Added in the 10-K for fiscal 2025
Under “Company Strategy”
Decarbonize Power—make progress toward customer-driven clean energy goals by continuing to add new renewable resources and products to the Company's energy mix;
Electrify the Economy—power the lives of approximately two million residents in its service territory by supporting the region’s economic growth industries and capturing the benefits of new technologies while serving approximately two-thirds of Oregon’s commercial and industrial activity; and
Advance Performance—build a safer and more reliable grid by accelerating cost-effective grid investments and modernizing transmission.
On February 15, 2026, PGE, through a newly formed, wholly-owned subsidiary, entered into an agreement (the “Agreement”) with PacifiCorp, an indirect subsidiary of Berkshire Hathaway Energy Company, to acquire select Washington state generation, transmission, and electric utility operations for $1.9 billion. The Acquisition would enable PGE to extend its service to approximately 140,000 Washington customers.
Under the Agreement, if the Acquisition is completed, PGE will acquire three generation facilities: the Chehalis thermal plant (477 MW), the Goodnoe Hills wind facility (94 MW), and the Marengo I and II wind facilities (234 MW). The Acquisition would also include 4,500 miles of transmission and distribution lines, and local utility operations across approximately 2,700 square miles.
PGE intends to manage the Washington operations as a separate company through a newly created subsidiary regulated by the Washington Utilities and Transportation Commission. PGE intends to retain current Washington employees and honor existing labor agreements. PGE corporate functions are expected to provide shared support for both Washington and Oregon companies.
The Acquisition is designed with the goal that Washington and Oregon customers would not be impacted by costs associated with executing the acquisition and transaction financing. PGE expects the Acquisition and state and federal regulatory reviews to close in approximately twelve months following the submission of regulatory applications.
Central to this Acquisition is PGE’s plan to enter into a joint venture with Manulife Infrastructure Fund III, L.P. and its affiliates, including John Hancock Life Insurance Company (U.S.A.), which will collectively be a minority owner of the Washington utility business. PGE would remain majority owner and sole operator.
Added in the 10-K for fiscal 2025
Under “Investing in a Clean Energy Future”
On June 18, 2025, PGE submitted a CEP/IRP Update to the OPUC. The CEP/IRP Update identified a new Preferred Portfolio as a result of the refreshed analysis. PGE did not propose any changes to the Action Plan that was acknowledged within the 2023 CEP/IRP, which supports the Company's progress toward emissions targets and Preferred Portfolio resource need procurement through the 2025 All-Source RFP. This approach represents the best combination of cost, risk, community benefit, and decarbonization.
To better distinguish resource needs, the CEP/IRP Update reports the capacity from hybrid solar and battery storage resources by individual technology. The capacity need is 3,500 to 4,500 MW of renewable energy and non-emitting capacity, inclusive of 2023 RFP projects, which remain under negotiation.
The actions summarized in the CEP/IRP Update will also serve as an important tool in furthering conversations with all stakeholders, and the OPUC, on PGE’s path forward to making continued progress towards emission targets while continuing to serve customers safely, reliably, and at the lowest cost possible. PGE and parties will work through the regulatory review process for the CEP/IRP Update filing (OPUC Docket LC 80) during the coming months. PGE cannot predict the ultimate outcome of the regulatory process.
Added in the 10-K for fiscal 2025
Under “2023 All-Source RFP”
Biglow Optimization—PGE entered into an agreement to construct a 125 MW solar facility and a 125 MW BESS in Sherman County, Oregon. PGE will own the resource with an investment of approximately $540 million, excluding AFUDC. The project has an estimated commercial operation date at the end of 2027.
Wheatridge Expansion—PGE and NextEra Energy, Inc. entered into agreements to construct a 240 MW solar facility and a 125 MW BESS facility, located in Morrow County, Oregon. PGE will own 110 MW of solar and 65 MW of BESS production capacity with an investment of approximately $490 million, excluding AFUDC. NextEra Energy, Inc. will operate the facility, own the remaining 130 MW of solar and 60 MW of BESS production capacity and sell their portion of the output to PGE under a 30-year PPA. The project has an estimated commercial operation date at the end of 2027.
Added in the 10-K for fiscal 2025
Under “Additional Procurement Activities”
PGE has entered into the following agreements outside of the Company’s 2023 RFP and for each has requested the OPUC to grant a waiver to Oregon’s competitive bidding rules:
Meadowlark BESS—a 20-year storage capacity agreement for a 200 MW BESS located in Washington County, Oregon. This project will be owned by Copenhagen Infrastructure Partners, LLC and has an estimated commercial operation date at the end of 2027, pending OPUC approval of the requested waiver of the competitive bidding rules.
Nottingham BESS—a 20-year storage capacity agreement for a 200 MW BESS located in Washington County, Oregon. This project has an estimated commercial operation date in 2028, pending OPUC approval of the requested waiver of the competitive bidding rules.
Added in the 10-K for fiscal 2025
Under “2025 All-Source RFP”
PGE is proceeding to commercial negotiations with projects on the final shortlist, prioritizing those that include renewable generation and that have a viable pathway to achieve commercial operations earlier in the 2028 - 2030 eligibility period. The ultimate outcome of the RFP process may involve the selection of multiple projects for both renewable and non-emitting dispatchable capacity resources, which PGE expects will be approximately 2,500 MWs in total.
Added in the 10-K for fiscal 2025
Under “Transmission Upgrades”
Grid Enhancing Technologies (GETs)—Limited network upgrades or non-wires solutions are important strategies that offer incremental improvements and can unlock capacity on existing transmission paths in the region. GETs include advanced conductors and coatings, topological optimization, and dynamic line ratings. PGE is actively incorporating GETs across its system to further increase the performance of new and existing transmission assets. These efforts, when deployed across a number of areas and assets, have the potential to add incremental capacity to the grid at lower costs.
Added in the 10-K for fiscal 2025
Under “Transmission Upgrades”
In October 2023, the OPUC accepted PGE’s second TE plan, which covers the 2023 to 2025 time period and considers current and planned activities, along with forecasted EV loads. To date, PGE has incurred $14 million in capital expenditures under the 2023-2025 TE plan.
Added in the 10-K for fiscal 2025
Under “Laws and Regulations”
Trade Tariffs—Recently, trade tariffs were imposed through presidential executive orders. While some tariffs scheduled to take effect were temporarily suspended, broad tariffs remain in effect. Trade tariffs may increase the cost of imported materials and equipment, disrupt supply chains, drive economic volatility, and create adverse capital and credit market conditions. The cost of steel utility poles, meters, transformers, and specialized electrical equipment, among other items, may increase materials and supplies balances and elevate the cost of capital projects. Similarly, prices may rise and lead times may lengthen for necessary components in resources considered for acquisition in PGE’s All-Source RFPs. For further information on the Company’s RFPs, see “The Resource Planning Process” in the Investing in a Clean Energy Future section of this Overview. While PGE’s Canadian natural gas imports are not expected to be impacted by the current state of trade tariffs due to the imports being U.S.-Mexico-Canada Agreement compliant, the future of trade tariff impacts on such imports is uncertain. The Company is unable to reasonably estimate the effects of the rapidly evolving trade tariff landscape, as those effects could include project delays and cost increases, and present obstacles to PGE’s strategic plan execution. PGE is closely monitoring the impacts of trade tariffs and the potential effect they may have on the Company’s financial position, results of operations, or cash flows.
