NuScale Power MD&A: what changed

In NuScale Power's 10-Q for fiscal Q3 2026, the MD&A added 11 passages, removed 9 and rewrote 13 against the 10-Q for fiscal Q3 2025, the same quarter a year earlier. In its 10-K for fiscal 2025, the MD&A added 11 passages, removed 10 and rewrote 12 against the 10-K for fiscal 2024.

Source: Management's discussion and analysis (Item 2) of NUSCALE POWER CORPORATION's 10-Q filed Nov 5, 2026 (accession 0001822966-26-000091, period ended Sep 30, 2026) compared with its 10-Q filed Nov 6, 2025 (accession 0001822966-25-000175, period ended Sep 30, 2025), on SEC EDGAR

Added
11
Passages new in the 10-Q for fiscal Q3 2026
10-Q · Nov 5, 2026
Removed
9
In the 10-Q for fiscal Q3 2025 only
10-Q · Nov 6, 2025
Rewritten
13
15+ words changed, figures not counted
10-Q · Nov 5, 2026
Paragraphs compared
40
37 in the 10-Q for fiscal Q3 2025
10-Q · Nov 5, 2026

NuScale Power's latest quarterly report against the same quarter a year earlier

10-Q for fiscal Q3 2026 against the 10-Q for fiscal Q3 2025

In NuScale Power's 10-Q for fiscal Q3 2026, the MD&A added 11 passages, removed 9 and rewrote 13 against the 10-Q for fiscal Q3 2025, the same quarter a year earlier.

Compared: Item 2 of the 10-Q filed Nov 5, 2026 (accession 0001822966-26-000091, period ended Sep 30, 2026; 40 paragraphs) and Item 2 of the 10-Q filed Nov 6, 2025 (accession 0001822966-25-000175, period ended Sep 30, 2025; 37 paragraphs).

NuScale Power's figures, dates and period names change every period and are not counted. A paragraph is rewritten when at least 15 other words were added or removed: added text is underlined and shaded, removed text is struck through, and long unchanged stretches are shortened to the words around each change.

Introduction

1 rewritten

The following discussion and analysis of the financial condition and results of operations of …+12 / −6 words

The following discussion and analysis of the financial condition and results of operations of NuScale Corp should be read together with our financial statements as of and for the years ended December 31, 2025, 2024 and 2023 and 2022 , including as may be found in the Company’s 2025 Annual Report on Form 10-K, and our unaudited interim condensed consolidated financial statements as of and for the three and nine months ended September 30, 2026 and 2025, and 2024, together with related notes thereto. This discussion may contain forward-looking statements based upon current expectations that involve risks and uncertainties, including, but not limited to, those described under the sections entitled “Risk Factors” in this Form 10-Q and our 2024 2025 Annual Report on Form 10-K. Our actual results may differ materially from those projected in these forward-looking statements as a result of various factors. As used herein, “NuScale,” the “Company,” “us,” “our” or “we” refer to NuScale Corp, together with its consolidated subsidiaries.

Overview

1 added · 2 removed · 2 rewritten

Added in the 10-Q for fiscal Q3 2026

NuScale is actively collaborating with ENTRA1 on development initiatives for the deployment of NuScale’s nuclear technology. ENTRA1 is NuScale’s exclusive global partner for the commercialization and development of our products and services, including NPMs to be included in nuclear power plants. While ENTRA1 can decide in its sole discretion whether to participate in commercialization and development opportunities with NuScale, NuScale must obtain ENTRA1’s consent to pursue opportunities without their involvement.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Our small modular reactor (“SMR”), known as NuScale Power Module™ (“NPM”), provides a scalable power plant solution incorporating enhanced safety, improved affordability and extended flexibility for diverse electrical and process heat applications. Our scalable design provides carbon-free energy at a reduced cost when compared with gigawatt-sized nuclear facilities.

Since our founding in 2007, we have made significant progress towards commercializing the first SMR in the United States. In 2017, we submitted our Design Certification Application (“DCA”) to the U.S. Nuclear Regulatory Commission (“NRC”). On August 28, 2020, the NRC issued its Final Safety Evaluation Report, representing the NRC’s completion of its technical review. On September 11, 2020, the NRC issued its Standard Design Approval (“SDA”) of our NPM and scalable plant design. On January 19, 2023, the NRC published in the Federal Register a final rule that certifies NuScale’s SMR design for use in the United States, which became effective 30 days after publication.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

The Company has partnered with ENTRA1, NuScale’s global strategic partner for commercialization and development of power plants utilizing NPMs. ENTRA1 holds the exclusive rights for the worldwide commercialization, distribution, sales and development of our products, services and power plants. In this strategic partnership, the Company collaborates on joint development initiatives and financially contributes alongside the partnership in joint activities which may be recoverable as part of its development costs. To this end, on August 27, 2025, NuScale LLC and ENTRA1 executed a Partnership Milestones Agreement (“PMA”). Under the PMA, the Company will make milestone contributions (“Milestone Contribution”) to ENTRA1, or its designated affiliate, for each NPM or other NuScale product that is anticipated to be placed in a contemplated project or power plant (each, an “Energy Project”). Under the PMA, NuScale is named the key supplier to future ENTRA1 Energy Projects with respect to the supply of SMR technology. The PMA also includes a negotiated maximum sale price for each NPM to be delivered and installed in an ENTRA1 Energy Project, subject to adjustments. It is anticipated that NuScale will enter into agreements for the delivery and installation of NPMs with ENTRA1.

The initial term of the PMA expires on December 31, 2045. The term of the PMA automatically renews for subsequent twenty-year periods, unless either party gives at least twelve months prior written notice before the end of the then relevant term. The PMA may be terminated by either party upon written notice if the other party: (i) becomes insolvent (as declared by a court of competent jurisdiction in a final non-appealable judgment); (ii) makes an assignment for the benefit of creditors; (iii) admits in writing its inability to pay debts as they mature; or (iv) is the subject of any proceeding filed by such other party under any bankruptcy or insolvency law that is not dismissed within 120 days.

Show the rest (183 words)

As of September 30, 2025, the criteria for triggering Milestone Contribution 1 has been achieved for 72 NPMs, as ENTRA1 has entered into a non-binding agreement regarding NPMs with the Tennessee Valley Authority (“TVA”). On September 2, 2025, TVA announced the signing of an agreement under which ENTRA1 and TVA will collaborate to develop plants to provide TVA with up to 6 gigawatts of new nuclear power generation, with ENTRA1’s immediate strategy being the utilization of NuScale’s SMR equipment inside ENTRA1 Energy PlantsTM. This achievement resulted in a one-time expense of $495.0 million included in General and administrative (“G&A”) expenses on the condensed consolidated statement of operations, a liability of $346.5 million included in Accounts payable and accrued expenses on the condensed consolidated balance sheet and a payment of $148.5 million, reflected as Net cash used in operating activities in the condensed consolidated statement of cash flows.

