Skip to content
Stackyear
Freeport-McMoRan Inc.More widely searched companies

Freeport-McMoRan MD&A: what changed

In Freeport-McMoRan's 10-Q for fiscal Q3 2026, the MD&A added 37 passages, removed 25 and rewrote 108 against the 10-Q for fiscal Q3 2025, the same quarter a year earlier.

Source: Management's discussion and analysis (Item 2) of Freeport-McMoRan Inc.'s 10-Q filed Nov 6, 2026 (accession 0000831259-26-000051, period ended Sep 30, 2026) compared with its 10-Q filed Nov 6, 2025 (accession 0000831259-25-000050, period ended Sep 30, 2025), on SEC EDGAR

Added
37
Passages new in the 10-Q for fiscal Q3 2026
10-Q · Nov 6, 2026
Removed
25
In the 10-Q for fiscal Q3 2025 only
10-Q · Nov 6, 2025
Rewritten
108
15+ words changed, figures not counted
10-Q · Nov 6, 2026
Paragraphs compared
291
253 in the 10-Q for fiscal Q3 2025
10-Q · Nov 6, 2026

Freeport-McMoRan's latest quarterly report against the same quarter a year earlier

10-Q for fiscal Q3 2026 against the 10-Q for fiscal Q3 2025

In Freeport-McMoRan's 10-Q for fiscal Q3 2026, the MD&A added 37 passages, removed 25 and rewrote 108 against the 10-Q for fiscal Q3 2025, the same quarter a year earlier.

Compared: Item 2 of the 10-Q filed Nov 6, 2026 (accession 0000831259-26-000051, period ended Sep 30, 2026; 291 paragraphs) and Item 2 of the 10-Q filed Nov 6, 2025 (accession 0000831259-25-000050, period ended Sep 30, 2025; 253 paragraphs).

Freeport-McMoRan's figures, dates and period names change every period and are not counted. A paragraph is rewritten when at least 15 other words were added or removed: added text is underlined and shaded, removed text is struck through, and long unchanged stretches are shortened to the words around each change.

Overview

1 added · 2 removed · 3 rewritten

Added in the 10-Q for fiscal Q3 2026

We delivered strong financial results in third-quarter 2026, which benefited from favorable realized prices for copper and molybdenum and continued execution of our operating plans. We continue to advance the ramp-up of operations in the Grasberg minerals district, increasing production volumes while maintaining our focus on safe and sustainable operations. The strength and diversity of our portfolio of assets contributed to our results – operating income from our U.S. copper mines more than doubled and operating income from our South America operations increased over 90% in the first nine months of 2026, compared with the first nine months of 2025. These improvements, driven primarily by higher average realized copper and molybdenum prices, helped offset lower operating income from Indonesia during the continued ramp-up of the Grasberg Block Cave underground mine and higher costs for energy (primarily diesel) and other inputs.

Across our U.S. copper mines and South America operations, we are incorporating new applications, technologies and data analytics into our leaching processes to strengthen long-term cost competitiveness and unlock value. These initiatives are expected to increase annual copper production from the current run rate of approximately 220 million pounds to 300 million pounds in 2027, with potential for further significant increases in recoverable metal in future years.

We are also advancing high-value organic growth opportunities. In November 2026, our Board of Directors (Board) approved a $4.5 billion expansion and modernization program at our Bagdad copper and molybdenum operation in northwest Arizona that would more than double Bagdad’s mining and milling rates. In Chile, we are advancing the permitting process for a significant expansion at our El Abra mine.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

As a leading global supplier of copper and other metals with large-scale production, significant reserves and resources and an attractive pipeline for future growth, we are focused on the important role we play to provide copper, gold and molybdenum reliably and responsibly to a world with growing demand for metals.

We continue to incorporate new applications, technologies and data analytics into our leaching processes, and are applying operational enhancements on a larger scale and advancing testing of innovative technology to increase production from these initiatives. We are targeting annual production of 300 million pounds of copper in 2026 from these initiatives and believe we have the potential for further significant increases in recoverable metal beyond the current target run rate. Continued success with these initiatives would be expected to contribute to favorable adjustments in recoverable copper in leach stockpiles and favorably impact average unit net cash costs.

Our third-quarter 2025 results were impacted by the tragic mud rush incident that occurred on September 8, 2025, in the Grasberg minerals district. The entire FCX organization is grieving the loss of our seven team members and we remain steadfast in our commitment to prioritize the safety of our workforce above all else. Refer to further discussion of the mud rush incident below.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Grasberg Minerals District Mud Rush Incident”

On September 8, 2025, PTFI experienced a mud rush incident that resulted in seven fatalities. During the incident, which was unprecedented in PTFI’s multi-decade history of block cave mining in the Grasberg minerals district, a sudden rush of approximately 800,000 metric tons of wet material entered the Grasberg Block Cave underground mine from the former Grasberg open pit and traveled rapidly to multiple levels of the mine, including a service level where seven team members were later found deceased.

Mining operations were temporarily suspended following the incident to prioritize the recovery of the seven team members fatally injured during the incident and to conduct an investigation into the root cause of the incident. The recovery efforts were completed on October 5, 2025, and the investigation is advancing toward completion. Damage assessments, which are expected to be completed by year-end 2025, are being conducted in parallel with ongoing mud removal activities.

In late October 2025, PTFI restarted operations at the unaffected Big Gossan and Deep Mill Level Zone (DMLZ) underground mines. A phased restart and ramp-up of the Grasberg Block Cave underground mine is anticipated to begin during 2026.

Net income attributable to common stockholders totaled $1.2 billion in third-quarter 2026, $0.7 billion …+57 / −36 words

Net income attributable to common stockholders totaled $674 million $1.2 billion in third-quarter 2026, $0.7 billion in third-quarter 2025, $3.0 billion for the first nine months of 2026 and $1.8 billion for the first nine months of 2025. Higher net income attributable to common stock in the 2026 periods, compared to the 2025 periods, primarily reflects higher average realized copper and molybdenum prices, combined with $526 million in third-quarter 2024 the impact of lower income taxes and $1.6 billion for noncontrolling interests from our Indonesia operations. The first nine months of 2024. Higher net income in 2026 also include the 2025 periods, compared recognition of a gain for the insurance settlement related to the 2024 periods, primarily reflects higher operating income from our U.S. and South America mining operations, partly offset by lower financial results from Indonesia operations as a result of the September 2025 external mud rush incident. Refer to “Consolidated Results” and “Business Divisions and Segments” for further discussion.

At September 30, 2026, we had consolidated debt of $9.4 billion and consolidated cash …+46 / −0 words

At September 30, 2025, 2026, we had consolidated debt of $9.4 billion and consolidated cash and cash equivalents of $4.3 billion. Net debt totaled $1.8 billion, excluding $3.2 billion of debt for PT Freeport Indonesia’s (PTFI) downstream processing facilities. Refer to “Net Debt” for a reconciliation of consolidated debt and consolidated cash and cash equivalents to net debt. At September 30, 2026, we had $3.0 billion of availability under our revolving credit facility, and PTFI and Cerro Verde had $1.5 billion and $350 million, respectively, of availability under their revolving credit facilities.

During the first nine months of 2026, we returned $955 million to shareholders, including …+16 / −0 words

During the first nine months of 2026, we returned $955 million to shareholders, including $650 million through common stock dividends and $305 million through share repurchases. Refer to Note 4 and “Capital Resources and Liquidity” for further discussion.

Outlook

2 added · 1 removed · 7 rewritten

Added in the 10-Q for fiscal Q3 2026

Under “Consolidated Sales Volumes”

Consolidated copper and gold production volumes for the year 2026 are expected to exceed sales volumes, reflecting deferrals of approximately 100 million pounds of copper and 70 thousand ounces of gold associated with inventory held at PTFI’s smelting operations.

Added in the 10-Q for fiscal Q3 2026

Under “Consolidated Unit Net Cash Costs”

During the ramp-up period of the Grasberg Block Cave underground mine and until PTFI’s operations return to normalized levels, a portion of PTFI's production and delivery costs will be recognized as idle facility costs, which are non-inventoriable. Idle facility and restoration costs are expected to total $1.2 billion for the year 2026 (including approximately $250 million in fourth-quarter 2026). Refer to “Operations – Indonesia” for further discussion.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Consolidated Capital Expenditures”

We are carefully managing operating costs and near-term capital expenditures in connection with revised operating plans at the Grasberg minerals district to manage cash flow and liquidity during the phased ramp-up period.

Our financial results vary as a result of fluctuations in metals market prices primarily …+7 / −49 words

Our financial results vary as a result of fluctuations in metals market prices primarily for copper, gold and to a lesser extent, molybdenum, as well as other factors. World market prices for these commodities have fluctuated historically and are affected by numerous factors beyond our control. Refer to “Markets” below, and “Risk Factors” in Part I, Item 1A. of our 2024 2025 Form 10-K and Part II, Item 1A. herein for further discussion. Because we cannot control the prices of our products, the key measures that management focuses on in operating our business are sales volumes, unit net cash costs, operating cash flows and capital expenditures. In addition, as a result of the September 2025 mud rush incident at PTFI, our consolidated sales volumes, unit net cash costs, operating cash flows and capital expenditures for the year 2025 have been revised, compared to the guidance provided in our quarterly report on Form 10-Q for the quarter ended June 30, 2025.

Projected consolidated sales volumes for fourth-quarter 2026 are expected to approximate 875 million pounds …+72 / −8 words · under “Consolidated Sales Volumes”

Projected consolidated sales volumes in for fourth-quarter 2025 reflect minimal volumes from Indonesia operations and 2026 are expected to approximate 635 875 million pounds of copper, 60 300 thousand ounces of gold and 21 22 million pounds of molybdenum. With the projected significant increase in gold sales in fourth-quarter 2026, PTFI may sell gold in the export market to the extent not required by the domestic market. PTFI is seeking clarity from the Indonesia government on administrative procedures for PTFI’s refined gold exports since current regulations (specifying a 10% export duty) conflict with the terms in PTFI’s special mining business license (IUPK) (which do not require the payment of duties on refined gold exports).

Projected sales volumes are dependent on operational performance; the continued ramp-up of the Grasberg …+12 / −41 words · under “Consolidated Sales Volumes”

Projected sales volumes are dependent on operational performance; the timing continued ramp-up of restarting the Grasberg Block Cave underground mine and ramping up mining and smelting operations at PTFI following the September 2025 mud rush incident; PTFI’s smelter; weather-related conditions; timing of shipments and sales and other factors detailed in the “Cautionary Statement” below. For other important factors that could cause results to differ materially from projections, refer to “Risk Factors” contained in Part I, Item 1A. of our 2024 Form 10-K.

The impact of price changes on consolidated unit net cash costs for the year …+17 / −99 words · under “Consolidated Unit Net Cash Costs”

Consolidated unit net cash costs (net of by-product credits and excluding estimated expenses attributable to the September 2025 mud rush incident at PTFI for idle facility costs and recovery efforts) for our copper mines are expected to average $1.68 per pound of copper for the year 2025, based on achievement of current sales volume and cost estimates, and assuming average prices of $4,000 per ounce of gold and $25.00 per pound of molybdenum in fourth-quarter 2025. Quarterly unit net cash costs vary with fluctuations in sales volumes by region, including the ratio of copper and gold sales within a period, and realized prices, primarily for gold and molybdenum. The impact of price changes during fourth-quarter 2025 on consolidated unit net cash costs for the year 2025 2026 would approximate $0.01 per pound of copper for each $100 per ounce change in the average price of gold and $0.01 per pound of copper for each $2 per pound change in the average price of molybdenum during fourth-quarter 2026.

Our consolidated operating cash flows vary with sales volumes; prices realized from copper, gold …+32 / −0 words · under “Consolidated Operating Cash Flows”

Our consolidated operating cash flows vary with sales volumes; prices realized from copper, gold and molybdenum sales; production costs; income taxes; other working capital changes; and other factors, such as the ramp-up of the Grasberg Block Cave underground mine and PTFI’s smelter, and impacts related to the conflict in the Middle East, including changes in energy costs and other consumables.

Consolidated operating cash flows are expected to approximate $8.5 billion for the year 2026, …+7 / −54 words · under “Consolidated Operating Cash Flows”

Our consolidated operating cash flows vary with sales volumes; prices realized from copper, gold and molybdenum sales; production costs; income taxes; other working capital changes; and other factors, including the timing of restarting and ramping up mining and smelting operations at PTFI following the September 2025 mud rush incident. Consolidated operating cash flows are estimated expected to approximate $5.5 $8.5 billion for the year 2025, 2026, net of $0.7 $0.6 billion of working capital and other uses, based on current sales volume and cost estimates, and assuming average prices of $4.75 $6.50 per pound of copper, $4,000 per ounce of gold and $25.00 $32.00 per pound of molybdenum in fourth-quarter 2025. 2026. Estimated consolidated operating cash flows for the year 2025 also reflect 2026 include a projected income tax provision of $2.2 $2.9 billion (refer to “Consolidated Results – Income Taxes” for further discussion of our projected income tax rate for the year 2025). 2026). The impact of price changes in during fourth-quarter 2025 2026 on consolidated operating cash flows are estimated to for the year 2026 would approximate $80 $75 million for each $0.10 per pound change in the average price of copper, $15 $25 million for each $100 per ounce change in the average price of gold and $30 $12 million for each $2 per pound change in the average price of molybdenum.

a.Includes $1.4 billion for planned projects, primarily associated with underground mine development and supporting …+20 / −20 words · under “Consolidated Capital Expenditures”

a.Includes $950 million $1.4 billion for planned projects, primarily associated with underground mine development and supporting mill and power capital costs and a portion of spending on a new gas-fired combined cycle facility in the Grasberg minerals district and potential U.S. expansion projects, a leaching project at El Abra, and $1.35 $1.6 billion for discretionary growth projects, primarily in the Grasberg minerals district for the continued development of Kucing Liar and at Bagdad for early works associated with the Bagdad mine expansion project. Refer to “Operations” for tailings infrastructure. further discussion.