Added in the 10-K for fiscal 2025
Under “Laws and Regulations”
On October 2, 2025, PGE received notice from the U.S. DOE of the termination of four federal grants that originally planned to provide $61 million in federal reimbursement over the life of the grants. PGE has incurred an immaterial amount of costs associated with the terminated grants and does not expect the termination process to result in a material impact on the Company’s financial position and results of operations.
PGE has been awarded five additional grants totaling approximately $252 million, either as a direct recipient or subrecipient. These grants remain in various stages of execution, with the largest being the Warm Springs Power Pathway. PGE continues to monitor these grants for potential modification or termination but has not received any formal notice of termination. To date, PGE has incurred only immaterial costs related to these grants. See “Transmission Upgrades” in the Investing in a Clean Energy Future section of this Overview for further discussion on the Warm Springs Power Pathway grant. The Company cannot predict the ultimate timing and success of securing funding from federal programs or predict the outcome of existing grants.
Added in the 10-K for fiscal 2025
Under “Laws and Regulations”
The One Big Beautiful Bill Act—The OBBB significantly amends or repeals several renewable-energy tax incentives originally enacted under the IRA. Projects placed in service during 2025 that met applicable tax credit qualification requirements received PTC or ITC benefits, which are reflected in the Company’s consolidated financial statements. The transferability of tax credits, as provided under the IRA, also remains in effect. Following the July 7, 2025 executive order that added uncertainty with respect to the specific actions necessary to demonstrate a project’s start of construction, on August 15, 2025, the Treasury Department issued a notice for establishing the beginning of construction for wind and solar projects. The notice requires large projects to satisfy a physical-work test after September 2, 2025, eliminates certain inventory-procurement safe harbors, and accelerates the placed in service deadline to December 31, 2027.
These changes, together with the repeal of the permanent ten percent ITC, as outlined in the OBBB, are expected to reduce or eliminate the availability of RECs on future projects. The Company cannot yet reasonably estimate the impact on PGE’s results of operations, financial position, and cash flows or on future capital expenditures, deferred tax assets, current and future All-Source RFPs, and customer prices.
Added in the 10-K for fiscal 2025
Under “Laws and Regulations”
HB 3179—In response to increasing utility bills and concerns about affordability, the Oregon Legislature in 2025 passed HB 3179. Under the provisions of the legislation, which will require a significant amount of rulemaking to implement, the OPUC shall balance the interests of the utility investor and the consumer by considering the cumulative economic impact of the proposed price or schedule of prices on the electric or natural gas company’s residential customers. Electric or natural gas companies are required to file a multiyear rate plan on a regular interval that is no less than three and no more than seven years long. The OPUC shall require each electric and natural gas company to, at least annually, file with the OPUC, and make publicly available, a report on any price adjustments that the electric or natural gas company expects within the next twelve months. Such report, the first of which would be due at the end of 2026 at the earliest, must identify all price adjustment requests that an electric or natural gas company has filed or reasonably knows or anticipates to file. Any increase in residential prices may not take effect from November 1 to March 31.
Added in the 10-K for fiscal 2025
Under “Laws and Regulations”
On April 8, 2025, the President issued a proclamation, Regulatory Relief for Certain Stationary Sources to Promote American Energy, granting a two-year compliance exemption pursuant to the CAA Section 112(i)(4) for the EPA’s MATS rule. The EPA subsequently notified companies whether their sources had been granted the exemption. Colstrip was granted an exemption until July 8, 2029. Environmental groups have filed court challenges to the MATS exemptions.
On June 11, 2025, to advance the goals of the President’s Unleashing American Energy executive order, the EPA proposed to repeal the 2024 GHG emissions standards for fossil fuel-fired power plants promulgated under Section 111 of the CAA. The EPA also proposed to repeal specific amendments to the updated MATS, that were promulgated in 2024, including the revised filterable particulate matter emissions standard. Additionally, on June 30, 2025, the EPA proposed to update the 2024 ELG Rule to extend compliance deadlines and explore flexibilities to promote reliable and affordable power generation. On February 12, 2026, the EPA revoked the 2009 endangerment finding, thus removing the EPA’s authority to regulate GHGs.
PGE continues to evaluate each of these rules to assess the impact it may have on the Company’s continuing investment in Colstrip, which could be material. Compliance with the 2024 rules could require material upgrades at Colstrip with proposed compliance dates that may not be achievable or require the use of unproven technology, resulting in significant impacts to costs related to Colstrip. If upheld, or not modified by the EPA, the 2024 MATS and GHG Rules would require compliance as early as 2027 and 2032, respectively.
Added in the 10-K for fiscal 2025
Under “Regulatory Matters”
Corporate structure— On July 25, 2025, the Company submitted a formal application to the OPUC seeking approval of a holding company reorganization. PGE believes it to be in the best interests of its customers and shareholders to update its corporate structure into a holding company structure. The structure currently contemplated involves placing a non-operating corporate entity over the Company’s existing structure.
Additionally, this structure would allow for the formation of a subsidiary of the holding company that could hold existing and future transmission assets. The intent of the reorganization is to take advantage of the financial flexibility provided by a holding company structure, and to support construction of new transmission assets, reliability planning, and economic development.
The application is one of many steps required to complete the reorganization, which needs OPUC approval under Oregon law as well as any necessary FERC approvals. Later in the process, PGE's Board of Directors will decide whether to submit the proposed reorganization to PGE shareholders for approval. Following completion of these steps and the receipt of all required approvals, each outstanding share of PGE common stock would automatically convert into a share of the new holding company (HoldCo) common stock on a one-for-one basis. PGE shareholders, immediately prior to consummation of the reorganization would own the same relative percentages of HoldCo following consummation of the reorganization. After the reorganization, PGE would be a wholly owned subsidiary of HoldCo, which would be an Oregon corporation.
As of the date of this filing, the OPUC proceeding remains in the evidentiary phase. Written testimony has been submitted, and the OPUC is continuing to compile additional filings and public input. No final order has been issued, and the proceeding remains active.
Added in the 10-K for fiscal 2025
Under “Regulatory Matters”
Under the RAC, during 2023, the Company submitted a filing in OPUC Docket UE 427 for Clearwater proposing to defer the revenue requirement, net of NVPC benefits, from the in-service date of January 2024 until Clearwater was reflected in customer prices, which was March 1, 2025. For the year ended December 31, 2024, PGE deferred the revenue requirement, net of NVPC benefits resulting in a net regulatory liability of $40 million, which began amortizing as a refund to customers on March 1, 2025 over a twelve month period, as approved by the OPUC in Order 25-075 issued February 21, 2025.
Order 25-075 also adopted conditions to be applied to the AUT and clarification of the applicability of those conditions were subsequently provided by the OPUC in Order 25-223, which granted certain of PGE’s requests and denied others. PGE and NewSun Energy LLC, as an intervenor, both have Petitions for Judicial Review of Order 25-075 pending at the Oregon Court of Appeals. For the period of January 1, 2025 through December 31, 2025, PGE deferred an additional net $13 million regulatory liability, which remains subject to a future regulatory review, representing the deferred revenue requirement that the Company believes is probable of recovery, net of NVPC that is probable of refund to customers under the RAC for that period. The OPUC has significant discretion on overall prudence and in making the final determination of recovery or refund. Any cost disallowance or increased refunds would be recognized as a charge to earnings.