As our global strategic partner for commercialization and development, ENTRA1 can decide whether to participate in a commercial opportunity. If ENTRA1 declines to participate in a commercial opportunity, NuScale may pursue the opportunity on its own.

Our mission is to provide scalable advanced nuclear technology to produce electricity, heat and …+76 / −17 words

Our mission is to provide scalable advanced nuclear technology to produce electricity, heat and clean water to improve the quality of life for people around the world. We are changing commercializing a modular, scalable electric Light Water Reactor technology that we believe will deliver safer, scalable, cost-effective and reliable carbon free power. Our core technology, the NPM, can generate 77 MWe, with a focus on the integration of components, simplification or elimination of systems and use of passive safety features. We believe that this results in a safe and highly reliable power that changes the world by creating an energy source that plant suitable to be sited close to where electricity, water desalinization, hydrogen production or process heat is smarter, cleaner, safer and cost competitive. needed.

Since our founding in 2007, we have made significant progress towards commercializing the first …+59 / −13 words

Since our founding in 2007, we have made significant progress towards commercializing the first SMR in the United States. In September 2020, our 12-module design (currently approved for 160 million watts of thermal power or 50 MWe per NPM) became the first and only SMR to receive an SDA from the NRC. In May 2025, the NRC finalized their review and approved the Company’s our second SDA application and the associated licensing topical reports for NuScale’s our 6-unit 77 MWe NPM design, giving customers in the United States are now able the ability to reference the certified approved design and SDA for expedited construction and operating licensing of NuScale’s for a plant that is using the NuScale SMR pursuant to 10 CFR Part 52. technology.

Outlook

2 added · 1 rewritten

Added in the 10-Q for fiscal Q3 2026

Under “Foreign SMR Market”

Demand for energy in foreign markets is currently being driven by population growth, industrialization and urbanization with countries in Asia contributing the most to international growth. Rising living standards, driven by economic growth, have increased the need for residential electricity, a trend that is expected to increase in the coming years, with Asia forecasted to account for nearly 60% of global growth in electricity consumption through 2050.

Added in the 10-Q for fiscal Q3 2026

Under “Foreign SMR Market”

On February 12, 2026 the Romanian Government approved the investment decision for the RoPower Doicești SMR plant project, allowing for the ability to seek financing to further feasibility studies, and site-specific design work prior to any construction moving forward. This is a positive step in support of advancing the project to the next phase, which we refer to as the “pre-EPC phase”, as RoPower is authorized to advance the licensing and geotechnical work, finalize a pre-engineering, procurement and construction (“EPC”) contract, and begin negotiating contracts for long lead items. We do not anticipate that RoPower will enter into a pre-EPC contract until they have secured financing to support the pre-EPC activities but once a pre-EPC contract is entered into, we anticipate that we will recommence work on the project.

With ENTRA1, we continue to develop our international customer interest as we foresee significant customer demand over the long-term outside of the United States as industry trends like decarbonization, an increasing demand for renewable energy alternatives, and changes in broader economic and geopolitical conditions continue to grow. Our collective team puts significant effort into developing dialogue with foreign governments and corporations in order to educate and market our technology.

Show the rest (221 words)

Demand for energy in the United States is currently being driven by the significant growth in the data center industry, particularly as artificial intelligence (“AI”) deployment, cloud computing adoption, and digital transformation initiatives accelerate across sectors. Further, the United States government has identified nuclear technology as imperative to the country’s national security objectives and ordered the expansion of American nuclear energy capacity to 400 gigawatts by 2050, or nearly 400% the current capacity.

On September 2, 2025, the Tennessee Valley Authority (“TVA”) announced the signing of a non-binding agreement under which ENTRA1 and TVA will collaborate to develop plants to provide TVA with up to 6 gigawatts of new nuclear power generation. TVA and ENTRA1 announced that this collaboration is an important first step to advance deployment of nuclear technology in the United States, with ENTRA1 also announcing that its immediate strategy is to utilize NuScale’s SMR equipment inside their power plants.

We are positioning ourselves to support the potential next phase of the collaboration between TVA and ENTRA1 which is contingent on the execution of one or more power purchase agreements between ENTRA1 and TVA.

In addition, ENTRA1 and NuScale continue to develop domestic customer interests, including interest from hyperscaler, technology, industrial and micro-grid customers in sectors that include direct air capture, water desalinization, hydrogen production and mission critical facilities.

The Company currently has one international customer: RoPower Nuclear S.A. (“RoPower”), which is a …+31 / −87 words · under “Foreign SMR Market”

Currently, The Company currently has one major international customer: RoPower Nuclear S.A. (“RoPower”), which is a joint venture established by S.N. Nuclearelectrica S.A. (“Nuclearelectrica”) and Nova Power & Gas S.A. Under Phase 1 In July 2024, NuScale and RoPower signed a technology licensing agreement, which granted RoPower a right to use certain intellectual property of the contract with RoPower, we defined the major site and specific inputs for a NuScale 6-module power plant to be deployed at the Doicesti Power Station site in Romania. NuScale’s. In the third quarter of the 2024 fiscal year, Nuclearelectrica and RoPower signed the Front-End Engineering and Design (“FEED”) Phase 2 contract with Fluor, at the time a related party to NuScale. FEED Phase 2 will include included tasks related to the development of a Class 3 plant cost estimate, as well as support to RoPower with its regulatory and stakeholder engagements. NuScale is supporting completed their scope of this work for FEED Phase 2 as a subcontractor to Fluor As the FEED Phase 2 project is nearing completion, we understand that the next phase of the Doicesti project will be subject to a Final Investment Decision by RoPower shareholders which depends on the finalization of their funding and level of support by the Romanian state and other governmental authorities. in late 2025.

Results of Operations

5 added · 5 removed · 5 rewritten

Added in the 10-Q for fiscal Q3 2026

Under “Revenue”

Revenue decreased by $8.0 million during the three months ended September 30, 2026 as compared to the three months ended September 30, 2025, primarily due to the revenue recognized from the work associated with the Fluor FEED Phase 2 engineering services in support of the RoPower project, which was completed in late 2025, with no comparable activity in 2026.

Added in the 10-Q for fiscal Q3 2026

Under “Other Expenses”

Other expenses increased by $8.1 million during the three months ended September 30, 2026 as compared to the three months ended September 30, 2025, primarily due to (a) the Company’s engineers and project personnel working on fewer commercial projects than in the prior year, resulting in the lower allocation to Cost of sales described above and (b) higher other compensation costs incurred as we have ramped up the resources supporting supply chain readiness and the delivery of future commercial projects.

Added in the 10-Q for fiscal Q3 2026

Under “Revenue”

Revenue decreased $28.8 million during the nine months ended September 30, 2026 as compared to the nine months ended September 30, 2025, primarily due to the revenue recognized from the RoPower technology license agreement (“TLA”) completed during the first three months of 2025 as well as the work associated with the Fluor FEED Phase 2 engineering services in support of the RoPower project, which was completed in late 2025, with no comparable activity in 2026.

