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “2021 GRC Wildfire Mitigation Memorandum Account Balances”

In June 2022, SCE filed an application with the CPUC requesting reasonableness review of the incremental costs incurred in 2021 related to non-WCCP wildfire mitigation and vegetation management activities, requesting a total revenue requirement of approximately $327 million plus an ongoing capital-related revenue requirement. In March 2024, the CPUC issued a decision fully authorizing SCE's requested revenue requirement. The revenue requirement is being recovered in rates over 12 months starting June 1, 2024.

In October 2023, SCE requested authority to recover a revenue requirement of $384 million, including interest associated with 2022 operations and maintenance and capital expenditures above levels authorized in wildfire mitigation accounts and the vegetation management balancing account. In July 2024, the CPUC approved SCE's request for interim rate recovery of $210 million of this revenue requirement, subject to refund. The revenue requirement for interim rate recovery is being recovered in rates over 17 months starting October 1, 2024. A final decision for the total authorized revenue requirement is expected in the second quarter of 2025 according to the CPUC adopted schedule.

SCE filed a catastrophic event memorandum account application in 2022, primarily related to restoration efforts related to multiple 2020 wildfires. In May 2024, the CPUC issued a decision approving the recovery of SCE's capital request of $312 million and operation and maintenance expenses of $200 million, resulting in a revenue requirement of $191 million plus its ongoing capital-related revenue requirement. The revenue requirement is being recovered in rates over a 12-month period starting October 1, 2024.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “ERRA Trigger Application”

SCE recovers its fuel and purchased power-related costs through various balancing accounts, primarily the ERRA and the PABA. SCE sets rates based on an annual forecast of the costs that it expects to incur during the subsequent year. The aggregate overcollection in the ERRA and the eligible portion of the PABA at April 30, 2024 resulted in SCE triggering an established mechanism, which required SCE to file an expedited application for the CPUC's approval to reduce bundled service generation rates (see "Business—SCE—Overview of Ratemaking Process" for further information about the trigger mechanism). The CPUC approved this application in August 2024, resulting in a $742 million reduction in the revenue requirement, returned through rates over a 12-month period starting October 1, 2024.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Major Transmission Projects”

3In June 2023, SCE filed an amended application for a certificate of public convenience and necessity ("CPCN") with technical design modifications and engineering refinements to the proposed project that decreases project costs and reduces GHG emissions. Accordingly, the direct expenditures of the project are estimated to be reduced from $486 million to $472 million. SCE is unable to predict the final project costs for the Alberhill System Project.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Alberhill System Project”

The Alberhill System Project consists of constructing a new 500 kV substation, two 500 kV transmission lines to connect the proposed substation to the existing Serrano-Valley 500 kV transmission line, telecommunication equipment, and subtransmission lines in western Riverside County. The project was designed to meet long-term forecasted electrical demand in the proposed Alberhill System Project area and to increase electrical system reliability and resiliency. In April 2018 and July 2018, the CPUC issued a proposed decision and an alternate proposed decision, both denying SCE's ability to construct the Alberhill System Project based on a perceived lack of need. SCE filed comments on both proposed decisions requesting that the CPUC grant the CPCN for the Alberhill System Project. In August 2018, the CPUC issued a decision that did not deny or approve the Alberhill System Project but directed SCE to submit supplemental information on the Alberhill System Project, including, but not limited to, a load forecast and cost benefit analysis of several alternatives to the proposed project. In January 2020, SCE submitted a supplemental analysis to the CPUC for the Alberhill System Project including several alternatives to the proposed project as well as an update to the original project cost. In June 2023, SCE filed an amended CPCN with technical design modifications and engineering refinements to the proposed project that decrease project costs and reduce GHG emissions. In June 2024, the CPUC issued an addendum to its 2017 Final

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Alberhill System Project”

Approximately 48% of the Alberhill System Project costs spent to date would be subject to recovery through CPUC revenue and 52% through FERC revenue. In October 2017, SCE obtained approval from the FERC for abandoned plant treatment for the Alberhill System Project, which allows SCE to seek recovery of 100% of all prudently incurred costs after the approval date and 50% of prudently incurred costs prior to the approval date. As of December 31, 2024, SCE had incurred approximately $69 million of capital expenditures, which excludes land costs that may be recovered through sale to a third party and includes overhead costs, of which approximately $48 million may not be recoverable if the project is cancelled.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Utility Owned Storage Projects”