Seaside Grid BESS recovery—On May 30, 2025, PGE submitted a request to the OPUC to recover the revenue requirement associated with the Seaside Battery Energy Storage System (Seaside). The regulatory filing was pursuant to the expedited cost-recovery option introduced by the OPUC in its Order issued December 20, 2024 related to PGE's 2025 GRC (OPUC Docket UE 435).
On October 21, 2025, the OPUC issued an Order (Order 25-417) that was supported by a memorandum of understanding (MOU) entered into between PGE and key regulatory stakeholders. The MOU guided the recovery proceeding for Seaside, PGE’s largest standalone battery storage project which has been serving customers since July 2025.
Added in the 10-K for fiscal 2025
Under “Regulatory Matters”
a rate base increase of $220 million, net of estimated ITC benefits of $125 million;
a 9.34% return on equity; and an annual revenue requirement increase of $42 million, excluding impacts related to NVPC, compared to PGE’s filed request of $46 million at closing briefs.
The Order also resulted in a $6 million revenue requirement increase for the remainder of 2025, inclusive of NVPC customer benefits. Seaside’s NVPC is included in PGE’s AUT filings for 2026 (OPUC docket UE 452) and onward.
Other key items in the Order include the adoption of an earnings test for the twelve-month period ended October 31, 2026 at PGE’s authorized ROE, implemented via a deferral to track Seaside revenues and refund excess earnings, if applicable. The Company has contested the applicability of an earnings test and in addition has not accrued any refunds, as it currently does not forecast to over earn for the period covered by the test.
The Seaside revenue requirement was included in customer prices effective October 31, 2025.
Distribution System Plan recovery mechanism—On December 23, 2025, PGE and certain intervening parties submitted a stipulation to the OPUC reflecting an agreement that resolves all issues, with the exception of the application of an earnings test as proposed by intervening parties, in PGE's request for recovery in UE 459 related to the Company’s DSP Alternative Recovery Mechanism (ARM). The settlement and submitted stipulation were supported by an MOU entered into between PGE and key regulatory stakeholders. The MOU limited the scope of the ARM to specific capital investments included in the DSP docket (UM 2362) filed in December 2024, which enable network modernization, reliable customer service, and integration of clean energy and distributed energy resources.
Primary components of the stipulation include:
A rate base increase of $218 million;
9.34% ROE per the MOU reflecting PGE's latest rate case;
Added in the 10-K for fiscal 2025
Under “Regulatory Matters”
Of the $15 million of revenue requirement adjustments, approximately 87% are temporary in nature, allowing PGE to seek recovery of associated investments as applicable in its next GRC. These adjustments are driven primarily by non-distribution investments and are not attributable to specific assets. Per the previously noted MOU reached with stakeholders, the earliest possible rate effective date of PGE's next GRC would be May 1, 2027.
The terms of the stipulation remain subject to OPUC approval. The OPUC has adopted a procedural schedule for the regulatory review process in Docket UE 459 that anticipates an order in March 2026, with customer prices effective April 1, 2026. PGE cannot predict the ultimate outcome of the regulatory process.
Added in the 10-K for fiscal 2025
Under “Regulatory Matters”
On April 15, 2025, the OPUC approved PGE's filing, as revised, with an effective date of April 16, 2025, on condition that the issues raised in the filing would continue to be evaluated in a new Commission docket, UM 2377. This initial approval allowed PGE to begin working with large load customers to form a load interconnection queue, conduct studies to assess and allocate connection costs, and offer study and service agreements. Applicable agreements with new large load customers may be revised and updated based on the outcome in the separate OPUC proceeding, UM 2377, that was opened to address PGE’s proposed tariff changes and related issues.
In June 2025, the Oregon Legislature passed HB 3546 relating to service to large data centers. HB 3546, which became effective in June 2025, directs the OPUC to provide a classification for retail customers deemed large energy use data center facilities. Any tariffs for the class must allocate costs to the class in a manner that is equal or proportional to the costs of serving the class, or directly assign the costs to large energy use data center facilities and avoid unwarranted shifting of costs to other classes. HB 3546 also directs the OPUC to require that electric companies serving data centers must enter into a contract for services with such customer under terms and conditions specified by the law. The OPUC has included HB 3546 alignment and establishment of a data center classification for retail customers within the scope of UM 2377 as well as other topics that may apply to all large load customers. The OPUC is expected to issue an Order in UM 2377 in the second quarter of 2026.
Added in the 10-K for fiscal 2025
Under “Operating Activities”
PGE participates in the western EIM, which enables, among other benefits, greater integration of renewable energy onto the grid by better balancing the variable output of renewable resources.
The Company signed an implementation agreement and filed tariff changes with the FERC to join the EDAM, which is expected to build on the success of the western EIM and help provide PGE and its customers additional access to affordable, reliable, and clean energy. In August 2025, the FERC approved PGE’s revisions to its Open Access Transmission Tariff for EDAM participation. In September 2025, the California Legislature approved Assembly Bill 825 (the Pathways Bill), authorizing the CAISO to transition market governance, including the EDAM, to an independent regional organization.
Added in the 10-K for fiscal 2025
Under “Operating Activities”
As part of its ongoing commitment to reliably serving both retail and wholesale customers, PGE is evaluating alternatives to participation as a financially binding entity in the Western Power Pool’s resource adequacy program known as the Western Resource Adequacy Program (WRAP). While PGE continues to support the regional planning and analytical framework established by the WRAP, the Company provided notice of withdrawal in October 2025. PGE is in collaboration with utilities committed to the EDAM and Oregon regulated load serving entities to develop and adopt a resource adequacy framework that enhances reliability, is aligned more closely with the EDAM design, and reflects the operational realities of a rapidly evolving electric grid across the western United States, with a target operational date of 2028.
Added in the 10-K for fiscal 2025
Under “Operating Activities”
Business transformation and optimization expenses—In 2025, PGE incurred $42 million incremental business transformation and optimization expenses, which include strategic advisory and workforce realignment expenses, focused on a multi-year cost management initiative to realize long-term benefits. For more information on the impact of these costs on annual results, see “Generation, transmission and distribution,” “Administrative and other,” “Depreciation and amortization,” and “Other income, net” in the Results of Operations section of this Overview. The Company expects to incur business transformation and optimization expenses related to these initiatives throughout 2026.
Additionally, PGE has incurred incremental accounting, legal, and consulting costs related to its submission of a regulatory application for approval of a holding company reorganization. For more on the corporate structure see “Corporate Structure” in the Regulatory Matters section of this Overview.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “Company Strategy”
• Electrify the Economy—Increase beneficial electricity use to capture the benefits of new technologies while building an increasingly clean, flexible and reliable grid; and
• Advance Performance—Improve safety, efficiency, and system and equipment reliability while maintaining affordable energy service and growing earnings per share 5% to 7% annually.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “Climate Change”
The Climate Pledge—In 2021, PGE joined The Climate Pledge, a commitment to be net-zero annual carbon emissions by 2040, which is a decade ahead of the Paris Agreement’s goal of 2050. As a signatory to The Climate Pledge, PGE agrees to: i) measure and report GHG emissions on a regular basis; ii) implement decarbonization strategies in line with the Paris Agreement through real business changes and innovations, including efficiency improvements, renewable energy, materials reductions, and other carbon emission elimination strategies; and iii) neutralize any remaining emissions with additional, quantifiable, real, permanent, and socially-beneficial offsets.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “Investing in a Clean Energy Future”
Throughout the remainder of 2023, PGE refreshed its forecasts, first in an Addendum filed in July 2023 then several times in subsequent comments in the CEP and IRP docket with the OPUC (LC 80). PGE currently estimates a total resource need of approximately 3,500 to 4,500 MW of renewable energy and non-emitting capacity in order to make continual progress towards meeting the Company’s clean energy targets. Through the 2021 All-Source RFP, PGE procured 311 MW of wind resources and 475 MW of capacity, leaving a remaining need to procure approximately 2,700 to 3,700 MW.