Added in the 10-Q for fiscal Q3 2026

Under “Research and Development”

R&D expenses increased $17.3 million during the nine months ended September 30, 2026 as compared to the nine months ended September 30, 2025, primarily as a result of $19.7 million higher costs associated with the Company’s increased activities to advance the technological readiness and design maturity of our NPM components, partially offset by $2.4 million in lower regulatory and testing costs as we received SDA approval in May 2025.

Added in the 10-Q for fiscal Q3 2026

Under “Other Expenses”

Other expenses increased by $26.2 million during the nine months ended September 30, 2026 as compared to the nine months ended September 30, 2025, primarily due to (a) the Company’s engineers and project personnel working on fewer commercial projects than in the prior year, resulting in the lower allocation to Cost of sales described above and (b) higher other compensation costs incurred as we have ramped up the resources supporting supply chain readiness and the delivery of future commercial projects as well as advisory fees.

The increase of $27.5 million in investment income reflects the Company’s stronger cash position which resulted in higher investments in interest bearing cash equivalents, Short-term investments and Investments during the nine months ended September 30, 2026.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Research and Development”

Research and development (“R&D”) expenses decreased $1.1 million during the three months ended September 30, 2025 as compared to the three months ended September 30, 2024, primarily as a result of the Company signing revenue-generating contracts that allow personnel to transition from R&D to commercial projects, resulting in an increase in Cost of sales and a reduction in R&D expenses.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Other Expenses”

Other expenses decreased $1.1 million during the three months ended September 30, 2025 as compared to the three months ended September 30, 2024, as a result of the Company’s increased commercial activities, allowing engineering & project personnel to work on commercial projects, resulting in an increase in Cost of sales and lower Other expenses.

There was no change in the fair value of warrant liabilities during the three months ended September 30, 2025 because all of the Company’s 18.5 million warrants outstanding at September 30, 2024 were either redeemed by the Company in the fourth quarter of the 2024 fiscal year or exercised by the holder during that period.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Revenue and Cost of Sales”

Revenue increased $26.9 million during the nine months ended September 30, 2025 as compared to the nine months ended September 30, 2024, due to engineering and licensing fees and services in support of advancing RoPower’s goal of deploying a power plant powered by six NPMs in Romania. Costs of sales increased $16.3 million due to engineering services in support of the same project.

R&D expenses decreased $5.5 million during the nine months ended September 30, 2025 as compared to the nine months ended September 30, 2024, primarily as a result of signing revenue-generating contracts that allow management to redeploy engineering and project personnel from R&D activities, resulting in an increase in Cost of sales, as noted above, and $4.0 million of lower R&D costs. The Company also incurred lower professional fees of $2.0 million after receiving the NRC approval of the SDA in the second quarter of 2025.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Other Expenses”

Other expenses decreased $5.9 million during the nine months ended September 30, 2025 as compared to the nine months ended September 30, 2024, due primarily to (a) engineering and project personnel being reassigned to revenue-generating commercial projects, resulting in the increase in Cost of sales, noted above, and (b) a one-time charge of $3.2 million incurred in the nine months ended September 30, 2024, in relation with a plan to reduce the Company’s workforce by 154 full-time employees, or 28%, in order to continue our transition from an R&D-based company to a commercial company. These decreases were partially offset by higher equity-based compensation costs and hardware and software purchases.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Change in Fair Value of Warrant Liabilities”

There was no change in the fair value of warrant liabilities during the nine months ended September 30, 2025 because all of the Company’s 18.5 million warrants outstanding at September 30, 2024 were either redeemed by the Company in the fourth quarter of the 2024 fiscal year or exercised by the holder during that period.

Cost of sales decreased $5.4 million during the three months ended September 30, 2026 …+26 / −15 words · under “Cost of Sales”

Sponsored Cost share of sales decreased $6.4 $5.4 million during the nine three months ended September 30, 2026 as compared to the three months ended September 30, 2025, as compared to the nine months ended September 30, 2024, primarily due to the Company reaching completion of the cost share cap work associated with DOE and USTDA. the Fluor FEED Phase 2 engineering services in support of the RoPower project in late 2025.

R&D expenses increased $7.0 million during the three months ended September 30, 2026 as …+24 / −20 words · under “Research and Development”

Investment income R&D expenses increased $11.1 $7.0 million during the nine three months ended September 30, 2026 as compared to the three months ended September 30, 2025, as compared to the nine months ended September 30, 2024, primarily as a result of $6.7 million higher costs associated with the Company’s stronger cash position increased activities to advance the technological readiness and higher investments in cash equivalents, short-term investments and longer-term investments. design maturity of our NPM components.

G&A expenses decreased by $491.3 million during the three months ended September 30, 2026 …+38 / −26 words · under “General and Administrative”

G&A expenses increased $502.2 decreased by $491.3 million during the three months ended September 30, 2025 2026 as compared to the three months ended September 30, 2024, 2025, primarily due to (a) the 2025 recognition of Milestone Contribution 1 of $495.0 million associated with the signing of a non-binding agreement between ENTRA1 and (b) higher strategic business development costs of $3.6 million, both resulting from increased commercialization efforts, (c) $2.2 million TVA, with no comparable activity in legal and accounting fees and (d) $1.1 million in 2026. This decrease was slightly offset by higher compensation costs, fees associated with the implementation of the enterprise resource planning system (“ERP”) and equity-based compensation expense. insurance costs.

Cost of sales decreased $17.3 million during the nine months ended September 30, 2026 …+21 / −22 words · under “Cost of Sales”

Revenue and Cost of sales increased $7.8 decreased $17.3 million and $5.2 million, respectively, during the three nine months ended September 30, 2026 as compared to the nine months ended September 30, 2025, as compared to the three months ended September 30, 2024, primarily due to the completion of the work associated with the Fluor FEED Phase 2 engineering services in support of advancing RoPower’s goal of deploying a power plant powered by six NPMs the RoPower project in Romania. late 2025.

G&A expenses decreased $485.4 million during the nine months ended September 30, 2026 as …+39 / −32 words · under “General and Administrative”

G&A expenses increased $511.8 decreased $485.4 million during the nine months ended September 30, 2025 2026 as compared to the nine months ended September 30, 2024, 2025 primarily due to (a) the 2025 recognition of Milestone Contribution 1 of $495.0 million (b) higher strategic business development costs associated with the signing of a non-binding agreement between ENTRA1 and TVA, with no comparable activity in the amount of $11.2 million as we increased our commercialization efforts and (c) $7.2 million in legal and accounting fees. These increases were partially 2026. slightly offset by $4.2 million of higher equity-based compensation and compensation costs due to increased headcount and $2.7 million of ERP costs and higher $2.2 million of compensation cost savings. organizational and advisory costs.