In October 2021, SCE contracted with Ameresco, Inc. ("Ameresco") for the construction of utility owned energy storage projects at three sites in SCE's service area with an aggregate capacity of 537.5 MW, consisting of a 225 MW project, a 200 MW project, and a 112.5 MW project, and an in-service date of August 1, 2022. The 200 MW and 112.5 MW projects went in-service during the third quarter of 2024, and Ameresco has advised SCE that it currently expects the 225 MW project to be in-service by the first quarter of 2025. SCE believes that there is risk of delay beyond Ameresco's projected in-service date.

In April 2022, SCE received a force majeure event notice from Ameresco in which Ameresco asserted that both manufacturing delays related to COVID-19 shut-downs in China and new shipping restrictions imposed by Chinese governmental authorities were then impacting the supply of batteries from China necessary for timely completion of the projects. Ameresco subsequently supplemented its force majeure notice noting additional supply chain issues related to COVID-19. Permitting delays and engineering issues and certain changes requested by SCE also impacted the projects in 2022. In January 2023, SCE received a force majeure event notice from Ameresco in which Ameresco asserted that severe winter storms in Southern California had impacted the timely completion of the projects.

Show the rest (447 words)

In April 2023, Ameresco discovered damage to some of the equipment at the 225 MW project. Ameresco has sent SCE a notice of potential force majeure event and has concluded that the damage was caused by soil heave and that the soil heave was caused by extreme rainstorms at the project site in the winter of 2022 – 2023. Ameresco is performing corrective action in response to the damage discovered in 2023.

SCE is continuing to evaluate the force majeure event notices and is awaiting additional information from Ameresco on the underlying events. If there is a valid force majeure event under the contracts with Ameresco, subject to certain conditions, the project schedules and any related triggers of liquidated damages may be extended, and the contract prices may be increased to account for the impact of the force majeure event.

SCE currently expects these storage projects to result in $1.0 billion of capital expenditures of which approximately $800 million has been incurred, as of December 31, 2024. SCE also expects to receive in aggregate approximately $380 million of tax credits available under the IRA for all three projects, which will accrue to the benefit of its customers (see "Notes to Consolidated Financial Statements—Note 8. Income Taxes" for further information). Because Ameresco did not achieve an in-service date of August 1, 2022, SCE is entitled to liquidated damages under the terms of the contracts subject to any relief Ameresco may be entitled to under the contracts, including any relief for any valid force majeure events. Once triggered, delay-related liquidated damages accrue daily for up to 60 days up to a maximum of $89 million in aggregate for all three projects.

Ameresco has obtained surety bonds to secure its obligations to complete the construction of the projects, and is also required to obtain surety bonds or letters of credit after completion of the projects to secure its performance obligations, including its warranty obligations. If Ameresco is unable to fulfill its obligations and the amounts available under any surety bonds or letters of credit are insufficient or the issuer of any such surety bonds or letters of credit disputes coverage or otherwise does not perform or pay for the performance of Ameresco’s obligations, SCE will incur additional costs beyond its contractual obligations.

In December 2021, the CPUC approved recovery of the capital expenditures and establishment of a balancing account for the associated revenue requirement, which have been reflected in rates beginning in the first quarter of 2022. Authorized revenue requirements have been and will continue to be included in the annual ERRA review proceeding and can only be disallowed upon a finding that SCE failed to prudently administer the contracts.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Decommissioning of San Onofre”

SCE filed the 2021 NDCTP with the CPUC in February 2022 to request reasonableness review of approximately $570 million (SCE share in 2022 dollars) of recorded San Onofre Units 2 and 3 decommissioning costs incurred during the period 2018 to 2020, and subsequently agreed to a $30 million disallowance under a settlement with the relevant intervenors. In the third quarter of 2024, the CPUC approved the 2021 NDCTP, as modified by the settlement agreement, and SCE made a contribution accordingly to the non-qualified nuclear decommissioning trust to effectuate the disallowance.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Edison International Parent and Other”

Edison International Parent has $800 million of debt maturities arising in the next 12 months. Edison International expects to issue debt to refinance these maturities.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Inflation Reduction Act of 2022”

The law also includes significant extensions, expansions, and enhancements of numerous energy-related investment tax credits, as well as creating new credits applicable to electricity production which may apply to SCE's capital expenditures. Under the IRA, as of December 31, 2024, SCE generated investment tax credits of approximately $231 million related to two utility owned storage projects, which will be recognized and returned to customers, as the credits are utilized.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Net Cash Provided by Operating Activities”

1Non-cash items include depreciation and amortization, allowance for equity during construction, impairment and other income, Wildfire Insurance Fund amortization expense, deferred income taxes, and other.