On January 25, 2024, the OPUC acknowledged PGE’s IRP, subject to certain conditions, providing regulatory support for the Company to pursue the near-term resource additions articulated in the Action Plan. However, the OPUC declined to acknowledge the CEP, directing the Company to provide additional forecast of its emission reductions based on new analysis in the CEP/IRP Update to be filed in April 2025. PGE will continue to pursue its 2023 All-Source RFP while revising forecasts of emissions in the CEP.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “2021 and 2023 All-Source RFPs”
• Clearwater Wind Development—The 311 MW wind energy facility is part of the larger Clearwater Wind Development in Eastern Montana. PGE owns 208 MW of production capacity of the facility. Subsidiaries of NextEra Energy Resources, LLC, which operates the facility, owns the remaining 103 MW of production capacity and sells their portion of the output to PGE under a 30-year PPA. The Company owned portion of the facility was placed in-service during the first quarter of 2024. As of December 31, 2024, the Company has recorded $414 million in Electric Utility Plant, net, including Allowance for funds used during construction (AFUDC).
• Seaside Grid—The 200 MW Battery Energy Storage System (BESS) facility, located in Portland, Oregon has an estimated commercial operation date of June 30, 2025 and will be owned by PGE. As of December 31, 2024, the Company has recorded $225 million, including AFUDC, in construction work-in-progress (CWIP) for the Seaside Grid.
• Constable BESS (formerly Evergreen)—The 75 MW BESS facility, located in Hillsboro, Oregon was placed in-service on December 20, 2024 and is owned by PGE. As of December 31, 2024, the Company has recorded $156 million in Electric Utility Plant, net, including AFUDC.
• Sundial BESS (formerly Troutdale Grid)—The 200 MW BESS facility, located in Troutdale, Oregon, reached commercial operations on December 20, 2024. NextEra Energy Resources, LLC owns the resource and sells the capacity to PGE under a 20-year agreement.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “2021 and 2023 All-Source RFPs”
All BESS projects will be directly interconnected to PGE’s transmission and distribution system. In the event emissions are associated with energy obtained to charge the BESS, they are accounted for when they are emitted from the generating facility. As such, BESS projects do not add incremental emissions to the grid, and therefore, are considered non-emitting dispatchable capacity resources. The BESS facilities qualify for ITCs. The agreements related to the Clearwater Wind Development qualify for PTCs and are eligible under Oregon’s RPS. The agreements will be subject to prudency review by the OPUC.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “2021 and 2023 All-Source RFPs”
PGE constructed the final short list to provide optionality and address the Company’s future capacity need. The Company ranked the final shortlist in two groups, prioritized based on performance in the RFP price scoring evaluation, representing the optimal intersection of value to customers at the least-cost and the least-risk. These two groups together represented the final shortlist of projects recommended for regulatory acknowledgement. On November 19, 2024, the OPUC acknowledged, with conditions, PGE’s final shortlist of resources as follows:
• Group A, as shown below, consisted of three bids that are top performing and PGE expected to enter commercial negotiation for all of these projects. Group A included 375 megawatts (MW) nameplate of renewable resources and 400 MW nameplate of battery storage; and
• Group B, as shown below, consisted of five bids, all of which represent capacity options via BESS facilities. These projects are also high performing and PGE may enter commercial negotiations with some or all of these projects, allowing flexibility to address any remaining capacity need. Group B includes 885 MW nameplate of battery storage.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “2021 and 2023 All-Source RFPs”
(1) MW values do not include nameplate capacity of paired energy storage of 250 MW for project 1 and 125 MW for project 3.
(2) Hybrid commercial structure includes a PPA portion and a Company-owned portion of project resources.
On December 12, 2024, Project 1 in Group A notified PGE that it was withdrawing from commercial negotiations. PGE continues to negotiate with the remaining Group A projects and aims to finalize contracts over the course of 2025.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “Transmission Upgrades”
In 2021, the Oregon legislature enacted HB 2165, ensuring the OPUC has clear and broad authority to allow electric company investments in infrastructure to support TE.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “Laws and Regulations”
Executive Orders—A series of Presidential executive orders were recently issued that relate to changes in energy and environmental policies. These orders aim to accelerate fossil fuel development, reverse climate change and environmental justice initiatives, and halt wind farm construction on federal lands and waters. Key actions include potential tariffs on natural gas imports, reviewing agency actions that burden domestic energy resources, pausing disbursement of federal funding, streamlining permitting processes, and declaring a national emergency to expedite energy projects, particularly on the West Coast.
PGE is analyzing these executive orders to understand their potential impact on grant funding, which include Diversity, Equity, and Inclusion and Community Benefits Plans, and potential supply tariffs, including natural gas used as fuel that is imported from Canada. PGE plans to collaborate with industry groups to engage with the administration when appropriate, while closely monitoring the implementation and legal challenges arising from these executive orders. The Company is unable to predict the outcome of executive orders or the impact they may have on its financial position, results of operations, or cash flows.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “Laws and Regulations”
As of December 31, 2024, PGE has been associated with the submission of 42 grant applications as the Prime or Sub-recipient/Supporter and has been awarded 10 grants totaling $315 million, including the following:
• U.S. DOE Bethel-Round Butte Transmission Line Upgrade—The U.S. DOE selected the CTWS, with PGE as a subrecipient under the grant, for a $250 million grant to upgrade the existing 230 kV Bethel-Round Butte Transmission line to 500 kV. The US DOE and CTWS, as the prime recipient, entered into a Cooperative Agreement on August 13, 2024. Subsequently CTWS entered into a subrecipient agreement with PGE on December 1, 2024. These agreements memorialize the funding and scope for the multiyear line upgrade. See “Transmission Upgrades” in this Overview for further discussion.
• U.S. DOE Grid Edge Devices—The U.S. DOE selected and subsequently entered into an agreement on October 1, 2024 with PGE leading a consortium for a $50 million grant for the Grid Edge Devices project. The project will enable real-time information at each meter to improve the visibility of the electrical system to grid operators, providing detection of potential operational problems and shorten outage times, ultimately helping to anticipate and mitigate the impacts of extreme weather on grid resiliency.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “Laws and Regulations”
The Company believes the tax incentives in the IRA provide additional investment opportunities for PGE and provide benefits to customers. Increased capital expenditures in such investment opportunities would likely result in additional financing needs through debt and equity instruments. PGE continues to monitor for potential impacts to its business due to executive orders that may change tax incentives under IRA programs. See “Executive Orders” in this Overview section, for further information.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “Laws and Regulations”
In addition, the regulations included Disposal of Coal Combustion Residuals (CCR) from Electric Utilities – Legacy CCR Surface Impoundments. This rule builds on 2015 regulations, which apply to active power plants that dispose of coal combustion residuals in surface impoundments or landfills, by regulating inactive surface impoundments at inactive power plants, and CCR management units at active and inactive power plants. PGE has assessed the potential impact of the CCR regulation changes and believes it will not have a material impact on the Company’s current Asset Retirement Obligations.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “Regulatory Matters”
• capital structure of 50% debt and 50% equity;
• ROE of 9.34%;
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “Regulatory Matters”
• rate base of $6.8 billion.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “Regulatory Matters”
(1) Excluding $17 million related to NVPC and other Supplemental filings.