Liquidity and Capital Resources

3 added · 2 removed · 4 rewritten

Added in the 10-Q for fiscal Q3 2026

On February 26, 2026, NuScale entered into a sales agreement with UBS Securities LLC, B. Riley Securities, Inc., Canaccord Genuity LLC and Tuohy Brothers Investment Research, Inc. as sales agents under which the Company may offer and sell shares of our Class A common stock, having an aggregate sales price of up to $1,000,000 (the “2026 ATM Program”). This 2026 ATM Program was completed in June 2026.

On August 11, 2026, the Company entered into a sales agreement with UBS Securities LLC, B. Riley Securities, Inc., Canaccord Genuity LLC, Craig-Hallum Capital Group, LLC, TCBI Securities, Inc., doing business as Texas Capital Securities, and Tuohy Brothers Investment Research, Inc as sales agents under which the Company may offer and sell shares of our Class A common stock, having an aggregate sales price of up to $750,000.

Added in the 10-Q for fiscal Q3 2026

Under “Cash Flows used in Investing Activities”

Net cash used in investing relates to purchases and sales of investments as management continues to implement its strategy of deploying excess cash into a mix of short-term and long-term investments. This opportunistic allocation reflects our objective of maximizing returns while maintaining liquidity, aligning with our expected future operational needs and cash requirements.

Added in the 10-Q for fiscal Q3 2026

Under “Commitments and Contractual Obligations”

The Company executed a letter of credit associated with the Houston facility lease in the amount of $4.3 million, which is collateralized by restricted cash in the amount of $4.5 million. The future cash payments associated with this lease have been included in the commitments table below.

In 2023, NuScale entered into a sales and marketing agreement with ENTRA1, which was amended effective as of January 1, 2025, to increase the Company’s annual commitment to $34.8 million for services provided ratably over the course of the year. This sales and marketing agreement automatically renews for successive one-year periods, unless terminated by either party upon six months’ prior notice.

On August 27, 2025, NuScale LLC and ENTRA1 executed the PMA, in furtherance of business development and project development activities supported by ENTRA1. Under the PMA, the Company is required to make Milestone Contributions to ENTRA1 under certain circumstances (see Note 9 for more information). While the Company might be subject to future payments in relation to Milestone Contribution 2 and or Milestone Contribution 3, the criteria to record such liability has not been met yet, and the Company does not have an accrued PMA liability as of September 30, 2026.

In June 2026, the Company executed supply chain readiness and design contracts with Paragon Energy Solutions totaling $25.8 million. These contracts will complement the Company’s offering by designing and developing the Highly Integrated Protection System that will be utilized with our NPM and are included in our commitments schedule below.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Cash Flows used in Investing Activities”

During the nine months ended September 30, 2025, management executed a strategy to diversify the Company’s investment portfolio by purchasing more short term and longer-term investments to take advantage of higher interest rates, thereby leveraging the Company’s strong cash position.

In the 10-Q for fiscal Q3 2025, not in the 10-Q for fiscal Q3 2026

Under “Commitments and Contractual Obligations”

In December 2024, the Company entered into a purchase commitment for additional LLM to support the development of future NPMs. During the course of 2025, the Company entered into additional long-term commitments to support the development of future NPMs.

In January 2025, NuScale entered into sales and marketing agreements for services to be provided ratably over 2025 and these sales and marketing agreements were extended for one additional year, increasing the Company’s commitment by an additional $34.8 million.

As part of the LLM Settlement, NuScale is required to pay CFPP LLC an amount equal to $32,323, on or before October 1, 2025. As this payment was made subsequent to September 30, 2025, it has been included in our commitments schedule below within the Materials purchase commitments - LLM.

As of September 30, 2025, the criteria for triggering payment of Milestone Contribution 1 under the PMA has been achieved, as ENTRA1 has entered into a non-binding agreement relating to 72 NPMs. This achievement resulted in a liability of $346.5 million, which is included in Accounts payable and accrued expenses on the condensed consolidated balance sheet, the payments of which are included in the commitments schedule below.

While the Company did not issue and sell any Class A common stock during …+9 / −65 words

During November 2024 and August 2025, NuScale entered into two separate Sales Agreements with entities as sales agents under which While the Company may offer did not issue and sell shares of our any Class A common stock having an aggregate sales price of up to $200.0 million and $500.0 million, respectively (collectively, during the “ATM Program”). During three months ended September 30, 2026, for the nine months ended September 30, 2025, 2026, the Company issued and sold a total of 17,764,936 89,727,165 shares of Class A common stock under these two Sales Agreements, for the gross and net proceeds of $577.6 million $1,000,000 and $562.4 million, $984,475, respectively, and with a weighted average price of $33.68 $11.14 per share. As of September 30, 2025, we had 16,783,191 shares of Class A common stock, at an aggregate sales price up to $24.8 million, eligible for sale under the ATM Program.

Since NuScale’s inception, we have incurred significant operating losses and have an accumulated deficit …+3 / −40 words

Since NuScale’s inception, we have incurred significant operating losses and have an accumulated deficit of $682.0 $868.1 million, with negative operating cash flows. As of September 30, 2025, 2026, we had Cash and cash equivalents of $407.6 $513.4 million, Short-term investments of $284.2 $420.0 million and Investments of $930.7 million, with no debt. Historically, our primary sources of cash included sales under the ATM Programs, investment capital, and DOE and other government sponsored cost [… 23 unchanged words …] commercialization of our technology, we are focusing on commercial contracts that generate revenue and are investing in activities that advance the production of our NPMs. During the year ended December 31, 2024, we executed two revenue generating agreements in relation to the advancement of Doicesti project Phase 2 Front-End Engineering and Design, a project which targets the development of six NuScale power modules at a former coal plant site in Doicesti, Romania.

We believe that we have sufficient Cash and cash equivalents and Investments, along with …+6 / −14 words

We believe that we have sufficient Cash and cash equivalents and Investments, along with continued access to capital markets, to satisfy our cash requirements for the next 12 months and beyond. For additional information regarding these our risk factors, see the related section in the Company’s 2024 2025 Annual Report on Form 10-K. and below in Part II, Item 1A “Risk Factors” of this Form 10-Q.

Our cash used in operations increased during the nine months ended September 30, 2026, …+12 / −12 words · under “Cash Flows used in Operating Activities”

Our cash used in operations increased during the nine months ended September 30, 2025, 2026, primarily due to the payment to ENTRA1 of $148.5 $259.9 million, partially offset by higher revenue lower collections from customers and interest income as well as collections prepayments to vendors for the manufacture of receivables. the LLM.

3 other paragraphs were edited by fewer than 15 words; 1 changed only figures, dates or period names; 2 are word for word the same; their text is in the 10-Q for fiscal Q3 2026 and the 10-Q for fiscal Q3 2025 linked above.

NuScale Power's annual report against the year before

10-K for fiscal 2025 against the 10-K for fiscal 2024

In NuScale Power's 10-K for fiscal 2025, the MD&A added 11 passages, removed 10 and rewrote 12 against the 10-K for fiscal 2024.