2Changes in working capital items include receivables, accrued unbilled revenue, inventory, amortization of prepaid expenses, accounts payable, tax receivables and payables, derivative assets and liabilities, and other current assets and liabilities.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Net Cash Provided by Operating Activities”

Net income and non-cash items increased in 2024 by $231 million primarily due to higher revenue authorized in Track 4 and an increase in the authorized rate of return resulting from the cost of capital adjustment mechanism, partially offset by higher interest expense.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Net Cash Provided by Operating Activities”

Net cash provided by regulatory assets and liabilities, including changes in net over or undercollections recorded in balancing accounts, was $1,219 million and $576 million in 2024 and 2023, respectively. SCE has a number of balancing and memorandum accounts, which impact cash flows based on differences between timing of collection through rates and incurring expenditures. Cash inflows in 2024 and 2023 were both due to recovery of prior year undercollections. The higher inflow in 2024 compared to 2023 was driven by higher prior year undercollections implemented into rates in 2024, higher sales volume due to hotter weather in 2024, and higher overcollection from funds collected for customer-funded wildfire self-insurance in 2024.

In the next 12 months, SCE expects to fund its cash requirements through operating …+51 / −29 words

In the next 12 months, SCE expects to fund its cash requirements through operating cash flows, and capital market and bank financings, and equity contributions from Edison International Parent, as needed. In addition, SCE expects to fund authorized wildfire-related cost recoveries through securitization financings, and fund costs related to the Eaton Fire through customer-funded self-insurances and reimbursement from the Initial Account. SCE also has availability under its credit facility and agreements with lenders to issue bilateral unsecured standby letters of credit to fund cash requirements. SCE expects to may issue additional debt for general corporate purposes. and to securitize the recovery of 2017/2018 Wildfire/Mudslide Events as permitted by the TKM Settlement Agreement subject to the filing and approval of a securitization financing order.

Following the passage of SB 254 in September 2025, Moody's reaffirmed SCE's long-term issuer …+54 / −5 words · under “Credit Ratings”

Following the passage of SB 254 in September 2025, Moody's reaffirmed SCE's long-term issuer credit rating and outlook, and Fitch also reaffirmed SCE's credit rating and revised its outlook from ratings watch negative to stable. However, S&P downgraded SCE's long-term issuer credit rating. For further details on SB 254, see "Business—Southern California Wildfires—Recovery of Wildfire-Related Costs—California Wildfire Legislation." The following table summarizes SCE's current long-term issuer credit ratings and outlook from the major credit rating agencies and SCE's credit rating outlook as of February 20, 2025: 11, 2026:

SCE's credit ratings may be affected by various factors. These include, but are not …+67 / −17 words · under “Credit Ratings”

SCE's credit ratings may be affected if, among other things, by various factors. These include, but are not limited to, failure by regulators fail to successfully implement AB 1054 the California Wildfire Legislation in a consistent and credit supportive manner, or investigations into wildfire events or associated settlements result in material utility liability exposure, particularly in the absence of broader credit-supportive legislative actions to mitigate SCE's wildfire Insurance Fund is materially depleted, or risk, including those to be recommended under SB 254 in a report due April 1, 2026. Additionally, a persistent increase in the frequency and severity of severe wildfires in California leads may lead the credit rating agencies to reassess SCE's wildfire-related operational risk exposure or believe the Wildfire Insurance Fund is at risk of a material depletion. Credit rating downgrades increase the cost and may impact the availability of short-term and long-term borrowings, including commercial paper, credit facilities, bond financings or other borrowings. In addition, some of SCE's power procurement contracts, and environmental remediation obligations and workers' compensation self-insurance would require SCE to pay related liabilities or post additional collateral if SCE's credit rating were to fall below investment grade. For further details, see "—Margin and Collateral Deposits."