Markets

2 added · 1 removed · 4 rewritten

Added in the 10-Q for fiscal Q3 2026

Copper continues to trade at historically elevated levels, supported by tight market fundamentals, regional inventory dislocations, supply disruptions and strong long-term demand expectations. Trade policy uncertainty and refined copper tariff policy and expectations have changed physical trade flows, concentrating inventories in the U.S. while reducing copper availability in Asia and Europe.

Added in the 10-Q for fiscal Q3 2026

This graph presents London Bullion Market Association (London) PM gold prices from January 2016 through September 2026. During third-quarter 2026, average gold prices declined from second-quarter 2026, as gold market performance was influenced by changing expectations for U.S. interest rates, movements in the U.S. dollar, ongoing geopolitical tensions and continued central bank purchasing activity.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Copper priced on the LME and COMEX exchanges have historically traded in a narrow range with no material differential. Following U.S. trade policy announcements earlier in 2025, including proposed tariff announcements, the two benchmark prices began to differ and the spread significantly widened during July 2025. Effective August 1, 2025, a 50% tariff was imposed under Section 232 of the Trade Expansion Act, targeting U.S. imports of semi-finished copper products and copper-intensive derivative products. However, refined copper, including cathodes, concentrates and scrap, was exempted from the tariff and the U.S. government has indicated it will reassess by mid-2026 the potential for a refined copper tariff of 15% beginning in January 2027 and rising to 30% in 2028. Differences between COMEX and LME copper prices were present during third-quarter 2025, with the average COMEX copper settlement price 9% higher than the average LME copper settlement price. Both COMEX and LME copper prices have risen following the September 2025 mud rush incident, with LME settlement copper price hitting an all-time high of $5.02 per pound in October 2025. As of October 31, 2025, the COMEX copper settlement price of $5.07 per pound was 3% higher than the LME copper settlement price of $4.94 per pound.

Prices for copper, gold and molybdenum are affected by numerous factors beyond our control …+5 / −37 words

Prices for copper, gold and molybdenum are affected by numerous factors beyond our control and can fluctuate significantly (for further discussion refer to “Risk Factors” contained in Part I, Item 1A. of our 2024 2025 Form 10-K The following graphs present the London Metal Exchange (LME) and Commodity Exchange Inc. (COMEX) copper settlement prices, the London Bullion Market Association (London) PM gold prices, and the Platts Metals Daily Molybdenum Dealer Oxide weekly average prices since January 2015. Part II, Item 1A. herein).

We believe long-term fundamentals for copper are favorable with growing demand supported by copper’s …+6 / −15 words

We believe long-term fundamentals for copper are favorable with growing demand supported by copper’s critical role in the global transition to renewable power, electric vehicles and other carbon-reduction electrification initiatives, continued urbanization in developing countries, data centers, increased defense spending center and AI growth and growing connectivity globally.

During third-quarter 2026, London PM gold prices averaged $4,262 per ounce (ranging from a …+1 / −50 words

This graph presents London PM gold prices from January 2015 through September 2025. During third-quarter 2025, 2026, London PM gold prices averaged $3,457 $4,262 per ounce (ranging from a low of $3,299 $3,994 per ounce to a high of $3,827 $4,664 per ounce) and closed at $3,825 $4,176 per ounce on September 30, 2025. The prospect of additional U.S. interest rate reductions, geopolitical tensions, trade uncertainty and strong demand from central banks around the world continue to drive gold prices to record highs, with 2026. The London PM gold price reaching an all-time high of $4,294 per ounce in October 2025 and closing at $4,012 was $3,913 per ounce on October 31, 2025. 2026.

During third-quarter 2026, the weekly average prices for molybdenum averaged $32.92 per pound (ranging …+1 / −47 words

This graph presents the Platts Metals Daily Molybdenum Dealer Oxide weekly average prices from January 2015 through September 2025. During third-quarter 2025, 2026, the weekly average prices for molybdenum averaged $24.33 $32.92 per pound (ranging from a low of $22.10 $31.45 per pound to a high of $25.93 $33.76 per pound) and closed at $25.05 $33.61 per pound on September 30, 2025. Overall global demand for molybdenum is driven by energy, power generation, aerospace, defense and construction sectors. We believe fundamentals for molybdenum are positive with favorable demand drivers and limited supply. 2026. The Platts Metals Daily Molybdenum Dealer Oxide weekly average price closed at $24.09 was $32.74 per pound on October 31, 2025. 2026.

Consolidated Results

4 added · 6 removed · 19 rewritten

Added in the 10-Q for fiscal Q3 2026

d.Net income attributable to common stock (i.e., net of any taxes and noncontrolling interests) includes net charges totaling $101 million ($0.07 per share) in third-quarter 2026, $48 million ($0.04 per share) in third-quarter 2025, $146 million ($0.10 per share) for the first nine months of 2026 and $72 million ($0.05 per share) for the first nine months of 2025, primarily reflecting idle facility, direct recovery and restoration costs associated with PTFI’s September 2025 external mud rush incident. Net charges for the first nine months of 2026 were partially offset by a gain on the insurance settlement associated with the September 2025 external mud rush incident.

Added in the 10-Q for fiscal Q3 2026

Under “Production and Delivery Costs”

During the ramp-up period of the Grasberg Block Cave underground mine and until PTFI’s operations return to normalized levels, a portion of PTFI's production and delivery costs has been recognized as idle facility costs, which are non-inventoriable. Idle facility, direct recovery and restoration costs totaled $244 million ($0.33 per pound of copper) in third-quarter 2026, $171 million ($0.18 per pound of copper) in third-quarter 2025, $934 million ($0.44 per pound of copper) for the first nine months of 2026 and $171 million ($0.06 per pound of copper) for the first nine months of 2025, which were excluded from consolidated net cash costs.

Added in the 10-Q for fiscal Q3 2026

Under “Gain on PTFI Mud Rush Incident Insurance Settlement”

In first-quarter 2026, PTFI recognized a gain of $0.7 billion ($0.2 billion after taxes and noncontrolling interests) for an insurance settlement associated with the September 2025 external mud rush incident under its property and business interruption policies. PTFI collected the proceeds from this settlement in April 2026.

Added in the 10-Q for fiscal Q3 2026

Under “Income Taxes”

c.The U.S. income tax provision primarily relates to the U.S. Corporate Alternative Minimum Tax (CAMT) provisions, which do not benefit from regular tax U.S. net operating loss carryforwards.

d.In third-quarter 2026, PTFI received confirmation of income tax benefits associated with its smelter development, which include benefits attributable to a six-year incentive period from 2025 through 2030. In third-quarter 2026, PTFI recognized tax benefits associated with the year 2025 and first nine months of 2026.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

d.Includes net charges totaling $48 million in third-quarter 2025 and $72 million for the first nine months of 2025, primarily related to idle facility costs and recovery efforts associated with the September 2025 mud rush incident at PTFI, PTFI smelter fire repair costs not recoverable by insurance, and oil and gas impairments, partly offset by net favorable adjustments to environmental obligations and a gain on sales of assets. The first nine months of 2025 also include charges for previously capitalized costs associated with PTFI’s downstream processing facilities, partly offset by an adjustment to PTFI’s asset retirement obligation.

e.Includes net charges totaling $30 million in third-quarter 2024 and $81 million for the first nine months of 2024, primarily associated with impairments for legacy oil and gas matters and nonrecurring labor-related charges at Cerro Verde associated with new collective labor agreements (CLA), partly offset by a reduction in accruals for uncertain U.S. tax positions. The first nine months of 2024 also included charges associated with assumed oil and gas abandonment obligations resulting from bankruptcies of other companies, revisions to environmental obligation estimates and related litigation reserves, and inventory adjustments/write-offs.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

b.Excludes $171 million of idle facility costs and recovery expenses associated with the September 2025 mud rush incident at PTFI. Refer to “Grasberg Minerals District Mud Rush Incident” for further discussion.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Revenues”

During the third quarter and first nine months of 2025, our average U.S. copper price realization, which is generally based on COMEX settlement prices, was approximately 7% to 9% higher than the average copper price realizations for our South America and Indonesia operations, which are generally based on LME settlement prices. Refer to “Markets” for further discussion of COMEX and LME copper prices.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Depreciation, Depletion and Amortization”

We currently expect DD&A to approximate $2.2 billion for the year 2025, which will include depreciation associated with capitalized costs for PTFI’s downstream processing facilities.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Income Taxes”

As discussed in Note 3, we do not expect H.R.1, which was signed into law on July 4, 2025, to have a material impact on our consolidated financial results.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Noncontrolling Interests”

Our economic and ownership interest in PTFI is 48.76%, except for net income associated with the settlement of historical tax matters, which is attributed based on the economics prior to January 1, 2023 (i.e., approximately 81% to FCX and 19% to MIND ID).

b.Includes favorable adjustments to prior period provisionally priced concentrate and cathode copper sales totaling …+15 / −16 words

b.Includes favorable (unfavorable) adjustments to prior period provisionally priced concentrate and cathode copper sales totaling $52 million ($17 million to net income attributable to common stock or $0.01 per share) in third-quarter 2026, $11 million ($1 million to net income attributable to common stock or less than $0.01 per share) in third-quarter 2025, $(32) $58 million ($(13) ($24 million to net income attributable to common stock or $(0.01) $0.02 per share) in third-quarter 2024, for the first nine months of 2026 and $63 million ($21 million to net income attributable to common stock or $0.01 per share) for the first nine months of 2025. and $28 million ($9 million to net income attributable to common stock or $0.01 per share) for the first nine months of 2024. Refer to Note 5 for further discussion.

c.We defer recognizing profits on intercompany sales until final sales to third parties occur. …+15 / −22 words

c.We defer recognizing profits on intercompany sales until final sales to third parties occur. Changes in these deferrals attributable to variability in intercompany volumes resulted in net additions (reductions) to operating income totaling $24 million ($8 million to net income attributable to common stock or $0.01 per share) in third-quarter 2026, $13 million ($15 million to net income attributable to common stock or $0.01 per share) in third-quarter 2025, $(42) $76 million ($(13) ($25 million to net income attributable to common stock or $(0.01) $0.02 per share) in third-quarter 2024, for the first nine months of 2026 and $161 million ($58 million to net income attributable to common stock or $0.04 per share) for the first nine months of 2025. and $79 million ($23 million to net income attributable to common stock or $0.02 per share) for the first nine months of 2024. Refer to “Operations – Downstream Processing Facilities.”

Consolidated revenues totaled $7.5 billion in third-quarter 2026, $7.0 billion in third-quarter 2025, $20.8 …+16 / −22 words · under “Revenues”

Consolidated revenues totaled $7.5 billion in third-quarter 2026, $7.0 billion in third-quarter 2025, $6.8 $20.8 billion in third-quarter 2024, for the first nine months of 2026 and $20.3 billion for the first nine months of 2025. and $19.7 billion for the first nine months of 2024. Our revenues from our mining operations and processing facilities primarily include the sale of copper cathode, copper in rod and copper concentrate, copper rod, as well as gold in concentrate and anode slimes, gold bars and molybdenum products in various forms. Refer to Note 8 for a summary of product revenues.

Sales Volumes. Consolidated copper and gold sales volumes decreased in the 2026 periods, compared …+31 / −46 words · under “Revenues”

Sales Volumes. Consolidated copper and gold sales volumes decreased in the 2025 2026 periods, compared to the 2024 2025 periods, primarily reflecting the temporary suspension of operations in Indonesia since the September 2025 mud rush incident at PTFI and lower ore grades in Indonesia. Lower copper and gold sales volumes for the first nine months of 2025, compared to the first nine months of 2024, also reflect the impact of lower operating rates in Indonesia resulting from planned major maintenance projects. at PTFI during the ramp-up of the Grasberg Block Cave underground mine and timing of shipments and sales. Refer to “Operations” for further discussion of sales volumes at our mining operations.

Prior Period Provisionally Priced Copper Sales. Net favorable adjustments to prior periods’ provisionally priced …+29 / −7 words · under “Revenues”

Atlantic Prior Period Provisionally Priced Copper Revenues. Atlantic Sales. Net favorable adjustments to prior periods’ provisionally priced copper sales (i.e., provisionally priced sales at June 30, 2026 and 2025, and December 31, 2025 and 2024) recorded in consolidated revenues totaled $774 $52 million in third-quarter 2026, $11 million in third-quarter 2025, $765 $58 million in third-quarter 2024 for the first nine months of 2026 and $2.3 billion $63 million for each of the first nine months of 2025. and 2024.

Refer to Notes 5 and 8 for a summary of total adjustments to prior …+1 / −39 words · under “Revenues”

Prior Period Provisionally Priced Copper Sales. Net favorable (unfavorable) adjustments to prior periods’ provisionally priced copper sales (i.e., provisionally priced sales at June 30, 2025 and 2024, and December 31, 2024 and 2023) recorded in consolidated revenues totaled $11 million in third-quarter 2025, $(32) million in third-quarter 2024, $63 million for the first nine months of 2025 and $28 million for the first nine months of 2024. Refer to Notes 5 and 8 for a summary of total adjustments to prior period and current period provisionally priced copper sales.

Sales of Purchased Copper. We purchase copper cathode primarily for processing by our U.S. …+24 / −35 words · under “Revenues”

Sales of Purchased Copper. We purchase copper cathode primarily for processing by our U.S. Rod & Refining operations. The volumes of copper purchases vary depending on cathode production from our operations and totaled 20 million pounds in third-quarter 2026, 9 million pounds in third-quarter 2025, 36 67 million pounds in third-quarter 2024, for the first nine months of 2026 and 110 million pounds for the first nine months of 2025. and 142 million pounds for Revenues associated with the first nine months sale of 2024. During 2025, we have been able to meet customer demand for copper rod primarily using copper cathode produced by our U.S. and South America mining operations, resulting in a decrease in purchased copper volumes. vary with the volume of copper purchases and changes in copper prices.