Compared: Item 7 of the 10-K filed Feb 26, 2026 (accession 0001822966-26-000018, period ended Dec 31, 2025; 67 paragraphs) and Item 7 of the 10-K filed Mar 3, 2025 (accession 0001822966-25-000024, period ended Dec 31, 2024; 62 paragraphs).

NuScale Power's figures, dates and period names change every period and are not counted. A paragraph is rewritten when at least 15 other words were added or removed: added text is underlined and shaded, removed text is struck through, and long unchanged stretches are shortened to the words around each change.

Introduction

1 removed · 1 rewritten

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

“our” or “we” refer to NuScale Power, LLC (“NuScale LLC”) prior to the Transaction, and to NuScale Power Corporation (“NuScale Corp”) following the consummation of the Transaction.

The following discussion and analysis of the financial condition and results of operations should …+33 / −11 words

The following discussion and analysis of the financial condition and results of operations should be read together with our financial statements as of and for the years ended December 31, 2025, 2024 and 2023 and 2022 together with related notes thereto. This discussion may contain forward-looking statements based upon current expectations that involve risks and uncertainties, including, but not limited to, those described under the section entitled “Risk Factors” included in this Form 10-K. Our actual results may differ materially from those projected in these forward-looking statements as a result of various factors. Unless the context otherwise requires, references in this section to As used herein, “NuScale,” the “Company,” “us,” “our” or “we” refer to NuScale Corp, together with its consolidated subsidiaries.

Overview

1 added · 1 removed · 1 rewritten

Added in the 10-K for fiscal 2025

Since our founding in 2007, we have made significant progress towards commercializing the first SMR in the United States. In September 2020, our 12-module design (currently approved for 160 million watts of thermal power or 50 MWe per NPM) became the first and only SMR to receive an SDA from the NRC. In May 2025, the NRC finalized their review and approved our second SDA application and the associated licensing topical reports for our 6-unit 77 MWe NPM design, giving customers in the United States the ability to reference the approved design and SDA for expedited construction and operating licensing for a plant that is using the NuScale SMR technology.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Our small modular reactor (“SMR”), known as NuScale Power Module (“NPM”), provides a scalable power plant solution incorporating enhanced safety, improved affordability and extended flexibility for diverse electrical and process heat applications. Our scalable design provides carbon-free energy at a reduced cost when compared with gigawatt-sized nuclear facilities.

Since our founding in 2007, we have made significant progress towards commercializing the first SMR in the United States. In 2017, we submitted our Design Certification Application (“DCA”) to the U.S. Nuclear Regulatory Commission (“NRC”). On August 28, 2020, the NRC issued its Final Safety Evaluation Report, representing the NRC’s completion of its technical review. On September 11, 2020, the NRC issued its Standard Design Approval (“SDA”) of our NPM and scalable plant design. With this phase of NuScale’s DCA now complete, customers may proceed with plans to develop NuScale SMR-based power plants with the understanding that the NRC has approved the safety aspects of the NPM and plant design. We expect our operating losses and negative operating cash flow to grow until the commercialization of the NPM. On January 19, 2023, the NRC published in the Federal Register a final rule that certifies NuScale’s SMR design for use in the United States, which became effective 30 days after publication.

Our mission is to provide scalable advanced nuclear technology to produce electricity, heat and …+78 / −17 words

Our mission is to provide scalable advanced nuclear technology to produce electricity, heat and clean water to improve the quality of life for people around the world. We are changing commercializing a modular, scalable electric Light Water Reactor nuclear power plant, that we believe will deliver safer scalable, cost-effective and reliable carbon free power. Our core technology, the NPM, can generate 77 MWe, with a focus on the integration of components, simplification or elimination of systems and use of passive safety features. We believe that this results in a safe and highly reliable power that changes the world by creating an energy source that plant suitable to be sited close to where electricity, water desalinization, hydrogen production or process heat is smarter, cleaner, safer and cost competitive. needed.

Outlook

1 added

Added in the 10-K for fiscal 2025

NuScale has contracted with ENTRA1 as our global strategic partner for commercialization and development of power plants utilizing NPMs. ENTRA1 holds the exclusive rights for the worldwide commercialization, distribution, sales and development of our products, services and power plants. In this strategic partnership, the Company collaborates on joint development initiatives and financially contributes alongside the partnership in joint activities which may be recoverable as part of its development costs. ENTRA1 can decide whether to participate in a commercial opportunity. If ENTRA1 declines to participate in a commercial opportunity, NuScale may pursue the opportunity on its own.

Demand for energy in foreign markets is currently being driven by population growth, industrialization and urbanization with countries in Asia contributing the most to international growth. Rising living standards, driven by economic growth, has increased the need for residential electricity, a trend that is expected to increase in the coming years, with Asia forecasted to account for nearly 60% of global growth in electricity consumption through 2050.

Show the rest (611 words)

The Company has currently one international customer: RoPower Nuclear S.A. (“RoPower”), which is a joint venture established by S.N. Nuclearelectrica S.A. (“Nuclearelectrica”) and Nova Power & Gas S.A. In July 2024, NuScale and RoPower signed a technology licensing agreement, which granted RoPower a right to use certain intellectual property of NuScale’s. In the third quarter of the 2024 fiscal year, Nuclearelectrica and RoPower signed the Front-End Engineering and Design (“FEED”) Phase 2 contract with Fluor, a related party to NuScale. FEED Phase 2 included tasks related to the development of a Class 3 plant cost estimate, as well as support to RoPower with its regulatory and stakeholder engagements. NuScale completed their scope of FEED Phase 2 as a subcontractor to Fluor. On February 12, 2026 the Romanian Government approved the investment decision for the Doicesti SMR plant project, allowing for the ability to seek secured financing to further feasibility studies, and site-specific design work prior to any construction moving forward. This is a positive step in support of the project to the next phase. During the coming months, RoPower is authorized to advance the licensing and geotechnical work, finalize a pre-engineering, procurement and construction (“EPC”) contract, and begin negotiating contracts for long lead items. We anticipate that the pre-EPC activities will have an estimated duration of up to 15 months and will include, among other things, the development of a Class 2 cost estimate for the project. NuScale has yet to commence, but looks forward to negotiating definitive agreements related to our scopes within the elements of project finalization, construction, equipment installation and testing, plant commissioning, and post commercial operation date on-going technical support.

With ENTRA1 we continue to develop our international customer interest as we foresee a significant customer demand over the long-term to be outside of the United States as industry trends like decarbonization, an increasing demand for renewable energy alternatives, and changes in broader economic and geopolitical conditions continue to grow. Our collective team puts significant effort into developing dialogue with foreign governments and corporations in order to educate and market our technology.