At December 31, 2025, SCE had cash on hand of $98 million and restricted …+32 / −0 words · under “Available Liquidity”

At December 31, 2024, 2025, SCE had cash on hand of $78 $98 million and restricted cash of $522 million collected from customer-funded self-insurance. SCE also has approximately $2.1 $2.3 billion available to borrow on its $3.4 billion revolving credit facility. The credit facility is available for borrowing needs until May 2028. 2029. The aggregate maximum principal amount under the SCE revolving credit facility may be increased up to $4.0 billion, provided that additional lender commitments are obtained. SCE also had standby letters of credit with total capacity of $625 $660 million, and the unused amount was $507 $513 million as of December 31, 2024. 2025. At December 31, 2025, SCE had $1.0 billion outstanding commercial paper, net of discount, at a weighted average interest rate of 4.59% supported by the revolving credit facility. For further details, see "Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements."

In December 2025, SCE filed its 2024 WMCE Filing, seeking to recover incremental operating …+48 / −52 words · under “Wildfire Related Regulatory Proceedings”

In April 2024, December 2025, SCE filed its 2024 WMCE Filing, seeking to recover incremental operating and maintenance expenses of $320 $55 million and incremental capital expenditures of $702 $78 million, primarily associated with 2019 – 2023 WCCP capital expenditures recorded in the wildfire risk mitigation balancing account, 2023 operations and maintenance and capital expenditures as well as incremental to amounts authorized in wildfire mitigation accounts and the vegetation management balancing account, storm-related costs associated with certain 2020 2017 – 2022 2021 events recorded in the catastrophic event memorandum account. and certain The application also seeks recovery of $36 million in wildfire liability insurance premium expenses recorded mitigation related capital expenditures incurred in the wildfire expense memorandum account, which 2022 that were previously denied without prejudice and permitted to be included in base rates as part of the post-test year ratemaking mechanism, see "—2021 GRC Wildfire Mitigation Memorandum Account Balances" for further discussion. SCE proposed a previous procedural schedule with the final decision in July 2024, the CPUC adopted a schedule with a proposed decision expected in the third quarter of 2025. December 2026.

The Riverside Transmission Reliability Project is a joint project between SCE and Riverside Public …+12 / −105 words · under “Major Transmission Projects”

[… 57 unchanged words …] certain interconnection and telecommunication facilities and overhead transmission lines in the cities of Riverside, Jurupa Valley, and Norco and in portions of unincorporated Riverside County. SCE began construction in May 2022, June 2025. The Riverside City Council ("RCC") voted to investigate alternatives to the CPUC approved project. Consequently, SCE suspended all major activities on the project. In January 2023, the RCC voted to establish a working group to pursue funding for additional undergrounding. In October 2023, the City of Norco filed a petition for modification ("PFM") to modify the CPUC decision approving the project and reopen the record to reconsider full undergrounding. In November 2023, SCE filed a response opposing the PFM. In March 2024, the CPUC denied the PFM. In May 2024, the RCC voted to move forward with the original scope current cost estimate of the project is $748 million and SCE restarted its work on the project is expected to be completed in July 2024, SCE initiated construction bid solicitations with awards expected in the first half of 2025. 2029.

The Alberhill System Project consists of constructing a new 500 kV substation, two 500 …+69 / −0 words · under “Major Transmission Projects”

The Alberhill System Project consists of constructing a new 500 kV substation, two 500 kV transmission lines to connect the proposed substation to the existing Serrano-Valley 500 kV transmission line, telecommunication equipment, and subtransmission lines in western Riverside County. The project was designed to meet long-term forecasted electrical demand in the proposed Alberhill System Project area and to increase electrical system reliability and resiliency. In June 2024, the CPUC issued an addendum to its 2017 Final Environmental Impact Report, concluding its California Environmental Quality Act review. The project is now seeking final CPUC approval to begin construction. SCE is expecting the final CPUC decision in the second half first quarter of 2025. 2026.