Treatment Charges. Revenues from our copper concentrate sales are recorded net of treatment charges, …+40 / −18 words · under “Revenues”

Treatment Charges. Revenues from our copper concentrate sales are recorded net of treatment charges, which will vary with the market conditions, sales volumes and the price of copper. Treatment charges totaled $6 million in third-quarter 2026, $2 million in third-quarter 2025, $17 million for the decrease first nine months of 2026 and $45 million for the first nine months of 2025. The reduction in treatment charges in for the first nine months of 2026, compared with the first nine months of 2025, periods, compared to the 2024 periods, primarily reflects lower treatment charge rates in 2026 as a result of favorable market conditions and our reduced exposure to treatment charges following PTFI’s transition to a fully integrated producer of refined copper, concentrate sales volumes in Indonesia gold and South America. silver.

Export Duties. Prior to the expiration of its export license in September 2025, PTFI …+9 / −22 words · under “Revenues”

Export Duties. and Royalties. Prior to the expiration of its export license on in September 16, 2025, PTFI was assessed export duties on copper concentrate sales at a rate of 7.5%. PTFI pays royalties on all copper and gold sales, the amount Refer to Note 11 of which varies with sales volumes and metal prices. our 2025 Form 10-K for further discussion.

Mining Unit Site Production and Delivery Costs Per Pound. Site production and delivery costs …+12 / −39 words · under “Production and Delivery Costs”

Mining Unit Site Production and Delivery Costs Per Pound. Site production and delivery costs for our copper mining operations primarily include labor, energy and other commodity-based inputs, such as sulfuric acid, steel, reagents, liners, tires and explosives. Consolidated unit site production and delivery costs (before net noncash and other costs) for our copper mines averaged $3.24 per pound of copper in third-quarter 2026, $2.71 per pound of copper in third-quarter 2025, $2.61 $3.27 per pound of copper in third-quarter 2024, for the first nine months of 2026 and $2.67 per pound of copper for the first nine months of 2025. and $2.49 per pound of copper for the first nine months of 2024. Consolidated site production and delivery costs per pound of copper exclude idle facility costs and recovery expenses associated with the September 2025 mud rush incident at PTFI (refer to “Product Revenues and

Refer to “Operations” for further discussion of unit net cash costs associated with our …+1 / −157 words · under “Production and Delivery Costs”

This report on Form 10-Q also contains measures such as net debt and unit net cash costs (credits) per pound of copper and molybdenum, which are not recognized under U.S. GAAP. Refer to “Operations” – Unit Net Cash Costs” and “Operations – Unit Net Cash (Credits) Costs” for further discussion of unit net cash costs (credits) associated with our operating divisions, and to “Product Revenues and Production Costs” for reconciliations of per pound costs (credits) by operating division to production and delivery costs applicable to sales reported in our consolidated financial statements Refer to “Net Debt” for reconciliations of consolidated debt, and consolidated cash and cash equivalents to net debt. For forward-looking unit net cash costs (credits) per pound of copper and molybdenum measures, we are unable to provide a reconciliation to the most comparable U.S. GAAP measure without unreasonable effort because estimating such U.S. GAAP measures and providing a meaningful reconciliation is extremely difficult and requires a level of precision that is unavailable for these future periods, and the information needed to reconcile these measures is dependent upon future events, many of which are outside of our control as described above. Forward-looking non-U.S. GAAP measures are estimated consistent with the relevant definitions and assumptions. income.

Depreciation will vary under the unit-of-production (UOP) method as a result of changes in …+40 / −11 words · under “Depreciation, Depletion and Amortization”

Depreciation will vary under the unit-of-production (UOP) method as a result of changes in sales volumes and the related UOP rates at our mining operations. Consolidated depreciation, depletion and amortization (DD&A) totaled $520 million in third-quarter 2026, $625 million in third-quarter 2025, $600 million in third-quarter 2024, $1.6 billion for the first nine months of 2026 and $1.8 billion for the first nine months of 2025. and $1.7 billion for The first nine months of 2024. decrease in DD&A for in the 2026 periods, compared to the 2025 periods, includes $24 million associated with idle facilities primarily reflects the impact of lower sales volumes at PTFI following the September 2025 external mud rush incident, partially offset by higher depreciation at PTFI. our U.S. copper mines, primarily associated with placing assets into service in 2025.

Net charges for environmental obligations and shutdown costs totaled $8 million in third-quarter 2026, …+14 / −42 words · under “Environmental Obligations and Shutdown Costs”

Capitalized interest, which primarily related to our mining operations’ capital projects, including construction Net charges for environmental obligations and development of PTFI’s downstream processing facilities, shutdown costs totaled $75 $8 million in third-quarter 2025, $101 million 2026, no net charges in third-quarter 2024, $278 2025, $38 million for the first nine months of 2026 and $37 million for the first nine months of 2025. and $280 million for the first nine months of 2024. Refer to “Capital Resources and Liquidity – Investing Activities” for discussion of capital expenditures associated with our major development projects.

Consolidated interest expense, net totaled $86 million in third-quarter 2026, $107 million in third-quarter …+18 / −7 words · under “Interest Expense, Net”

Consolidated interest costs (before capitalization) expense, net totaled $182 $86 million in third-quarter 2026, $107 million in third-quarter 2025, $173 $295 million in third-quarter 2024, $537 for the first nine months of 2026 and $259 million for the first nine months of 2025. Refer to Note 4 for consolidated interest costs (before capitalization) and $529 million for the first nine months of 2024. capitalized interest.

Other income, net, primarily includes amounts associated with interest income, currency exchange gains and …+4 / −59 words · under “Other Income, Net”

Other income, net, which totaled $59 million in third-quarter 2025, $97 million in third-quarter 2024, $158 million for the first nine months of 2025 and $295 million for the first nine months of 2024, primarily includes amounts associated with interest income, currency exchange gains and losses, and mark-to-market impacts of associated with investments and trust assets used to satisfy financial assurance obligations for our New Mexico mining operations. Lower other income, net, in the 2025 periods, compared to the 2024 periods, primarily reflects lower interest income. The first nine months of 2024 also included a credit of $26 million associated with the reduction in the accrual to indemnify PT Mineral Industri Indonesia (MIND ID) from potential losses arising from PTFI’s historical tax disputes.

b.In addition to our U.S. copper and molybdenum mines, the U.S. jurisdiction reflects non-operating …+7 / −35 words · under “Income Taxes”

b.In addition to our U.S. copper and molybdenum mines, which had operating income of $1.1 billion for the first nine months of 2025 and $558 million for the first nine months of 2024 (refer to Note 8), the U.S. jurisdiction reflects non-operating sites and corporate-level expenses, which include interest expense associated with our senior notes and general and administrative expenses. The U.S. jurisdiction also includes net revisions Refer to environmental obligation estimates “Business Divisions and charges associated with oil and gas abandonment obligations and impairments. Segments” for additional information.

Assuming achievement of current sales volume and cost estimates and prices of $6.50 per …+34 / −16 words · under “Income Taxes”

Assuming achievement of current sales volume and cost estimates and prices of $4.75 $6.50 per pound of for copper, $4,000 per ounce of for gold and $25.00 $32.00 per pound of for molybdenum in fourth-quarter 2025, 2026, we estimate our consolidated effective tax rate for the year 2025 2026 would approximate 36%. Changes 30% (approximately 32% in projected sales volumes and average prices during fourth-quarter 2025 would incur tax impacts at 2026), including estimated effective tax rates of 39% 40% for Peru, 36% for Indonesia and 0% 10% for the U.S. (associated with CAMT provisions). Changes in projected sales volumes, commodity prices, and the relative proportion of jurisdictional income during fourth-quarter 2026 could impact our consolidated effective tax rate for the year 2026.

Net income attributable to noncontrolling interests, which is primarily associated with PTFI, Cerro Verde …+10 / −10 words · under “Noncontrolling Interests”

Net income attributable to noncontrolling interests, which is primarily associated with our noncontrolling shareholders at PTFI, Cerro Verde and El Abra, totaled $514 million in third-quarter 2026, $573 million in third-quarter 2025, $710 million in third-quarter 2024, $1.4 billion for the first nine months of 2026 and $1.8 billion for the first nine months of 2025. and $2.1 billion for the first nine months of 2024. Refer to Note 8 “Business Divisions and Segments” below for net income attributable to noncontrolling interests for each of our business segments.

Based on achievement of current sales volume and cost estimates and assuming average prices …+10 / −44 words · under “Noncontrolling Interests”

Based on achievement of current sales volume and cost estimates and assuming average prices of $4.75 $6.50 per pound of copper, $4,000 per ounce of gold and $25.00 $32.00 per pound of molybdenum in fourth-quarter of 2025, 2026, we estimate that net income attributable to noncontrolling interests will approximate $2.0 $2.3 billion for the year 2025. The impact 2026, which would represent approximately 24% of price changes on net our consolidated income attributable to noncontrolling interests for the year 2025 would approximate $50 million for each $0.25 per pound change in the average LME copper settlement price in fourth-quarter 2025 (net before income attributable to noncontrolling interests is not impacted by changes in the COMEX copper price). taxes. The actual amount will depend on various many factors, including relative performance of each business segment, commodity prices, costs and other factors.

Business Divisions and Segments

2 added · 1 removed · 2 rewritten

Added in the 10-Q for fiscal Q3 2026

We have organized our mining operations into four primary divisions – U.S. copper mines, South America operations, Indonesia operations and Molybdenum mines. Refer to “Operations” below for discussion of our mining operations.

U.S. Rod & Refining consists of copper conversion facilities located in the U.S., and includes a refinery, that primarily produces copper cathode from copper anode produced at FCX’s U.S. smelter, and two rod mills that produce salable copper rod from copper cathode primarily produced at FCX’s U.S. copper mines and refineries.

Added in the 10-Q for fiscal Q3 2026

Corporate, Other & Eliminations consist of our other mining operations, exploration activities, corporate and elimination items. Other mining operations include the Miami smelter, molybdenum conversion facilities in the U.S. and in Europe, five non-operating mines in the U.S. and other mining support entities.

Intersegment sales are based on terms similar to arm’s-length transactions with third parties at the time of the sale. Intersegment sales may not be reflective of the actual prices ultimately realized because of a variety of factors, including additional processing, the timing of sales to unaffiliated customers and transportation premiums.

We allocate certain operating costs, expenses and capital expenditures to our business divisions and segments. However, not all costs and expenses applicable to an operation are allocated. U.S. federal and state income taxes are recorded and managed at the corporate level (included in Corporate, Other & Eliminations in the below tables), whereas foreign income taxes are recorded and managed at the applicable country level. In addition, some selling, general and administrative costs are not allocated to the business divisions and segments. Accordingly, the following information reflects management determinations that may not be indicative of what the actual financial performance of each business division and segment would be if it were an independent entity.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Production and Delivery Costs”

As discussed in Note 7, as of September 30, 2025, PTFI had limited access to the area where the mud rush incident occurred and was unable to adequately assess damage to the impacted assets. Accordingly, no impairment charges were recorded in third-quarter 2025. Upon completion of damage assessments and evaluation of the affected infrastructure in fourth-quarter 2025, PTFI expects to write-off the carrying value of assets determined to be damaged beyond repair. Furthermore, we do not believe the incident indicates a broader impairment of PTFI’s long-lived mining assets based on PTFI’s reserve life, favorable market outlook for metal prices and expected resumption of operations at the Grasberg Block Cave underground mine in the near term.

a.Includes revenues from our molybdenum sales company, which includes sales of molybdenum produced by …+5 / −20 words · under “Financial Information by Business Division and Segment (continued)”

b.Represents the combined total for a.Includes revenues from our other mining operations as presented in Note 8. Also includes amounts associated with the molybdenum sales company, which includes sales of molybdenum produced by the our primary molybdenum mines and by certain of the U.S. copper mines and the Cerro Verde mine.

The third quarter and first nine months of 2025 also include $39 million of …+2 / −97 words · under “Financial Information by Business Division and Segment (continued)”

Consolidated production The third quarter and delivery costs totaled $4.2 billion in third-quarter 2025, $4.1 billion in third-quarter 2024, $12.2 billion for the first nine months of 2025 and $11.8 billion for the first nine months of 2024. Production and delivery costs in the 2025 periods include $171 million of idle facility costs and recovery expenses associated with the September 2025 mud rush incident at PTFI. The first nine months of 2025 also included charges totaling $73 million associated with planned maintenance turnaround costs at the Miami smelter and include $39 million of tolling fees that were recognized as idle facility costs associated with PT Smelting’s planned maintenance turnaround. (PT Smelting is PTFI’s 66%-owned smelter and refinery in Gresik, Indonesia). The first nine months of 2024 included charges of $99 million associated with assumed oil and gas abandonment obligations (and related adjustments) resulting from bankruptcies of other companies and $99 million for non-recurring labor-related charges at Cerro Verde associated with new CLAs.

Operations

10 added · 12 removed · 39 rewritten

Added in the 10-Q for fiscal Q3 2026

Under “Leaching and Technology Innovation Initiatives”

These initiatives are expected to increase annual production from the current run rate of approximately 220 million pounds of copper to 300 million pounds in 2027, with potential for further significant increases in recoverable metal in future years. We are continuing to deploy large-scale testing of an internally developed additive product at our Morenci operations, where early results have been encouraging. In addition, we have developed two customized additives that are being manufactured and are expected to be deployed at multiple stockpiles in the first half of 2027. Laboratory testing of these newly developed additives has demonstrated significant improvements in copper recoveries. We are also advancing projects to use heat sources to increase the temperature of our stockpiles to boost copper recoveries. Success with these initiatives has the potential to contribute to additions in recoverable copper in leach stockpiles and favorably impact average unit net cash costs.

Added in the 10-Q for fiscal Q3 2026

Under “United States”

In November 2026, our Board approved an expansion and modernization program at our Bagdad copper and molybdenum operation in northwest Arizona. Future incremental capital costs for a new concentrator, mining equipment and expanded infrastructure are expected to approximate $4.5 billion. This project is expected to more than double Bagdad’s mining and milling rates and includes new concentrator facilities and supporting infrastructure.