Demand for energy in the United States is currently being driven by the significant growth in the data center industry, particularly as artificial intelligence (“AI”) deployment, cloud computing adoption, and digital transformation initiatives accelerate across sectors. Further, the United States government has identified nuclear technology as imperative to the country’s national security objectives and ordered the expansion of American nuclear energy capacity to 400 gigawatts by 2050, or nearly 400% the current capacity.

On August 27, 2025, NuScale LLC and ENTRA1 executed a PMA. Under the PMA, NuScale is named the key supplier to future ENTRA1 Energy Projects (as defined in Note 9 in the accompanying consolidated financial statements) with respect to the supply of SMR technology. The PMA also includes a negotiated maximum sale price for each NPM to be delivered and installed in an ENTRA1 Energy Project, subject to adjustments. It is anticipated that NuScale will enter into agreements for the delivery and installation of NPMs with ENTRA1.

On September 2, 2025, the Tennessee Valley Authority (“TVA”) announced the signing of a non-binding agreement under which ENTRA1 and TVA will collaborate to develop plants to provide TVA with up to 6 gigawatts of new nuclear power generation, with ENTRA1’s immediate strategy being the utilization of NuScale’s SMR equipment inside ENTRA1 Energy PlantsTM.

Under the PMA, we are focused on our expanded ENTRA1 partnership positioning their ENTRA1 Energy Plants™ with NuScale SMRs inside first to TVA. The PMA also positions us to serve hyperscaler, technology, industrial and micro-grid customers in sectors that include direct air capture, water desalinization, hydrogen production and mission critical facilities.

Key Factors Affecting Our Prospects and Future Results

4 removed · 2 rewritten

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Overview”

The Company currently has only one “Class 1” customer: RoPower Nuclear S.A. (“RoPower”), which is a joint venture established by S.N. Nuclearelectrica S.A. (“Nuclearelectrica”) and Nova Power & Gas S.A. In November 2023, we entered into the Release Agreement with CFPP LLC, the Company’s first customer, pursuant to which the Company agreed to terminate the Development Cost Reimbursement Agreement (“DCRA”), as amended, and our Long Lead Material Reimbursement Agreement (“LLM Agreement”). CFPP LLC was receiving funding for approximately 79% of its qualified project costs, including the long-lead materials (“LLM”), under a cooperative agreement with the Department of Energy (“DOE”). Under the Release Agreement, we agreed to repay CFPP LLC’s Net Development Costs. Upon final settlement of the LLM Agreement, and once DOE is compensated for its investment in the LLM (stemming from DOE’s funding under its cost share agreement with CFPP LLC), NuScale will obtain all rights and obligations associated with the LLM.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Merger with Spring Valley”

In December 2021, NuScale LLC entered into an Agreement and Plan of Merger (the “Merger Agreement”) with Spring Valley Acquisition Corp. (“Spring Valley”) and Spring Valley Merger Sub, LLC (“Merger Sub”), a wholly owned subsidiary of Spring Valley. Pursuant to the Merger Agreement, Merger Sub merged with and into NuScale LLC (the “Merger”), with NuScale LLC surviving the Merger (the “Surviving Company”), Spring Valley being renamed NuScale Corp, and NuScale LLC continuing to be held as a wholly controlled subsidiary of NuScale Power Corporation in an “Up-C” structure. On May 2, 2022, the transactions contemplated by the Merger Agreement, including the Merger (collectively the “Transaction”) were completed.

The Transaction is shown as a reverse recapitalization under GAAP. Spring Valley is the acquired company, with NuScale LLC treated as the acquirer. This determination reflects Legacy NuScale Equityholders holding a majority of the voting power of NuScale Corp, NuScale LLC’s pre-merger operations being the majority post-merger operations of NuScale Corp and NuScale LLC’s management team retaining similar roles at NuScale Corp. Accordingly, although NuScale Corp (f/k/a Spring Valley) is the parent company, GAAP dictates that the financial statements of NuScale Corp represent a continuation of NuScale LLC’s operations, with the Transaction being treated as though NuScale LLC issued ownership interests for Spring Valley, accompanied by a recapitalization. The net assets of NuScale LLC are stated at historical cost, with no incremental goodwill or other intangible assets recorded for the effects of the Transaction. The consummation of the Transaction resulted in NuScale LLC receiving cash equal to $341.5 million and assuming Warrant liabilities valued at $47.5 million.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Commencing and Expanding Commercial Launch Operations”

In September 2020, we became the first and only company to receive NRC SDA for a small modular reactor. We believe our commercialization activities are being completed at a pace that can support delivery of NPMs to a client site as early as 2029. In December 2022, we signed a contract for Front-End Engineering and Design (“FEED”) work with RoPower to advance the deployment of our NPMs to Romania. Under Phase 1 of the contract, we defined the major site and specific inputs for a NuScale 6-module power plant to be deployed at the Doicesti Power Station site in Romania. We expect the site in Romania to use six modules and to be commercially operable as early as 2030.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Regulatory Approvals”

In January 2023, the Company submitted an SDA Application and the associated licensing topical reports to the NRC for a NuScale’s 6-unit 77 MWe NPM design. Once approved, customers in the United States will be able to reference the certified design and SDA for expedited construction and operating licensing of NuScale’s SMR pursuant to 10 CFR Part 52. On July 31, 2023, the NRC formally announced that it has accepted the Company’s SDA Application for review. Based on the NRC’s published schedule for SDA Application review, we expect the NRC will complete its review and SDA approval to be received by mid-year 2025.

The commencement and expansion of the commercialization of our NPMs will be crucial to …+71 / −39 words · under “Commencement and Expanding Commercial Launch Operations”

The commencement and expansion of the commercialization of our NPMs will be crucial to the success of our business. We believe that the long lead-time involved with siting an SMR, the number of potential customers in our the ENTRA1 pipeline and the work being performed by these potential customers ENTRA1 involving a NuScale deployment project bode well for our potential future success. Further, in December 2022, we completed our Standard Plant Design (“SPD”), which provides potential customers with a generic NuScale-based power plant design the Company has already begun manufacturing certain long-lead materials that will serve as a starting point for deploying site-specific designs, including supporting client licensing and deployment activities. be used to build the NPMs, while also placing advance orders with many of our supply chain partners to expedite the build. This process ensures that the Company will be poised to meet the needs of our customer base.

In May 2025, the NRC finalized their review and approved the Company’s SDA application …+10 / −52 words · under “Regulatory Approvals”

In January 2023, May 2025, the Company submitted an NRC finalized their review and approved the Company’s SDA application and the associated licensing topical reports to the NRC for NuScale’s 6-unit 77 MWe NPM design. Once approved, Customers in the United States will be are now able to reference the certified design and SDA for expedited construction and operating licensing of NuScale’s SMR pursuant to 10 CFR Part 52. On July 31, 2023, the NRC formally announced that it has accepted the Company’s SDA Application for formal review. Based on the NRC’s published schedule for SDA Application review, we expect the NRC will complete its review and SDA approval will be received by mid-year 2025.