Construction for the project began in November 2020. The total costs for the Eldorado-Lugo-Mohave …+25 / −60 words · under “Major Transmission Projects”

[… 26 unchanged words …] granted by the CPUC due to delays in regulatory approvals, contractor performance issues, supply chain constraints, COVID-19 impacts, and the availability of CAISO outage windows. In May 2023, SCE filed a SCE's petition for modification ("PFM") of the decision that approved the project to increase the maximum reasonable and prudent cost direct expenditures for the project which increased the direct expenditures from $247 million to $319 million SCE expects was approved by CPUC and the project to be in went into service in 2025. subject to the completion of environmental agency review of the mitigation work. Additional work after the in-service date is required to mitigate the impact of the project on nearby natural gas transmission lines. SCE's current estimate of the additional work is $64 million. In January 2026, SCE anticipates filing filed a second PFM or amending the existing PFM to request an approximately $48 million to address the additional costs of the mitigation work. once The scope and cost of this mitigation work is finalized. expected to be completed in 2026.

In addition to amounts shown in the table, power and fuel contract counterparties may …+0 / −33 words · under “Margin and Collateral Deposits”

[… 22 unchanged words …] transactions to allow SCE to continue trading in power and fuel contracts at the time of a downgrade or upon significant increases in market prices. Furthermore, SCE may also be required to post up to $50 million in collateral in connection with its environmental remediation obligations, within 120 days of the end of the fiscal year in which a downgrade below investment grade occurs.

Edison International Parent's credit ratings may be affected by various factors. These include, but …+66 / −18 words · under “Credit Ratings”

Edison International Parent's credit ratings may be affected if, among other things, by various factors. These include, but are not limited to, failure by regulators fail to successfully implement AB 1054 the California Wildfire Legislation in a consistent and credit supportive credit-supportive manner, or investigations into wildfire events or associated settlements result in material utility liability exposure, particularly in the absence of broader credit-supportive legislative actions to mitigate SCE's wildfire Insurance Fund is materially depleted, or risk, including those to be recommended under SB 254 in a report due April 1, 2026. Additionally, a persistent increase in the frequency and severity of severe wildfires in California leads may lead the credit rating agencies to reassess Edison International Parent's wildfire-related operational risk exposure or believe the Wildfire Insurance Fund is at risk of a material depletion. Credit rating downgrades increase the cost and may impact the availability of short-term and long-term borrowings, including commercial paper, credit facilities, note financings or other borrowings.

1Includes nuclear decommissioning trusts. See "Nuclear Decommissioning Activities" below for further information. The amount …+31 / −15 words · under “Net Cash Provided by Operating Activities”

4Includes 1Includes nuclear decommissioning trusts. See "Nuclear Decommissioning Activities" below for further information. The amount in 2025 includes $236 million in cash proceeds primarily from the monetization of investment tax credits related to utility owned storage projects, which SCE expects to flow through to customers. The amount in 2024 also includes cash received from customers to fund certain construction projects and cash received for a state incentive program to pass on through to customers. The amount in 2023 also includes outflow from the increases in wildfire insurance receivables.

Net cash provided by operating activities increased by $769 million in 2025 compared to …+32 / −3 words · under “Net Cash Provided by Operating Activities”

Net cash provided by operating activities increased by $769 million in 2025 compared to 2024. The increase was impacted by primarily due to $645 million from changes in working capital and the following: investment tax credit proceeds of $236 million mentioned above in the change of other noncurrent assets and liabilities.

The net inflows (outflows) in cash resulting from working capital were $424 million and …+37 / −39 words · under “Net Cash Provided by Operating Activities”

The net inflows (outflows) in cash resulting from working capital were $221 $424 million and $762 $(221) million in 2025 and 2024, and 2023, respectively. Net cash outflows inflows for both 2024 and 2023 2025 were primarily due to cash collected from the sale of renewable energy credits under a CPUC-established program during 2025 and a decrease in accounts receivable primarily resulted from improved collection. The net cash outflow in 2024 was mainly due to increases in unbilled revenue and power procurement related receivables. The higher outflow in 2023 was also due to payments of power purchase contracts that had high gas prices from December 2022, as well as an increase in customer receivables due to various customer protection programs in place.