When it reaches full operating rates, the project is expected to increase Bagdad’s annual copper production to over 400 million pounds of copper (an increase of approximately 225 million pounds per year) and annual molybdenum production to over 20 million pounds (an increase of approximately 12 million pounds per year). We expect the expansion, along with Bagdad’s fully autonomous haulage fleet and other modern technologies, to improve Bagdad’s long-term cost position and performance. The expansion would position Bagdad as the second-largest copper mine in the U.S., behind our Morenci operation, a top producer of molybdenum in the U.S. and one of the lowest-cost operations in our U.S. portfolio.

We are advancing engineering, procurement planning and early works for the project and construction is expected to take approximately 3.5 years, with initial production targeted for mid-2030. Based on current estimates, we expect to incur approximately 20% of project costs in 2027, 30% to 35% in 2028 and the balance in 2029 and 2030. We will incorporate the project’s planned capital expenditures into our outlook as a discretionary growth project under our financial policy. The capital cost estimates are based on current market conditions. Ongoing inflationary pressures, cost escalation and other factors could cause actual costs and timing to differ from these estimates.

Added in the 10-Q for fiscal Q3 2026

Under “United States”

Our U.S. copper mines faced challenging operating conditions in third-quarter 2026 associated with an increased frequency of extreme weather conditions, which adversely affected operating rates and productivity.

Added in the 10-Q for fiscal Q3 2026

Under “Indonesia”

Kucing Liar. Since 2022, PTFI has conducted long-term mine development activities at its Kucing Liar deposit in the Grasberg minerals district. PTFI’s long-term mine plans include a ramp-up of Kucing Liar, commencing in the 2030 timeframe, to a design capacity of approximately 130,000 metric tons of ore per day. The project start-up schedule is under review. Average annual production from Kucing Liar at full operating rates would approximate 750 million pounds of copper and 735 thousand ounces of gold and would enable continuity of large-scale production in the Grasberg minerals district.

Added in the 10-Q for fiscal Q3 2026

Under “Indonesia”

Long-Term Mining Rights. In February 2026, we and PTFI entered into a Memorandum of Understanding (MOU) with the Indonesia government for a life of resource extension of operating rights in the Grasberg minerals district beyond the current expiration in 2041. Under the terms of the MOU, we would maintain our current ownership interest in PTFI of 48.76% through 2041 and hold approximately 37% beginning in 2042. The existing governance and operating structure, and terms of the existing shareholder agreement, IUPK and other agreements in effect will continue over the life of the resource.

Added in the 10-Q for fiscal Q3 2026

Under “Indonesia”

In June 2026, PTFI submitted its application for extension of its IUPK, and we and PTFI are working with the Indonesia government to complete the formal license process. The extension of operating rights and other terms are subject to, among other things, the Indonesia government’s issuance of an amended IUPK and entry into definitive agreements.

Grasberg Block Cave Ramp-Up. Following the September 2025 external mud rush incident, PTFI has made significant progress with the ramp-up of the Grasberg Block Cave underground mine to achieve a safe and sustainable ramp-up to full operating capacity.

Show the rest (359 words)

In third-quarter 2026, mill throughput averaged 141 thousand metric tons of ore per day (approximately 67% of capacity), including 70 thousand metric tons of ore per day from the Grasberg Block Cave underground mine. PTFI continues to expect to reach 80% of capacity in mid-2027 and approach full capacity by year-end 2027.

PTFI completed remediation and restoration activities required for the restart of Production Blocks 2 and 3 and commenced initial ramp-up activities at the end of March 2026. Initial upgrades to the material handling system at the Grasberg Block Cave haulage level have progressed on schedule with expected completion by early 2027. Preparations continue for the targeted restart of production from Production Block 1S by mid-2027.

Downstream Processing Facilities. PTFI’s smelter and PT Smelting (PTFI’s 66%-owned smelter and refinery in Gresik, Indonesia) smelt and refine copper concentrate from PTFI, and the precious metals refinery (PMR) processes anode slimes from PTFI’s smelter and PT Smelting.

PTFI has combined smelting capacity, including PT Smelting, to produce up to approximately 800,000 metric tons of copper cathode annually, and the PMR is capable of processing all of PTFI’s gold production.

Construction of PTFI’s smelter was completed in 2024. During start-up activities, a fire that occurred in October 2024 resulted in a temporary suspension of smelting operations to complete repairs. Operations commenced in May 2025, and PTFI’s smelter produced its first copper cathode in July 2025. As part of start-up activities, PTFI commenced gold production from the PMR in December 2024 and operated on a limited basis during 2025, primarily processing anode slimes from PT Smelting.

Following the September 2025 external mud rush incident, during the ramp-up period of the Grasberg Block Cave underground mine, smelting operations at both PTFI’s smelter and PT Smelting were adjusted as a result of limited copper concentrate availability. PT Smelting resumed operations in late 2025 and PTFI’s smelter successfully re-commenced operations in late August 2026. Ramp-up activities continue to progress in line with expectations.

The PMR continues to operate on a limited basis following the September 2025 external mud rush incident, primarily processing slimes from PT Smelting, and has recently started to receive slimes from PTFI’s smelter.

Added in the 10-Q for fiscal Q3 2026

Under “Indonesia”

Labor Matters. In March 2026, PTFI reached a new two-year collective labor agreement (CLA) with its three employee unions at its Grasberg minerals district operations. PTFI did not incur any significant nonrecurring costs associated with the new CLA.

Added in the 10-Q for fiscal Q3 2026

Under “Indonesia”

In Indonesia, abnormally dry weather conditions have been generally favorable for mining but present various challenges in the milling process. Water availability for the operations and site infrastructure is being actively managed with limited impacts to production to date. Extended periods without precipitation may impact future mill rates and mitigation efforts will continue to be implemented during this period.

Added in the 10-Q for fiscal Q3 2026

Under “Gross Profit per Pound of Copper and per Ounce of Gold”

a.Reflects downstream tolling fees and operating costs and does not represent market treatment and refining rates. Favorable offsets associated with incremental metals and sulfuric acid produced by PTFI’s downstream processing facilities are included in revenues and by-product credits.

Added in the 10-Q for fiscal Q3 2026

Under “Downstream Processing Facilities”

Sulfuric acid production from our smelters in the U.S., Spain and Indonesia, together with our sulfur burner plant at the Safford mine, generally exceeds the requirements of our SX/EW leaching operations. Accordingly, volatility in the price of sulfuric acid is not expected to have a material impact on our consolidated results. Certain of our SX/EW leaching operations in the U.S. and South America purchase sulfuric acid from third parties, and while sulfuric acid price fluctuations may impact costs for these mining operations, favorable offsets associated with sulfuric acid sales by our smelters are reflected in revenues.

PTFI is a fully integrated producer of refined copper, gold and silver. PTFI’s smelter and PT Smelting smelt and refine copper concentrate from PTFI’s mines in the Grasberg minerals district, and the PMR processes anode slimes from the smelter and PT Smelting. PTFI’s treatment charges, which are recorded in production and delivery costs, reflect downstream tolling fees and operating costs and do not represent market treatment and refining rates. Favorable offsets associated with incremental metals and sulfuric acid produced and sold by PTFI’s downstream processing facilities are included in revenues and by-product credits.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Grasberg Minerals District Mud Rush Incident”

We and PTFI, including external experts, are completing an investigation of the root cause of the incident and to identify actions required to safeguard against recurrence. In parallel, and in coordination with Indonesia government authorities, future production plans are being evaluated and damage assessments are being completed.

During third-quarter 2025, PTFI recorded charges totaling $195 million associated with the mud rush incident, including $152 million for idle facility costs and $43 million related to recovery efforts. During the phased restart and ramp-up of operations in fourth-quarter 2025 and in 2026, a portion of PTFI’s cost of sales are expected to be recognized as idle facility costs, which are non-inventoriable costs.

Show the rest (308 words)

As of September 30, 2025, PTFI had limited access to the area where the incident occurred and was unable to adequately assess damage to the impacted assets. Accordingly, no impairment charges were recorded in third-quarter 2025. Upon completion of damage assessments and evaluation of the affected infrastructure in fourth-quarter 2025, PTFI expects to write-off the carrying value of assets determined to be damaged beyond repair. Furthermore, we do not believe the incident indicates a broader impairment of PTFI’s long-lived mining assets based on PTFI’s reserve life, favorable market outlook for metal prices and expected resumption of operations at the Grasberg Block Cave underground mine in the near term.

While evaluation of PTFI’s operating plans, including production and sales estimates and cost and capital budgets are ongoing, and revised plans are expected to be finalized following completion of the investigation and damage assessments, we expect the incident to have a significant impact on our fourth-quarter 2025 and 2026 operating and financial results. FCX plans to hold a conference call with analysts and investors on November 18, 2025, to provide a report on the investigation of the mud rush incident and present FCX’s multi-year operational and financial outlook, including for PTFI.

PTFI is seeking recovery of damages under its property and business interruption insurance policies, which cover up to $1.0 billion in losses (subject to a limit of $0.7 billion on underground incidents), after a $0.5 billion deductible. PTFI’s ability to recover damages under its insurance coverage with respect to the mud rush incident is subject to certain conditions. Any amounts recoverable under PTFI’s insurance policies will be reflected in future periods in which recovery is considered realizable in accordance with the gain contingency accounting guidance.

As a result of the incident and impact on operations, PTFI has also notified certain commercial counterparties of a force majeure under its contracts.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Leaching and Technology Innovation Initiatives”

We continue to apply operational enhancements on a larger scale and are advancing testing of innovative technology to increase production from these initiatives. We are targeting annual production of 300 million pounds of copper in 2026 from these initiatives and believe we have the potential for further significant increases in recoverable metal beyond the current target run rate. We are performing large-scale testing at our Morenci operations of an internally developed additive product with the potential to enhance copper recovery. In addition, we have identified other possible additives with strong potential and plan to apply heat with the new additives to further enhance recoveries. Continued success with these initiatives would be expected to contribute to favorable adjustments in recoverable copper in leach stockpiles and favorably impact average unit net cash costs.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “U.S. Tariffs”

Our third-quarter 2025 costs were not significantly impacted by U.S. tariffs, and we are continuing to monitor impacts on our business, cost structure and supply chains associated with tariffs on U.S. imports. Based on our current supply chains and discussions with suppliers, we estimate that the tariffs in effect and announced to date could have the potential to increase the costs of goods purchased in the U.S. by approximately 5%, primarily reflecting the potential pass-through of tariffs incurred by suppliers. Efforts continue to evaluate alternative sourcing options to mitigate potential impacts.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “United States”

We have a potential expansion project to more than double the concentrator capacity of the Bagdad operation in northwest Arizona. Bagdad’s reserve life currently exceeds 80 years and supports an expanded operation. We completed technical and economic studies in late 2023 and continue to monitor capital cost trends and opportunities for value engineering. These studies indicate the opportunity to construct new concentrating facilities to increase copper production by 200 to 250 million pounds per year. Estimated incremental project capital costs, which continue to be reviewed, approximate $3.5 billion. Expanded operations would provide improved efficiency and reduce unit net cash costs through economies of scale. Project economics indicate that the expansion would require an incentive copper price of less than $4.00 per pound and three to four years to complete. The decision to proceed with and timing of the potential expansion will take into account overall copper market conditions and other factors.

In October 2025, the conversion of Bagdad’s haul truck fleet to autonomous haulage was substantially complete, making Bagdad the first major mine in the U.S. to operate a fully autonomous haulage fleet. We expect to continue to optimize the performance of the new autonomous fleet, and Bagdad is advancing projects to expand tailings facilities and local infrastructure to enhance optionality in the future expansion opportunity.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “United States”

a.During the third quarter and first nine months of 2025, our average U.S. copper price realization, which is generally based on COMEX settlement prices, was approximately 7% to 9% higher than the average copper price realizations for our South America and Indonesia operations, which are generally based on LME settlement prices. Refer to “Markets.”

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Gross Profit per Pound of Copper and Molybdenum”

We expect our average unit net cash costs (net of by-product credits) for our U.S. copper mines to continue to trend lower for the year 2025 and in 2026, compared to 2024 levels, reflecting the projected impact of efficiencies, improved volumes and cost reduction plans currently in progress.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “South America”

South America operations include open-pit mining, sulfide-ore concentrating, leaching and SX/EW facilities. Production from our South America operations is sold as copper concentrate or cathode under long-term contracts.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Gross Profit per Pound of Copper”

In October 2025, El Abra and its two workers' unions signed new CLAs, which expire on April 30, 2029. No significant charges are expected to be recorded in fourth-quarter 2025 associated with the new CLAs.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Indonesia”

Grasberg Minerals District Mud Rush Incident. On September 8, 2025, PTFI experienced a mud rush incident, which was unprecedented in its multi-decade history of block cave mining in the Grasberg minerals district. During the incident, a sudden rush of approximately 800,000 metric tons of wet material entered the Grasberg Block Cave underground mine from the former Grasberg open pit and traveled rapidly to multiple levels of the mine, including a service level where seven team members were later found deceased.

Mining operations were temporarily suspended following the incident to prioritize the recovery of the seven team members fatally injured during the incident and to conduct an investigation into the root cause of the incident. The recovery efforts were completed on October 5, 2025, and the investigation is advancing toward completion. Damage assessments, which are expected to be completed by year-end 2025, are being conducted in parallel with ongoing mud removal activities.

In late October 2025, PTFI restarted operations at the unaffected Big Gossan and DMLZ underground mines. A phased restart and ramp-up of the Grasberg Block Cave underground mine is anticipated to begin during 2026. We and PTFI, including external experts, are completing an investigation of the root cause of the incident and to identify actions required to safeguard against recurrence. In parallel, and in coordination with Indonesia government authorities, future production plans are being evaluated and damage assessments are being completed.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Indonesia”

PTFI’s Downstream Processing Facilities. In July 2025, PTFI’s new smelter in Eastern Java, Indonesia, produced its first copper cathode. The PMR, which commenced operations in December 2024, continued its ramp-up during third-quarter 2025, processing anode slimes from PT Smelting.