Key Components of Results of Operations

1 added · 2 rewritten

Added in the 10-K for fiscal 2025

Under “Cost of Sales”

Our cost of sales generated to date consists of direct expenses incurred to deliver our services to customers. It is comprised primarily of direct labor expenses, travel and other personnel costs, professional fees and engineering overhead typically expensed when the associated Revenue is recognized.

General and administrative (“G&A”) expenses consist of compensation costs for personnel in executive, finance, …+25 / −8 words · under “General and Administrative Expense”

General and administrative (“G&A”) expenses consist of compensation costs for personnel in executive, finance, accounting, human resources, and other administrative functions G&A expenses also include legal fees, advertising and marketing, professional fees paid for accounting, auditing and consulting services, insurance costs and facility costs. G&A expenses also include advertising, marketing and business development expenses, including the costs of our PMA milestone payments not supported by a binding customer contract.

When the Company was focused on R&D activities, the Company entered into cost share …+12 / −14 words · under “Sponsored Cost Share”

As our commercialization When the Company was focused on R&D activities, advance, we have continued to enter the Company entered into cost share agreements with various entities, including both governmental and private entities, under which the Company is reimbursed for specific R&D certain activities. Generally, as our qualifying operating costs change, there is a corresponding change in the reimbursable amounts. The amount of any reimbursement is recognized in the period that we recognize the qualifying expenses.

Results of Operations

3 added · 1 removed · 1 rewritten

Added in the 10-K for fiscal 2025

Under “Revenue”

The decrease in Revenue was primarily due to a reduction in revenue recognized from the RoPower technology license agreement (“TLA”) executed in 2024. This decrease was partially offset by substantially higher Fluor FEED Phase 2 engineering services in support of the RoPower project.

The increase in Cost of sales compared to the prior year was due to the engineering services required by Fluor under their FEED Phase 2 contract with RoPower. The licensing revenue earned under the TLA has no cost of sales.

G&A expenses increased $533.9 million, primarily due to (i) the recognition of Milestone Contribution 1 of $507.4 million and (ii) higher strategic business development costs of $14.6 million, both resulting from increased commercialization efforts, (iii) and $11.8 million in advisory, legal and accounting fees.

The decrease in Other expenses was a result of Company personnel being assigned to the Fluor FEED phase 2 contract, rather than R&D, which is reflected in the increase in Cost of sales. This decrease is partially offset by higher information technology fees.

Added in the 10-K for fiscal 2025

Under “Change in fair value of warrant liabilities”

The Company recognized no change in fair value of warrant liabilities during the 2025 fiscal year due to all the Warrants being redeemed or exercised at the end of the 2024 fiscal year.

Investment income increased $16.9 million due to the Company’s stronger cash position and higher balances in cash equivalents and short and longer-term investments compared to 2024.

Added in the 10-K for fiscal 2025

Under “Cost of Sales”

The decrease in Cost of sales was a result of the type of revenue earned, much of which was from a technology licensing agreement, which included no associated cost of sales.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Changes in Presentation”

For the year ended December 31, 2022, sponsored cost share totaling $0.2 million that was previously included in Interest income (expense) has been reclassified to Sponsored cost share to conform to the current year presentation on the accompanying consolidated statements of operations. No such reclassifications were required for 2023.

For the year ended December 31, 2022, amounts totaling $4.2 million and $3.5 million were reclassified out of G&A expenses and into R&D expenses and Other expenses, respectively, to conform to the current year presentation. No such reclassification was required in 2023.

The increase in revenue was attributable to activities in support of the Engineering, Procurement and Construction Development Agreement for CFPP, as well as nuclear technologies consulting services.

R&D expenses increased due to the Release Agreement with CFPP in the amount of $49.8 million, partially offset by lower compensation costs of $8.7 million as we transition from R&D to commercialization activities, as well as lower professional fees.

G&A expenses increased as a result of $4.3 million in compensation costs due to an increase in headcount and $7.3 million in marketing and advertising costs as we continue to build brand recognition across the globe, partially offset by lower professional fees.

Other expenses increased as a result of higher equity-based compensation of $4.1 million and higher software license expenses of $2.8 million, partially offset by lower compensation costs.

Sponsored cost share decreased due to the Company hitting the cost share cap with …+19 / −18 words · under “Sponsored Cost Share”

Sponsored cost share decreased due to a lower the Company hitting the cost share percentage cap with DOE and funding from the DOE, partially offset by increases in United States Trade and Development Agency and subrecipient cost share for other projects. (“USTDA”) during the 2025 fiscal year as the Company continues to focus on commercialization.

Liquidity and Capital Resources

4 added · 3 removed · 4 rewritten

Added in the 10-K for fiscal 2025

Program, Q3 2025 ATM Program and 2024 ATM Program. As of December 31, 2025, we have sold shares of Class A common stock for an aggregate sales price of $750,000 under the Q4 2025 ATM Program.

Added in the 10-K for fiscal 2025

Under “Cash Flows used in Operating Activities”

Our cash used in operations during the year ended December 31, 2025 increased due to the trigger of Milestone Contribution 1 under the PMA of $247.5 million as we move forward with commercialization efforts, the payment associated with the tri-Party Agreement with the U.S. Department of Energy and CFPP LLC on Long Lead Materials and additional payments toward the acquisition and construction of long-lead material in the amounts of $32.3 million and $60.4 million, respectively.

During the 2025 fiscal year, management executed a strategy to diversify the Company’s investment portfolio by purchasing more short term and longer-term investments to take advantage of higher interest rates, thereby leveraging the Company’s strong cash position.

The Company’s financing activities consist of proceeds arising from utilizing our ATM sales and the exercise of options. The current year saw much higher ATM activity, as management is increasing liquid holdings in order to make payments under the PMA and to supply chain vendors to continue the advancement of the manufacturing of our first NPM. In the prior year, the Company received proceeds of $205.4 million for either the exercise or redemption of Warrants, with no such Warrants outstanding at December 31, 2024.

Added in the 10-K for fiscal 2025

Under “Off-Balance Sheet Arrangements”

During the years ended December 31, 2025 and 2024, NuScale entered into various purchase commitments with our supply chain partners for additional material to support the development of future NPMs, as well as to expedite said development of NPMs.

As of December 31, 2025, the criteria for triggering payment of Milestone Contribution 1 under the PMA has been achieved, as ENTRA1 has entered into a non-binding agreement relating to 72 NPMs. This achievement resulted in a liability of $259.9 million for contributions payable in 2026, which is included in Accounts payable and accrued expenses on the consolidated balance sheet.