Net cash used in operating activities decreased by $17 million in 2025 compared to …+39 / −21 words · under “Net Cash Used in Operating Activities”

Net cash used in operating activities increased decreased by $89 $17 million in 2024 2025 compared to 2023, 2024. This is primarily due to cash outflows of $318 $77 million in 2024 intercompany tax settlement from SCE, partially offset by $50 million wildfire-related claims and $280 related legal expenses paid by EIS to SCE (for further information, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides"), and $10 million in 2023 for higher interest and operating costs. Additionally, there was $51 million cash outflow in 2024 related to a California state income tax payment.

8 more paragraphs were rewritten here (+113 / −69 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

Market Risk Exposures

3 rewritten

Edison International's and SCE's primary market risks include fluctuations in interest rates, commodity prices …+2 / −44 words

Edison International's and SCE's primary market risks include fluctuations in interest rates, commodity prices and volumes, investment prices, and counterparty credit. Derivative instruments are used to manage market risks including market risks to SCE's customers. For further discussion of market risk exposures, including commodity price risk, credit risk and interest rate risk, see "Notes to Consolidated Financial Statements—Note 6. Derivative Instruments" and "—Note 4. Fair Value Measurements."

Edison International and SCE are exposed to changes in interest rates primarily as a …+98 / −0 words · under “Interest Rate Risk”

Edison International and SCE are exposed to changes in interest rates primarily as a result of financing, investing and borrowing activities used for liquidity purposes, and to fund business operations and capital investments. The nature and amount of Edison International's and SCE's long-term and short-term debt can be expected to vary as a result of future business requirements, market conditions and other factors. Fluctuations in interest rates can affect earnings and cash flows. Changes in interest rates may impact SCE's authorized rate of return for the period beyond 2026 through a CPUC cost of capital proceeding, see "Business—SCE—Overview of Ratemaking Process" for further discussion. The following table summarizes the increase or decrease to the fair value of long-term debt including the current portion, if the market interest rates were changed while leaving all other assumptions the same:

Credit risk exposure from counterparties for power and gas trading activities is measured as …+19 / −19 words · under “Credit Risk”

[… 127 unchanged words …] exposures related to credit, SCE does not anticipate a material adverse effect on their financial statements as a result of counterparty nonperformance. At December 31, 2024, 2025, SCE's power and gas trading counterparty credit risk exposure was $110 $3 million, 99.8% 31.7% of which was associated with entities to counterparties with an investment grade rating of A or higher SCE assigns and 67.2% was associated with a credit rating to counterparties based on the lowest of CPUC approved electronic broker and exchange platform operating under a counterparty's S&P's, Moody's, and Fitch's rating. rigorous risk management framework.

Critical Accounting Estimates and Policies

3 added · 2 removed · 5 rewritten

Added in the 10-K for fiscal 2025

Under “Application to Wildfires”

Edison International and SCE may be unable to estimate a reasonably possible loss or range of losses that could be incurred in connection with a wildfire, including those where a loss is probable, due to the complexities associated with estimating damages, such as making judgments for which no reasonably substantive basis exists and which require significant speculation about the conduct of litigation counterparties. The large number and varying types of claims, including individual claims, subrogation claims, and claims from public entities, and the interrelationship among these claims, for example, levels of insurance held by claimants, can create additional estimation complexity and uncertainty. Management's ability to develop a reasonable estimate improves as information about the scope of the loss becomes more fully developed, key factual and legal issues are resolved, and as additional information becomes available through settlement and litigation processes.

Added in the 10-K for fiscal 2025

Under “Contributions to the Wildfire Fund”

SCE reassess the period of coverage of the fund at least annually in the first quarter each year and when new or additional information becomes available. As of the date of this filing, after considering the current accrued losses for the Eaton Fire, SCE does not have new or additional information that would enable it to change its prior assessment that the Wildfire Fund would provide coverage for an estimated 20 years from the date SCE committed to participate in the Wildfire Fund. When updating its estimate, SCE includes all its fires for which losses can be reasonably estimated, and relies on publicly disclosed wildfire-related losses related to other participating utilities. As discussed in "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides," while SCE believes that it will incur material losses in connection with the Eaton Fire, it is currently unable to reasonably estimate a range of losses that may be incurred. The Wildfire Fund amortization period will be evaluated and adjusted as new or additional information on contributions and wildfire events, including reasonably estimated losses related to the Eaton Fire, becomes available.