Following the September 2025 mud rush incident and related suspension of mining activities at the Grasberg minerals district, smelting and refining operations at PTFI’s downstream processing facilities and at PT Smelting have operated with limited availability and are currently on stand-by status, pending the delivery of copper concentrate.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Indonesia”

PTFI is preparing its application for a long-term extension expected to cover the life of the resource, which is expected to be submitted in fourth-quarter 2025. In connection with the extension, PTFI expects to pursue additional exploration, conduct studies for future additional development and expand its social programs. We expect to maintain our ownership interest of approximately 49% through 2041 and would transfer an additional interest in PTFI to a state-owned enterprise beginning in 2042, leaving us to hold an approximately 37% interest. We also expect the existing governance agreements would continue over the life of the resource.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Downstream Processing Facilities”

PTFI smelts and refines copper concentrate from its mining operations and operates a PMR to process anode slimes from its smelter and PT Smelting. With the completion of its newly constructed downstream processing facilities, PTFI became a fully integrated producer of refined copper and gold. Treatment charges reflecting the cost of smelting and refining operations are recorded in production and delivery costs.

During third-quarter 2025, PT Smelting completed a planned major maintenance turnaround. However, operational challenges with a third-party oxygen plant caused a delay in the restart of operations. As a result, $39 million of tolling fees paid by PTFI in third-quarter 2025 were recognized as idle facility costs.

In addition to our innovative leaching initiatives, we are pursuing opportunities to leverage new …+12 / −12 words · under “Leaching and Technology Innovation Initiatives”

[… 21 unchanged words …] operating practices with a goal of improving operating efficiencies and reducing costs and capital intensity of our current operations and future development projects. We believe these our innovative leaching and technology initiatives are particularly important to will strengthen our U.S. operations, which have lower ore grades. operational performance and enhance opportunities for profitable growth.

The Copper Mark. We demonstrate our responsible production performance through a comprehensive assurance framework …+16 / −3 words · under “Responsible Production”

The Copper Mark. We demonstrate our responsible production performance through the Copper Mark, a comprehensive assurance framework under Veramark Assurance (formerly the Copper Mark) developed specifically for the copper industry, and extended to other metals, including molybdenum. To achieve the Copper Mark and Molybdenum Mark, as applicable, each site is required to complete an independent external assurance process to assess conformance with various environmental, social and governance criteria. Awarded sites must be revalidated every three years. We have achieved, and are committed to maintaining, the Copper Mark and Molybdenum Mark, as applicable, at all of our operating sites globally.

$131 million for the first nine months of 2025. We estimate the costs of …+2 / −56 words · under “Feasibility and Optimization”

We are engaged in various studies associated with potential future expansion projects primarily at our mining operations. We are also undertaking optimization projects at our current mining operations to enhance efficiencies and reduce costs. The costs for these studies are charged to production and delivery costs as incurred and totaled $43 million in third-quarter 2025, $45 million in third-quarter 2024, $131 million for the first nine months of 2025. and $117 million for the first nine months of 2024. We estimate the costs of these studies and projects will approximate $200 million for the year 2025, 2026, subject to market conditions and other factors.

Government actions related to tariffs and other controls on imports and exports or trade …+20 / −4 words · under “U.S. Tariffs”

Governmental action Government actions related to tariffs and other controls on imports and exports or trade agreements or policies of the U.S. and other countries are difficult to predict and have caused, and may continue to in the future cause, significant volatility in our financial performance and in the trading prices of our common stock. Refer to “Risk Factors” in Part I, Item 1A. of our 2024 2025 Form 10-K and Part II, Item 1A. herein for further discussion.

Section 232 Tariffs. Effective in August 2025, a 50% tariff was imposed under Section …+7 / −26 words · under “U.S. Tariffs”

Section 232 Tariffs. Effective in August 1, 2025, a 50% tariff was imposed under Section 232 of the Trade Expansion Act, targeting U.S. imports of semi-finished copper products and copper-intensive derivative products. However, refined copper, including cathodes, concentrates and scrap, was exempted from the tariff, and the U.S. government has indicated it will would reassess by mid-2026 the potential for a refined copper tariff of 15% beginning in January 2027 and rising to 30% in 2028. Refer to “Markets” for further discussion of The differential between LME and COMEX copper prices as a result of U.S. trade policy announcements. evaluation remains open.

Additionally, the U.S. Secretary of Commerce was directed to impose requirements that 25% of …+15 / −0 words · under “U.S. Tariffs”

Additionally, the U.S. Secretary of Commerce was directed to impose requirements that 25% of copper cathode and concentrate produced in the U.S. be sold domestically in 2027, potentially increasing to 30% in 2028 and 40% in 2029. Because of our integrated operations, these requirements are not expected to negatively impact our business.

Our U.S. copper operations include open-pit mining, sulfide-ore concentrating, leaching and solution extraction/electrowinning (SX/EW) …+0 / −17 words · under “United States”

[… 28 unchanged words …] into copper rod by our U.S. Rod & Refining segment. The remainder of our U.S. copper production is sold as copper cathode or copper concentrate. a portion of which is shipped to Atlantic Copper (our wholly owned smelter and refinery in Spain). Molybdenum concentrate, gold and silver are also produced by certain of our U.S. copper operations.

Consolidated copper sales volumes from our U.S. copper mines totaled 333 million pounds in …+23 / −0 words · under “United States”

Consolidated copper sales volumes from our U.S. copper mines totaled 333 million pounds in third-quarter 2026, 339 million pounds in third-quarter 2025, 972 million pounds for the first nine months of 2026 and 954 million pounds for the first nine months of 2025. Consolidated copper sales from our U.S. mines are expected to approximate 1.3 billion pounds for the year 2025. 2026. Refer to “Outlook” for projected molybdenum sales volumes.

b.Includes charges for feasibility studies and optimization projects totaling $0.08 per pound of copper …+11 / −10 words · under “Gross Profit per Pound of Copper and Molybdenum”

b.Includes charges for feasibility studies and optimization studies projects totaling $0.08 per pound of copper in third-quarter 2026, $0.07 per pound of copper in third-quarter 2025, $0.06 per pound of copper in third-quarter 2024, for the first nine months of 2026 and $0.07 per pound of copper for the first nine months of 2025. and $0.05 per pound of copper for the first nine months of 2024.

Our U.S. copper mines have varying cost structures because of differences in ore grades …+66 / −28 words · under “Gross Profit per Pound of Copper and Molybdenum”

Our U.S. copper mines have varying cost structures because of differences in ore grades and characteristics, processing costs, by-product credits and other factors. Higher average unit net cash costs (net of by-product credits) for our U.S. copper mines totaled of $3.16 per pound of copper in third-quarter 2026, compared to $3.11 per pound of copper in third-quarter 2025, $3.24 reflect the impact of lower volumes from reduced productivity and higher costs for energy (primarily diesel) and other inputs, partially offset by higher by-product credits. Lower average unit net cash costs for our U.S. copper mines of $3.01 per pound of copper in third-quarter 2024, for the first nine months of 2026, compared to $3.09 per pound of copper for the first nine months of 2025, and $3.13 per pound of copper for the first nine months of 2024. Lower average unit net cash costs in the 2025 periods, compared to the 2024 periods, primarily reflect higher copper volumes and higher molybdenum by-product credits and volumes, partially offset by higher costs for energy (primarily diesel) and other inputs.

Based on achievement of current sales volume and cost estimates, and assuming an average …+21 / −21 words · under “Gross Profit per Pound of Copper and Molybdenum”

Based on achievement of current sales volume and cost estimates, and assuming an average price of $32.00 per pound of molybdenum in fourth-quarter 2026, average unit net cash costs (net of by-product credits) for our U.S. copper mines are expected to approximate $3.03 $3.08 per pound of copper for the year 2025, based on achievement of current sales volume and cost estimates, and assuming an average price of $25.00 per pound of molybdenum in fourth-quarter 2025. 2026. Our U.S. copper mines’ average unit net cash costs for the year 2025 2026 would change by approximately $0.01 per pound for each $2 per pound change in the average price of molybdenum in fourth-quarter 2025. 2026.

We manage two copper operations in South America – Cerro Verde in Peru (55.66%-owned) …+16 / −2 words · under “South America”

We manage two copper operations in South America – Cerro Verde in Peru (55.08%-owned) (55.66%-owned) and El Abra in Chile (51%-owned). which These operations are consolidated in our financial statements. In addition to copper, the Cerro Verde mine produces molybdenum concentrate and silver.

Development Activities. At the El Abra operations in Chile, we are advancing the permitting …+43 / −49 words · under “South America”

Development Activities. At the El Abra operations in Chile, we have completed substantial drilling and evaluations are advancing the permitting process for a significant expansion opportunity to define include a large sulfide resource that could support a potential major mill project facility similar to the large-scale concentrator at Cerro Verde. The estimated resource approximates 20 billion recoverable pounds of copper, which project could result in the addition of 750 over 700 million pounds of copper production per year. We have advanced stakeholder engagement and preparation of our permitting application and plan to submit In March 2026, El Abra submitted an environmental impact statement in first-quarter 2026. study to Chile regulatory authorities and continues to advance the regulatory process. Preliminary estimates, which remain under review, indicate that the project capital costs of approximately $7.5 billion (based on estimates prepared in 2024) with project economics would be supported using an incentive copper price of less than $4.00 per pound. The decision to proceed with and timing of the potential project will take into account overall copper required permitting, market conditions required permitting and other factors.

Our consolidated copper sales volumes from South America operations totaled 263 million pounds in …+43 / −7 words · under “South America”

Higher Our consolidated copper sales volumes from our U.S. mines South America operations totaled 263 million pounds in third-quarter 2026, 278 million pounds in third-quarter 2025, 756 million pounds for the first nine months of 2026 and 818 million pounds for the first nine months of 2025. Lower copper sales volumes in the 2025 2026 periods, compared to the 2024 2025 periods, primarily reflect higher operating rates slightly lower production resulting from lower ore grades. Copper sales volumes for the first nine months of 2026 were also impacted by lower leach placements and ore grades.

a.Includes charges for feasibility studies and optimization projects totaling $0.05 per pound of copper …+10 / −72 words · under “Gross Profit per Pound of Copper”

Our South America operations have varying cost structures because of differences in ore grades a.Includes charges for feasibility studies and characteristics, processing costs, by-product credits and other factors. Average unit net cash costs (net of by-product credits) for South America operations totaled $2.30 optimization projects totaling $0.05 per pound of copper in third-quarter 2025, $2.44 per pound of copper in third-quarter 2024, $2.38 2026, $0.04 per pound of copper for the first nine months of 2025 2026 and $2.50 $0.06 per pound of copper for in the third quarter and first nine months of 2024. Lower average unit net cash costs in the 2025. periods, compared to the 2024 periods, reflect higher by-product credits and lower treatment charges, partly offset by the impact of lower copper volumes.

b.Includes charges for materials and supplies inventory write-offs totaling $0.05 per pound of copper …+13 / −49 words · under “Gross Profit per Pound of Copper”

d.Includes b.Includes charges for operational readiness materials and startup costs associated with PTFI’s downstream processing facilities supplies inventory write-offs totaling $0.23 $0.05 per pound of copper in third-quarter 2025, $0.09 per pound of copper in third-quarter 2024, $0.17 per pound of copper for the first nine months of 2025 2026 and $0.06 per pound of copper for the first nine months of 2024. Also includes charges for amounts capitalized in prior years associated with the construction of PTFI’s downstream processing facilities totaling $0.02 per pound of copper for the first nine months of 2025 and $0.03 2026. Also includes charges for stockpile inventory write-offs totaling $0.01 per pound of copper for the first nine months of 2024. 2026.

Average unit net cash costs (net of by-product credits) for South America operations were …+73 / −14 words · under “Gross Profit per Pound of Copper”

Consolidated copper sales volumes from our Average unit net cash costs (net of by-product credits) for South America operations were lower $2.39 per pound of copper in third-quarter 2026, $2.30 per pound of copper in third-quarter 2025, $2.41 per pound of copper for the first nine months of 2026 and $2.38 per pound of copper for the first nine months of 2025. Higher average unit net cash costs in the 2025 2026 periods, compared to the 2024 2025 periods, primarily reflecting anticipated reflect lower leach production copper volumes and mill ore grades. higher costs for employee profit sharing at Cerro Verde, energy (primarily diesel) and other inputs, and maintenance and contractor costs at El Abra, partially offset by higher by-product credits.

Based on achievement of current sales volume and cost estimates and assuming an average …+45 / −16 words · under “Gross Profit per Pound of Copper”

Based on achievement of current sales volume and cost estimates and assuming an average price of $32.00 per pound of molybdenum in fourth-quarter 2026, average unit net cash costs (net of by-product credits) for our South America operations are expected to approximate $2.45 $2.59 per pound of copper for the year 2025, based on achievement of current sales volume and cost estimates, and assuming an 2026. Our South America operations’ average unit net cash costs for the year 2026 would change by approximately $0.02 per pound for each $2 per pound change in the average price of $25.00 per pound of molybdenum in fourth-quarter 2025. 2026.

PTFI operates one of the world’s largest copper and gold mines at the Grasberg …+28 / −28 words · under “Indonesia”

PTFI operates one of the world’s largest copper and gold mines at the Grasberg minerals district in Central Papua, Indonesia. In addition to copper and gold, the Grasberg minerals district also produces silver. With the completion of its downstream processing facilities, PTFI produces is a fully integrated producer of refined copper, concentrate that contains significant quantities of gold and silver. We have a 48.76% ownership interest in PTFI and manage its operations. PTFI's results are consolidated in our financial statements. With the completion of PTFI’s newly constructed downstream processing facilities, PTFI became a fully integrated producer of refined copper and gold.

PTFI has identified additional exploration targets to leverage its infrastructure in the Grasberg minerals …+16 / −8 words · under “Indonesia”

PTFI is also conducting has identified additional exploration targets to leverage its infrastructure in the Grasberg minerals district, targeting the including a potential extension of significant mineralization below the DMLZ underground mine, which requires further drilling and evaluation.