(2) Consists of adjustments related to load, capital forecast updates, ROE adjustments, and other revenue requirement items updated during the rate review process.
(3) Reduction relates primarily to: i) the Final order’s method of applying inflation rates to 2023 actual balances for general wages and salaries and Generation O&M, and ii) amounts related to incentives and stock compensation.
(4) The OPUC’s Final order authorized an ROE of 9.34%. At the time of Closing briefs, PGE’s adjusted requested ROE was 9.5%, which was also PGE’s previously approved ROE.
(5) The Final order and related revenue requirement reflects the following items: i) an adjustment for actual plant placed in-service compared to amounts forecasted in Closing briefs with cost recovery expected to be pursued in future regulatory proceedings and, ii) other immaterial items removed from rate base.
(6) Per the OPUC's Final order, Clearwater is to be excluded from this rate case as prudency is being determined in a separate proceeding, OPUC Docket UE 427. The target rate effective date for Clearwater in UE 427 has been delayed to March 1, 2025. This adjustment reflects the removal of the revenue requirement of Clearwater from rate base, net of NVPC benefits. Under the RAC, PGE will continue to defer the revenue requirement, net of NVPC benefits, from the in-service date of January 2024 until Clearwater is reflected in customer prices.
(7) Primarily comprised of reductions of certain working capital and inventory items and other revenue credit items.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “Regulatory Matters”
• Invitation for PGE to file for a balanced cost-recovery tracker mechanism to incorporate the approximately $375 million Seaside Grid BESS system into rates under an expedited regulatory review; and
• Acceptance of PGE's rate base methodology in this GRC, which, after adjustments, resulted in $6.8 billion and included the following key elements:
◦A reduction of $402 million related to Clearwater to reflect the delay of the target rate effective date to March 1, 2025 and allow for further regulatory review;
◦A reduction of $112 million to reflect the planned sale of PTCs and inclusion of ITCs as a reduction of rate base and expected to be amortized as a refund to customers over the life of the related battery assets;
◦A reduction of $69 million primarily related to actual plant placed in-service compared to amounts forecasted in Closing briefs and cost recovery expected to be pursued in future regulatory proceedings; and
◦A reduction of $61 million for amounts removed from rate base related to working capital, materials and supplies, and fuel.
All items included within NVPC have been resolved in OPUC Docket UE 436 and reflect the treatment of Clearwater in the GRC Final order. New customer prices, as approved by the OPUC, became effective January 1, 2025.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “Regulatory Matters”
As of September 30, 2024, PGE's forecasted preliminary regulated return on equity for the full-year 2024 exceeded the OPUC's authorized rate of return. Consequently, under the earnings test the Company's third quarter results included a $17 million decrease to the deferral and a corresponding charge to earnings. However, as of December 31, 2024, PGE's preliminary return on equity, based on actual results, did not exceed the OPUC's authorized rate of return. As a result, the $17 million reduction recorded in the third quarter has been reversed as of December 31, 2024.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “Regulatory Matters”
Decoupling—The decoupling mechanism, previously authorized by the OPUC through 2022, was intended to provide for recovery of margin lost as a result of a reduction in electricity sales attributable to energy efficiency, customer-owned generation, and conservation efforts by residential and certain commercial customers. The mechanism provided for collection from (or refund to) customers if weather-adjusted use per customer was less (or more) than that projected in the Company’s most recent GRC.
In the 2022 GRC, parties reached an agreement that eliminated PGE’s decoupling mechanism upon the effective date of new customer prices that resulted in May 2022. Pursuant to the 2022 GRC Order, the OPUC adopted the agreement such that deferrals would not occur after 2022, although amortization of then previously recorded deferrals was to continue as scheduled until collected or refunded in future customer prices. For the year ended December 31, 2022, with OPUC approval, PGE collected $5 million in customer prices over a one-year period that began January 1, 2024.
In the 2024 GRC filing, the Company included a concept proposal that would have led to resuming decoupling, with certain modifications. PGE then made a tariff filing that proposed weather-normalized decoupling, although at a public meeting in June 2024, the OPUC permanently suspended PGE’s proposed tariff, effectively denying the proposal.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “Operating Activities”
In its ongoing effort to benefit retail and wholesale customers, in 2023, PGE joined the Western Power Pool’s resource adequacy program known as the Western Resource Adequacy Program (WRAP), which has announced that it is on a path to begin binding operation in 2027. The WRAP represents a regional framework to more effectively address resource adequacy, enhance reliability, integrate clean energy, and manage costs through resource diversification and capacity sharing across a wide geographic footprint and broad pool of participants across the west.
In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025
Under “Operating Activities”
On a weather-adjusted basis, total retail deliveries increased 3.1% from 2023. The increase was driven by a 10.7% growth in industrial deliveries, and a 0.5% increase in weather-adjusted deliveries to residential customers, as average use per customer has declined from the highs seen during the COVID-19 pandemic, partially offset by a 0.9% decline in commercial energy deliveries. The Company projects that retail energy deliveries for 2025 will be between 2.5% and 3.5% above 2024 weather-adjusted levels, reflecting continued growth in industrial deliveries.
PGE's corporate strategy places customers at the center of everything the Company does. PGE …+38 / −98 words · under “Company Strategy”
PGE's corporate strategy places customers at the center of everything the Company exists to power the advancement of society. does. PGE energizes supports energizing lives, strengthens strengthening communities, and fosters driving advancement in energy solutions that to promote social, economic, and environmental progress. With a focus on affordability, the Company continuously innovates, streamlines, and manages costs to deliver exceptional experiences for its customers. The Company is committed to being a clean energy leader and delivering steady growth and returns to shareholders. PGE is focused on working with customers, communities, policy makers, and other stakeholders to deliver affordable, safe, reliable electricity service to all, while increasing opportunities to deliver clean and renewable energy, reducing GHG emissions, and responding to evolving customer expectations. At the same time, The Company is building an increasingly smart, integrated, and interconnected grid that spans from residential customers to other utilities within the region. PGE is transforming all aspects of its business to empower its workforce to be even more results oriented to serve customers well. To create a clean energy future, PGE is focused on the following strategic imperatives:
Severe weather—In recent years, PGE’s service territory has experienced unprecedented heat, historic ice and …+75 / −60 words · under “Climate Change”
Severe weather—In recent years, PGE’s service territory has experienced unprecedented heat, historic ice and snowstorms, and wildfires. In December 2025, Portland, Oregon experienced the warmest December on record, averaging six degrees above normal temperatures for the region. In January 2024, the Company’s service territory encountered a severe winter weather event, including snow, ice, and high winds that caused catastrophic damage to physical assets and resulted in widespread customer power outages. For more information regarding the January 2024 severe winter weather event, see “Declared States of Emergency” within this Overview section. In August 2023 the region experienced a record-breaking heat wave with temperatures reaching all-time recorded highs for the month. This resulted in a peak load demand of 4,498 MW, exceeding the Company’s previous all-time peak load demand, Beginning January 13, 2024, and surpassing the Company’s service territory encountered the first of a series of severe winter weather events, including snow, ice, and high winds that caused catastrophic damage to physical assets and resulted in widespread customer power outages. For more information regarding the January 2024 severe winter weather events, see “Declared States of Emergency” and “RCE” within the Regulatory Matters section of this Overview. prior summer peak load by nearly six percent. The increase and impact severity of severe weather events highlights the importance of combating the effects of climate change through decarbonizing the power supply and investing in a more reliable and resilient grid.