Added in the 10-K for fiscal 2025

Under “Contributions to the Wildfire Fund”

In 2025, management determined that the period of coverage for the Wildfire Fund, based on available historical data from wildfires caused by electrical utility equipment to estimate expected loss, the current accrued losses for the Eaton Fire, as well as based on the fact that it is currently unable to reasonably estimate the range of losses associated with the Eaton Fire, continues to be an estimated 20 years from the date SCE committed to participate in the Wildfire Fund.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Application to pre-AB 1054 fires”

Regulatory recovery of SCE's losses realized in connection with the 2017/2018 Wildfire/Mudslide Events in excess of available insurance is subject to approval by regulators. Under accounting standards for rate-regulated enterprises, SCE defers costs as regulatory assets in the period it concludes that such costs are probable of future recovery in electric rates.

SCE utilizes objectively determinable evidence to form its view on probability of future recovery. The only directly comparable precedent, in which a California investor-owned utility sought recovery for uninsured wildfire claims related costs and the CPUC made a prudency determination, is SDG&E's requests for cost recovery related to 2007 wildfire activity. The FERC allowed recovery of all FERC-jurisdictional wildfire claims related costs, while the CPUC rejected recovery of all CPUC-jurisdictional wildfire claims related costs based on a determination that SDG&E did not meet the CPUC's prudency standard.

In January 2025, the CPUC approved the TKM Settlement Agreement and closed the proceeding. However, the CPUC did not make a determination regarding SCE's prudency when it approved the TKM Settlement Agreement. Therefore, notwithstanding CPUC approval of the TKM Settlement Agreement, SCE believes that the CPUC's interpretation and application of the prudency standard to SDG&E continues to create substantial uncertainty regarding how that standard will be applied to an investor-owned utility in wildfire cost-recovery proceedings for fires ignited prior to July 12, 2019. Consequently, SCE is unable to estimate the uninsured CPUC-jurisdictional claims related costs related to the Woolsey Fire or Creek Fire, both pre-AB 1054 events, that are probable of future recovery, and will not record a regulatory asset for recoveries related to the Woolsey Fire or Creek Fire in connection with the approval of the TKM Settlement Agreement. SCE will continue to evaluate the facts and circumstances of the pre-AB 1054 cost recovery proceeding to determine if and when a regulatory asset for pre-AB 1054 events may be recorded.

Through the operation of its FERC Formula Rate, and based upon the precedent established in SDG&E's recovery of FERC-jurisdictional wildfire-related costs, SCE believes it is probable it will recover its FERC-jurisdictional wildfire and mudslide related costs and has recorded total expected recoveries within the FERC balancing account.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Contributions to the Wildfire Insurance Fund”

In January 2024, Edison International and SCE used Monte Carlo simulations for the annual assessment to estimate the period of coverage of the fund. This assessment was based on ten years (2014 – 2023) of historical data from wildfires caused by electrical utility equipment to estimate expected loss, resulting in an estimated fund life of 20 years from the date SCE committed to participate in the Wildfire Insurance Fund. The details of the operation of the Wildfire Insurance Fund and estimates related to claims by SCE, PG&E, and SDG&E against the fund have been applied to the expected loss simulations to estimate the period of coverage of the fund. The most sensitive inputs to the estimated period of coverage are the expected frequency of wildfire events caused by investor-owned utility electrical equipment and the estimated costs associated with those forecasted events. These inputs are most affected by the historical data used in estimating expected losses. Using a 17-year period (2007 – 2023) of historical data would further increase the period of coverage. There were fires in the service area of SCE, PG&E and SDG&E since the inception of the Wildfire Insurance Fund, including fires for which the cause is unknown, which may in the future be determined to be covered by the Wildfire Insurance Fund and have not been reflected or estimated at this time. As of the date of this filing, SCE is continuing to perform its annual assessment for 2025 to reassess its estimate of the life of the Wildfire Insurance Fund.