As of September 30, 2026, PTFI has incurred approximately $1.6 billion for Kucing Liar …+5 / −116 words · under “Indonesia”

Kucing Liar. PTFI is conducting long-term mine development activities at its Kucing Liar deposit in the Grasberg minerals district. Kucing Liar is expected to produce over 7 billion pounds of copper and 6 million ounces of gold between 2029 and the end of 2041, and an extension of PTFI’s operating rights beyond 2041 would extend the life of the project. Development activities commenced in 2022 and are expected to continue over an approximate 10-year timeframe. As of September 30, 2025, 2026, PTFI has incurred approximately $1.0 $1.6 billion for Kucing Liar development, and capital investments are estimated to total approximate an additional $4 billion over the next seven to eight years through 2033 (averaging approximately $0.5 billion per year). At full operating rates, annual production from Kucing Liar is expected to approximate 560 million pounds of copper and 520 thousand ounces of gold, providing PTFI with sustained long-term, large-scale and low-cost production. Kucing Liar will benefit from substantial shared infrastructure and PTFI’s experience and long-term success in block-cave mining.

An extension would enable continuity of large-scale operations for the benefit of all stakeholders …+0 / −35 words · under “Indonesia”

Long-term Mining Rights. With the completion of PTFI’s downstream processing facilities during 2025, FCX and PTFI have advanced discussions with the Indonesia government for a long-term extension of PTFI’s operating rights beyond the current expiration in 2041. An extension would enable continuity of large-scale operations for the benefit of all stakeholders and provide growth options through additional resource development opportunities in the highly attractive Grasberg minerals district.

We expect higher variability between PTFI’s production and sales until its downstream processing facilities …+2 / −27 words · under “Indonesia”

Smelting operations in Indonesia operated with limited availability since the incident, and both smelters are currently on stand-by status pending the delivery of copper concentrate. We expect higher variability between PTFI PTFI’s production and sales until PTFI’s its downstream processing facilities achieve normalized operating rates.

Natural Gas Facilities. PTFI plans to transition its existing energy source from coal to …+36 / −9 words · under “Indonesia”

Natural Gas Facilities. PTFI plans to transition its existing energy source from coal to natural gas, which would meaningfully reduce PTFI’s greenhouse gas emissions at the Grasberg minerals district. Following the September 2025 external mud rush incident, PTFI’s planned investments for in a new gas-fired combined cycle combined-cycle power facility have been were deferred. by 18 months. Current plans contemplate completion of the infrastructure in 2029, with natural gas initially supplied to the existing dual-fuel power plant with commissioning of the new facility scheduled in the second half of 2029. Once complete, PTFI’s dual-fuel power plant and the new gas-fired combined cycle combined-cycle facility will be fueled by natural gas supplied by a floating liquefied natural gas storage and regassification regasification unit.

Historically, PTFI recognized concentrate sales upon loading of shipments; however, as a fully integrated …+20 / −9 words · under “Indonesia”

Historically, PTFI recognized concentrate sales upon loading of shipments; however, as a fully integrated producer of refined copper, gold and silver, PTFI’s future concentrate production will be is now processed by PT Smelting and its smelter, and refined sales will be are recognized after processing and sale of the metal. Accordingly, PTFI there may experience higher be variability in the timing between production and sales volumes.

Consolidated sales volumes from PTFI are expected to approximate 0.7 billion pounds of copper …+26 / −28 words · under “Indonesia”

Consolidated sales volumes from PTFI are expected to approximate 1.2 0.7 billion pounds of copper and 1.0 0.6 million ounces of gold for the year 2025, which assumes minimal fourth-quarter 2025 sales prior to a phased ramp-up of refined 2026. Copper and gold production volumes for the year 2026 are expected to exceed sales in 2026. We expect higher variability between PTFI production volumes, reflecting deferrals of approximately 100 million pounds of copper and sales until 70 thousand ounces of gold associated with inventory held at PTFI’s downstream processing facilities achieve normalized operating rates. smelting operations.

b.Includes idle facility costs associated with the September 2025 external mud rush incident totaling …+14 / −40 words · under “Gross Profit per Pound of Copper and per Ounce of Gold”

c.Includes charges (i) for b.Includes idle facility costs and recovery efforts associated with the September 2025 external mud rush incident totaling $0.47 $0.42 per pound of copper in third-quarter 2026, $0.07 per pound of copper in third-quarter 2025, $0.61 per pound of copper for the first nine months of 2026 and $0.16 $0.02 per pound of copper for the first nine months of 2025. (ii) tolling fees that were recognized as idle facility costs associated with PT Smelting’s planned maintenance turnaround totaling $0.11 per pound of copper in third-quarter 2025 and $0.04 per pound of copper for the first nine months of 2025 and (iii)

c.Includes idle facility, direct recovery and restoration costs associated with the September 2025 external …+20 / −20 words · under “Gross Profit per Pound of Copper and per Ounce of Gold”

b.Includes c.Includes idle facility, direct recovery and restoration costs resulting from associated with the September 2025 external mud rush incident totaling $0.07 $1.59 per pound of copper in third-quarter 2026, $0.47 per pound of copper in third-quarter 2025, $2.40 per pound of copper for the first nine months of 2026 and $0.02 $0.16 per pound of copper for the first nine months of 2025. (refer to note c below for additional idle facility costs included in noncash and other costs, net).

d.Includes operational readiness and start-up costs associated with PTFI’s downstream processing facilities totaling $0.14 …+39 / −10 words · under “Gross Profit per Pound of Copper and per Ounce of Gold”

a.Includes $0.12 d.Includes operational readiness and start-up costs associated with PTFI’s downstream processing facilities totaling $0.14 per pound of copper in third-quarter 2024 2026 and $0.11 $0.08 per pound of copper for the first nine months of 2024 for nonrecurring labor-related charges at Cerro Verde 2026, and a gain associated with new CLAs. insurance recoveries related to the October 2024 incident at PTFI’s smelter totaling $0.06 per pound of copper in third-quarter 2026 and $0.02 per pound of copper for the first nine months of 2026.

e.Includes charges for (i) operational readiness and start-up costs associated with PTFI’s downstream processing …+87 / −9 words · under “Gross Profit per Pound of Copper and per Ounce of Gold”

e.Includes charges for (i) operational readiness and start-up costs associated with PTFI’s downstream processing facilities totaling $0.23 per pound of copper in third-quarter 2025 and $0.17 per pound of copper for the first nine months of 2025, (ii) tolling fees that were recognized as idle facility costs associated with PT Smelting’s planned maintenance turnaround totaling $0.11 per pound of copper in third-quarter 2025 and $0.04 per pound of copper for the first nine months of 2025 and (iii) remediation costs related to the October 2024 fire incident at the PTFI’s smelter not recoverable under PTFI’s construction insurance program totaling $0.07 per pound of copper in third-quarter 2025 and $0.05 per pound of copper for the first nine months of 2025. The first nine months of 2025 also include $0.02 per pound of copper related to the reversal of previously capitalized land lease costs associated with PTFI’s downstream processing facilities.

Excluding amounts recognized as idle facility, direct recovery and restoration costs, PTFI’s unit net …+23 / −58 words · under “Gross Profit per Pound of Copper and per Ounce of Gold”

A significant portion of PTFI’s Excluding amounts recognized as idle facility, direct recovery and restoration costs, are fixed and unit costs will vary depending on volumes and other factors. PTFI’s unit net cash credits (including by-product credits) were totaled $0.84 per pound of copper in third-quarter 2026, $0.92 per pound of copper in third-quarter 2025, $0.71 $1.40 per pound of copper in third-quarter 2024, for the first nine months of 2026 and $0.53 per pound of copper for the first nine months of 2025, and $0.34 per pound of copper for the first nine months of 2024. Favorable unit net cash credits in the 2025 periods, compared with the 2024 2026 periods primarily reflect lower treatment charges, partly offset by reflecting the impact of lower copper and gold volumes. and higher export duties. In addition, the first nine months of 2025 benefited from higher gold credits.

Treatment charges reflect downstream tolling fees and operating costs and vary with the volume …+66 / −11 words · under “Gross Profit per Pound of Copper and per Ounce of Gold”

Treatment charges reflect downstream tolling fees and operating costs and vary with the volume of metals sold and the price of copper, and royalties vary with the volume of metals sold and the prices of copper, gold and silver. As a fully integrated producer of refined copper, gold and silver in Indonesia, there may be variability in the decrease rate of royalties per pound of copper as a result of the ratio of copper sales to gold and silver sales. The increase in treatment charges and royalties per pound of copper in the 2025 2026 periods, compared to the 2024 2025 periods, primarily reflects lower treatment charge rates as a result of favorable market conditions. copper volumes and higher costs associated with PTFI’s integrated downstream operations.

Because certain assets are depreciated on a straight-line basis, PTFI’s unit depreciation rate may …+34 / −0 words · under “Gross Profit per Pound of Copper and per Ounce of Gold”

Because certain assets are depreciated on a straight-line basis, PTFI’s unit depreciation rate may vary with asset additions and the level of copper volumes and changes in copper and gold inventory. PTFI’s DD&A per pound of copper for the 2026 periods primarily reflects the impact of lower copper sales volumes. The first nine months of 2026 also reflect higher depreciation associated with placing assets into service in 2025.

Based on achievement of current sales volume and cost estimates and assuming an average …+28 / −40 words · under “Gross Profit per Pound of Copper and per Ounce of Gold”

Average unit net cash credits (including by-product credits and excluding estimated expenses attributable to the September 2025 mud rush incident at PTFI for idle facility costs and recovery efforts) for PTFI are expected to approximate $0.53 per pound of copper for the year 2025, Based on achievement of current sales volumes volume and cost estimates and assuming an average price of $4,000 per ounce of gold in fourth-quarter 2025. 2026, average unit net cash credits (including by-product credits and excluding idle facility and restoration costs) for PTFI are expected to approximate $1.25 per pound of copper for the year 2026. PTFI’s average unit net cash credits for the year 2025 2026 would change by approximately $0.01 $0.04 per pound of copper for each $100 per ounce change in the average price of gold in fourth-quarter 2025. 2026.

Operating Activities. Production from the Molybdenum mines totaled 8 million pounds of molybdenum in …+9 / −9 words · under “Molybdenum Mines”

Operating and Development Activities. Production from the Molybdenum mines totaled 8 million pounds of molybdenum in third-quarter both the third quarters of 2026 and 2025, 6 25 million pounds in third-quarter 2024, for the first nine months of 2026 and 26 million pounds for the first nine months of 2025. and 21 million pounds for the first nine months of 2024. Refer to “Consolidated Results” for our consolidated molybdenum operating data, which includes sales of molybdenum produced at our primary molybdenum mines operations and from our U.S. copper mines and Cerro Verde mine. Refer to “Outlook” for projected consolidated molybdenum sales volumes and to “Markets” for a discussion of molybdenum prices.

Average unit net cash costs for our Molybdenum mines totaled $20.04 per pound of …+18 / −17 words · under “Molybdenum Mines”

Average unit net cash costs for our Molybdenum mines were totaled $20.04 per pound of molybdenum in third-quarter 2026, $19.41 per pound of molybdenum in third-quarter 2025, $21.06 $18.19 per pound of molybdenum in third-quarter 2024, for the first nine months of 2026 and $15.60 per pound of molybdenum for the first nine months of 2025. and $18.59 per pound of molybdenum for the first nine months of 2024. Lower average Higher unit net cash costs in the 2025 2026 periods, compared with the 2024 2025 periods, primarily reflect higher volumes costs for supplies, labor and lower contract labor costs. energy (primarily diesel).

Average unit net cash costs for our Molybdenum mines are expected to approximate $18.66 …+12 / −13 words · under “Molybdenum Mines”

Based on achievement of current sales volumes and cost estimates, Average unit net cash costs for the our Molybdenum mines are expected to average approximately $15.61 approximate $18.66 per pound of molybdenum for the year 2025. 2026, based on achievement of current sales volume and cost estimates. Refer to “Product Revenues and Production Costs” for a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

Atlantic Copper smelts and refines copper concentrate and markets refined copper and precious metals …+10 / −10 words · under “Downstream Processing Facilities”

Atlantic Copper smelts and refines copper concentrate and markets refined copper and precious metals in slimes. During For the first nine months of 2025, 2026, Atlantic Copper’s Copper purchased 81% of its concentrate purchases included 22% from our copper mining operations and 78% from third parties and 19% from our South America operations. Atlantic Copper’s treatment charges, which consist of a base rate per pound of copper and per ounce of gold, are generally fixed and represent a [… 46 unchanged words …]

We defer recognizing profits on sales from our mining operations to Atlantic Copper until …+12 / −13 words · under “Downstream Processing Facilities”

We defer recognizing profits on sales from our mining operations to Atlantic Copper until final sales to third parties occur. Changes in these deferrals attributable to variability in intercompany volumes resulted in net additions (reductions) to operating income totaling $24 million ($8 million to net income attributable to common stock) in third-quarter 2026, $13 million ($15 million to net income attributable to common stock) in third-quarter 2025, $(42) $76 million ($(13) ($25 million to net income attributable to common stock) in third-quarter 2024, for the first nine months of 2026 and $161 million ($58 million to net income attributable to common stock) for the first nine months of 2025. and $79 million ($23 million to net income attributable to common stock) for the first nine months of 2024. Our net deferred profits on our inventories at Atlantic Copper to be recognized in future periods’ operating income totaled $52 $77 million ($17 ($25 million to net income attributable to common stock) at September 30, 2025. 2026. Quarterly variations in ore grades, the timing of intercompany shipments and changes in product prices will result in variability in our net deferred profits and quarterly earnings.

Capital Resources and Liquidity

2 added · 2 removed · 9 rewritten

Added in the 10-Q for fiscal Q3 2026

During the first nine months of 2026, FCX returned $955 million to shareholders, consisting of $650 million in common stock dividends and $305 million in share repurchases. Refer to Note 4 and “Financing Activities” below for further discussion.