The Resource Planning Process—PGE’s resource planning process includes working with customers, stakeholders, and regulators …+68 / −1 words · under “Investing in a Clean Energy Future”
The Resource Planning Process—PGE’s resource planning process includes working with customers, stakeholders, and regulators to chart the course toward a clean, affordable, and reliable energy future. With the passage of HB 2021, PGE created a Clean Energy Plan (CEP), which articulates the Company’s strategy to make continued progress towards the 2030, 2035, and 2040 emission reduction targets through an equitable transition to a decarbonized grid. The CEP is based on, and was submitted to the OPUC in connection with, the Company’s 2023 Integrated Resource Plan (IRP) in March 2023, the first combined IRP and CEP. That filing projected PGE’s resource and capacity needs over the next 20 years and proposed an Action Plan to meet the near-term needs, subject to HB 2021 emissions reduction requirements.
These agreements represent the final procurement from the 2023 All-Source RFP. The 2023 RFP …+52 / −18 words · under “2023 All-Source RFP”
The agreements related to the Clearwater Wind Development and all BESS These agreements represent the final procurement from the 2021 2023 All-Source RFP. The 2023 RFP is a component of PGE’s multi-pronged procurement approach focused on customer affordability, system reliability, and decarbonization. Both the 2023 RFP reprice and the 2025 RFP disclosed below were designed to capture expiring tax credits to support customer affordability. Additional resources required to meet the remaining 2030 need are anticipated to be procured through future acquisition processes, including, but not limited to, PPAs, including a bilateral all-call for PPAs, community-based renewable energy procurement, the 2023 All-Source ongoing 2025 RFP, and future RFPs.
PGE filed notice with the OPUC in November 2024 that an RFP in 2025 …+29 / −5 words · under “2025 All-Source RFP”
[… 24 unchanged words …] capacity shortfall and to make continued progress toward decarbonization targets under HB 2021. These actions were consistent with the 2023 IRP Action Plan and CEP Update. PGE plans to file filed the draft 2025 All-Source RFP in on April 17, 2025, and regulatory approval was granted on July 22, 2025. The first half of Company issued the RFP to market on July 31, 2025, seeking bids for resources that can provide non-emitting dispatchable capacity and renewable generation.
Various regulatory and legal challenges directed at the OPUC have been initiated by NewSun …+10 / −43 words · under “Legal Challenges to the RFP Process”
Both the 2021 and 2023 RFPs were the subject of Various regulatory and legal challenges directed at the OPUC have been initiated by NewSun Energy LLC, focused on the scoring methodology of the RFPs and OPUC acknowledgement of the final shortlists. However, two of NewSun’s challenges related to the 2021 PGE’s RFP were dismissed as moot in recent court decisions. process. PGE has joined the proceedings as an intervenor, and the remaining challenges are in various stages of litigation or regulatory review. PGE cannot predict the outcome of these proceedings or potential impact, if any. on its 2021 and 2023 All-Source RFP process.
In May 2024, PGE signed a non-binding memorandum of understanding in the development of …+52 / −6 words · under “Transmission Upgrades”
On In May 28, 2024, PGE signed a non-binding memorandum of understanding in the development of the North Plains Connector, an approximately 415-mile, high-voltage direct-current (HVDC) transmission line to be constructed with endpoints near Bismarck, North Dakota and Colstrip, Montana. The parties have entered negotiations with the United States Department of Energy (U.S. DOE) to finalize the project objectives, terms, and conditions, including the Company’s participation, which is expected to involve a 20% ownership share of the approximately $3.2 billion total investment of the project. On In August 6, 2024, the project was awarded a $700 million grant from the U.S. Department of Energy’s DOE’s Grid Resilience and Innovation Partnerships program to further support its development and would reduce the overall total investment of the project. A portion of the GRIP funding is also allocated to assess upgrades to the Colstrip Transmission System. See “Federal Grants” in the Laws and Regulations section of this Overview for further discussion over the impacts of Federal grants and effect of Presidential executive orders.
The U.S. DOE selected the CTWS, with PGE as a subrecipient under the grant, …+20 / −15 words · under “Transmission Upgrades”
The United States Department of Energy U.S. DOE selected the Confederated Tribes of Warm Springs CTWS, with PGE as a subrecipient under the grant, for a $250 million grant to upgrade the existing 230 kV Bethel-Round Butte Transmission line to 500 kV. The project (Warm Springs Power Pathway) will accelerate the development of transmission capacity, enabling new carbon-free generation in Central and Eastern Oregon to reach customer demand loads in Western Oregon. The added capacity and associated upgrades will also increase resiliency of the transmission system as well as resiliency of the CTWS communities by increasing resources available to the CTWS to support adaptation and response strategies. economic growth opportunities. See “Federal Grants” in the Laws and Regulations section of this Overview for further discussion over the impacts of Federal grants.
Wildfire Mitigation—PGE has a Wildfire Mitigation Program under which an annual Wildfire Mitigation Plan …+10 / −38 words · under “Transmission Upgrades”
• Wildfire Mitigation—PGE has a Wildfire Mitigation Program under which an annual Wildfire Mitigation Plan (WMP) is developed and submitted to the OPUC, as required by State law, to coordinate activities across the Company and with State-wide stakeholders. The On December 31, 2025, WMP Update PGE filed its 2026-2028 Wildfire Mitigation Plan, which forecasts $53 $47 to $57 $50 million annually in operations and maintenance costs and an additional $57 $70 to $78 $84 million annually in capital investments, for the year ending 2025, 2026-2028 period, to continue system hardening efforts, expand situational awareness capabilities, implement specific inspection and maintenance along with vegetation management, raise community and customer awareness, and take operational actions within high fire risk zones. PGE strives to improve regional safety by reducing mitigating the risk that PGE’s electric utility infrastructure could cause a wildfire, while limiting the impacts of PSPS events and other mitigation activities on customers and increasing the resiliency of PGE assets to wildfire damage. During 2024, 2025, PGE invested $40 $56 million in capital projects related to wildfire mitigation and resiliency and utility asset management. consistent with the 2024 WMP. See the “Wildfire Mitigation” section in Note 7, Regulatory Assets and Liabilities, in the Notes to Consolidated Financial Statements in Item 8.—“Financial Statements and Supplementary Data, for further discussion.