Key Assumptions and Approach Used. The determination of an accrual for a loss contingency …+37 / −11 words · under “Accounting for Contingencies”

Key Assumptions and Approach Used. The determination of an accrual for a loss contingency is based on management judgment and estimates with respect to the likely outcome of the matter, including the analysis of different scenarios. Recorded liabilities are recorded or adjusted when events or circumstances cause these judgments or estimates to change. In assessing whether a loss is a reasonable possibility, probable, reasonably possible, or remote, Edison International and SCE may consider the following factors, among others: the nature of the litigation, claim or assessment, opinions or views of legal counsel and other advisors, and the experience gained from similar cases. Edison International and SCE provide disclosures For material contingencies when there is a reasonable possibility that a loss or an additional loss may be incurred, Edison International and SCE disclose the nature of the contingency and an estimate of the possible loss or range of loss or a statement that such an estimate cannot be made.

Estimated losses for wildfire events are based on a number of assumptions and are …+59 / −14 words · under “Application to Wildfires”

Edison International and SCE have incurred material losses in connection with several wildfires. Estimated losses for wildfire litigation events are based on a number of assumptions and are subject to change as additional information becomes available. Those assumptions include volume of claims, damages asserted and associated loss, opinions of counsel regarding litigation risk, the status of and developments in the course of litigation, prior experience litigating and settling wildfire litigation claims, the amount of insurance that may offset losses, and estimating contributory liabilities from third parties who may be responsible for portions of loss. Actual losses incurred may be higher or lower than estimated based on several factors, including the uncertainty in estimating damages that have been or may [… 42 unchanged words …] settlements and the outcomes of settlements reached through the ongoing claims mediation and trial processes, uncertainties related to the sufficiency of insurance held by plaintiffs and potential plaintiffs, uncertainties related to the litigation processes, including whether plaintiffs will ultimately pursue claims, uncertainty as to the legal and factual determinations to be made during [… 22 unchanged words …]

Key Assumptions and Approach Used. The Wildfire Fund does not have a defined life …+29 / −135 words · under “Contributions to the Wildfire Fund”

Key Assumptions and Approach Used. The Wildfire Insurance Fund does not have a defined life and instead, the Wildfire Insurance Fund will terminate when the fund administrator determines that the fund has been exhausted. Management reassesses Estimating the period of coverage of the fund at least annually in requires significant judgment. Frequency of wildfire events and estimated costs associated with wildfire events caused by participating utilities are among the first quarter each year and adjustments are applied on a prospective basis. significant factors used to estimate the determination of the correct period in which to record an expense in relation to contributions to the Wildfire Insurance Fund depends, among other factors, on management's assessment of: the future occurrence and magnitude of wildfires; the involvement of SCE, or other electrical corporations which could access the Wildfire Insurance Fund, in the ignition of those fires; the probable future outcomes of CPUC cost recovery proceedings for wildfire claims, which may require reimbursement of the fund by electrical corporations; and the use of the contributions by the administrator of the Wildfire Insurance Fund. Further information regarding these factors may become available due to the actions of the fund administrator, or other entities, which could require management to reassess the fund's period of coverage.

Edison International and SCE adjust the period of coverage on a prospective basis and …+26 / −12 words · under “Contributions to the Wildfire Fund”

Edison International and SCE assess adjust the period of coverage on a prospective basis and amortize the Wildfire Insurance Fund contribution asset for impairment each reporting period. ratably over the remaining estimated life of the fund. An impairment will be recorded to the Wildfire Fund contribution asset, if the Wildfire Insurance Fund contribution asset exceeds SCE's ability to benefit from the remaining coverage provided by the Wildfire Insurance Fund.

1 more paragraph was rewritten here (+24 / −6 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.

52 other paragraphs were edited by fewer than 15 words; 29 changed only figures, dates or period names; 66 are word for word the same; 44 were split, merged or moved, with most of their text in the other filing; their text is in the 10-K for fiscal 2025 and the 10-K for fiscal 2024 linked above.

How this page works

The text is Edison International's own disclosure, quoted as filed in the MD&A of the 10-Q for fiscal Q3 2026 and the 10-Q for fiscal Q3 2025, split at its own subsection headings and matched by fixed rules, without a language model; tables of figures are left out. A new, rewritten or removed passage is not a judgment by Stackyear about Edison International or its shares. How MD&A pages are compared.

To keep this page to a readable length, passages over 800 words show their opening paragraphs, and the rewrites with the fewest words changed are counted without their text. The counts include them all.