Added in the 10-Q for fiscal Q3 2026

Under “Debt”

In September 2026, PTFI amended and restated its $1.75 billion, senior unsecured revolving credit facility and extended the maturity date from November 2028 to September 2031. The terms of the amended facility are substantially similar to PTFI’s prior facility. In addition, FCX’s and Cerro Verde’s revolving credit facilities were extended to 2031 earlier in 2026.

At September 30, 2026, there were no borrowings and $5 million in letters of credit issued under our revolving credit facility, PTFI had $250 million in borrowings outstanding under its revolving credit facility and Cerro Verde had no borrowings under its revolving credit facility. At September 30, 2026, Atlantic Copper had borrowings of $0.5 billion outstanding under short-term lines of credit used for working capital requirements.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

As of October 31, 2025, we have acquired a total of 52 million shares ($38.51 average cost per share) and have $3.0 billion available under our current share repurchase program. We had 1.4 billion shares of common stock outstanding at October 31, 2025. Refer to Note 4 for further discussion.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Investing Activities”

Insurance Recoveries. During third-quarter 2025, PTFI collected $25 million under its construction insurance program associated with the 2024 smelter fire incident. Additional recoveries are expected by early 2026.

Based on current sales volume, cost and metal price estimates and planned capital expenditures …+0 / −66 words

Based on current sales volume, cost and metal price estimates and planned capital expenditures discussed in “Outlook,” our available cash and cash equivalents plus our projected consolidated operating cash flows of $5.5 $8.5 billion for the year 2025 2026 exceed our expected consolidated capital expenditures of $4.5 $4.4 billion. While evaluation of PTFI’s operating plans, including production and sales estimates and cost and capital budgets are ongoing following the September 2025 mud rush incident, and revised plans are expected to be finalized following completion of the investigation and damage assessments, we expect the incident to have a significant impact on our fourth-quarter 2025 and 2026 operating and financial results (refer to “Grasberg Minerals District Mud Rush Incident” for further discussion).

We expect to have cash on hand and the financial flexibility to fund capital …+3 / −25 words

We expect to have cash on hand and the financial flexibility to fund capital expenditures and our other cash requirements for the next 12 months, including noncontrolling interest distributions, income tax payments, current common stock dividends (base and variable), senior note maturities and any share or debt repurchases. Planned capital expenditures for major projects over the next few years are primarily associated with underground mine development in the Grasberg minerals district and expansion projects in the U.S. At September 30, 2025, we had $4.3 billion in consolidated cash and cash equivalents, and FCX, PTFI and Cerro Verde have $3.0 billion, $1.5 billion and $350 million, respectively, of availability under their revolving credit facilities.

On September 23, 2026, our Board declared cash dividends totaling $0.15 per share on …+38 / −0 words

On September 23, 2026, our Board declared cash dividends totaling $0.15 per share on our common stock (including a $0.075 per share quarterly base cash dividend and a $0.075 per share quarterly variable, performance-based cash dividend), which were paid on November 2, 2026, to common stockholders of record on October 15, 2026. The declaration and payment of dividends (base or variable) and timing and amount of any share repurchases are at the discretion of our Board and [… 61 unchanged words …]

At September 30, 2026, consolidated debt totaled $9.4 billion, with a weighted-average interest rate …+17 / −17 words · under “Debt”

At September 30, 2025, 2026, consolidated debt totaled $9.3 $9.4 billion, with a weighted-average interest rate of 5.2%. Substantially all of our outstanding debt is fixed rate and our total debt has an average a weighted-average remaining duration maturity of approximately nine eight years. There are no PTFI has $0.7 billion in scheduled senior note maturities in April 2027, and FCX has $0.6 billion in scheduled senior note maturities in 2026 and $1.3 billion scheduled in the second half of 2027. Refer to Note 4 for further discussion of debt.

For the first nine months of 2026, we generated operating cash flows of $5.5 …+39 / −95 words · under “Operating Activities”

For the first nine months of 2026, we generated operating cash flows of $5.5 billion, net of $0.8 billion for working capital and other uses, and including $0.7 billion in pre-tax proceeds collected by PTFI for an insurance settlement associated with the September 2025 external mud rush incident. For the first nine months of 2025, we generated operating cash flows of $4.9 billion, net of $0.5 billion for working capital and other uses. for the first nine months of 2025 and $5.7 billion for the first nine months of 2024. Operating cash flows in the first nine months of 2025, compared with the first nine months of 2024, primarily reflect lower copper and gold sales volumes, which were impacted by the temporary suspension of operations at PTFI since the September 2025 mud rush incident, partly offset by higher copper and gold prices. Operating cash flows for the first nine months of 2025 were also impacted by an increase in accounts receivable associated with the timing of collections in the normal course of business and higher tax payments in Indonesia, partly offset by reserves associated with asbestos and talc claims (refer to Note 7).

Capital Expenditures. Capital expenditures, including capitalized interest, totaled $3.2 billion for the first nine …+32 / −22 words · under “Investing Activities”

Capital Expenditures. Capital expenditures, including capitalized interest, totaled $3.2 billion for the first nine months of 2026 and $3.5 billion for the first nine months of 2025, and $3.6 include amounts for major projects ($2.0 billion for the first nine months of 2024, 2026 and include amounts for major projects $1.7 billion for the first nine months of 2025), and $1.3 billion for the first nine months of 2024), primarily associated with underground mine development activities and supporting mill and power capital costs in the Grasberg minerals district, early works associated with the expansion project at Bagdad and for PTFI’s downstream processing facilities ($0.6 billion for the first nine months of 2025 and $1.0 billion for the first nine months of 2024). a leaching project at El Abra.

Debt Transactions. Net proceeds from debt totaled $15 million for the first nine months …+4 / −30 words · under “Financing Activities”

Debt Transactions. Net proceeds from debt totaled $15 million for the first nine months of 2026 and $337 million for the first nine months of 2025, primarily related to borrowings by Atlantic Copper under short-term lines of credit used for working capital requirements. Net proceeds from debt totaled $249 million for the first nine months of 2024, primarily related to borrowings under the PTFI revolving credit facility that were used to fund capital expenditures for its downstream processing facilities.

Cash Dividends and Distributions Paid to Noncontrolling Interests. Cash dividends and distributions paid to …+8 / −7 words · under “Financing Activities”

Cash Dividends and Distributions Paid to Noncontrolling Interests. Cash dividends and distributions paid to noncontrolling interests at our international operations totaled $0.6 billion for the first nine months of 2026 related to Cerro Verde and $1.3 billion (including $1.0 billion from PTFI) for the first nine months of 2025. and $1.3 billion (including $1.1 billion from PTFI) for the first nine months of 2024. Cash dividends and distributions to noncontrolling interests vary based on the operating results and cash requirements of our consolidated subsidiaries.

Treasury Stock Purchases. In the first nine months of 2026, we acquired 4.9 million …+24 / −0 words · under “Financing Activities”

Treasury Stock Purchases. In the first nine months of 2026, we acquired 4.9 million shares of our common stock for a total cost of $305 million ($62.69 average cost per share) under our share repurchase program. In the first nine months of 2025, we acquired 2.9 million shares of our common stock for a total cost of $107 million ($36.41 average cost per share). Refer to Note 4 for further discussion.

Contingencies

1 rewritten

Refer to Note 10 of our 2025 Form 10-K for further discussion regarding environmental …+0 / −23 words · under “Environmental Obligations and Asset Retirement Obligations (AROs)”

There have been no significant updates to our environmental obligations and AROs since December 31, 2024, other than as disclosed in Note 7. Refer to Note 10 of our 2024 2025 Form 10-K as updated in Note 7, for further discussion regarding environmental contingencies and AROs.

Critical Accounting Estimates

1 rewritten

Refer to our 2025 Form 10-K for a description of our critical accounting estimates …+20 / −92 words

MD&A is based on Refer to our consolidated financial statements, which have been prepared in conformity with U.S. GAAP. The preparation 2025 Form 10-K for a description of these statements requires our critical accounting estimates that we require us to make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses. We base There have been no changes from these estimates on historical experience and on assumptions that we consider reasonable under the circumstances; however, reported results could differ from those based on the current estimates under different assumptions or conditions. For a description of our critical accounting estimates that require us to make the most difficult, subjective or complex judgments, refer to our 2024 Form 10-K. We have not changed any of these policies from those previously disclosed in that report. estimates.

Product Revenues and Production Costs

14 added · 20 rewritten

Added in the 10-Q for fiscal Q3 2026

Under “U.S. Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs”

e.Represents Corporate, other & eliminations as presented in “Business Divisions and Segments.”

Added in the 10-Q for fiscal Q3 2026

Under “U.S. Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs”

e.Represents Corporate, other & eliminations as presented in “Business Divisions and Segments.”

Added in the 10-Q for fiscal Q3 2026

Under “U.S. Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs”

e.Represents Corporate, other & eliminations as presented in “Business Divisions and Segments.”

Added in the 10-Q for fiscal Q3 2026

Under “U.S. Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs”

e.Represents Corporate, other & eliminations as presented in “Business Divisions and Segments.”

Added in the 10-Q for fiscal Q3 2026

Under “South America Operations Product Revenues, Production Costs and Unit Net Cash Costs”

d.Represents Corporate, other & eliminations as presented in “Business Divisions and Segments.”

Added in the 10-Q for fiscal Q3 2026

Under “South America Operations Product Revenues, Production Costs and Unit Net Cash Costs”

d.Represents Corporate, other & eliminations as presented in “Business Divisions and Segments.”

Added in the 10-Q for fiscal Q3 2026

Under “South America Operations Product Revenues, Production Costs and Unit Net Cash Costs”

c.Represents the combined total for U.S. copper mines, Indonesia operations, Molybdenum mines, U.S. Rod & Refining and Atlantic Copper as presented in “Business Divisions and Segments.”

d.Represents Corporate, other & eliminations as presented in “Business Divisions and Segments.”

Added in the 10-Q for fiscal Q3 2026

Under “South America Operations Product Revenues, Production Costs and Unit Net Cash Costs”

c.Represents the combined total for U.S. copper mines, Indonesia operations, Molybdenum mines, U.S. Rod & Refining and Atlantic Copper as presented in “Business Divisions and Segments.”

d.Represents Corporate, other & eliminations as presented in “Business Divisions and Segments.”

Added in the 10-Q for fiscal Q3 2026

Under “Indonesia Operations Product Revenues, Production Costs and Unit Net Cash (Credits) Costs”

f.Represents Corporate, other & eliminations as presented in “Business Divisions and Segments.”

Added in the 10-Q for fiscal Q3 2026

Under “Indonesia Operations Product Revenues, Production Costs and Unit Net Cash (Credits) Costs”

f.Represents Corporate, other & eliminations as presented in “Business Divisions and Segments.”

Added in the 10-Q for fiscal Q3 2026

Under “Indonesia Operations Product Revenues, Production Costs and Unit Net Cash (Credits) Costs”

e.Represents the combined total for U.S. copper mines, South America operations, Molybdenum mines, U.S. Rod & Refining and Atlantic Copper as presented in “Business Divisions and Segments.”

f.Represents Corporate, other & eliminations as presented in “Business Divisions and Segments.”

Added in the 10-Q for fiscal Q3 2026

Under “Indonesia Operations Product Revenues, Production Costs and Unit Net Cash (Credits) Costs”

e.Represents the combined total for U.S. copper mines, South America operations, Molybdenum mines, U.S. Rod & Refining and Atlantic Copper as presented in “Business Divisions and Segments.”

f.Represents Corporate, other & eliminations as presented in “Business Divisions and Segments.”

Added in the 10-Q for fiscal Q3 2026

Under “Molybdenum Mines Product Revenues, Production Costs and Unit Net Cash Costs”

b.Represents the combined total for U.S. copper mines, South America and Indonesia operations, U.S. Rod & Refining and Atlantic Copper as presented in “Business Divisions and Segments.”

Added in the 10-Q for fiscal Q3 2026

Under “Molybdenum Mines Product Revenues, Production Costs and Unit Net Cash Costs”

c.Represents the combined total for U.S. copper mines, South America and Indonesia operations, U.S. Rod & Refining and Atlantic Copper as presented in “Business Divisions and Segments.”

c.Includes charges totaling $26 million ($0.08 per pound of copper) for feasibility studies and …+15 / −3 words · under “U.S. Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs”

c.Includes charges totaling $23 $26 million ($0.08 per pound of copper) for feasibility studies and optimization projects and $22 million ($0.07 per pound of copper) for feasibility materials and optimization studies. supplies inventory write-offs.

d.Represents the combined total for South America and Indonesia operations, Molybdenum mines, U.S. Rod …+16 / −4 words · under “U.S. Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs”

d.Represents the combined total for our other mining South America and Indonesia operations, Molybdenum mines, U.S. Rod & Refining and Atlantic Copper as presented in Note 8. “Business Divisions and Segments.”

d.Represents the combined total for South America and Indonesia operations, Molybdenum mines, U.S. Rod …+16 / −4 words · under “U.S. Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs”

d.Represents the combined total for our other mining South America and Indonesia operations, Molybdenum mines, U.S. Rod & Refining and Atlantic Copper as presented in Note 8. “Business Divisions and Segments.”

d.Represents the combined total for South America and Indonesia operations, Molybdenum mines, U.S. Rod …+16 / −4 words · under “U.S. Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs”

d.Represents the combined total for our other mining South America and Indonesia operations, Molybdenum mines, U.S. Rod & Refining and Atlantic Copper as presented in Note 8. “Business Divisions and Segments.”

d.Represents the combined total for South America and Indonesia operations, Molybdenum mines, U.S. Rod …+16 / −4 words · under “U.S. Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs”

d.Represents the combined total for our other mining South America and Indonesia operations, Molybdenum mines, U.S. Rod & Refining and Atlantic Copper as presented in Note 8. “Business Divisions and Segments.”

b.Includes charges totaling $14 million ($0.05 per pound of copper) for feasibility studies and …+14 / −2 words · under “South America Operations Product Revenues, Production Costs and Unit Net Cash Costs”

c.Includes b.Includes charges totaling $63 $14 million ($0.07 ($0.05 per pound of copper) for feasibility studies and optimization studies. projects and $13 million ($0.05 per pound of copper) for materials and supplies inventory write-offs.