Virtual Power Plant (VPP)—PGE’s VPP is comprised of Distributed Energy Resources and flexible loads …+2 / −60 words · under “Transmission Upgrades”
• Virtual Power Plant (VPP)—PGE’s VPP is comprised of Distributed Energy Resources and flexible loads that are managed through technology platforms to provide grid and power operations services. PGE’s customer offerings related to flexible load programs, rooftop solar, battery storage, and electric vehicle (EV) charging solutions support grid reliability and increase portfolio flexibility and resource diversity. These Distributed Energy Resources and flexible loads are the foundation of PGE’s VPP that increasingly provides a growing suite of grid and system services over time. When coordinated through the Company’s Distributed Energy Resources Management Systems, Distributed Energy Resource and flexible loads support cost-effective decarbonization, advance customer and community energy resiliency, promote customer engagement with the energy system, and unlock additional grid services that enhance PGE’s operation of a dynamic two-way system. As customer participation in the VPP helps avoid customer service interruptions and reduces exposure to scarcity pricing in energy markets. On July 8, 2024, customer actions, orchestrated through the VPP, reduced load by more than 100 MW. As their participation in PGE’s VPP grows, customer their actions provide increasing benefit and help avoid customer service interruptions and reduce exposure to scarcity pricing in energy markets.
On July 25, 2025, PGE filed with the OPUC its draft 2026-2028 TE plan, …+10 / −54 words · under “Transmission Upgrades”
In 2023, PGE’s second On July 25, 2025, PGE filed with the OPUC its draft 2026-2028 TE plan, was filed and accepted by the OPUC in October 2023. The TE plan considers current and planned activities, along with forecasted EV loads and potential system impacts. The 2023 TE plan which represents a continuation of the approach and programmatic efforts strategy found within PGE’s 2019 2023-2025 TE plan. while also outlining the Company’s current strategy to integrate TE into utility business in order to plan, service, and manage EV load.
Federal Grants—PGE continues to evaluate opportunities on behalf of customers to leverage state, federal …+19 / −32 words · under “Laws and Regulations”
Federal Grants—In November 2021, the $1.2 trillion IIJA, which includes approximately $550 billion of new federal spending, was signed into law. PGE Grants—PGE continues to pursue multiple areas under evaluate opportunities on behalf of customers to leverage state, federal and private foundation funding programs to offset the IIJA, and other state and federal programs, for potential grant funding cost of projects. These projects target improvements in electrical system reliability and resiliency, wildfire situational awareness and mitigation, greater communications capabilities, advancements in customer usage analytics using artificial intelligence, renewable resources and advanced electrical grid support, hydro generation operations, hydrogen production, and regional transmission capacity constraints.
PGE has entered into agreements to transfer 2023 through 2025 tax credits and transferred …+2 / −136 words · under “Laws and Regulations”
The United States Treasury and the Internal Revenue Service released extensive rules addressing credit transfer eligibility and application, including but not limited to, required registration, filing, and documentation for transferors and transferees to elect and claim a credit transfer. In December 2023, PGE received approval from the OPUC to transfer 2023 PTCs and record any difference in the full value and the discounted value in a property balancing account. Consistent with options available under the IRA, the Company transferred 2023 credits with the final transfer occurring in the first quarter of 2024. On April 17, 2024, PGE received approval from the OPUC to transfer 2024 and 2025 PTCs and record any difference between the full value and the discounted value in a property balancing account. On December 11, 2024, PGE received approval from the OPUC to transfer 2024 ITCs and return the net proceeds from the sale to PGE customers. PGE has entered into agreements to transfer 2023 to through 2025 tax credits and transferred $112 $179 million and $24 $112 million, net of discounts, for cash proceeds in 2025 and 2024, and 2023, respectively.
HB 2021 requires utilities to develop a CEP for meeting the reduction targets, concurrent …+22 / −24 words · under “Laws and Regulations”
HB 2021 requires utilities to develop a CEP for meeting the reduction targets, concurrent with each IRP. In reviewing a CEP, the OPUC must ensure that utilities take actions as soon as practicable that facilitates rapid reduction of GHG emissions, demonstrate continual progress toward meeting the targets, and create a plan that is in the public interest. demonstrate continual progress toward meeting the targets, and take actions as soon as practicable that facilitate rapid reduction of GHG emissions. Further, the CEP must result in an affordable, reliable, and clean electric system. The law does not require particular GHG percentage reductions be attained until 2030. The law contains a cost cap affordability and reliability related provisions that can slow or pause compliance with the GHG targets, if implicated. The OPUC has a current open docket, UM 2273, in which provisions regarding the cost cap are being investigated.
The Company has a 20% ownership share in Colstrip and has fully depreciated it …+45 / −12 words · under “Laws and Regulations”
The Company has a 20% ownership share in Colstrip and in response to SB 1547, has accelerated depreciation fully depreciated it as of Colstrip to December 31, 2025. Any capital spending after 2025 is expected to be fully depreciated within the year of spending. The forecasted annual revenue requirement for Colstrip, including depreciation, is updated annually in a separate, supplemental tariff and power cost related items are recovered annually under the AUT. In order to meet PGE’s regulatory, legislative, and reliability requirements, the Company continues to evaluate the continuation of its ongoing ownership in Colstrip. See Note 19, Contingencies in the Notes to Consolidated Financial Statements in Item 8.—“Financial Statements and Supplementary Data” for information regarding legal proceedings matters related to Colstrip.
GHG regulations for new natural gas-based turbines and existing coal-based units, pursuant to section …+0 / −37 words · under “Laws and Regulations”
• GHG regulations for new natural gas-based turbines and existing coal-based units, pursuant to section 111 of the Clean Air Act (CAA); The rule finalizes: i) guidelines for GHG emissions from existing fossil fuel-fired steam generating electric units; and ii) revisions to existing performance standards for new, reconstructed, or heavily modified fossil fuel-fired stationary combustion turbine electric generating units.
In addition to the EPA’s proposed rulemakings, several legal challenges have been filed regarding …+73 / −30 words · under “Laws and Regulations”
PGE continues In addition to evaluate each of these rules to assess the impact it may have on the Company’s continuing investment in Colstrip, which could be material. PGE notes that a substantial number of EPA’s proposed rulemakings, several legal challenges have been filed regarding these rules. In challenges to all three rules, at the EPA’s request, the courts have granted stays to allow new EPA leadership to reevaluate the rule. These challenges, or attempts by the federal government to withdraw or modify the regulations, if successful, could affect the applicability to PGE and Colstrip, specifically. Given the uncertainty surrounding applicability of these laws and regulations, PGE cannot reasonably estimate the impact to its results of operations, financial position, and cash flows, however, if the MATS Rule and GHG Rule are ultimately enforced, it could require material additional compliance costs. To the extent these regulations result in increased compliance costs, the Company expects to seek recovery of those costs through the ratemaking process.