Added in the 10-K for fiscal 2025

Under “Off-Balance Sheet Arrangements”

The following table sets forth the principal cash obligations and commitments noted above assuming no renewals thereafter.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

On November 19, 2024, the Company provided notice in accordance with its Warrant Agreement dated November 23, 2020 between the Company and Continental Stock Transfer & Trust Company, as warrant agent, of the redemption of all Warrants outstanding as of 5:00 p.m., New York City time, on December 19, 2024 (the “Redemption Time”). As of the Redemption Time, 599,440 Warrants were outstanding and were redeemed by NuScale for $0.01 per Warrant. During the year ended December 31, 2024, Warrant holders exercised 17,859,261 Warrants for Class A common shares and $205.4 million in cash. There were no Warrants outstanding as of December 31, 2024.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

On January 5, 2024, NuScale announced a plan to reduce the Company’s workforce by 154 full-time employees, or 28%, in order to continue our transition from an R&D-based company to a commercial company. This resulted in a one-time charge of $3.2 million during the year ended December 31, 2024, and is included in Other expenses on our consolidated income statement.

In the 10-K for fiscal 2024, not in the 10-K for fiscal 2025

Under “Cash Flows used in Operating Activities”

Net cash used in our operating activities increased during year ended December 31, 2023 due to the Release Agreement payment to CFPP LLC in the amount of $49.8 million, partially offset by a buildup of our accounts payables and accruals associated with the manufacture of our long-lead materials.

Investing cash flows generally reflect capital expenditures on computer equipment and software. However, in 2022, we invested $50 million in short-term investments, while in 2023, we sold those short-term investments.

During 2023, our cash provided by financing activities consisted of proceeds from our ATM sales and the exercise of options, while in 2022 the majority of the cash consisted of proceeds from the Transaction, with another $28.7 million received for the exercise of warrants and options.

We do not have any material commitments and contractual obligations.

On November 8, 2024, the Company entered into a sales agreement with TD Securities …+17 / −47 words

On November 8, 2024, NuScale the Company entered into a new sales agreement with TD Securities (USA) LLC, UBS Securities LLC, B. Riley Securities, Inc. and Canaccord Genuity LLC as sales agents under which the Company may was able to offer and sell shares of our Class A common stock, having an aggregate sales price of up to $200.0 million $200,000 (the “2024 ATM Program”). During In connection with the year ended December 31, entry into the Q3 2025 Sales Agreement, NuScale terminated the 2024 the Company issued and sold 3,264,524 shares of Class A common stock for the gross and net proceeds of $71.2 million and $69.2 million, respectively. As of December 31, 2024, we have 21,735,476 shares of Class A common stock, at an aggregate sales price up to $128.8 million, eligible for sale under the ATM Program.

During the year ended December 31, 2025, the Company issued and sold 57,112,216 shares …+3 / −51 words

Previous to the current ATM Program, the Company fully utilized a similar agreement under which the Company offered and sold 20,000,000 shares of the Company’s Class A common stock. During the year ended December 31, 2024, 2025, the Company issued and sold 18,262,622 57,112,216 shares of Class A common stock for the gross and net proceeds of $139.0 $1,327.6 million and $135.5 $1,299.7 million, respectively, while during associated with the year ended December 31, 2023, the Company issued and sold 1,737,378 shares of Class A common stock for the gross and net proceeds of $10.4 million and $9.8 million, respectively. Q4 2025 ATM

Since NuScale’s inception, we have incurred significant operating losses and have an accumulated deficit …+36 / −25 words

Since NuScale’s inception, we have incurred significant operating losses and have an accumulated deficit of $377.1 $732.9 million, with negative operating cash flows. As of December 31, 2024, 2025, we had cash and cash equivalents of $401.6 $836.4 million, liquid investments of $450.8 million and restricted cash of $5.1 million with no debt, while using $108.7 $459.6 million of cash in operations. Historically, our primary sources of cash included sales under our at-the-market equity (“ATM”) programs, investment capital, government grants and DOE and other government sponsored cost share agreements to support the advancement of the Company’s our SMR technology both domestically and abroad. As we transition from a focus on research and development R&D to the commercialization of our technology, the Company is we are focusing on revenue producing commercial contracts that generate revenue and are investing in activities that advance the production of our NPMs. During the year ended December 31, 2024, the Company we executed two revenue generating agreements in relation to the advancement of Doicesti project FEED Phase 2 Front-End Engineering Design, a project, which targets the development of six NuScale power modules NPM at a former coal plant site in Doicesti, Romania.

We believe that we have sufficient cash and cash equivalents and investments, along with …+17 / −73 words

We believe that based on our current level of operating expenses and currently available cash resources, we will have sufficient funds available cash and cash equivalents and investments, along with continued access to cover R&D activities and operating capital markets, to satisfy our cash needs requirements for the next twelve 12 months However, considering that we have not yet completed the development of a commercial product and have minimal revenue to date, we may require additional funds in future years. Further, management plans to prudently manage its expenses and cash reserves into the future, recognizing the need to secure additional customer commitments to support long-term operations. beyond. For additional information on our potential need for future funding, see the section of this Annual Report on Form 10-K entitled “Risk Factors.”

Critical Accounting Policies and Estimates

1 added · 1 rewritten

Added in the 10-K for fiscal 2025

Under “Consideration Paid to Customer or Prospective Customer”

Under the PMA, ENTRA1 is a prospective customer of NuScale. As such, contributions made by NuScale to ENTRA1 under the PMA fall under the guidance of the Financial Accounting Standards Board Accounting Standards Codification (“ASC”) 606, Revenue Recognition, for consideration paid to customers or prospective customers. Management evaluates the facts and circumstances of any payments to ENTRA1 to determine the nature of the payment, rights and obligations under the contract and whether the payment meets the definition of an asset. Based on management’s review of the terms that trigger payment of Milestone Contribution 1 of the PMA (see Note 9), the Company has determined that payment of Milestone Contribution 1 does not meet the criteria required under ASC 606 for capitalization, and as such has been expensed as incurred.

NuScale has also executed contracts that include variable consideration. The variable consideration is recognized …+8 / −30 words · under “Revenue Recognition”

NuScale has also executed contracts that include variable consideration. The variable consideration is recognized subject to appropriate constraints, as required by GAAP, to avoid a significant reversal of revenue in future periods. Management reviews reviewed the Company’s variable consideration on at least a quarterly basis. The only All significant contract contracts with variable consideration outstanding at have been completed as of December 31, 2024, is a time and material contract that will be recognized as services are provided, until the customer’s goals are achieved or the contract terminates. 2025.

7 other paragraphs were edited by fewer than 15 words; 1 changed only figures, dates or period names; 20 are word for word the same; 4 were split, merged or moved, with most of their text in the other filing; their text is in the 10-K for fiscal 2025 and the 10-K for fiscal 2024 linked above.

How this page works

The text is NuScale Power's own disclosure, quoted as filed in the MD&A of the 10-Q for fiscal Q3 2026 and the 10-Q for fiscal Q3 2025, split at its own subsection headings and matched by fixed rules, without a language model; tables of figures are left out. A new, rewritten or removed passage is not a judgment by Stackyear about NuScale Power or its shares. How MD&A pages are compared.

General research from public filings, not investment advice.