c.Represents the combined total for U.S. copper mines, Indonesia operations, Molybdenum mines, U.S. Rod …+17 / −4 words · under “South America Operations Product Revenues, Production Costs and Unit Net Cash Costs”

c.Represents the combined total for our other segments U.S. copper mines, Indonesia operations, Molybdenum mines, U.S. Rod & Refining and Atlantic Copper as presented in Note 8. “Business Divisions and Segments.”

c.Represents the combined total for U.S. copper mines, Indonesia operations, Molybdenum mines, U.S. Rod …+16 / −4 words · under “South America Operations Product Revenues, Production Costs and Unit Net Cash Costs”

c.Represents the combined total for our other mining U.S. copper mines, Indonesia operations, Molybdenum mines, U.S. Rod & Refining and Atlantic Copper as presented in Note 8. “Business Divisions and Segments.”

b.Includes charges totaling $34 million ($0.04 per pound of copper) for feasibility studies and …+22 / −2 words · under “South America Operations Product Revenues, Production Costs and Unit Net Cash Costs”

c.Includes b.Includes charges totaling $48 $34 million ($0.05 ($0.04 per pound of copper) for feasibility studies and optimization studies. projects, $13 million ($0.02 per pound of copper) for materials and supplies inventory write-offs and $10 million ($0.01 per pound of copper) for stockpile inventory write-offs.

c.Includes $244 million ($1.59 per pound of copper) of idle facility and restoration costs …+40 / −4 words · under “Indonesia Operations Product Revenues, Production Costs and Unit Net Cash (Credits) Costs”

b.Includes charges totaling $39 c.Includes $244 million ($0.09 ($1.59 per pound of copper) of idle facility and restoration costs associated with the September 2025 external mud rush incident and $22 million ($0.14 per pound of copper) for operational readiness and startup start-up costs associated with PTFI’s downstream processing facilities, partially offset by a $9 million ($0.06 per pound of copper) gain associated with insurance recoveries related to the October 2024 incident at PTFI’s smelter.

d.Primarily represents tolling costs paid to PT Smelting, and excludes idle facility related tolling …+23 / −1 words · under “Indonesia Operations Product Revenues, Production Costs and Unit Net Cash (Credits) Costs”

c.Represents d.Primarily represents tolling costs paid to PT Smelting, and excludes idle facility related tolling fees that are included in noncash and other costs, net (refer to note c above).

e.Represents the combined total for U.S. copper mines, South America operations, Molybdenum mines, U.S. …+18 / −4 words · under “Indonesia Operations Product Revenues, Production Costs and Unit Net Cash (Credits) Costs”

e.Represents the combined total for our other segments U.S. copper mines, South America operations, Molybdenum mines, U.S. Rod & Refining and Atlantic Copper as presented in Note 8. “Business Divisions and Segments.”

c.Includes charges totaling (i) $171 million ($0.47 per pound of copper) for idle facility …+7 / −14 words · under “Indonesia Operations Product Revenues, Production Costs and Unit Net Cash (Credits) Costs”

c.Includes charges totaling (i) $171 million ($0.47 per pound of copper) for idle facility and direct recovery costs and recovery efforts associated with the September 2025 external mud rush incident, (ii) $83 million ($0.23 per pound of copper) for operational readiness and startup start-up costs associated with PTFI’s downstream processing facilities, (iii) $39 million ($0.11 per pound of copper) associated with PT Smelting Smelting’s planned maintenance and idle facility related tolling fees and (iv) $26 million ($0.07 per pound of copper) for remediation costs related to the October 2024 fire incident at the PTFI’s smelter. not recoverable under PTFI’s construction insurance program.

e.Represents the combined total for U.S. copper mines, South America operations, Molybdenum mines, U.S. …+17 / −4 words · under “Indonesia Operations Product Revenues, Production Costs and Unit Net Cash (Credits) Costs”

e.Represents the combined total for our other mining U.S. copper mines, South America operations, Molybdenum mines, U.S. Rod & Refining and Atlantic Copper as presented in Note 8. “Business Divisions and Segments.”

b.Includes $236 million ($0.61 per pound of copper) of idle facility costs associated with …+8 / −8 words · under “Indonesia Operations Product Revenues, Production Costs and Unit Net Cash (Credits) Costs”

b.Includes $34 $236 million ($0.12 ($0.61 per pound of copper) of nonrecurring labor-related charges at Cerro Verde idle facility costs associated with new CLAs. the September 2025 external mud rush incident.

c.Includes $934 million ($2.40 per pound of copper) of idle facility and restoration costs …+36 / −32 words · under “Indonesia Operations Product Revenues, Production Costs and Unit Net Cash (Credits) Costs”

b.Includes charges totaling (i) $74 c.Includes $934 million ($0.06 ($2.40 per pound of copper) of idle facility and restoration costs associated with the September 2025 external mud rush incident and $30 million ($0.08 per pound of copper) for operational readiness and startup start-up costs associated with PTFI’s downstream processing facilities, (ii) $34 million ($0.03 per pound of copper) related to the reversal of previously capitalized land lease costs at PTFI’s downstream processing facilities and (iii) $22 partially offset by a $9 million ($0.02 per pound of copper) for feasibility and optimization studies. gain associated with insurance recoveries related to the October 2024 incident at PTFI’s smelter.

d.Primarily represents tolling costs paid to PT Smelting, and excludes idle facility related tolling …+23 / −1 words · under “Indonesia Operations Product Revenues, Production Costs and Unit Net Cash (Credits) Costs”

c.Represents d.Primarily represents tolling costs paid to PT Smelting, and excludes idle facility related tolling fees that are included in noncash and other costs, net (refer to note c above).

b.Includes $24 million ($0.02 per pound of copper) of idle facility costs associated with …+8 / −8 words · under “Indonesia Operations Product Revenues, Production Costs and Unit Net Cash (Credits) Costs”

b.Includes $99 $24 million ($0.11 ($0.02 per pound of copper) of nonrecurring labor-related charges at Cerro Verde idle facility costs associated with new CLAs. the September 2025 external mud rush incident.

c.Includes charges totaling (i) $185 million ($0.17 per pound of copper) for operational readiness …+10 / −16 words · under “Indonesia Operations Product Revenues, Production Costs and Unit Net Cash (Credits) Costs”

c.Includes charges totaling (i) $185 million ($0.17 per pound of copper) for operational readiness and startup start-up costs associated with PTFI’s downstream processing facilities, (ii) $171 million ($0.16 per pound of copper) for idle facility and direct recovery costs and recovery efforts associated with the September 2025 external mud rush incident, (iii) $56 million ($0.05 per pound of copper) of for remediation costs related to the October 2024 fire incident at the PTFI’s smelter, not recoverable under PTFI’s construction insurance program, (iv) $39 million ($0.04 per pound of copper) associated with PT Smelting Smelting’s planned maintenance and idle facility related tolling fees and (v) $24 million ($0.02 per pound of copper) related to the reversal of previously capitalized land lease costs at associated with PTFI’s downstream processing facilities.

c.Represents Corporate, other & eliminations as presented in “Business Divisions and Segments,” which also …+10 / −12 words · under “Molybdenum Mines Product Revenues, Production Costs and Unit Net Cash Costs”

b.Represents the combined total for our c.Represents Corporate, other mining operations & eliminations as presented in Note 8. “Business Divisions and Segments,” which also includes amounts associated with the our molybdenum sales company, which includes including sales of molybdenum produced by the Molybdenum mines and by certain of the U.S. copper mines and the Cerro Verde mine.

Cautionary Statement

3 rewritten

Our discussion and analysis contain forward-looking statements in which we discuss our potential future …+53 / −59 words

Our discussion and analysis contain forward-looking statements in which we discuss our potential future performance, operations and projects. Forward-looking statements are all statements other than statements of historical facts, such as plans, projections or expectations relating to business outlook, strategy, goals or targets; project plans and schedules, restoration and remediation efforts, and ramp-up of production and downstream processing following the underlying assumptions and estimated impacts on our business and stakeholders related to the September 2025 external mud rush incident at PTFI’s Grasberg Block Cave underground mine and the anticipated impact on our business, production, sales, results of operations and operating plans; global market conditions, including trade policies; ore grades and mining and milling rates; production and sales volumes; higher variability between PTFI production and sales; unit net cash costs (credits) and operating costs; capital expenditures; operating plans, including mine sequencing; cash flows; liquidity; investigations, repair efforts, and phased restart and ramp-up the life of production and downstream processing following resource extension of operating rights in the mud rush incident at PTFI’s Grasberg Block Cave underground mine and minerals district, including the anticipated impact on future production, sales, results of operations and operating plans, and recoveries under insurance policies; potential extension of PTFI’s special mining business license IUPK beyond 2041; timing of sales or shipments of inventoried production; our sustainability-related commitments, aspirations and targets; our overarching commitment to deliver responsibly produced copper and molybdenum, including plans to implement, validate and maintain validation of our operating sites under specific frameworks; achievement of our 2030 climate targets and our 2050 net zero aspiration; improvements in operating procedures and technology innovations and applications; exploration efforts and results; development and production activities, rates and costs; future organic growth opportunities and investment decisions; tax rates; the impact of copper, gold and molybdenum price changes; the impact of deferred intercompany profits on earnings; mineral reserve and mineral resource estimates; final resolution of settlements associated with ongoing legal and environmental proceedings; debt repurchases; and the ongoing implementation of our financial policy and future returns to shareholders, common stockholders, including dividend payments (base or variable) and share repurchases. The words “anticipates,” “may,” “can,” “plans,” “believes,” “estimates,” “expects,” “projects,” “targets,” “intends,” “likely,” “will,” “should,” “could,” [… 113 unchanged words …]

We caution readers that forward-looking statements are not guarantees of future performance and actual …+109 / −66 words

[… 42 unchanged words …] anticipated in the forward-looking statements include, but are not limited to, supply of and demand for, and prices of the commodities we produce, primarily copper, gold and gold; molybdenum; changes in export duties and tariff rates; production rates; timing of shipments and sales; reduced customer demand or capacity; changes in the terms of arrangements or contracts; PTFI’s ability to repair mud rush incident-related damage, implement enhanced operating procedures, safely restart with a ramp-up and achieve full operating rates of production and downstream processing on the expected timeline and optimize production plans; maintain relationships with commercial counterparties; price and availability of consumables and components we purchase as well as constraints on supply and logistics, and transportation services; changes in cash requirements, financial position, financing or investment plans; changes in general market, economic, geopolitical, regulatory or industry conditions, including market volatility regarding trade policies and tariff uncertainty; reductions in liquidity and access to capital; PTFI’s ability to repair mud rush incident-related damage, complete the investigation to the satisfaction of the Indonesian government authorities and implement any recommendations therefrom, safely restart, phase-in ramp-up and achieve full operating rates of production and downstream processing on the expected timeline and optimize production plans; recover amounts under insurance policies; resolve force majeure declarations and maintain relationships with commercial counterparties; changes in tax laws and regulations; political and social risks, including the potential effects of violence in Indonesia, civil unrest in Peru, and relations with local communities and Indigenous Peoples; operational risks inherent in mining, with higher inherent risks in underground mining; mine sequencing; timely completion of development projects; changes in mine plans or operational modifications, delays, deferrals or cancellations, including the ability to smelt and refine or inventory production; results of technical, economic or feasibility studies; potential inventory adjustments; potential impairment of long-lived mining assets; satisfaction of requirements in accordance with PTFI’s IUPK to extend mining rights from 2031 through 2041; process delays in Indonesia government approvals or failure to obtain Indonesia government approval, including on the terms of the MOU and relating to the extension of amendment to the IUPK to extend PTFI’s IUPK operating rights beyond 2041; delays in consummating the terms of the MOU, including entering into any definitive agreements; cybersecurity risks; any major public health crisis; labor relations, including labor-related work stoppages and increased costs; compliance with applicable environmental, health and safety laws and [… 36 unchanged words …] any changes to such frameworks and other factors described in more detail under the heading “Risk Factors” contained in Part I, Item 1A. of our 2024 2025 Form 10-K and Part II, Item 1A. herein.

This report on Form 10-Q also contains measures such as net debt and unit …+143 / −0 words

This report on Form 10-Q also contains measures such as net debt and unit net cash costs (credits) per pound of copper and molybdenum, which are not recognized under U.S. GAAP. Refer to “Operations – Unit Net Cash Costs” and “Operations – Unit Net Cash (Credits) Costs” for further discussion of unit net cash costs (credits) associated with our operating divisions, and to “Product Revenues and Production Costs” for reconciliations of per pound costs (credits) by operating division to production and delivery costs applicable to sales reported in our consolidated financial statements. Refer to “Net Debt” for reconciliations of consolidated debt and consolidated cash and cash equivalents to net debt. For forward-looking unit net cash costs (credits) per pound of copper and molybdenum measures, we are unable to provide a reconciliation to the most comparable U.S. GAAP measure without unreasonable effort because estimating such U.S. GAAP measures and providing a meaningful reconciliation is extremely difficult and requires a level of precision that is unavailable for these future periods, and the information needed to reconcile these measures is dependent upon future events, many of which are outside of our control as described above. Forward-looking non-GAAP measures are estimated consistent with the relevant definitions and assumptions.

48 other paragraphs were edited by fewer than 15 words; 17 changed only figures, dates or period names; 28 are word for word the same; 43 were split, merged or moved, with most of their text in the other filing; their text is in the 10-Q for fiscal Q3 2026 and the 10-Q for fiscal Q3 2025 linked above.

How this page works

The text is Freeport-McMoRan's own disclosure, quoted as filed in the MD&A of the 10-Q for fiscal Q3 2026 and the 10-Q for fiscal Q3 2025, split at its own subsection headings and matched by fixed rules, without a language model; tables of figures are left out. A new, rewritten or removed passage is not a judgment by Stackyear about Freeport-McMoRan or its shares. How MD&A pages are compared.

General research from public filings, not investment advice.

Related