Any disallowance would be a charge to earnings, which could be material to the …+0 / −67 words · under “Regulatory Matters”
PGE believes that the full amount of the deferral is probable of recovery and plans to file with the OPUC in mid-2025, seeking recovery to begin during 2026. The OPUC has significant discretion in making the final determination of recovery based on its determination of prudency and interpretation of the earnings test application, either of which could result in all or a portion of the deferral being disallowed. Any disallowance would be a charge to earnings, which could be material to the Company’s financial condition, results of operations, or cash flows. For further [… 28 unchanged words …]
RCE—Under the RCE mechanism, originally authorized by the OPUC to be effective through 2025, …+131 / −28 words · under “Regulatory Matters”
OPUC RCE—Under the RCE mechanism, originally authorized by the end OPUC to be effective through 2025, PGE is allowed to pursue recovery of 80% of costs for RCEs above amounts forecasted in the Company’s AUT, without application of an earnings test, with the remaining 20% flowing through operating expenses and subject to the existing PCAM. As of December 31, 2025, PGE’s deferred balance related to RCEs was $90 million, which includes $88 million related to RCEs in 2024 and $2 million in 2025. PGE filed the results of the 2024 PCAM with the OPUC on July 1, 2025, in Docket UE 457, which included a request for $86 million, before considering interest, in RCE costs incurred in 2024, initiating a regulatory review process. Included in the filing, the Company requested an extension of the RCE mechanism for one year, of filing, with through 2026. The OPUC has adopted a procedural schedule for the regulatory review process that expects an order in March 2026. Any resulting refund or collection impacting customer prices is expected to be effective January April 1, of the following year. RCE costs incurred in 2024 will be included in the PCAM for 2024, which the Company expects to file no later than July 1, 2025. 2026. PGE believes the deferred amounts as of December 31, 2024 2025 are probable of recovery. The OPUC has significant discretion in making the final determination of recovery. The OPUC’s conclusion of overall prudence could result in [… 21 unchanged words …]
Renewable recovery framework—As previously authorized by the OPUC, the RAC is a primary method …+15 / −150 words · under “Regulatory Matters”
[… 33 unchanged words …] with renewables, under certain conditions. The RAC allows PGE to recover prudently incurred costs of renewable resources through filings made each year, outside of a General Rate Case (GRC). During 2024, In 2023, the Company filed for Clearwater, which went into service in January 2024. PGE did not submit a request for recovery of any renewable resources under the RAC In 2023, the Company filed for Clearwater, which went into service January 5, during 2024 Per the OPUC's Final order in the or 2025. GRC, Clearwater was excluded from the rate case as prudency is being determined in a separate proceeding, OPUC Docket UE 427. The target rate effective date for price changes for Clearwater in UE 427 is March 1, 2025. Under the RAC, PGE will continue to defer the revenue requirement, net of NVPC benefits, from the in-service date in January 2024 until Clearwater is reflected in customer prices. As of December 31, 2024, the Company has recorded a $40 million regulatory liability, which represents the deferred revenue requirement that PGE believes is probable of recovery, net of NVPC that is probable of refund to customers under the RAC. For further information, see “Alternative Revenue Programs” in Note 2, Summary of Significant Accounting Policies and “Clearwater RAC” in Note 7, Regulatory Assets and Liabilities in the Notes to Consolidated Financial Statements in Item 8.—“Financial Statements and Supplementary Data.”
New Large Load—In December 2023, the OPUC established Docket UE 430 to investigate new …+8 / −29 words · under “Regulatory Matters”
New Large Load—In October 2023, in Docket UE 416, the OPUC directed a docket be opened to investigate new load connection costs and in December 2023, the OPUC established Docket UE 430 for that purpose. to investigate new load connection costs. Following a lengthy regulatory process, on in December 20, 2024, PGE filed Advice No. 24-38 with the OPUC. This filing introduces introduced several proposed changes to PGE policies and tariffs that, if approved, would: i) reasonably protect other customers from the cost to connect new large load customers; ii) improve transmission system planning and capacity; by managing capacity requests over one MW; iii) provide fair recovery of distribution investment costs from large load users; and iv) implement contractual requirements designed to appropriately allocate and recover distribution and transmission costs and mitigate the risk of stranded assets, while providing flexibility to meet large customer needs.
The EDAM, anticipated to begin operation in 2026, will allow market participants to submit …+30 / −100 words · under “Operating Activities”
PGE participates in the western EIM, which allows, among other things, more renewable energy integration into the grid by better complementing the variable output of renewable resources. The Company recently signed the implementation agreement to join The EDAM, to build on the success of the western EIM and help provide PGE and its customers access to more affordable, reliable and clean energy. Utilities that participate in the EDAM, expected anticipated to begin operating operation in 2026, will bid allow market participants to submit bids for their anticipated forecasted energy demand and generating available generation resources into the market a day ahead of expected usage. use. The EDAM will then optimize generation resources transmission and the energy needed for resource use across all market participants, allowing them enabling access to receive the least costly and cleanest energy lowest cost resources to meet their energy regional needs. The EDAM is expected to build upon leverage PGE's existing technology and systems and utilize the Company has deployed and leverage PGE’s Company’s transmission system to connect regional resources, such as hydropower and wind facilities in the Pacific Northwest and solar facilities in California and the desert Southwest, across a common unified market platform.
PGE generates revenues and cash flows primarily from the sale and distribution of electricity …+11 / −116 words · under “Operating Activities”
[… 98 unchanged words …] experienced its highest average megawatt deliveries and retail energy sales during the winter heating season and recorded its current winter peak load in December 2022. Summer peak deliveries in each year since 2021 have exceeded that winter peak. For further information regarding seasonal fluctuations, see “Seasonality” in the Customers and Revenues section in Item 1.—“Business.” Retail customer price changes and customer usage patterns, which can be affected by the economy, also have an effect on revenues. Wholesale power availability and price, hydro and wind generation, and fuel costs for thermal plants can also affect income from operations. PGE has taken measures to enhance the availability of supply chain-constrained items that are needed to serve new and existing customers, such as securing inventory of critical materials to improve reliability, reserving manufacturing capacity with strategic partners, and evaluating availability with established and new suppliers. PGE’s materials and supplies forecasting process is designed to secure materials availability as well as help mitigate cost increases through long-term agreements, supplier engagement, and expanding the supply base.
In 2025, retail energy deliveries increased 3.8% from 2024, with increases in demand from …+22 / −26 words · under “Operating Activities”
In 2024, 2025, retail energy deliveries increased 1.3% 3.8% from 2023, 2024, with increases in demand from industrial customers outweighing the decreases seen in the residential and commercial classes. The industrial class has experienced an increase in energy deliveries, due primarily to continued growth in the high-tech and digital services sectors. Compared to the prior year, weather had a negative impact on served to reduce deliveries, The first quarter of 2023 was unseasonably cold, whereas the same period of 2024 was as temperatures were overall mild. as was Temperatures in the fourth quarter of 2024. Normally, were mild, with December experiencing the first and fourth quarters have warmest average temperature on record at the highest demand for heating. Portland International Airport.
Customers are measured and reported in terms of individual service points, with certain companies, …+106 / −0 words · under “Operating Activities”
Customers are measured and reported in terms of individual service points, with certain companies, which are classified among the commercial, industrial, or Direct Access categories, having multiple service points. ESSs supplied Direct Access customers with energy representing 11% of PGE’s total retail energy deliveries during both 2025 and 2024. The maximum retail load allowed to be supplied under the fixed three-year and minimum five-year opt-out programs represent 12% of the Company’s total retail energy deliveries for 2025. With the adoption of the New Large Load Direct Access program in 2020, as much as 17% 16% of the Company’s 2024 2025 energy deliveries could have been supplied by ESSs. The OPUC, under docket UM 2024, has undertaken an investigation of long-term Direct Access with program caps being one of the issues under consideration. This regulatory proceeding is expected to conclude in early 2026.
For 2025, actual NVPC was below baseline NVPC by $6 million, which was within …+29 / −7 words · under “Operating Activities”
• For 2023, 2025, actual NVPC was above below baseline NVPC by $5 $6 million, which was within the established deadband range. Accordingly, there is no estimated collection from refund to customers was recorded as of December 31, 2023. under the PCAM for 2025. A final determination regarding the 2025 PCAM results will be made by the OPUC through a public filing and review in 2026.
17 more paragraphs were rewritten here (+177 / −220 words), the smallest rewrites on this page; their text is left out to keep the page short and is in the filings above.